Removable panel roof for modular, self-contained, mobile clean room

Information

  • Patent Grant
  • 11624182
  • Patent Number
    11,624,182
  • Date Filed
    Thursday, August 13, 2020
    3 years ago
  • Date Issued
    Tuesday, April 11, 2023
    a year ago
Abstract
Modular building cleanrooms having integrated mechanical rooms with removable, walkable floor panels above their ceilings are disclosed. The attic area above the sealed cleanroom ceiling and below joists of the modular building's frame provides an interstitial volume through which ducts, piping, electrical conduit, etc. run from the mechanical room to dampers, valves, and junctions boxes. The walkable floor panels can be bar grating through which maintenance people can see components below. The floor panels can have individual sections that may be removed for access to the components. Along with walkable floor panels, the modular building roofs can have foldable electrical panelboards that are pre-wired at the factory and then rotated upright once delivered to their destination.
Description
BACKGROUND
1. Field of the Invention

The present application generally relates to chemical or physical laboratory apparatuses for general use including dust-free rooms or enclosures, specifically to mobile building cleanrooms with a walkable, removable panel roof under which utilities are routed from a mechanical room to over the ceiling of the cleanroom and underneath the panels.


2. Description of the Related Art

In some traditional cleanroom-within-a-warehouse architectures, plumbing and other utilities are routed into a set of components well above a cleanroom. The set of components includes HVAC (heating, ventilation, and air conditioning) air handling units, plumbing utilities, and circuit breaker panels. Ducts, piping, and electrical conduit extend from the components down to just above the ceiling of the cleanroom. At this point, they may meet with dampers, valves, and junction boxes.


These dampers, valves, and junction boxes sometimes need servicing by maintenance personnel. Because this “mezzanine” area on the ceiling is open, access is not normally a problem.


Modern cleanrooms are built like modular buildings, complete with their own mechanical rooms that house the HVAC air handling units, plumbing utilities, and circuit breaker panels. These modular buildings can be pre-fabricated in a factory and then shipped by rail, aircraft, or truck to a final location. So that they fit inside the envelope of the modular building frame, the mechanical rooms are located on the same floor as the cleanroom, often sharing a wall with it. Ducts, piping, and electrical conduit run from the mechanical room through the walls to the cleanroom or over its ceiling to where they need to go.


Just like for traditional cleanrooms, there must be dampers, valves, and junction boxes into which the ducts, piping, and conduit run. And they need to be serviced. However, because everything is enclosed in a modular building structure built for transport, access to them is difficult. Further, just inspecting them may be difficult because space is at a premium and components are close together.


There is a need in the art for modern, transportable cleanrooms that are serviceable and maintainable.


BRIEF SUMMARY

Generally, an interstitial area above a modular building cleanroom's ceiling is covered with walkable floor panels, such as bar grating, that is removable so that dampers, valves, and junction boxes on the ceiling may be serviced by removing sections of the floor panels. The floor panels are suspended above the ceiling on joists that run the full width of the modular building so that ductwork, piping, and electrical conduit may be routed from a mechanical room at one end of the modular building's frame to where they need to go in the cleanroom.


If the walkable floor panels are bar grating, then the utility service components connected with the ductwork, piping, and electrical conduit can be more easily inspected by a maintenance technician inspector walking the roof because he or she can see through the grating to components below without having to remove the panels.


A folding stand can be incorporated to hold electrical panelboards. The electrical panelboard may be pre-connected at a factory through a flexible conduit to electrical and other connections to the cleanroom. Once delivered to a warehouse gray space in which the modular building is installed, the stand can be unfolded or otherwise deployed so that the panelboard is upright, accessible, and meets electrical codes.


Some embodiments of the invention are related to a modular building apparatus for pharmaceutical cleanroom manufacturing including a controlled air, sealable cleanroom having a ceiling, a mechanical room, a unitary frame for a modular building, the frame surrounding the cleanroom and the mechanical room and projecting above the cleanroom ceiling, joists suspended by the frame above the ceiling of the sealable cleanroom and forming an interstitial volume above the ceiling and below the joists, a utility service component mounted within the interstitial volume, a duct, a pipe, or an electrical conduit running from the mechanical room, through the interstitial volume, and to the utility service component, and walkable floor panels supported by the joists and over the utility service component, at least some of the floor panels being removable in order to provide personnel access to the utility service component.


The walkable floor panels can be grating sections, each grating section being independently removable from the joists. The grating sections can include a smooth bar grating or a serrated bar grating. A hinge can support an end of each grating section. The grating can be made of aluminum, steel, fiberglass, or other materials.


Each joist can include a lateral support ledge, and the floor panels can be configured to rest between the joists. Each internal joist of the joists can include lateral support ledges on opposite sides of said internal joist, and multiple floor panels can be supported on either side of said internal joist. Each joist can include a lateral support ledge at a depth equal to a height of the floor panels, and the floor panels can be configured to rest between the joists and have a top that is flush with a top of the joists. Each joist can include extruded metal and be welded to a metal wall plate, each extruded metal joist including a 5 cm (2 inch) depth between a bottom of a lateral support ledge and a bottom of the joist, the depth being suitable for a 5 cm thick solid panel.


The floor panels can extend an entire width and length of the cleanroom below. The floor panels can extend an entire length of the unitary frame. The mechanical room can be above the ceiling of the cleanroom. The mechanical room can have a personnel entry point separate from an entry point of the cleanroom. A height of the mechanical room can extend to a height of the floor panels.


The utility service component can include a damper, a valve, a junction box, or other utility access point.


Some embodiments are related to a modular building apparatus for pharmaceutical cleanroom manufacturing including a controlled air, sealable cleanroom having a ceiling, a unitary frame for a modular building, the frame surrounding the cleanroom and projecting above the cleanroom ceiling, joists suspended by the frame above the ceiling of the sealable cleanroom and forming an interstitial volume above the ceiling and below the joists, walkable floor panels supported by the joists, each floor panel being removable in order to provide personnel access to the interstitial volume, and a deployable stand connected with at least one of the joists, the deployable stand supporting an electrical panelboard connected with conduit running to the cleanroom, the deployable stand being repositionable from i) a horizontal configuration laying down over the joists and ii) an upright configuration.


There can exist a clear working space over the floor panels in front of the electrical panelboard at least 750 millimeters (mm) wide and at least 900 mm deep when the deployable stand is in the upright configuration. This area is per National Electric Code § 110.26(A).


At least some of the conduit connected with the electrical panelboard can be flexible conduit that does not require withdrawing internal wires when the deployable stand is repositioned between the horizontal and upright configurations. The deployable stand can be connected through a pivot to at least one of the joists, and the deployable stand can be configured to rotate around the pivot from the horizontal configuration to the upright configuration.


The floor panels can be set between the joists, and tops of the floor panels can be flush with tops of the joists. The floor panels can be solid or see-though bar grating.


Some embodiments are related to a method of assembling a modular cleanroom apparatus for pharmaceutical cleanroom manufacturing, the method including providing a controlled air, sealable cleanroom having a ceiling, installing a unitary frame for a modular building, the frame surrounding the cleanroom and projecting above the cleanroom ceiling, fastening joists to the frame above the ceiling of the sealable cleanroom to form an interstitial volume above the ceiling and below the joists, attaching a deployable stand to at least one of the joists, the deployable stand being repositionable from i) a horizontal configuration laying down over the joists and ii) an upright configuration, wiring an electrical panelboard mounted on the deployable stand to the cleanroom through flexible conduit, positioning the deployable stand to the horizontal configuration after the wiring, transporting, to a destination, the cleanroom with the unitary frame and horizontally configured deployable stand, and deploying, at the destination, the deployable stand with the electrical panelboard to the upright configuration.


A portion of the deployable stand can rest between at least two of the joists when in the horizontal configuration. The deployable stand can be connected through a pivot to at least one of the joists, the positioning including rotating the deployable stand around the pivot from the horizontal configuration to the upright configuration.


The method can further include inserting walkable floor panels between the joists, each floor panel being removable in order to provide personnel access to the interstitial volume.





BRIEF DESCRIPTION OF THE DRAWINGS


FIG. 1 is a perspective, elevation view of a modular cleanroom building in accordance with an embodiment.



FIG. 2A is an inside perspective view of two modular building sections being put together in accordance with an embodiment.



FIG. 2B is an inside perspective view of the two modular building of FIG. 2A closer together.



FIG. 3 is a top, side isometric view of interstitial space of an assembled modular building in accordance with an embodiment.



FIG. 4 is an isometric view of walkable bar grating on top of a modular building in accordance with an embodiment.



FIG. 5A is an isometric view of bar grating between joists in accordance with an embodiment.



FIG. 5B is a cross section view of the bar grating of FIG. 5A.



FIG. 6 is a perspective view of a section of bar grating removed from its joists in accordance with an embodiment.



FIG. 7A is a perspective view of an electrical panelboard laying down in accordance with an embodiment.



FIG. 7B is a perspective view of the electrical panelboard of FIG. 7A deployed upright.



FIG. 8 is a flowchart illustrating an embodiment in accordance with the present invention.





DETAILED DESCRIPTION

A transportable, modular building cleanroom is described with an adjoining mechanical room that routes air, fluids, electrical power, and communications from a floor area of the mechanical room into an interstitial space over the ceiling of the cleanroom to dampers, valves, junction boxes, etc. in the interstitial space. The roof of the module building comprises a set of walkable, removable floor panels that rest between extruded metal joists. The floor panels can be bar grating through which personnel can see in order to locate and inspect the dampers, etc. Whether bar grating or solid, the floor panels can be lifted off by personnel so that they can service the equipment below.


An “internal joist” is a joist that is not a rim joist or at the end of a row of joists and exposed externally, or as otherwise known in the art.


An “interstitial volume” or “interstitial space” is an area above a ceiling of a cleanroom and below a roof of a modular building structure surrounding the cleanroom, or as otherwise known in the art.



FIG. 1 is a perspective, elevation view of a cleanroom modular building. Modular building assembly 100 includes modular building structure 102 that is designed to be transported from one location to another. This can mean that has a welded or bolted unitary frame 104, is rigid enough to be transported by aircraft, ship, or tractor trailer, is sized to fit on or in such vehicles, or as otherwise known in the art.


Unitary frame 104 surrounds controlled air, sealable cleanroom 114. Cleanroom 114 is defined by several walls, ceiling 110, and floor 112. Personnel can ingress or egress the cleanroom through doorway 108 and see into or out of the cleanroom through window 106.


In some configurations, the entrance and exit may be separated into distinct doorways and have airlock-type areas through which personnel may don or doff gowns or other protective equipment.


Mechanical room 116 is adjacent cleanroom 114. Its height 118 in the exemplary embodiment is the same height has cleanroom 114. Mechanical room 116 houses heating, ventilation, and air conditioning (HVAC) blower and conditioning units, electrical power and computer subsystems, pipe valves, and other utility systems.


In some embodiments, the height of the mechanical room can extend all the way to the roof instead of being at the same height as the cleanroom. Removing a walkable floor panel can then allow one to see all the way to the floor of the mechanical room.


Truss 124 of unitary frame 104 projects above cleanroom 114 and mechanical room 116, forming an attic-like interstitial volume 120. The interstitial space is a meter or so high, too short for personnel to stand up in. It is above cleanroom ceiling 110 and below walkable panel roof supported by joists 125. Through interstitial space 120 runs ducts 122, which run to vents 127 within cleanroom 114. Pipes and electrical wires also run through interstitial space 120 to outlets 128 and 129, respectively.


Within the cleanroom, personnel can perform research & development activities or manufacturing that requires a clean, dustless environment. The uses for such spaces are innumerable. The fact that the cleanroom is manufactured in a factory as a modular building and then connected together to others in a warehouse or other gray space with a flat floor typically means that its walls are straighter and tolerances tighter than if an equivalent room were built in place. Further, its electrical systems and other utilities can be factory checked with centralized test equipment before transport. This generally results in better quality checks and fewer leaks in the final product.



FIGS. 2A-2B are inside perspective views of two modular building sections being put together. Two frames 204 with interstitial spaces 220 and metal structural supports 205 are moved horizontally together on a smooth, flat floor such that they join. They are then bolted and fastened together such that their floors converge and their ceilings 210 connect to form a common floor and ceiling. The common floor and ceiling define a large room inside. The common ceiling and the frame structure above it define one or more interstitial spaces through which utilities are routed.


There can be several vents, outlets for chilled or hot water, lights and detectors within the cleanroom. Associated with these fixtures are dampers, valves, and junction boxes in the ceiling. During maintenance, accessing the dampers, valves, and junction boxes from inside the cleanroom would create a problem with potential contamination of the cleanroom because they are, at least in relation to the cleanroom, dirty. Thus, it is desirable to access them from outside the cleanroom.



FIG. 3 is a top, side isometric view of interstitial space of modular buildings in accordance with an embodiment. Within modular building 302 are interstitial spaces 320 above cleanroom 314 and mechanical room 316, shown here without their ceilings.


HVAC duct 330 feeds vent 336, while electrical conduit 332 feeds electrical outlets. Pipes 334 feed air and water outlets in the cleanroom. Ducts 330, electrical conduit 332, and pipes 334 travel through interstitial volume 320 from mechanical room 316 to their respective ends in cleanroom 320.



FIG. 4 is an isometric view of walkable bar grating on top of a modular building 402. On the roof of modular building assembly 400, walkable floor panels 440 are supported between joists 425. Each floor panel 440 is independently removable from its surrounding joists to provide for access by personnel.


In the exemplary embodiment, the swath of floor panels 440 extend an entire width and length of the unitary frame of modular building 402.


Each commercially available bar grating section is 147 cm (4 ft. 10 inches)×91 cm (3 ft.) long, but other sizes are available. Modular buildings are about 366 cm (12 ft.) wide by 1524 cm (50 ft.) long. Therefore, four of the grating sections placed side-by-side can go across the roof to cover the 366 cm (12 ft.) width. Twelve sets of the grating sections placed end to end between the joists cover the 1524 cm (50 ft.) length.


In some embodiments, the mechanical room is mounted on a skid above the ceiling of the cleanroom. This allows more floor space to be devoted to the cleanroom operations and may reduce the length of pipes and conduit needed to reach all parts of the cleanroom.


In some embodiments, the mechanical room has a doorway or other personnel entry point that is separate from an entry point of the cleanroom. This allows maintenance people to service utilities without dirtying the cleanroom or interrupting operations there.



FIGS. 5A-5B illustrate bar grating 540 that is set between extruded inner joist 525 and end joist 542. End joist 542 and inner joist 525 are welded to metal wall plate 544.


Grating 540 rests upon lateral support ledge 546 (see FIG. 5B) of internal joist 525 and lateral support ledge 548 of end joist 542. Inner joist 525 includes lateral support ledges 546 on opposite sides such that it supports multiple gratings. Its cross section is plus ‘+’ shaped. Meanwhile, end joist 542 includes a single lateral support ledge 548 to form a tee ‘T’ shape.


The depth of each lateral support ledge 546 and 548 is equal to the height of the grating. Thus, the top of each floor panel grating 540 is flush with the top of joist 525 and 548.


The joists are fabricated from aluminum so that they are strong, corrosion resistant, and light weight.


Each extruded end joist 542 and internal joist 525 include a common depth between a bottom of their lateral support ledges 546 and 548 and their respective bottoms. This depth is different from the common depth between a top of their lateral support ledges 546 and 548 and their respective tops. This is so that the extruded joists can be flipped upside down so that their alternate common depth is facing up. This alternate depth can accommodate a different depth of floor panels. For example, the alternate common depth can be 5 centimeters (2 inches) to accommodate opaque floor panels instead of a thinner see-through bar grating.



FIG. 6 is a perspective view of a section of walkable floor panel bar grating removed from joists 625. Utility service component 660, as well as junction box 629, is mounted within the interstitial space. The utility service component can include a damper, valve, or other components. Data cables 632 in cable trays and pipe 634 are also mounted within the interstitial space. Removing the grating section allows personnel to access the components in the interstitial space without having to enter the cleanroom.



FIGS. 7A-7B are perspective views of the roof 700 of a modular building with a reconfigurable electrical panelboard mounting system. Walkable gratings 740 are set between joists 725.


Deployable stand 750 supports electrical conduit 754, which runs from the cleanroom and mechanical room to electrical panelboards 752 that are mounted on the stand. Electrical and other connections are made and tested at the factory in preparation for the modular building to be transported to its operating location. When the stand is deployed, the flexible conduit section does not require withdrawing internal wires or otherwise re-wiring the panelboard connections.


Connected to joists 725 through mechanical pivot 758, deployable stand is reconfigurable from a laying down, horizontal position, shown in FIG. 7A, to a deployed, upright configuration, shown in FIG. 7B. It simply rotates around pivot 758. It its upright configuration, it is secured with a diagonal brace. In the horizontal position, the deployable stand may require one or more of the removable gratings to be removed so that its components may fit between the joists for travel.


When the deployable stand is upright, there is a clear, flat area in front of the panelboard(s) of the stand at least 750 millimeters (mm) wide and at least 900 mm deep. This meets typical requirements for access to such panelboards in electric codes, such as National Electric Code § 110.26(A).



FIG. 8 is a flowchart of a process 800 in accordance with an embodiment. In operation 801, a controlled air, sealable cleanroom having a ceiling is provided. In operation 802, a unitary frame for a modular building is installed surrounding the cleanroom and projecting above the cleanroom ceiling. In operation 803, joists are fastened to the frame above the ceiling of the sealable cleanroom to form an interstitial volume above the ceiling and below the joists. In operation 804, a deployable stand is attached to at least one of the joists, the deployable standing being repositionable from i) a horizontal configuration laying down over the joists and ii) an upright configuration. In operation 805, an electrical panelboard mounted on the deployable stand is wired to the cleanroom through flexible conduit. In operation 806, the deployable stand is positioned to the horizontal configuration after the wiring. In operation 807, the cleanroom with the unitary frame and horizontally configured deployable stand is transported to a destination. In operation 808, the deployable stand with the electrical panelboard is deployed to the upright configuration.


It is contemplated that any embodiment discussed in this specification can be implemented with respect to any method, kit, reagent, or composition of the invention, and vice versa. Furthermore, compositions of the invention can be used to achieve methods of the invention.


It will be understood that particular embodiments described herein are shown by way of illustration and not as limitations of the invention. The principal features of this invention can be employed in various embodiments without departing from the scope of the invention. Those skilled in the art will recognize, or be able to ascertain using no more than routine experimentation, numerous equivalents to the specific procedures described herein. Such equivalents are considered to be within the scope of this invention and are covered by the claims.


All publications and patent applications mentioned in the specification are indicative of the level of skill of those skilled in the art to which this invention pertains. All publications and patent applications are herein incorporated by reference to the same extent as if each individual publication or patent application was specifically and individually indicated to be incorporated by reference.


The use of the word “a” or “an” when used in conjunction with the term “comprising” in the claims and/or the specification may mean “one,” but it is also consistent with the meaning of “one or more,” “at least one,” and “one or more than one.” The use of the term “or” in the claims is used to mean “and/or” unless explicitly indicated to refer to alternatives only or the alternatives are mutually exclusive, although the disclosure supports a definition that refers to only alternatives and “and/or.” Throughout this application, the term “about” is used to indicate that a value includes the inherent variation of error for the device, the method being employed to determine the value, or the variation that exists among the study subjects.


As used in this specification and claim(s), the words “comprising” (and any form of comprising, such as “comprise” and “comprises”), “having” (and any form of having, such as “have” and “has”), “including” (and any form of including, such as “includes” and “include”) or “containing” (and any form of containing, such as “contains” and “contain”) are inclusive or open-ended and do not exclude additional, unrecited elements or method steps.


The term “or combinations thereof” as used herein refers to all permutations and combinations of the listed items preceding the term. For example, “A, B, C, or combinations thereof” is intended to include at least one of: A, B, C, AB, AC, BC, or ABC, and if order is important in a particular context, also BA, CA, CB, CBA, BCA, ACB, BAC, or CAB. Continuing with this example, expressly included are combinations that contain repeats of one or more item or term, such as BB, AAA, MB, BBC, AAABCCCC, CBBAAA, CABABB, and so forth. The skilled artisan will understand that typically there is no limit on the number of items or terms in any combination, unless otherwise apparent from the context.


As used herein, words of approximation such as, without limitation, “about”, “substantial” or “substantially” refers to a condition that when so modified is understood to not necessarily be absolute or perfect but would be considered close enough to those of ordinary skill in the art to warrant designating the condition as being present. The extent to which the description may vary will depend on how great a change can be instituted and still have one of ordinary skilled in the art recognize the modified feature as still having the required characteristics and capabilities of the unmodified feature. In general, but subject to the preceding discussion, a numerical value herein that is modified by a word of approximation such as “about” may vary from the stated value by at least ±1, 2, 3, 4, 5, 6, 7, 10, 12 or 15%.


All of the compositions and/or methods disclosed and claimed herein can be made and executed without undue experimentation in light of the present disclosure. While the compositions and methods of this invention have been described in terms of preferred embodiments, it will be apparent to those of skill in the art that variations may be applied to the compositions and/or methods and in the steps or in the sequence of steps of the method described herein without departing from the concept, spirit and scope of the invention. All such similar substitutes and modifications apparent to those skilled in the art are deemed to be within the spirit, scope and concept of the invention as defined by the appended claims.

Claims
  • 1. A modular building apparatus for pharmaceutical cleanroom manufacturing comprising: a controlled air, sealable cleanroom having a ceiling;a mechanical room;a unitary frame for a modular building, the frame surrounding the cleanroom and the mechanical room and projecting above the cleanroom ceiling;joists suspended by the frame above the ceiling of the sealable cleanroom and forming an interstitial volume above the ceiling and below the joists;a utility service component mounted within the interstitial volume;a duct, a pipe, or an electrical conduit running from the mechanical room, through the interstitial volume, and to the utility service component; andwalkable floor panels supported by the joists and over the utility service component, at least some of the floor panels being removable in order to provide personnel access to the utility service component.
  • 2. The apparatus of claim 1 wherein the walkable floor panels are grating sections, each grating section being independently removable from the joists.
  • 3. The apparatus of claim 2 wherein the grating sections comprise a smooth bar grating or a serrated bar grating.
  • 4. The apparatus of claim 1 wherein each joist includes a lateral support ledge, and the floor panels are configured to rest between the joists.
  • 5. The apparatus of claim 4 wherein each internal joist of the joists includes lateral support ledges on opposite sides of said internal joist, and multiple floor panels are supported on either side of said internal joist.
  • 6. The apparatus of claim 1 wherein each joist includes a lateral support ledge at a depth equal to a height of the floor panels, the floor panels being configured to rest between the joists and have a top that is flush with a top of the joists.
  • 7. The apparatus of claim 1 wherein each joist comprises extruded metal and is welded to a metal wall plate, each extruded metal joist comprising a 5 cm (2 inch) depth between a bottom of a lateral support ledge and a bottom of the joist, the depth being suitable for a 5 cm thick solid panel.
  • 8. The apparatus of claim 1 wherein the floor panels extend an entire width and length of the cleanroom below.
  • 9. The apparatus of claim 8 wherein the floor panels extend an entire length of the unitary frame.
  • 10. The apparatus of claim 1 wherein the mechanical room is above the ceiling of the cleanroom.
  • 11. The apparatus of claim 1 wherein the mechanical room has a personnel entry point separate from an entry point of the cleanroom.
  • 12. The apparatus of claim 1 wherein a height of the mechanical room extends to a height of the floor panels.
  • 13. The apparatus of claim 1 wherein the utility service component comprises a damper, a valve, or a junction box.
  • 14. A modular building apparatus for pharmaceutical cleanroom manufacturing comprising: a controlled air, sealable cleanroom having a ceiling;a unitary frame for a modular building, the frame surrounding the cleanroom and projecting above the cleanroom ceiling;joists suspended by the frame above the ceiling of the sealable cleanroom and forming an interstitial volume above the ceiling and below the joists;walkable floor panels supported by the joists, each floor panel being removable in order to provide personnel access to the interstitial volume; anda deployable stand connected with at least one of the joists, the deployable stand supporting an electrical panelboard connected with conduit running to the cleanroom, the deployable stand being repositionable from i) a horizontal configuration laying down over the joists and ii) an upright configuration.
  • 15. The apparatus of claim 14 wherein there exists a clear working space over the floor panels in front of the electrical panelboard at least 750 millimeters (mm) wide and at least 900 mm deep when the deployable stand is in the upright configuration.
  • 16. The apparatus of claim 14 wherein at least some of the conduit connected with the electrical panelboard is flexible conduit that does not require withdrawing internal wires when the deployable stand is repositioned between the horizontal and upright configurations.
  • 17. The apparatus of claim 14 wherein the deployable stand is connected through a pivot to at least one of the joists, the deployable stand configured to rotate around the pivot from the horizontal configuration to the upright configuration.
  • 18. The apparatus of claim 14 wherein the floor panels are set between the joists, and tops of the floor panels are flush with tops of the joists.
  • 19. The apparatus of claim 14 wherein the floor panels are solid or see-though bar grating.
  • 20. A method of assembling a modular cleanroom apparatus for pharmaceutical cleanroom manufacturing, the method comprising: providing a controlled air, sealable cleanroom having a ceiling;installing a unitary frame for a modular building, the frame surrounding the cleanroom and projecting above the cleanroom ceiling;fastening joists to the frame above the ceiling of the sealable cleanroom to form an interstitial volume above the ceiling and below the joists;attaching a deployable stand to at least one of the joists, the deployable stand being repositionable from i) a horizontal configuration laying down over the joists and ii) an upright configuration;wiring an electrical panelboard mounted on the deployable stand to the cleanroom through flexible conduit;positioning the deployable stand to the horizontal configuration after the wiring;transporting, to a destination, the cleanroom with the unitary frame and horizontally configured deployable stand; anddeploying, at the destination, the deployable stand with the electrical panelboard to the upright configuration.
  • 21. The method of claim 20 wherein a portion of the deployable stand rests between at least two of the joists when in the horizontal configuration.
  • 22. The method of claim 20 wherein the deployable stand is connected through a pivot to at least one of the joists, the positioning including rotating the deployable stand around the pivot from the horizontal configuration to the upright configuration.
  • 23. The method of claim 20 further comprising: inserting walkable floor panels between the joists, each floor panel being removable in order to provide personnel access to the interstitial volume.
CROSS-REFERENCES TO RELATED APPLICATIONS

This application claims the benefit of U.S. Provisional Patent Application No. 62/887,303, filed Aug. 15, 2019, which is hereby incorporated by reference in its entirety for all purposes.

US Referenced Citations (184)
Number Name Date Kind
1967511 Meyer Jul 1934 A
1991536 Austin Feb 1935 A
2098111 Sconce Nov 1937 A
2156859 Lowe May 1939 A
2168725 Whelan Aug 1939 A
3115819 Mahlmeister et al. Dec 1963 A
3378963 Obata Apr 1968 A
3456829 Glassmeyer Jul 1969 A
3470871 Shoen Oct 1969 A
3570385 Heisterkamp Mar 1971 A
3623283 Abromavage et al. Nov 1971 A
3638404 Moll et al. Feb 1972 A
3638641 Abromavage et al. Feb 1972 A
3678639 Panitz Jul 1972 A
3742932 Greenspan Jul 1973 A
3756342 Burdick Sep 1973 A
3766844 Donnelly et al. Oct 1973 A
4255912 Kovacs Mar 1981 A
4267769 Davis et al. May 1981 A
4304224 Fortney Dec 1981 A
4327529 Bigelow, Jr. et al. May 1982 A
4409889 Burleson Oct 1983 A
4549472 Endo et al. Oct 1985 A
4554766 Ziemer Nov 1985 A
4599829 DiMartino, Sr. et al. Jul 1986 A
4667579 Daw May 1987 A
4667580 Wetzel May 1987 A
4682418 Tuss et al. Jul 1987 A
4693175 Hashimoto Sep 1987 A
4694736 Yamagata et al. Sep 1987 A
4731961 Bona Mar 1988 A
4820931 Dunbar Apr 1989 A
4850268 Saito et al. Jul 1989 A
4860420 Cadwell, Jr. Aug 1989 A
4869156 Hutton Sep 1989 A
4883512 Griffis Nov 1989 A
4923352 Tamura et al. May 1990 A
5029518 Austin Jul 1991 A
5058491 Wiemer et al. Oct 1991 A
5096477 Shinoda et al. Mar 1992 A
5125203 Daw Jun 1992 A
5128855 Hilber et al. Jul 1992 A
5152814 Nelson Oct 1992 A
5163517 Kozai et al. Nov 1992 A
5195922 Genco Mar 1993 A
5207035 Fowler May 1993 A
5256105 Austin Oct 1993 A
5259812 Kleinsek Nov 1993 A
5279632 Decker et al. Jan 1994 A
5326316 Hashimoto et al. Jul 1994 A
5344365 Scott et al. Sep 1994 A
5350336 Chen et al. Sep 1994 A
5474411 Schoenfeld et al. Dec 1995 A
5511594 Brennan et al. Apr 1996 A
5562539 Hashimoto et al. Oct 1996 A
5626786 Huntington et al. May 1997 A
5641354 Sakauchi et al. Jun 1997 A
5656491 Cassani et al. Aug 1997 A
5706846 Sutton Jan 1998 A
5713791 Long et al. Feb 1998 A
5735639 Payne et al. Apr 1998 A
5752985 Nagafune et al. May 1998 A
5795356 Leveen Aug 1998 A
5941846 Duffy et al. Aug 1999 A
6044596 Driggett Apr 2000 A
6132309 Panelli Oct 2000 A
6179358 Hirayama Jan 2001 B1
6179522 Sanford et al. Jan 2001 B1
6196514 Kienholz Mar 2001 B1
6304005 Aoki et al. Oct 2001 B1
6360494 Emerson Mar 2002 B1
6394523 Yoo et al. May 2002 B1
6397755 Kamler Jun 2002 B1
6450411 Rash et al. Sep 2002 B1
6512384 Lagowski et al. Jan 2003 B1
6602128 Spengler Aug 2003 B1
6602457 Lee et al. Aug 2003 B1
6634149 Cates et al. Oct 2003 B2
6688055 Lindsley Feb 2004 B2
6869457 Nakagawa Mar 2005 B2
6925761 De La Marche Aug 2005 B1
6960236 Tamura et al. Nov 2005 B1
6969102 Orischak et al. Nov 2005 B2
7022009 Kim Apr 2006 B2
7083515 Rapisarda et al. Aug 2006 B2
7160717 Everett Jan 2007 B2
7162833 Faris Jan 2007 B2
7222246 Pomaranski et al. May 2007 B2
7272733 Pomaranski et al. Sep 2007 B2
7323025 Weidner Jan 2008 B2
7326355 Graetz et al. Feb 2008 B2
7472513 Bula Jan 2009 B2
7511960 Hillis et al. Mar 2009 B2
7527664 Jackson May 2009 B2
7586420 Fischer et al. Sep 2009 B2
7707931 Garrett et al. May 2010 B2
7724513 Coglitore et al. May 2010 B2
7827738 Abrams et al. Nov 2010 B2
7861102 Ranganathan et al. Dec 2010 B1
7934124 Bechtolsheim et al. Apr 2011 B2
7985382 Henry et al. Jul 2011 B1
8001730 Wallance Aug 2011 B2
8061080 Loebl et al. Nov 2011 B2
8065560 Patil Nov 2011 B1
8147301 Ghattas Apr 2012 B2
8239340 Hanson Aug 2012 B2
8322086 Weber Dec 2012 B2
8371912 Ozeki Feb 2013 B2
8397441 Wallance Mar 2013 B2
8479038 Patil Jul 2013 B1
8584349 Scannon et al. Nov 2013 B2
8656670 Mouzannar Feb 2014 B2
8826600 Wallance Sep 2014 B2
8854349 Eom Oct 2014 B2
9115504 Wallance Aug 2015 B2
9187894 Zadok et al. Nov 2015 B2
9353543 Lam May 2016 B2
9518748 Holtz et al. Dec 2016 B2
9671798 Hodge et al. Jun 2017 B2
9765980 Holtz et al. Sep 2017 B2
9795957 Holtz et al. Oct 2017 B2
10006218 Marinoni Jun 2018 B2
10161147 Jornitz Dec 2018 B2
10371394 Wernimont et al. Aug 2019 B2
10371411 Cursetjee Aug 2019 B2
10654036 Holtz et al. May 2020 B2
11492795 Williams et al. Nov 2022 B2
20020174888 Brown Nov 2002 A1
20030045226 Yokoyama et al. Mar 2003 A1
20030140555 Saether Jul 2003 A1
20040159051 Lam Aug 2004 A1
20040194484 Zou et al. Oct 2004 A1
20050082445 Groves Apr 2005 A1
20050091916 Faris May 2005 A1
20050124010 Short et al. Jun 2005 A1
20050154494 Ahmed Jul 2005 A1
20050193643 Pettus Sep 2005 A1
20060107635 Homan et al. May 2006 A1
20060217056 Gomi et al. Sep 2006 A1
20060234621 Desrochers et al. Oct 2006 A1
20070039260 Haddad Feb 2007 A1
20070089854 Jaisinghani Apr 2007 A1
20070130844 Arts et al. Jun 2007 A1
20070132262 Chui Peng Sun et al. Jun 2007 A1
20070167126 Ghattas Jul 2007 A1
20070228692 Kern et al. Oct 2007 A1
20070251145 Brusatore Nov 2007 A1
20070253831 Lee Nov 2007 A1
20080005976 Montaigne Jan 2008 A1
20080047207 Lam Feb 2008 A1
20080047224 Lam Feb 2008 A1
20080086980 Martin Apr 2008 A1
20080201008 Twelves et al. Aug 2008 A1
20080302004 Lin Dec 2008 A1
20090122533 Brukilacchio May 2009 A1
20090126285 Suh et al. May 2009 A1
20090199470 Capen et al. Aug 2009 A1
20090305626 Hope Dec 2009 A1
20100031564 Loebl et al. Feb 2010 A1
20100112677 Onishi et al. May 2010 A1
20100112926 Ozeki May 2010 A1
20100192493 Nakai Aug 2010 A1
20100251677 Franck Oct 2010 A1
20100304658 Grcevic Dec 2010 A1
20110053486 Holtz et al. Mar 2011 A1
20110217917 Sulva Sep 2011 A1
20110219953 Schreiber Sep 2011 A1
20110258837 Scannon et al. Oct 2011 A1
20120077429 Wernimont et al. Mar 2012 A1
20120099035 Burgess Apr 2012 A1
20120152800 Parzy et al. Jun 2012 A1
20120181869 Chapel et al. Jul 2012 A1
20130109291 Holtz et al. May 2013 A1
20140179216 Walters Jun 2014 A1
20150101264 Jornitz Apr 2015 A1
20150101265 Nyce et al. Apr 2015 A1
20150159127 Guerini et al. Jun 2015 A1
20160010883 Jornitz et al. Jan 2016 A1
20160010884 Holtz et al. Jan 2016 A1
20170030097 Marinoni Feb 2017 A1
20170260763 Fortin et al. Sep 2017 A1
20180043347 Holtz et al. Feb 2018 A1
20190145118 Gauthier et al. May 2019 A1
20200146186 Fotouh May 2020 A1
Foreign Referenced Citations (44)
Number Date Country
1373824 Oct 2002 CN
201281413 Jul 2009 CN
102884256 Jan 2013 CN
105723036 Jun 2016 CN
107002408 Aug 2017 CN
107371371 Nov 2017 CN
108884673 Nov 2018 CN
8913876 Mar 1990 DE
4007740 Sep 1991 DE
0940292 Sep 1999 EP
2098111 Sep 2009 EP
3263789 Jan 2018 EP
3274524 Jan 2018 EP
2819536 Jul 2002 FR
61101733 May 1986 JP
02209526 Aug 1990 JP
06174279 Jun 1994 JP
06183511 Jul 1994 JP
09296944 Nov 1997 JP
10077711 Mar 1998 JP
11166269 Jun 1999 JP
2000054654 Feb 2000 JP
2000142211 May 2000 JP
2001141274 May 2001 JP
2002221464 Aug 2002 JP
2004033498 Feb 2004 JP
2004233021 Aug 2004 JP
2007107779 Apr 2007 JP
2007107830 Apr 2007 JP
2007198666 Aug 2007 JP
2008304989 Dec 2008 JP
2009002634 Jan 2009 JP
20060130383 Dec 2006 KR
100675682 Feb 2007 KR
200912219 Mar 2009 TW
0002618 Jan 2000 WO
WO-0017462 Mar 2000 WO
03095765 Nov 2003 WO
2004005170 Jan 2004 WO
2007067656 Jun 2007 WO
2008018671 Feb 2008 WO
2011022325 Feb 2011 WO
2013132086 Sep 2013 WO
2018006184 Jan 2018 WO
Non-Patent Literature Citations (13)
Entry
“Clean-Room Products and Equipment”, Medical Device Technology, vol. 16, Online Available at: http://search.proquest.com/docview/195254246?accountid =142944, Jan.-Feb. 2005, pp. 43-44.
“Fast-Track Clean Room Building”, European Semiconductor, vol. 14, No. 3, Mar. 1992, pp. 43-45.
“Hardwall Cleanroom”, HDW Series, Abtech Incorporated, p. 8.
“Pharmadule Doubles Production Capacity and Acquires Patent for Modular Biotech Plants”, Pharmadule Press Release, Available Online at: http://www.pharmadule.com/pharmaduledoubles-production-capacity, Sep. 26, 2002, 1 page.
“Pneumatic Powered Load Moving Systems—Air Bearing Principle”, Hovair Systems, Available Online at: https://web. archive. o rg/web/20080521 025052/http ://www. hovai r. com/air-bearing -info/features-and-benefits. htm, May 21, 2008, 3 pages.
“Starrco Brochure”, Cleanroom Solutions, 4 pages.
“Vanguard Modular Building Systems Brochure”, Astra-Zeneca Pharmaceutical Building, Dec. 9, 2004, 2 pages.
Muth , “Modular Construction: Pros and Cons for the Lab Building”, Laboratory Design, Research and Development Magazine, Jun. 17, 2009, 5 pages.
Oliviera , “Factory in a Clean Room”, Quality Progress, Milwaukee, vol. 23, No. 1, Available Online at: https://search.proquest.com/docview/214764942?accountid=142944, Jan. 1990, pp. 37-39.
Watkins , “Clean Rooms: Their Performance and Design”, Journal of Semi-Custom Integrated Circuits, vol. 2, No. 3, Mar. 1985, pp. 36-41.
PCT/US2021/046271 , “International Search Report and Written Opinion”, dated Nov. 29, 2021, 10 pages.
PCT/US2020/046143 , “International Preliminary Report on Patentability”, dated Feb. 24, 2022, 8 pages.
PCT/US2020/046143 , “International Search Report and Written Opinion”, dated Dec. 2, 2020, 10 pages.
Related Publications (1)
Number Date Country
20210047828 A1 Feb 2021 US
Provisional Applications (1)
Number Date Country
62887303 Aug 2019 US