a. Field of the Invention
The present invention generally relates to microprocessors, and more particularly to maintaining the performance of such microprocessors using control circuitry.
b. Background of Invention
Microprocessor devices should operate reliably across a variety of environmental conditions. One occurrence associated with microprocessor environments is voltage droop, whereby as a result of, for example, changes in current load, the supply voltage momentarily drops. Voltage droop may in turn affect the maximum operating frequency (fmax) of the microprocessor compared to the actual frequency at which the microprocessor is being driven. For example, the microprocessor may be operating at a nominal clock frequency of 4.5 GHz, while the maximum operating frequency (fmax) of the microprocessor may be characterized as being 4.7 GHz. Thus, a guardband of 200 MHz (i.e., 4.7 GHz−4.5 GHz=0.2 MHz) exists.
According to one scenario, a voltage drop may cause the maximum operating frequency (fmax) of the microprocessor to reduce to 4.6 GHz while the microprocessor continues to operate at the nominal clock frequency of 4.5 GHz. Here, the microprocessor continues to operate within the provided guardband since the nominal frequency (i.e., 4.5 GHz) remains below the fmax(i.e., 4.6 GHz) of the microprocessor. However, according to another scenario, the voltage drop may be significant enough to cause the maximum operating frequency (fmax) of the microprocessor to reduce to, for example, 4.3 GHz while the microprocessor continues to operate at the 4.5 GHz nominal frequency. Here, the microprocessor fails to operate within the provided guardband since the nominal frequency (i.e., 4.5 GHz) is now higher than the fmax (i.e., 4.3 GHz) of the microprocessor. Therefore, as a result of driving the microprocessor at a nominal frequency (i.e., 4.5 GHz) that is beyond the momentarily reduced fmax (i.e., 4.3 GHz) value, the microprocessor operation may fail.
According to one exemplary embodiment, a circuit for monitoring and controlling a clock signal generated by a clock source in a microprocessor device may include a voltage divider network that provides a plurality of voltages, a selector device that receives the plurality of voltages and provides a scaled supply voltage and a scaled ground voltage selectable from the received plurality of voltages, and at least one delay element that receives the scaled supply voltage and the scaled ground voltage and generates a delayed pulse signal by applying a delay to each pulse of the clock signal. The delayed pulse signal may include a delay magnitude that is controllable by the scaled supply voltage and the scaled ground voltage, such that the delayed pulse signal is used to generate a frequency correction signal based on a variation to a supply voltage of the microprocessor. The frequency correction signal may then be applied to the clock source for maintaining a frequency guardband for the clock signal of the microprocessor during the variation to the supply voltage.
According to another exemplary embodiment, a circuit for monitoring and controlling a clock signal generated by a clock source in a microprocessor device may include a voltage divider network that provides a plurality of voltages, a selector device that receives the plurality of voltages and provides a scaled supply voltage selectable from the received plurality of voltages, and a delay path that receives the scaled supply voltage and generates a delayed pulse signal by applying a delay to each pulse of the clock signal. The delayed pulse signal may have a delay magnitude controllable by the scaled supply voltage, such that the delayed pulse signal is used to generate a frequency correction signal based on a variation to a supply voltage of the microprocessor. The frequency correction signal may then be applied to the clock source for maintaining a frequency guardband for the clock signal of the microprocessor during the variation to the supply voltage.
According to an exemplary embodiment, a method of monitoring and controlling a clock signal generated by a clock source in a microprocessor device is provided. The method may include generating a plurality of scaled voltages, selecting at least one scaled voltage from the generated plurality of scaled voltages, applying the at least one scaled voltage to at least one delay element, and delaying each pulse of the clock signal propagating through the at least one delay element based on the selected at least one scaled voltage. The method may further include generating a frequency correction signal from the delaying of each pulse of the clock signal based on a variation to a supply voltage of the microprocessor. The frequency correction signal may then be applied to the clock source for maintaining a frequency guardband for the clock signal of the microprocessor during the variation to the supply voltage.
The drawings are not necessarily to scale. The drawings are merely schematic representations, not intended to portray specific parameters of the invention. The drawings are intended to depict only typical embodiments of the invention. In the drawings, like numbering represents like elements.
The following one or more exemplary embodiments describe emulation circuits that may be present within microprocessor devices. Particularly, the circuits emulate system critical paths across a range of microprocessor supply voltages (i.e., Vdd), whereby the system critical paths may be paths within the microprocessor design that limit frequency (i.e., the slowest path). The system critical paths may be emulated by one or more delay circuits that create different delay values in response to changes to microprocessor supply voltages (i.e., Vdd) undesirably caused by, for example, voltage droop. The changes in delay provide a means for sensing voltage droop and accordingly correcting the frequency value of the microprocessor's on-chip clock. This sensing and subsequent adjustment to the microprocessor's on-chip clock frequency maintains an adequate frequency guardband between the actual clock frequency and the maximum operating frequency (fmax) of the microprocessor. The following describes enhanced systems and methods for sensing and controlling microprocessor on-chip clock frequency based on fmax limitations.
Referring to
Curve 115 represents the rate of frequency change per voltage (i.e., tracking slope: MHz/100 mV) over the supply voltage range of the microprocessor for a delay path emulating super-high voltage threshold (SVT) transistor devices (e.g., Vth=0.4V). Curve 120 represents the rate of frequency change per voltage (i.e., tracking slope: MHz/100 mV) over the supply voltage range of the microprocessor for a delay path emulating medium voltage threshold (MVT) transistor devices (e.g., Vth=0.3V). Curve 125 represents the rate of frequency change per voltage (i.e., tracking slope MHz/100 mV) over the supply voltage range of the microprocessor for a delay path having high voltage threshold transistor devices with wire delay (HVTW). Also, curve 130 represents the rate of frequency change per voltage (i.e., tracking slope: MHz/100 mV) over the supply voltage range of the microprocessor for a delay path emulating high voltage threshold (HVT) transistor devices (e.g., Vth=0.2V).
Referring to Region A (0.8V-1.0V), the tracking slopes of curves 115, 120, 125, and 130, which correspond to delay paths SVT, MVT, HVTW, and HVT, respectively, do not track fmax with much accuracy. As depicted, the slopes of these curves are insufficient to track the fmax points. For example, referring to SVT curve 115, at a supply voltage of 0.9V, the SVT delay path has a tracking slope of approximately 700 MHz/100 mV, while a tracking slope of approximately 880 MHz/100 mV is required to track fmax point 112a at this supply voltage (i.e., 0.9V). Thus, the fmax values 112a, 112b are outside this grouping of curves, as indicated by 150.
Referring to Region B (1.0V-1.15V), the tracking slopes of curves 115, 120, 125, and 130, which correspond to delay paths SVT, MVT, HVTW, and HVT, respectively, to some extent track fmax with reasonable accuracy. As depicted, the slopes of some of these curves are reasonably sufficient to track the fmax points. For example, referring to SVT curve 115, at a supply voltage of about 1.08V, the SVT delay path has a tracking slope approximately equivalent to that of fmax point 112d at this supply voltage (i.e., 1.08V). However, fmax point 112c is outside this grouping of curves, as indicated by 160.
Referring to Region C (1.15V-1.3V), the tracking slopes of curves 115, 120, 125, and 130, which correspond to delay paths SVT, MVT, HVTW, and HVT, respectively, track fmax. As depicted, the slopes of theses curves are sufficient to track the fmax points. For example, referring to HVT curve 130, at a supply voltage of about 1.17V, the HVT delay path has a tracking slope approximately equivalent to that of fmax point 112e at this supply voltage (i.e., 1.17V). Moreover, at a supply voltage of about 1.22V, the HVTW delay path has a tracking slope approximately equivalent to that of fmax point 112f at this supply voltage (i.e., 1.22V). Thus, the fmax values are within this grouping of curves, as indicated by 170.
Graph 100B therefore indicates a requisite slope increase for the delay paths emulating fmax at the lower supply voltage values, while as the supply voltage increases, an increased tracking slope requirement becomes less. The following circuit embodiments thus provide a means for dynamically adjusting the tracking slope of the one or more delay paths over the entire range of supply voltage utilized by the microprocessor. As described, enhanced tracking of fmax may be accomplished by dynamically adjusting the tracking slope of the CPM circuits in accordance with the embodiments described herein.
Referring to
As further depicted, a local clock buffer (LCB) pulse generator 222 associated with microprocessor 201 distributes an on-chip microprocessor clock frequency fCLK that is received by inputs 228 and 230 of the first reconfigurable delay path 202 and the second (optional) reconfigurable delay path 204, respectively. Also, output 232 of the control logic 210 is coupled to a digital phase locked loop (DPLL) 236, which generates and adjusts the on-chip microprocessor clock frequency fCLK based on the operation of the control circuit 200, as further described below. The on-chip microprocessor clock frequency fCLK is then input to the LCB pulse generator 222.
The first reconfigurable delay path 202 emulates microprocessor system critical paths across a range (e.g., 0.7V-1.0V) of the microprocessor voltage supply. An exemplary embodiment corresponding to the first reconfigurable delay path 202 is illustrated and described in relation to
Similarly, the second reconfigurable delay path 204 emulates microprocessor system critical paths across another range (e.g., 1.0V-1.4V) of the microprocessor voltage supply. An exemplary embodiment corresponding to the second reconfigurable delay path 204 is also illustrated and described in relation to
The critical path monitoring (CPM) circuits 202, 204 also each include a selector device 254 such as a multiplexer that receives the scaled voltages generated by resistor network 250. The selector device 254 includes a select control line 255 that enables the selection of desired complementary scaled supply voltage and ground voltage pairs. For example, if 8-pairs of scaled voltages are generated by the resistor network 250, a 3-bit select line may be needed to controllably select any one of the 8-pairs of scaled voltages. If a pair corresponding to %90 of VDD and 10% above GND voltage is required, the select line 255 may, for example, be set to “001.” If a pair corresponding to %80 of VDD and 20% above GND voltage is required, the select line 255 may, for example, be set to “010.” If a pair corresponding to %70 of VDD and 30% above GND voltage is required, the select line 255 may, for example, be set to “011,” etc.
The critical path monitoring (CPM) circuits 202, 204 further include one or more serially connected delay elements such as delay element 256 (DE_1) and delay element 258 (DE_N). Each delay element introduces a time delay to a pulse signal (i.e., Input_Pulse) that propagates through it. For purposes of illustrative brevity, only the first delay element 256 and the last delay element 258 are depicted. However, between delay elements 256 and 258 any number of delay elements may be provided for emulating critical paths within the microprocessor. Each delay element may include a transmission gate including a PFET and NFET transistor, and an inverter logic gate delay stage. Thus, delay element 256 includes transmission gate 260 and inverter logic gate delay stage 262. Similarly, delay element 258 includes transmission gate 266 and inverter logic gate delay stage 268.
The transmission gate 260 includes PFET device 264a and NFET device 264b, where by switching on both the PFET device 264a and the NFET device 264b, an electrically conductive path is established between terminals A and B of the transmission gate 260. Conversely, by switching off both the PFET device 264a and the NFET device 264b, an electrically non-conductive path is created between terminals A and B. Similarly, transmission gate 266 includes PFET device 270a and NFET device 270b, where by switching on both the PFET device 270a and the NFET device 270b, an electrically conductive path is established between terminals C and D of the transmission gate 266. Conversely, by switching off both the PFET device 270a and the NFET device 270b, an electrically non-conductive path is created between terminals C and D.
As further depicted, each pair of scaled voltages output from the selector device 254 is coupled to each of the delay element transmission gates. Specifically, outputs VDD_scaled and GNDScaled of the selector device 254 are coupled to the NFET device and PFET devices of the delay elements, respectively. Thus, output VDD_Scaled is coupled to both NFET device 264b of transmission gate 260 and NFET device 270b of transmission gate 266. Output GNDScaled is accordingly coupled to both PFET device 264a of transmission gate 260 and PFET device 270a of transmission gate 266.
The selector device 254 may also output a VDD and GND voltage pair as well as each pair of scaled voltages. By scaling the VDD and GND supply voltages that are applied to the transmission gate FET transistors, the tracking slope of the CPM circuits 202, 204 may, however, be increased, especially for delay paths emulating fmax at lower supply voltage. Thus, the fmax tracking sensitivity of the CPM circuits 202, 204 may be adjusted over a wider range of supply voltages operating within the microprocessor.
This tracking sensitivity capability may be described with the aid of graph 400 depicted in
Referring to
Referring back to
Within each delay element, the inverter logic gates introduce a fixed delay, while the transmission gates each introduce a variable delay that changes based on the supply voltages that are applied to their respective NFET and PFET gate inputs. As described above, during normal operation whereby no voltage droop is experienced, the delay path resulting from delay elements DE_1 to DE_N of each of the CPM circuits 202, 204 introduce a known predetermined delay based on set supply voltages governed by VDD_Scaled and GNDscaled. This predetermined delay experienced by each pulse at output O/PDelayed is utilized along with the non-delayed version of these pulses by the edge detectors 206, 208 (
Upon the occurrence of voltage droop on the supply voltages, the VDD_Scaled and GNDScaled also drop. This voltage drop is therefore experienced at the NFET and PFET gate inputs of delay elements DE_1 to DE_N of respective transmission gates TG1 to TGN, which causes the delay elements DE_1, DE_N to further introduce an additional time delay to that of the predetermined delay for each pulse. As described above in relation to
Each delayed pulse received from output O/PDelayed (also see
For example, during normal operation whereby no voltage droop is experienced, the delay path resulting from delay elements DE1_1 to DE_N (
However, during voltage droop, an additional delay may be generated and experienced by each delayed pulse at O/PDelayed. Consequently, each delayed pulse at O/PDelayed may propagate less along the bank of delay gates 280 during each pulse period of fCLK. Thus, a D0-D11 multi-bit code of “111110000000” may be generated. This multi-bit code of “111111000000” when applied to the DPLL 236 (
The critical path monitoring (CPM) circuits 202, 204 also each include a selector device 354 such as a multiplexer that receives the scaled voltages generated by resistor network 350. The selector device 354 includes a select control line 355 that enable the selection of desired buffered scaled supply voltages. For example, if eight (8) scaled voltages are generated by the resistor network 350, a 3-bit select line may be needed to controllably select any one of the eight scaled voltages. If a scaled voltage corresponding to %90 of VDD is required, the select line 355 may, for example, be set to “001.” If a scaled voltage of %80 of VDD is required, the select line 355 may, for example, be set to “010.” If a scaled voltage corresponding to %70 of VDD is required, the select line 355 may, for example, be set to “011,” etc.
The critical path monitoring (CPM) circuits 202, 204 of
As further depicted, each scaled voltage output from the selector device 354 is coupled to supply voltages V1-VN of each respective delay element DE′_1-DE′_N, respectively, via the unity gain buffer amplifier 320. Specifically, output VDD_Scaled_Buffered of the unity gain buffer amplifier 320 is coupled to the supply voltages V1-VN of each respective delay element DE′_1-DE′_N. Thus, output VDD_Scaled_Buffered is coupled to the supply of both inverter logic gate delay stage 362 of delay element 356 and inverter logic gate delay stage 368 of delay element 358.
The selector device 354 may also output a VDD voltage as well as scaled voltages. By scaling the VDD supply voltage that is applied to the inverter logic gate delay stages, the tracking slope of the CPM circuits 202, 204 of
During normal operation whereby no voltage droop is experienced, the delay path resulting from delay elements DE′_1 to DE′_N of each of the CPM circuits 202, 204 introduce a known predetermined delay. Each pulse corresponding to the microprocessor clock signal, as indicated by Input_Pulse, is received at input I/P of inverter logic gate delay stage 362 of delay element 356 (i.e., DE′_1). Each pulse may then propagate through the inverter logic gate delay 362 at delay element 356 (i.e., DE′_1) and through that of all subsequent delay elements until the pulses are output from the last delay element 358. At the last delay element 358 (i.e., DE′_N) in the delay path, each pulse therefore propagates through the inverter logic gate delay 368 and is thus received at the output of the inverter logic gate delay 368, as indicated by O/P′Delayed.
Within each delay element, the inverter logic gates introduce a variable delay that changes based on the supply voltages that are applied to their respective supply voltages V1-VN. As described above, during normal operation whereby no voltage droop is experienced, the delay path resulting from delay elements DE′_1 to DE′_N of each of the CPM circuits 202, 204 (
Upon the occurrence of voltage droop on the supply voltages, the VDD_Scaled_Buffered voltage also drops. This voltage drop is therefore experienced at the respective supply voltages V1-VN of inverter logic gate delays G1-GN of delay elements DE′_1 to DE′_N, respectively. This may cause the delay elements DE′_1, DE′_N to further introduce an additional time delay to that of the predetermined delay for each pulse. As described above in relation to
The delay elements DE′_1 to DE′_N of the CPM circuit of
The CPM circuit of
As described above, the embodiment of
The range of scaled voltages may increase to about two-times VDD and reduce to 0V based on the delay element design. For example, the scaled supply voltage VDD-Scaled may be scaled up to two-times VDD and reduced down to 0V. Similarly, the scaled ground voltage GNDScaled may also be scaled up to VDD and reduced down to 0V. A scaling down may include reducing the supply voltage (e.g., 0.8V) from the VDD value (e.g., 1.0V), whereby increasing the scaling down may involve further reducing the VDD voltage value (e.g., 0.5V). A scaling up may include increasing the supply voltage (e.g., 1.2V) above the VDD value (e.g., 1.0V), whereby increasing the scaling up may involve further increasing above the VDD voltage value (e.g., 1.5V).
Design flow 900 may vary depending on the type of representation being designed. For example, a design flow 900 for building an application specific IC (ASIC) may differ from a design flow 900 for designing a standard component or from a design flow 900 for instantiating the design into a programmable array, for example a programmable gate array (PGA) or a field programmable gate array (FPGA) offered by Altera® Inc. or Xilinx® Inc.
Design process 910 preferably employs and incorporates hardware and/or software modules for synthesizing, translating, or otherwise processing a design/simulation functional equivalent of the components, circuits, devices, or logic structure shown in
Design process 910 may include hardware and software modules for processing a variety of input data structure types including netlist 980. Such data structure types may reside, for example, within library elements 930 and include a set of commonly used elements, circuits, and devices, including models, layouts, and symbolic representations, for a given manufacturing technology (e.g., different technology nodes, 20, 32 nm, 45 nm, 90 nm, etc.). The data structure types may further include design specifications 940, characterization data 950, verification data 960, design rules 970, and test data files 985 which may include input test patterns, output test results, and other testing information. Design process 910 may further include, for example, standard mechanical design processes such as stress analysis, thermal analysis, mechanical event simulation, process simulation for operations such as casting, molding, and die press forming, etc. One of ordinary skill in the art of mechanical design can appreciate the extent of possible mechanical design tools and applications used in design process 910 without deviating from the scope and spirit of the invention. Design process 910 may also include modules for performing standard circuit design processes such as timing analysis, verification, design rule checking, place and route operations, etc.
Design process 910 employs and incorporates logic and physical design tools such as HDL compilers and simulation model build tools to process design structure 920 together with some or all of the depicted supporting data structures along with any additional mechanical design or data (if applicable), to generate a second design structure 990 comprising second design data embodied on a storage medium in a data format used for the exchange of layout data of integrated circuits and/or symbolic data format (e.g. information stored in a GDSII (GDS2), GL1, OASIS, map files, or any other suitable format for storing such design structures). In one embodiment, the second design data resides on a storage medium or programmable gate array in a data format used for the exchange of data of mechanical devices and structures (e.g. information stored in an IGES, DXF, Parasolid XT, JT, DRG, or any other suitable format for storing or rendering such mechanical design structures). Similar to design structure 920, design structure 990 preferably comprises one or more files, data structures, or other computer-encoded data or instructions that reside on transmission or data storage media and that when processed by an ECAD system generate a logically or otherwise functionally equivalent form of the embodiments of the invention shown in
Design structure 990 may also employ a data format used for the exchange of layout data of integrated circuits and/or symbolic data format (e.g. information stored in a GDSII (GDS2), GL1, OASIS, map files, or any other suitable format for storing such design data structures).
Design structure 990 may comprise information such as, for example, symbolic data, map files, test data files, design content files, manufacturing data, layout parameters, wires, levels of metal, vias, shapes, data for routing through the manufacturing line, and any other data required by a manufacturer or other designer/developer to produce devices or structures as described above and shown in
The descriptions of the various embodiments of the present invention have been presented for purposes of illustration, but are not intended to be exhaustive or limited to the embodiments disclosed. Many modifications and variations will be apparent to those of ordinary skill in the art without departing from the scope and spirit of the described embodiments. The terminology used herein was chosen to best explain the principles of the one or more embodiment, the practical application or technical improvement over technologies found in the marketplace, or to enable others of ordinary skill in the art to understand the embodiments disclosed herein.
Number | Name | Date | Kind |
---|---|---|---|
6163289 | Ginetti | Dec 2000 | A |
7576569 | Carpenter et al. | Aug 2009 | B2 |
20020190283 | Seno et al. | Dec 2002 | A1 |
20050047040 | Naffziger | Mar 2005 | A1 |
20090031155 | Hofmann et al. | Jan 2009 | A1 |
Number | Date | Country |
---|---|---|
2010534890 | Nov 2010 | JP |
4804620 | Nov 2011 | JP |
Entry |
---|
Mohamed Elgebaly et al., “Efficient Adaptive Voltage Scaling System Through OnChip Critical Path Emulation”, Dept. of Electrical and Computer Engineering, University of Waterloo, Waterloo, Ontario, Canada, 2004, pp. 375-380. |
Number | Date | Country | |
---|---|---|---|
20150046721 A1 | Feb 2015 | US |