The present invention relates to tank construction, and more particularly to a rectangular tilt-up concrete tank construction.
Conventional rectangular concrete tank construction makes extensive use of wood formwork to define vertical walls and steel reinforcing bars which extend from slabs and adjacent walls to facilitate the joining of walls to the slab or adjacent walls to each other. The use of conventional rectangular concrete tank construction has many drawbacks. First, conventional rectangular concrete tank construction creates extreme safety hazards for construction personnel. Extending reinforcing steel at best creates a tripping hazard and at worst an instrument for severe injury to workers. Conventional rectangular concrete tank construction often requires workers to climb reinforcing steel and formwork which are not intended to support construction personnel, creating a risk of falling. Furthermore, the use of cranes to “fly-in” reinforcing steel, formwork and concrete creates obvious overhead hazards. Moreover, the piece-meal nature of conventional rectangular concrete tank construction creates a myriad of other specific hazards associated with the necessary carpentry, concrete finishing, and reinforcement placement trades, including formwork clutter, extensive small tool usage, extension cords and cutting tools, to name but a few.
Second, the extensive use of wood formwork in conventional rectangular concrete tank construction also raises environmental issues. The amount of wood formwork wasted in the construction of a medium to large sized rectangular tank can equate to enough lumber to build several homes.
Third, conventional rectangular concrete tank construction techniques inherently create the potential for concrete defects such as misaligned concrete panels and concrete consolidation problems. Furthermore, water leakage problems associated with shrinkage, cracking, tie holes, water stop installation and the use of construction and expansion joints are commonplace.
Further problems with conventional rectangular concrete tank construction include high labor costs, high material costs and equipment usage costs and sequencing difficulties caused by the need to stagger concrete panel placements to prevent shrinkage cracking. Furthermore, efficient access to the construction site for workers and equipment is severely hampered by protruding reinforcing dowels. In addition, stripping formwork at the construction site can be hazardous because of protruding reinforcing. Moreover, curing of vertical concrete surfaces can be difficult and a substantial amount of finishing work may be required after the concrete has been poured.
The rectangular concrete tilt-up tank construction of the present invention is intended to overcome one or more of the problems discussed above.
A first aspect of the present invention is a rectangular concrete tank having a concrete slab with a metal, preferably steel, slab plate anchored thereto. The slab metal plate defines a substantially linear concrete side wall location of a rectangular wall outline. A plurality of preformed concrete side panels each have metal plates attached along a bottom edge and opposing side edges. The bottom plates are welded in a liquid-tight weld to the slab metal plate and at least one side metal plate of each side panel is welded to a metal side plate of an adjacent side panel in a liquid-tight weld to define a rectangular tank sidewall.
The rectangular tilt-up tank preferably also includes a number of slab metal plates anchored to the concrete slab define at least two adjacent substantially linear concrete side wall locations of the rectangular tank outline. A number of preformed concrete side panels each have metal plates attached along a bottom edge and opposing side edges. The bottom edge plates are welded in a liquid-tight weld to a slab metal plate defining a concrete side wall location and at least one side metal plate of each side panel is welded to a side metal plate of an adjacent side panel in a liquid tight weld to define at least two adjacent rectangular tank side walls. An L-shaped continuous metal corner brace is between adjacent side panel edges of adjacent tank sides. Each leg of the L-shaped continuous metal corner brace abuts an adjacent side panel edge and the adjacent side panel edges are welded in a liquid-tight weld to the abutting leg of the L-shaped continuous metal corner brace to define a liquid-tight rectangular tank corner. The L-shaped continuous metal corner brace preferably includes a diagonal gusset plate extending between a distal end of each leg of the L-shaped continuous metal corner brace. Preferably, a number of vertically spaced horizontal post-tensioning sleeves are provided within each preformed concrete side panel and are configured to define a plurality of continuous horizontal post-tensioning sleeves with adjacent side panels. The continuous post-tensioning sleeves receive post-tensioned tendons. The post-tensioned tendons may be anchored at the L-shaped continuous metal corner braces adjacent each tank side made of the side panels. Alternatively, a pulley attached to an L-shaped continuous metal corner brace can be provided between one or more pairs of adjacent tank sides with a sheave of the pulley receiving the post-tensioned cable to direct the cable between aligned continuous post-tensioning channels of adjacent tank sides. In addition, a number of horizontally spaced vertical post-tensioning sleeves may be provided within each preformed concrete side panel. The vertical post-tensioning sleeves are aligned with a corresponding number of post-tensioning anchors in the tank bottom slab. The vertical post-tensioning sleeves receive post-tensioned tendons that are connected to the post-tensioning anchors in the slab.
A second aspect of the invention is a method of making a rectangular concrete tank. The method includes forming a tank bottom from concrete and embedding metal plates in the concrete of the tank bottom in a rectangular configuration with the metal plates being essentially level with the surface of the concrete forming the tank bottom. A plurality of wall panels are formed, each having a metal plate along the length of a bottom edge and a metal plate along the length of each side edge. The wall panels are aligned along the rectangular configuration of the embedded metal plates with the metal plates of the bottom edges abutting the metal plates of the tank bottom and the metal plates of the side edges being in abutment with the metal plates of the side edges of adjacent wall panels. The metal plates of the bottom edges are joined to the embedded metal plates by a liquid-tight weld and the metal plates of the side edges are joined to abutting side edge metal plates by a liquid-tight weld. The method may further include horizontal and/or vertical post-tensioning the wall panel with post-tensioning tendons.
Yet another aspect of the present invention is an expansion joint for a concrete panel. The expansion joint consists of first and second adjacent concrete panel segments each disposed with an adjacent panel edge separated by a space. A continuous metal U-shaped channel is embedded lengthwise in each adjacent panel edge of the first and second panel segments on opposite sides of the space with a leg of each U-shaped channel having an unembedded surface and the unembedded surfaces being essentially coplanar. A sheet of flexible water-stop extends between the unembedded surfaces of the U-shaped channel and bridges the space. A clamp secures the water-stop to each unembedded surface of the U-shaped channel. A preformed joint filler may be provided in the space behind the water-stop. The expansion joint may further consist of separate clamps of a clamp pair securing the water-stop to each unembedded surface on opposite sides of the space. Each clamp consists of an L-shaped metal bracket having a first leg abutting the surface of the water-stop opposite the unembedded surface and a second leg extending from the first leg away from the unembedded surface and parallel to a second leg of the other clamp of the clamp pair to define a volume between the second legs. The first legs are fastened to the unembedded leg to secure the water-stop therebetween. A flexible sealant may be provided within the volume. Preferably, the unembedded surfaces reside within a recess in the concrete at a select depth and the second leg of each clamp leg extends a distance about equal to the select depth from the first leg, thereby defining a cavity above each first leg of the clamps, the cavity being filled with a grout. The grout is preferably a non-shrink grout.
Yet another aspect of the invention is a channel form assembly for a concrete tank slab including a form having substantially flat elongate bottom and a pair of diverging walls extending therefrom, the elongate bottom having a plurality of holes spaced along its length. A plurality of ground anchors having rods extending are anchored in ground underlying form work of the concrete tank slab with the rods extending upward and being received in a hole in the elongate bottom. A first stay is configured to engage the rod beneath the elongate bottom to suspend the elongate bottom above the ground a select distance and a second stay is configured to engage the rod above the elongate bottom, the second stay and the first stay clamping the elongate bottom therebetween. Preferably the rods are threaded and first and second stays comprise a nut and threadably engage the threaded rods. The walls may include flanges on their distal ends configured to support an elongate cover over an open top of the form.
The rectangular tilt-up concrete tank and method for making the same substantially reduces the safety hazards associated with conventional rectangular tank construction. Climbing of reinforcing steel and formwork is substantially eliminated, as is the flying in of materials via overhead cranes. Dangerous, protruding reinforcing at the slab and side panel construction joints is eliminated. Furthermore, the rectangular tilt-up concrete tank of the present invention requires little or no wood formwork. This eliminates a significant environmental deficiency associated with conventional rectangular tank construction. The liquid-tight welded joints of the present invention eliminate conventional construction joints and are relatively easy to make liquid-tight and to repair if leakage testing reveals defects. Many sources of concrete defects are also eliminated. For example, because the wall sections are formed while lying horizontal, they can be readily covered by plastic during curing to improve effective curing. Furthermore, potential defects such as misalignment and concrete consolidation are substantially reduced or eliminated. Finally, the rectangular tilt-up tank and method significantly reduces the intensive labor necessary to erect reinforcing and formwork and then strip the formwork. Most overhead work is also eliminated and numerous time consuming steps such as framing, stripping, water-stop placement, roughing of construction joints and finishing work are reduced or eliminated. Crane time, which is always a large expense on such a project, is also substantially reduced over conventional rectangular concrete tank construction.
A rectangular tilt-up concrete tank 10 is shown in a perspective view in
Construction of the concrete slab 12 will begin with leveling and compaction of the base and subgrade and base materials which will be carefully controlled using motor graders and laser levels. Matt-type uniform thickness slabs are preferred for their ease of construction and for providing a flat surface for formation of the concrete side panels, as will be discussed in greater detail below. Slab edge forms will be put in place using laser lines and electronic distance measurement equipment. Expansion joints and wall lines are to be laid out and marked on the edge forms ensuring that all basin lines remain true. After edge form layout, reinforcing placement will begin. The reinforcing elevation is controlled using concrete blocks spaced throughout the subgrade which are precisely leveled. The reinforcing steel is spaced up off the subgrade from the concrete blocks using adjustable screw-type bolsters (similar to screed supports). During the slab reinforcing placement, vertical post-tensioning sleeves 43 are placed for anchoring within the concrete. Slab steel plates 32, which as described above, preferably consist of steel channels, are positioned so that they will be embedded substantially coplanar with the top surface of the concrete once it has been poured. The channels may be shop fabricated or they may be fabricated onsite from flat plate stock. Staggered holes will preferably be provided in the steel plates for insertion of concrete vibrators to ensure good concrete consolidation under the channels. Holes in the slab steel plates 32 are aligned with the vertical post-tensioning sleeves 43 and a post-tensioning coupling 72 will be provided near the finished concrete surface.
The slab steel plates 32 will be leveled and aligned with laser equipment and supported from the top layer of the reinforcing 46. Because the crossing bars in the top layer of reinforcing will be one bar-width different in elevation, the legs of the channels that would be supported from the lower bar 46B may be one bar-width longer than the legs of the channels supported from the upper bar 46A. To maintain horizontal alignment of the channels during concrete placement, short lengths of reinforcement bars may be securely tied in the top layer of reinforcing 46 under the channels and traverse the channels and the channel legs may be tack-welded to these bars. Welding will be to these added bars only, and not to the structural reinforcing. After all final adjustments, all channels will be welded together at the joints and intersections. In addition, as described below, fabricated metal expansion joint assembly components may be placed in the concrete slab formwork. These components also will be welded together at the joints and intersections. In addition, the top portion of these components will be welded to the slab channel legs 38, 40 where they intersect.
After all slab embeds have been set along wall lines and expansion joints, the slab will be poured. No wall dowels will protrude from the slab. This will facilitate access to the slab for personnel, for laser alignment and for pouring and finishing the concrete. Furthermore, this will enable much of the slab to be poured from trucks instead of overhead cranes or pumping equipment because access for concrete truck chutes will be improved and trucks may be driven onto previously completed slab sections to deliver concrete to subsequent sections. Because alignment tolerances in the wall panels will depend on slab tolerances, the slab should have a flat finish within about 0.25 inches. This should be achievable with screed pipes. Also, because there will be no protrusions from the slab, the use of automated screeding will be facilitated.
Referring to
Each concrete side panel 28 may be formed on top of the concrete slab 12 as illustrated in
Preferably, all the wall panels for a particular basin should be formed from a basin corner to a least one panel beyond a first expansion joint prior to pouring the concrete for any of the panel sections of that wall. This procedure will minimize the bracing needed on the edges of the panels to support concrete placement and will ensure proper alignment of all panels up to and including the expansion joint panels. Adjacent wall panels are formed with their sides in direct contact for match-casting the panels. This ensures the panels will remain square and true with respect to each other and will aid in aligning the vertical post-tensioning sleeves 60 and the horizontal post-tensioning sleeves 62. After positioning of all the panels through the expansion joint, the bottom interior corners of the panels between the bottom steel plate 52 and the side steel plates 50 are welded.
After the formwork is positioned, the reinforcing 58 is installed in each concrete side panel 28. The headed anchor studs may be positioned on the plates 50, 52 to act as guides for proper placement of the reinforcing within the formwork. In addition, the reinforcing may be fastened to some or all of the headed anchor studs 54 which will allow the reinforcing to double as form ties to resist deformation of the plates 50, 52 from pressure during concrete placement. This may allow the plate thickness to be minimized for economy. The first layer of reinforcing 58 will be spaced up off the slab with plastic chairs. After installation of the first reinforcing layer, the sleeves 60, 62 for vertical and horizontal post-tensioning are installed. The second layer of reinforcing is then installed. Firm spacers are preferably installed between the layers for positive spacing and to prevent the reinforcement from sagging and placing undue stress on the plates 50, 52.
The concrete is then placed in the formwork and finished with conventional mechanical screed equipment. A burnished surface can be achieved which will preclude the need for later finishing work or for exterior coatings. The wall sections may be poured essentially continuously until completion, because they are independent of one another and “staggering” of pours is not necessary. In addition, in many installations it would be possible for concrete trucks to drive out onto the slab allowing the wall panels to be poured directly from the truck instead of by crane and bucket or by pumping equipment.
After curing and strength gain, concrete side panels will be tilted up using a heavy lift crane. Prior to erecting the panels the embedded channels in the slab and the embedded plates in the wall panels are cleaned and rough welds are ground smooth. The panels are tilted up by using lift eyes embedded in lifting anchors previously installed. In one embodiment, vertical tendons are then inserted into the vertical post-tensioning sleeves 60 and the tendons mated with the vertical post-tensioning anchors 74 using the post-tensioning coupling 72. The concrete side panels 28 may be temporarily allowed to rest on blocking while the vertical tendons are being joined. After all the blocking has been removed, the bottom steel plates 52 will be carefully aligned with the slab steel plates 32 and the side steel plates will likewise be aligned in adjacent panel(s). Afterwards some or all of the vertical tendons will be stressed and locked to provide tension needed to hold the panel(s) in position. After the wall panels have been erected, they will be welded to each other and the and the embeds in the base and slab as discussed above. It should be noted that whether the vertical and/or horizontal tendons will first be tensioned and then welding will occur or whether welding will precede the post-tensioning may be determined by a variety of factors during tank construction. The horizontal and vertical post-tensioning sleeves may be pressure-grouted after tensioning to permanently anchor the tendons to the structure and to provide protection of the tendons against corrosion
A wall-to-wall cross connection 86 in accordance with the present invention is illustrated in
A wall-to-wall T-connection 98 is shown in a cross-section taken along line 6—6—6 of
Concrete panels (which are intended to include vertical sidewall panels and horizontal slab segments) sometimes require expansion joints to allow for expansion of the concrete with temperature changes. Special details provide for such expansion joints in the present invention. Referring to
The expansion joint 130 is formed during slab formation. The first slab segment 132 is poured including an embedded U-Shaped Channel 138 with a wooden strip bolted to the unembedded leg to form the lengthwise void 158. The preformed joint filler 143 is fastened to the face of the first slab section and the second slab segment 134 is poured including an embedded U-shaped channel with a wooden strip bolted to the unembedded leg to form a second lengthwise void. Thereafter, the flexible vinyl water stop 142 is laid into position as illustrated in
Wall expansion joints may also be necessary. A wall expansion joint 164 is illustrated in
As illustrated in
To facilitate wash down and cleanup of the basin, drain channels 170 may be installed in the slab along with placement of the reinforcing. Drain channels 170 may be preferred over sloping floors and drain sumps to ensure flat surfaces are maintained on the slab for construction of the wall panels. An illustrative drain channel 170 is shown in
In some circumstances it may be desirable to provide columns 26 in the tank interior for support of a roof or other items. Referring to
Form work for casting the columns 26 is illustrated in
Construction of the rectangular tilt-up concrete tank in accordance with the present invention requires three distinct welding tasks. The first is the extensive welding necessary for the wall panel erection. The second involves fabrication of the slab/wall connection plates and channels including the integral steel waterstops. The third involves miscellaneous field welding of the channels and plate joints, interior corners of the wall panels, etc. While the field welding will need to be done by individual welders, automated or semi-automatic welding equipment may be used in the welding for erection of the wall panels and for fabrication of the channels and flat plates.
Fabrication of the channels and plates including the welding, cutting of holes, etc., may be done onsite or could be prefabricated offsite. If they are to be fabricated onsite, a covered trailer-mounted welding/cutting shop may be utilized to process pieces in an assembly-line fashion.
The preferred embodiment described herein shows a single layer of concrete side panels 28. However, where deeper concrete structures such as pipe galleries, filters or pump stations are required, it may be feasible to stack the wall panels. Stacking of side panels may allow the formation of deep tanks with thick walls without exceeding the practical lift weights of conventional cranes.
Number | Name | Date | Kind |
---|---|---|---|
903909 | Steiner | Nov 1908 | A |
2178097 | Davison et al. | Oct 1939 | A |
2587724 | Henderson | Mar 1952 | A |
2596495 | Macerata | May 1952 | A |
2971295 | Orvel | Feb 1961 | A |
3228161 | McCown | Jan 1966 | A |
3555763 | Bloxom | Jan 1971 | A |
3621626 | Tylius | Nov 1971 | A |
3640038 | Heron | Feb 1972 | A |
3812637 | Yang et al. | May 1974 | A |
3824751 | Shelander | Jul 1974 | A |
4015383 | Crowley | Apr 1977 | A |
4043089 | Bush et al. | Aug 1977 | A |
4282690 | Meheen | Aug 1981 | A |
4781006 | Haynes | Nov 1988 | A |
4819394 | Compton | Apr 1989 | A |
4865213 | Kruger | Sep 1989 | A |
4901491 | Phillips | Feb 1990 | A |
4961293 | House et al. | Oct 1990 | A |
5129413 | Puder et al. | Jul 1992 | A |
5193714 | Carey | Mar 1993 | A |
5201786 | Larsen | Apr 1993 | A |
5507124 | Tadros et al. | Apr 1996 | A |
5560150 | Pearson | Oct 1996 | A |
5561956 | Englekirk et al. | Oct 1996 | A |
5609005 | Schierloh et al. | Mar 1997 | A |
5806273 | Kaminski et al. | Sep 1998 | A |
5809712 | Simanjuntak | Sep 1998 | A |
5865001 | Martin et al. | Feb 1999 | A |
5881519 | Newkirk | Mar 1999 | A |
5987827 | Lord | Nov 1999 | A |
6009677 | Anderson | Jan 2000 | A |
6067757 | Olson et al. | May 2000 | A |
6131365 | Crockett | Oct 2000 | A |
6282853 | Blaney et al. | Sep 2001 | B1 |
6338231 | Enriquez | Jan 2002 | B1 |
6412231 | Palatin | Jul 2002 | B1 |
6557316 | Van Der Heijden | May 2003 | B2 |
Number | Date | Country | |
---|---|---|---|
20040261326 A1 | Dec 2004 | US |