Claims
- 1. A method of remediating a site of earth and groundwater contamination comprising the steps of:
drilling at least one injection well into the underground water in the contaminated area; placing at least one extraction conduit into the earth above the water in the contaminated area; sealing the surface of the earth above the contaminated area and above the extraction conduit; injecting nutrient through the injection well into the contaminated area; injecting air through the injection well into the contaminated area; and creating a vacuum in the extraction conduit to withdraw gas and vapor from the earth in the contaminated area.
- 2. A method of remediation according to claim 1, wherein the at least one extraction conduit is installed vertically.
- 3. A method of remediation according to claim 1, wherein the at least one extraction conduit is installed horizontally.
- 4. A method of remediation according to claim 1, wherein the step of drilling at least one injection well into the underground water includes drilling a plurality of injection wells into the underground water spaced throughout the contaminated area.
- 5. A method of remediation according to claim 1, wherein the step of injecting nutrient comprises the step of injecting nutrient into the earth above the underground water on a periodic batch basis, and the step of injecting air comprises injecting air into the underground water.
- 6. A method of remediation according to claim 5, wherein the air injection conduit has a perforated end portion which extends greater than three feet into the groundwater and a plug is positioned in the well around the air injection conduit above the perforated end portion and extending at least three feet into the groundwater to substantially seal the well above the perforated end portion of the air injection conduit and below the nutrient injection conduit.
- 7. A method of remediation according to claim 5, wherein the step of injecting nutrient is performed on a periodic batch basis with a period of about once a month.
- 8. A method of remediation according to claim 1, additionally including the step of installing an air injection conduit having a perforated end portion in the at least one injection well so that the perforated end portion extends greater than three feet into the groundwater so that air injected is injected into the groundwater and installing a plug in the well around the air injection conduit above the perforated end portion of the air injection conduit and extending at least three feet into the ground water to substantially seal the well above the perforated end portion.
- 9. A method of remediation according to claim 8, wherein the air injection conduit is one-quarter inch diameter plastic tubing.
- 10. A method of remediation according to claim 1, additionally including the step of installing an air injection conduit having a perforated end portion in the at least one injection well so that the perforated end portion extends greater than three feet into the groundwater so that air injected is injected into the groundwater and installing a plug in the well around the air injection conduit above the perforated end portion of the air injection conduit to substantially seal the well above the perforated end portion, said air injection conduit being one-quarter inch diameter plastic tubing.
- 11. A method of remediating a site of earth and groundwater contamination comprising the steps of:
drilling at least one injection well into the underground water in the contaminated area; placing at least one extraction conduit into the earth above the water in the contaminated area; injecting nutrient through the injection well into the contaminated area; injecting air through the at least one injection well into the contaminated area at a rate of between five and forty cubic feet per hour; and creating a vacuum in the extraction conduit to withdraw gas and vapor from the earth in the contaminated area.
- 12. A method of remediation according to claim 11, wherein between about two and ten times the volume of vapor and air is extracted through the extraction conduit than the volume of air injected through the injection well.
- 13. A method of remediation according to claim 11, additionally including the step of installing an air injection conduit in the at least one injection well extending into the groundwater so that air injected is injected into the groundwater and installing a nutrient injection conduit in at least one of the at least one injection wells terminating above the groundwater so that nutrient is injected into soil above the groundwater.
- 14. A method of remediation according to claim 13, wherein the air injection conduit has a perforated end portion which extends greater than three feet into the groundwater and a plug is positioned in the well around the air injection conduit above the perforated end portion.
- 15. A method of remediation according to claim 14, wherein the perforated end portion of the air injection conduit extends between three and five feet into the ground water.
- 16. A method of remediation according to claim 15, wherein the air injection conduit is one-quarter inch diameter plastic tubing.
- 17. A method of remediation according to claim 13, wherein the step of injecting nutrient is performed on a periodic batch basis.
- 18. A method of remediation according to claim 17, wherein the step of injecting nutrient is performed on a periodic batch basis with a period of about once a month.
RELATED APPLICATION
[0001] This is a continuation of copending application Ser. No. 09/853,346, filed May 10, 2001, and entitled “Remediation Method.”