Claims
- 1. A method of mooring mobile offshore drilling units including the steps of:
- providing a first taut-leg mooring assembly including a plurality of taut mooring legs each having a mooring line and an anchor;
- installing the first taut-leg mooring assembly at a first drilling venue;
- subsequently locating a mobile offshore drilling unit at the first drilling venue;
- mooring the mobile offshore drilling unit at the first drilling venue by securing the mooring lines of the first taut-leg mooring assembly to the mobile offshore drilling unit;
- subsequently conducting drilling operations from the moored mobile offshore drilling unit at the first drilling venue;
- providing a second taut-leg mooring assembly comprising a plurality of taut mooring legs each having a mooring line and an anchor;
- installing the second taut-leg mooring assembly at a second drilling venue while simultaneously conducting drilling operations from the mobile offshore drilling unit at the first drilling venue;
- terminating drilling operations at the first drilling venue;
- disconnecting the mooring lines of the first taut-leg mooring assembly from the mobile offshore drilling unit;
- relocating the mobile offshore drilling unit from the first drilling venue to the second drilling venue;
- mooring the mobile offshore drilling unit at the second drilling venue by connecting the mooring lines of the installed second taut-leg mooring assembly to the mobile offshore drilling unit;
- subsequently conducting drilling operations for the moored mobile offshore drilling unit at the second drilling venue;
- relocating the first taut-leg mooring assembly to a third drilling venue while concurrently conducting drilling operations from the moored drilling assembly at the second drilling venue;
- subsequently terminating drilling operations at the second drilling venue;
- disconnecting the mobile offshore drilling unit from the second mooring assembly;
- relocating the mobile offshore drilling unit from the second drilling venue to the third drilling venue;
- mooring the offshore drilling unit at the third drilling venue by connecting the mooring lines of the installed first taut-leg mooring assembly to the mobile offshore drilling unit; and
- subsequently conducting drilling operations from the moored mobile offshore drilling unit at the third drilling venue.
- 2. The method of mooring mobile offshore drilling units according to claim 1 wherein the steps of providing first and second taut-leg mooring assemblies are further characterized by providing each of the taut mooring legs with a recoverable anchor.
- 3. The method of mooring mobile offshore drilling units according to claim 1 wherein the steps of providing first and second taut-leg mooring assemblies are further characterized by providing each of the taut mooring legs with a recoverable anchor having a riser line secured to and extending from the anchor, and further characterized by providing each of the taut mooring legs with a submerged buoy secured to the upper end of the riser line, said submerged buoy being positioned substantially below the surface of the water both when the taut mooring leg is connected to the mobile offshore drilling unit, thereby reducing vertical loading on the mobile offshore drilling unit and increasing the stiffness of the mooring leg, and when the taut mooring leg is not connected to the mobile offshore drilling unit, said submerged buoy having a predetermined buoyancy sufficient to maintain the riser line in tension and in an essentially vertical position when the taut mooring leg is not connected to the mobile offshore drilling unit, thereby minimizing flexure wear of a lower portion of the riser line.
- 4. The method of mooring mobile offshore drilling units according to claim 1 wherein the steps of providing first and second taut-leg mooring assemblies further comprises providing at least one of the taut mooring legs with a recoverable anchor comprising a suction anchor.
- 5. The method of mooring offshore drilling units according to claim 1 wherein the steps of providing first and second taut-lea mooring assemblies further comprises providing at least one of the taut mooring legs with a recoverable anchor comprising a vertically loaded anchor.
- 6. The method of mooring offshore drilling units according to claim 1 further comprising extending a riser line from at least one of the anchors that includes a plurality of discreet segments each formed from polyester rope.
- 7. A method of mooring mobile offshore drilling units including the steps of:
- providing a taut-leg mooring assembly including a plurality of taut mooring legs each having a mooring line and an anchor;
- installing the taut-leg mooring assembly at a first drilling venue;
- subsequently locating a mobile offshore drilling unit at the first drilling venue;
- mooring the mobile offshore drilling unit at the first drilling venue by securing the mooring lines of the taut-leg mooring assembly to the mobile offshore drilling unit;
- subsequently conducting drilling operations from the moored mobile offshore drilling unit at the first drilling venue;
- terminating drilling operations at the first drilling venue;
- disconnecting some of the taut mooring legs of the taut-leg mooring assembly from the mobile offshore drilling unit;
- subsequently installing the disconnected taut mooring legs of the taut-leg mooring assembly at a second drilling venue;
- disconnecting the remaining taut mooring legs of the taut-leg mooring assembly from the mobile offshore drilling unit;
- relocating the mobile offshore drilling unit from the first drilling venue to the second drilling venue;
- mooring the mobile offshore drilling unit at the second drilling venue by connecting the mooring lines of the installed taut mooring legs to the mobile offshore drilling unit;
- recovering the remaining taut mooring legs of the taut leg mooring assembly from the first drilling venue;
- thereafter installing the remaining taut mooring legs at the second drilling venue; and
- subsequently conducting drilling operations from the moored mobile offshore drilling unit at the second drilling venue.
- 8. The method of mooring mobile offshore drilling units according to claim 7 wherein the step of providing a taut-leg mooring assembly is further characterized by providing each of the taut mooring legs with a recoverable anchor.
- 9. The method of mooring mobile offshore drilling units according to claim 7 wherein the step of providing a taut-leg mooring assembly is further characterized by providing each of the taut mooring legs with a recoverable anchor having a riser line secured to and extending from the anchor, and further characterized by providing each of the taut mooring legs with a submerged buoy secured to the upper end of the riser line, said submerged buoy being positioned substantially below the surface of the water both when the taut mooring leg is connected to the mobile offshore drilling unit, thereby reducing vertical loading on the mobile offshore drilling unit and increasing the stiffness of the taut mooring leg, and when the taut mooring leg is not connected to the mobile offshore drilling unit, said submerged buoy having a predetermined buoyancy sufficient to maintain the riser line in tension and in an essentially vertical position when the taut mooring leg is not connected to the mobile offshore drilling unit, thereby minimizing flexure wear of a lower portion of the riser line.
- 10. The method of mooring mobile offshore drilling units according to claim 7 wherein the step of providing a taut-leg mooring assembly further comprises providing at least one of the taut mooring legs with a recoverable anchor comprising a suction anchor.
- 11. The method of mooring offshore drilling units according to claim 7 wherein the step of providing a taut-leg mooring assembly further comprises providing at least one of the taut mooring legs with a recoverable anchor comprising a vertically loaded anchor.
- 12. The method of mooring offshore drilling units according to claim 7 the step of providing a taut-leg mooring assembly further comprises providing a recoverable anchor and a user line extending therefrom which includes a plurality of discreet lengths of polyester rope.
- 13. A method of mooring mobile offshore drilling units including the steps of:
- providing a first taut-leg mooring assembly including a predetermined number of taut mooring legs each having a mooring line and an anchor;
- installing the first taut-leg mooring assembly at a first drilling venue;
- subsequently locating a mobile offshore drilling unit at the first drilling venue;
- mooring the mobile offshore drilling unit at the first drilling venue by securing the mooring lines of the first taut-leg mooring assembly to the mobile offshore drilling unit;
- subsequently conducting drilling operations from the moored mobile offshore drilling unit at the first drilling venue;
- providing a second taut-leg mooring assembly comprising a second pre-determined number of taut mooring legs each having a mooring line and an anchor;
- installing the second taut-leg mooring assembly at a second drilling venue while simultaneously conducting drilling operations from the mobile offshore drilling unit at the first drilling venue;
- terminating drilling operations at the first drilling venue;
- disconnecting the mooring lines of the first taut-leg mooring assembly from the mobile offshore drilling unit;
- relocating the mobile offshore drilling unit from the first drilling venue to the second drilling venue;
- mooring the mobile offshore drilling unit at the second drilling venue by connecting the mooring lines of the installed second taut-leg mooring assembly to the mobile offshore drilling unit;
- subsequently installing some of the taut mooring legs from the first taut-leg mooring assembly at the second drilling venue;
- subsequently conducting drilling operations from the moored mobile offshore drilling unit at the second drilling venue;
- recovering the remaining taut mooring legs comprising the first mooring assembly from the first drilling venue;
- installing the remaining taut mooring legs of the first mooring assembly at a third drilling venue while concurrently conducting drilling operations from the moored drilling assembly at the second drilling venue;
- subsequently terminating drilling operations at the second drilling venue;
- disconnecting the mobile offshore drilling unit from the second mooring assembly;
- relocating the mobile offshore drilling unit from the second drilling venue to the third drilling venue;
- mooring the offshore drilling unit at the third drilling venue by connecting the mooring lines of the installed first taut-leg mooring assembly to the mobile offshore drilling unit;
- subsequently removing some of the taut mooring legs from the second drilling venue and installing them at the third drilling venue; and
- subsequently conducting drilling operations from the moored mobile offshore drilling unit at the third drilling venue.
- 14. The method of mooring mobile offshore drilling units according to claim 13 wherein the steps of providing first and second taut-leg mooring assemblies are further characterized by providing each of the taut mooring legs with a recoverable anchor.
- 15. The method of mooring mobile offshore drilling units according to claim 13 wherein the steps of providing first and second taut-leg mooring assemblies are further characterized by providing each of the taut mooring legs with a recoverable anchor having a riser line secured to and extending from the anchor, and further characterized by providing each of the taut mooring legs with a submerged buoy secured to the upper end of the riser line, said submerged buoy being positioned substantially below the surface of the water both when the taut mooring leg is connected to the mobile offshore drilling unit, thereby reducing vertical loading on the mobile offshore drilling unit and increasing the stiffness of the taut mooring leg, and when the taut mooring leg is not connected to the mobile offshore drilling unit, said submerged buoy having a predetermined buoyancy sufficient to maintain the riser line in tension and in an essentially vertical position when the taut mooring leg is not connected to the mobile offshore drilling unit, thereby minimizing flexure wear of a lower portion of the riser line.
- 16. The method of mooring mobile offshore drilling units according to claim 13 wherein the steps of providing first and second taut-leg mooring assemblies further comprises providing at least one of the taut mooring legs with a recoverable anchor comprising a suction anchor.
- 17. The method of mooring mobile offshore drilling units according to claim 13 wherein the steps of providing first and second taut-leg mooring assemblies further comprises providing at least one of the taut mooring legs with a recoverable anchor comprising a vertically loaded anchor.
- 18. The method of mooring mobile offshore drilling units according to claim 13 wherein the steps of providing first and second taut-leg mooring assemblies further comprises providing each taut mooring leg with a recoverable anchor and a riser line extending from the anchor that includes a plurality of discreet segments of polyester rope.
- 19. A method of mooring mobile offshore drilling units comprising the steps of:
- providing a mooring assembly including a plurality of mooring legs each having a mooring line, a recoverable anchor with a riser line secured to and extending from the anchor having a submerged buoy secured to the upper end of the riser line;
- removably installing the mooring assembly at a first offshore venue such that the submerged buoy is positioned substantially below the surface of the water both when the mooring leg is connected to a mobile offshore drilling unit, thereby reducing vertical loading on the mobile offshore drilling unit and increasing the stiffness of the mooring leg, and when the mooring leg is not connected to the mobile offshore drilling unit, the submerged buoy having a predetermined buoyancy sufficient to maintain the riser line in an essentially vertical orientation thereby minimizing flexure wear of a lower portion of the riser line;
- mooring a mobile offshore drilling unit at the first offshore venue by securing the mooring lines of the mooring assembly to the mobile offshore drilling unit;
- releasing the mobile offshore drilling unit from the mooring lines of the mooring assembly at the first offshore venue;
- removing the mooring assembly from the first offshore venue; and
- installing at least a portion of the mooring legs of the mooring assembly at a second offshore venue.
- 20. The method as recited in claim 19 further characterized by providing each of the mooring legs with a recoverable anchor.
- 21. The method as recited in claim 20 wherein the recoverable anchors further comprise suction anchors.
- 22. The method as recited in claim 20 wherein the recoverable anchors further comprise vertically loaded anchors.
- 23. The method as recited in claim 19 wherein each of the mooring legs further comprises a taut mooring leg.
- 24. The method as recited in claim 19 wherein a riser line extends upwardly from the recoverable anchor and comprises a plurality of discreet sections of polyester rope.
Parent Case Info
This is a divisional application of pending application Ser. No. 08/948,227 filed on Oct. 9, 1997.
US Referenced Citations (33)
Foreign Referenced Citations (1)
Number |
Date |
Country |
B-5336379 |
Nov 1979 |
AUX |
Divisions (1)
|
Number |
Date |
Country |
Parent |
948227 |
Oct 1997 |
|