The present invention relates to a resonant switching power converter; particularly, it relates to such resonant switching power converter which is capable of performing discharging operation in an a sequential order.
Please refer to
In view of the above, to overcome the drawbacks in the prior art, the present invention proposes an innovated power converter.
From one perspective, the present invention provides a resonant switching power converter, which is configured to operably convert an input voltage to an output voltage. The resonant switching power converter comprises: a plurality of capacitors; a plurality of switches, which are coupled to the plurality of capacitors; at least one charging inductor, which is connected in series to at least one of the plurality of capacitors; at least one discharging inductor, which is connected in series to at least one of the plurality of capacitors; and a controller, which is configured to operably generate a charging operation signal corresponding to a charging process and a plurality of discharging operation signals corresponding to a plurality of discharging processes, so as to operate the plurality of switches, so that the plurality of switches switch electrical connection relationships of the plurality of capacitors. Each of the charging operation signal and the discharging operation signals has a respective ON period, wherein the ON periods do not overlap one another, so that the charging process and the plurality of discharging processes do not overlap one another. In the charging process, the controller is configured to operably control the switching of the switches via the charging operation signal, so that a series connection of the capacitors and the at least one charging inductor is formed between the input voltage and the output voltage, which forms a charging path. In in each discharging process, the controller is configured to operably control the switching of the switches via a corresponding one of the discharging operation signals, so that a series connection of a corresponding one of the capacitors and a corresponding one of the at least one discharging inductor is formed between the output voltage and a ground voltage level, which forms a discharging path in each respective discharging process. Thus, a plurality of discharging paths are formed in a sequential order in the plurality of discharging processes. The charging process and the plurality of discharging processes are arranged in a repeated, alternating manner, so as to convert the input voltage to the output voltage.
In one embodiment, the resonant switching power converter further comprises: a zero current detection circuit coupled between the controller and the output voltage, wherein the zero current detection circuit is configured to operably detect a charging resonant current in the charging process or detect a discharging resonant current in the plurality of discharging processes, wherein when the zero current detection circuit detects that a level of the charging resonant current or a level of the discharging resonant current is zero, the zero current detection circuit is configured to operably generate a zero current detection signal, which is inputted into the controller.
In one embodiment, the zero current detection circuit includes: a current sensing circuit, which is configured to operably sense the charging resonant current in the charging processes or sense the discharging resonant current in the plurality of discharging processes, so as to generate a current sensing signal; and a comparison circuit, which is configured to operably compare the current sensing signal with a reference signal, so as to generate the zero current detection signal.
In one embodiment, the resonant switching power converter further comprises: a plurality of switch drivers, each of which is coupled between the controller and a corresponding one of the switches, wherein each switch driver is configured to operably control the corresponding switch according to the charging operation signal or the corresponding discharging operation signal.
In one embodiment, after the plurality of discharging processes in a present cycle have completed, a following charging process in a next cycle begins after a delay interval from the completion of the plurality of present discharging processes in the present cycle, wherein all of the switches that operate in the charging and discharging processes are nonconductive during the delay interval.
In one embodiment, the at least one charging inductor is one single charging inductor and the at least one discharging inductor is one single discharging inductor.
In one embodiment, an inductance of the single charging inductor is equal to an inductance of the single discharging inductor.
In one embodiment, the at least one charging inductor and the at least one discharging inductor is one same single inductor.
In one embodiment, the one same single inductor is a variable inductor.
In one embodiment, in the charging process and in the plurality of discharging processes, the resonant switching power converter changes a voltage conversion ratio of the input voltage to the output voltage by keeping at least one of the plurality of switches to be ON and keeping at least two of the plurality of switches to be OFF.
In one embodiment, the charging process has a charging resonant frequency, whereas, the plurality of discharging processes have a discharging resonant frequency, and wherein the charging resonant frequency is identical to the discharging resonant frequency.
In one embodiment, the charging process has a charging resonant frequency, whereas, the plurality of discharging processes have a discharging resonant frequency, and wherein the charging resonant frequency is different from the discharging resonant frequency.
In one embodiment, zero voltage switching is achieved by adjusting a duration period of the charging process.
In one embodiment, zero voltage switching is achieved by adjusting at least one duration period of the discharging processes.
In one embodiment, the resonant switching power converter is a bidirectional resonant switching power converter.
In one embodiment, a voltage conversion ratio of the input voltage to the output voltage of the resonant switching power converter is 4:1, 3:1 or 2:1.
In one embodiment, in the charging process, turned-ON time points and turned-OFF time points of the switches operating in the charging process are synchronous with a start time point and an end time point of a positive half wave of a charging resonant current of the charging process, so that zero current switching is achieved.
In one embodiment, in the plurality of discharging processes, turned-ON time point and turned-OFF time point of the switches operating in the plurality of discharging processes are synchronous with the start time point and the end time point of a positive half wave of a discharging resonant current of one of the plurality of discharging processes, so that zero current switching is achieved.
One advantage of the present invention is that the present invention can eliminate the issue of unwanted inrush current and the issue of unwanted circulation current.
Further advantages of the present invention include that: the present invention can achieve soft switching such as zero current switching and/or zero voltage switching by simpler control mechanism, and the present invention can compensate device parameter variations controlled by the DC bias voltage or operation temperature.
Still other advantages of the present invention include that: the present invention can reduce switching frequency, to improve light load efficiency; the present invention achieves better current voltage balance; the present invention can support a voltage conversion ratio (input voltage to output voltage) of the resonant switching power converter to be 3:1 or above.
The objectives, technical details, features, and effects of the present invention will be better understood with regard to the detailed description of the embodiments below, with reference to the attached drawings.
The drawings as referred to throughout the description of the present invention are for illustration only, to show the interrelations between the circuits and the signal waveforms, but not drawn according to actual scale of circuit sizes and signal amplitudes and frequencies.
Please refer to
As shown in
The controller 201 is configured to operably generate a charging operation signal G1 corresponding to a charging process and discharging operation signals G2, G3 and G4 corresponding to plural discharging processes, so as to operate the switches Q1-Q10, so that the switches Q1-Q10 respectively switch electrical connection relationships of the corresponding capacitors C1-C3. Zero current detection circuit 202 is coupled between the controller 201 and the output voltage Vout. The zero current detection circuit 202 is configured to operably detect a charging resonant current IL1 flowing through a node between the charging inductor L1 and the output voltage Vout in the charging process or detect a discharging resonant current IL2 flowing through anode between the discharging inductor L2 and the output voltage Vout in the discharging processes. When the zero current detection circuit 202 detects that a level of the charging resonant current IL1 or a level of the discharging resonant current IL2 is zero, the zero current detection circuit 202 is configured to operably generate a zero current detection signal, which is inputted into the controller 201. In this embodiment, the zero current detection circuit 202 includes a current sensing circuit 2021, which is configured to operably sense the charging resonant current IL1 in the charging processes or sense the discharging resonant current IL2 in the discharging processes. The zero current detection circuit 202 further includes a comparison circuit 2022, which is configured to operably compare the sensed charging resonant current IL1 or discharging resonant current IL2 with a reference signal Vref1, so as to generate the zero current detection signal. The switch drivers 203 are coupled between the controller 201 and the corresponding switches Q1-Q10. Each switch driver 203 is configured to operably control a corresponding one of the switches Q1-Q10 according to the charging operation signal G1 or the corresponding discharging operation signals G2, G3 and G4.
The switches Q1-Q10 are controlled by the switch drivers 203 to respectively switch electrical connection relationships of the capacitors C1-C3 with the charging inductor L1 and the discharging inductor L2 according to the charging operation signal G1 and the discharging operation signals G2, G3 and G4 generated by the controller 201. In one embodiment, the charging operation signal G1 and the discharging operation signals G2, G3 and G4 have respective ON periods and these plural ON periods do not overlap one another. In a charging process, according to the charging operation signal G1, the switches Q1-Q4 are controlled to be ON, whereas, the switches Q5-Q10 are controlled to be OFF, so that a series connection of the capacitors C1-C3 and the charging inductor L1 is formed between the input voltage Vin and the output voltage Vout, which forms a charging path. In plural discharging processes, according to the discharging operation signals G2, G3 and G4, the switches Q5-Q10 are respectively controlled to be ON in turn, whereas, the switches Q1-Q4 are controlled to be OFF, so that the capacitors C1, C2 and C3 are respectively connected in series to the discharging inductor L2 in a sequential order, to form plural discharging paths. That is, one discharging path is formed in a corresponding one of the plural discharging processes, in a sequential order. For example, during a first time interval, according to the discharging operation signal G2, the switches Q5 and Q8 are controlled to be ON, whereas, the switches Q1-Q4, Q6-Q7 and Q9-Q10 are controlled to be OFF, so that a series connection of the capacitor C1 and the discharging inductor L2 is formed between the output voltage Vout and the ground voltage level, which forms a discharging path. During a second time interval, according to the discharging operation signal G3, the switches Q6 and Q9 are controlled to be ON, whereas, the switches Q1-Q5, Q7, Q8 and Q10 are controlled to be OFF, so that a series connection of the capacitor C2 and the discharging inductor L2 is formed between the output voltage Vout and the ground voltage level, which forms another discharging path. During a third time interval, according to the discharging operation signal G4, the switches Q7 and Q10 are controlled to be ON, whereas, the switches Q1-Q6 and Q8-Q9 are controlled to be OFF, so that a series connection of the capacitor C3 and the discharging inductor L2 is formed between the output voltage Vout and the ground voltage level, which forms still another discharging path.
It is noteworthy that, in one embodiment, the above-mentioned charging process and the above-mentioned plural discharging processes are arranged at different periods in a repeated, alternating manner. That is, the above-mentioned charging process and the above-mentioned plural discharging processes are not performed at the same time. In one embodiment, the charging process and each one of the discharging processes are arranged in a repeated, alternating manner, so as to convert the input voltage Vin to the output voltage Vout. In this embodiment, the DC bias voltages of the capacitors C1, C2 and C3 all have a level of Vo. Hence, as compared to the prior art, under the same level of the input voltage and the same level of the output voltage, the capacitors C1, C2 and C3 of the present invention will only need to withstand a relatively lower rated voltage. Hence, the present invention can use capacitors having a smaller size.
In one embodiment, the charging resonant frequency of the above-mentioned charging process is identical to the discharging resonant frequency of the above-mentioned discharging process. In one embodiment, the charging resonant frequency of the above-mentioned charging process is different from the discharging resonant frequency of the above-mentioned discharging process. In one embodiment, the above-mentioned resonant switching power converter 20 can be a bidirectional resonant switching power converter. As one of average skill in the art readily understands, in a “bidirectional resonant switching power converter”, the input terminal (which is coupled to the input voltage Vin) and the output terminal (which is coupled the output voltage Vout) are interchangeable. That is, in the embodiment shown in
In one embodiment, the duration period (Ton1) of the above-mentioned charging process is correlated with the charging resonant frequency (fr1) of the above-mentioned charging process. In one embodiment, the duration period (Ton1) of the above-mentioned charging process is correlated with a positive half wave of a charging resonant current of the charging process. For example, turned-ON time points and turned-OFF time points of the switches Q1-Q4 are substantially synchronous with a start time point and an end time point of the positive half wave of the charging resonant current of the charging process. In one embodiment, the duration period (Ton2) of the above-mentioned discharging process is correlated with the discharging resonant frequency (fr2) of the above-mentioned discharging process. In one embodiment, the duration period (Ton2) of the above-mentioned plural discharging processes is correlated with a positive half wave of a discharging resonant current of the plural discharging processes. For example, turned-ON time points and turned-OFF time points of the switches Q5-Q10 are substantially synchronous with a start time point and an end time point of the positive half wave of the discharging resonant current of each respective discharging process.
In the embodiment wherein the charging resonant frequency (fr1) of the above-mentioned charging process is equal to the discharging resonant frequency (fr2) of each of the above-mentioned respective discharging processes, when the duration period (Ton1) of the above-mentioned charging process is equal to the duration period (Ton2) of each of the above-mentioned discharging processes (e.g., when the duration period (Ton1) of the above-mentioned charging process is equal to 25% of the cycle period, i.e., duty ratio=25%), the switches can be switched at a time point when the currents flowing through the switches are at a relatively lower level of their respective positive half waves, so that soft switching can be achieved. In one embodiment, zero current switching (ZCS) can be achieved.
Note that although it is preferred for the duration period of the charging process to be equal to the duration period of each of the discharging processes (in this embodiment this means that the duration period of the charging process is equal to 25% of the cycle period, i.e. duty ratio=25%), so that zero current switching can be achieved, however due to non-idealities controlled by for example imperfection of components or imperfect matching among components, the duration period of the charging process may not be exactly equal to 25% of the cycle period, but just close to 25% of the cycle period. In other words, according to the present invention, a certain level of error between the duration period of the charging process and 25% of the cycle period is acceptable, and therefore the term “substantially” is used to mean that an insignificant error within a tolerable range is acceptable. The term “substantially” used elsewhere in this specification also mean that an insignificant error within a tolerable range is acceptable.
In one embodiment, the duration period of the above-mentioned charging process is smaller than 25% of the cycle period by a predetermined period. Thus, after the first switches Q1-Q4 have been turned OFF, a little amount of current remains, which flows through the charging inductor L1 to take away accumulated charges stored in a parasitic capacitor of the switch Q10 via the parasitic diode of the first switch Q4, so that the voltage across the first switch Q10 can be reduced, thus achieving soft switching. In one embodiment, zero voltage switching (ZVS) can be achieved by adjusting the predetermined period. In one embodiment, the duration period of a last one of the above-mentioned plural discharging processes is greater than a specific ratio of the cycle period by a predetermined period. For example, the duration period of the above-mentioned discharging process is greater than 50% of the cycle period by a predetermined period. Thus, during the delayed turned-OFF period of the first switches Q5-Q10, a negative current of the discharging inductor L2 will flow through a parasitic diode of the first switch Q5, to charge a parasitic capacitor of the first switch Q1. As a result, the voltage across the first switch Q1 will be reduced, for achieving soft switching. In one embodiment, zero voltage switching (ZVS) can be achieved by adjusting the predetermined period.
Let it be assumed that C1=C2=C3=C. The charging resonant frequency (fr1) of the above-mentioned charging process and the respective discharging resonant frequency (fr2) of the above-mentioned respective discharging processes can be represented by the following equations:
Besides, it is desired to achieve fr1=fr2 (as described above), so the following equation can be obtained through combining the equation (1) and the equation (2).
Accordingly, the inductance of the charging inductor L1 and the inductance of the discharging inductor L2 should meet the following equation:
L2=⅓L1 (3)
That is, if it is intended to ensure that the charging resonant frequency (fr1) of the above-mentioned charging process is equal to the discharging resonant frequency (fr2) of the above-mentioned discharging process (i.e., if it is intended to ensure fr1=fr2), the inductance of the charging inductor L1 and the inductance of the discharging inductor L2 should be designed to comply with the relationship addressed in the equation (3).
In another embodiment, in a case where the inductance of the charging inductor L1 is equal to the inductance of the discharging inductor L2 and in a case where it is assumed that C1=C2=C3=C, the equation (1) and equation (2) can be rewritten and represented by the following equations:
According to the above-mentioned equations, it can be realized that in a case where the inductance of the charging inductor L1 is equal to the inductance of the discharging inductor L2, the charging resonant frequency is not equal to the discharging resonant frequency. Under such situation, if it is intended to achieve ZCS, the duration period (Ton1) should be set as a half period of the corresponding charging resonant frequency (fr1) should be set as a half period of the corresponding charging resonant frequency (fr1) and the duration period (Ton2) should be set as a half period of the corresponding discharging resonant frequency (fr2), which can be represented by the following equations:
If it is intended to achieve ZCS, in light of the above-mentioned equations, the duration period (Ton1) and the duration period (Ton2) should comply with the following relationship:
That is, in a case where the inductance of the charging inductor L1 is equal to the inductance of the discharging inductor L2, the duration period (Ton2) of the discharging process should be set as being √{square root over (3)} a times of the duration period (Ton1) of the charging process. That is, if the duration period (Ton1) of the charging process is substantially equal to 16% of the cycle period, whereas, the duration period (Ton2) of the discharging process is substantially equal to 28% of the cycle period, zero current switching is still achievable.
In a specific preferred embodiment, the charging inductor L1 and the discharging inductor L2 can be one same single inductor, which functions as the charging inductor and the discharging inductor at different periods, respectively.
Please refer to
It is noteworthy that, in this embodiment, the charging inductor and the discharging inductor is one same single inductor L3. In the plural discharging processes, through switching the switches Q1-Q10, the capacitors C1-C3 are respectively connected in series to the same single inductor L3 in a sequential order. As one of average skill in the art readily understands, when the charging inductor and the discharging inductor is one same single inductor L3, the charging resonant current and discharging resonant current flow through one single inductor L3 during the charging process and the plural discharging processes, respectively, but neither the charging resonant current IL3 nor the discharging resonant current IL3 flows through any other inductor. In one embodiment, the inductor L3 can be a variable inductor.
As shown in
The switches Q1-Q10 are controlled by the switch drivers 303 to respectively switch electrical connection relationships between the corresponding capacitors C1-C3 and the inductor L3 according to the charging operation signal G1 and the discharging operation signals G2, G3 and G4 generated by the controller 301. In one embodiment, the charging operation signal G1 and the discharging operation signals G2, G3 and G4 have respective ON periods and these plural ON periods do not overlap one another. Please refer to
Please refer to
In the embodiment where the charging inductor and the discharging inductor are implemented as one same single inductor L1, zero current switching (ZCS), which is one form of soft switching, can be achieved by properly arranging a ratio of the duration period (Ton1) of the above-mentioned charging process to the duration period (Ton2) of the above-mentioned discharging process according to the above-mentioned equations. To be more specific, in one embodiment, the duration period of the above-mentioned charging process can be substantially equal to for example 16% of the cycle period (i.e. duty ratio=16%). the switches can be switched at a time point when the currents flowing through the switches are at a relatively lower level of their respective positive half waves, so that soft switching can be achieved. In one embodiment, zero current switching (ZCS) can be achieved. In one embodiment, the duration period of the above-mentioned charging process is smaller than 16% of the cycle period by a predetermined period. Thus, after the first switches Q1-Q4 have been turned OFF, a little amount of current remains, which flows through the inductor L3 to take away accumulated charges stored in a parasitic capacitor of the switch Q10 via the parasitic diode of the first switch Q4, so that the voltage across the first switch Q10 can be reduced, thus achieving soft switching. In one embodiment, zero voltage switching (ZVS) can be achieved by adjusting the predetermined period. In one embodiment, the duration period of a last one of the above-mentioned plural discharging processes is greater than 28% of the cycle period by a predetermined period. Thus, during the delayed turned-OFF period of the first switches Q5-Q10, a negative current of the inductor L3 will flow through a parasitic diode of the first switch Q5, to charge a parasitic capacitor of the first switch Q1. As a result, the voltage across the first switch Q1 will be reduced, for achieving soft switching. In one embodiment, zero voltage switching (ZVS) can be achieved by adjusting the predetermined period.
In one embodiment, the above-mentioned resonant switching power converter 30 can be a bidirectional resonant switching power converter. In one embodiment, a voltage conversion ratio of the input voltage Vin to the output voltage Vout of the above-mentioned resonant switching power converter 30 is 4:1, 3:1 or 2:1. In one embodiment, a voltage conversion ratio of the above-mentioned resonant switching power converter 30 can be flexibly adjusted. For example, in the charging process and in the discharging process, by keeping the switch Q7 to be always ON keeping causing the switches Q4 and Q10 to be always OFF, the voltage conversion ratio of the resonant switching power converter 30 can be adjusted to 3:1. For another example, in the charging process and in the discharging process, by keeping the switch Q6 to be always ON while keeping the switches Q9, Q3, Q7, Q4 and Q10 to be always OFF, the voltage conversion ratio of the resonant switching power converter 30 can be adjusted to 2:1.
Please refer to
Please refer to
Please refer to
It is noteworthy that, as one of average skill in the art readily understands, when “turned-ON time points and turned-OFF time points of the switches are substantially synchronous with a start time point and an end time point of the positive half wave of the charging resonant current of the charging process”, it means that: the turned-ON time points and turned-OFF time points of the switches coincide with the start time point and the end time point of the positive half wave of the charging resonant current of the charging process, respectively, or, there is a constant interval between the turned-ON time points of the switches and the start time point of the positive half wave of the charging resonant current of the charging process, and between the turned-OFF time points of the switches and the end time point of the positive half wave of the charging resonant current of the charging process. When “turned-ON time points and turned-OFF time points of the switches are substantially synchronous with a start time point and an end time point of the positive half wave of the discharging resonant current of the discharging process”, it means that: the turned-ON time points and turned-OFF time points of the switches coincide with the start time point and the end time point of the positive half wave of the discharging resonant current of the discharging process, respectively, or, there is a constant interval between the turned-ON time points of the switches and the start time point of the positive half wave of the discharging resonant current of the discharging process, and between the turned-OFF time points of the switches and the end time point of the positive half wave of the discharging resonant current of the discharging process.
The present invention provides a resonant switching power converter as described above. The present invention has the following merits that: the present invention can eliminate the issue of undesired inrush current and circulation current; the present invention can achieve soft switching such as zero current switching and/or zero voltage switching; the present invention can compensate device parameter variations (e.g., variation in capacitance) caused by a DC bias voltage or operation temperature; the present invention can reduce switching frequency, so as to improve light load efficiency; the present invention achieves better current voltage balance; the present invention can provide a resonant switching power converter having a voltage conversion ratio of the input voltage to the output voltage which is equal to 3:1 or above.
The present invention has been described in considerable detail with reference to certain preferred embodiments thereof. It should be understood that the description is for illustrative purpose, not for limiting the scope of the present invention. An embodiment or a claim of the present invention does not need to achieve all the objectives or advantages of the present invention. The title and abstract are provided for assisting searches but not for limiting the scope of the present invention. Those skilled in this art can readily conceive variations and modifications within the spirit of the present invention. For example, to perform an action “according to” a certain signal as described in the context of the present invention is not limited to performing an action strictly according to the signal itself, but can be performing an action according to a converted form or a scaled-up or down form of the signal, i.e., the signal can be processed by a voltage-to-current conversion, a current-to-voltage conversion, and/or a ratio conversion, etc. before an action is performed. It is not limited for each of the embodiments described hereinbefore to be used alone; under the spirit of the present invention, two or more of the embodiments described hereinbefore can be used in combination. For example, two or more of the embodiments can be used together, or, a part of one embodiment can be used to replace a corresponding part of another embodiment. In view of the foregoing, the spirit of the present invention should cover all such and other modifications and variations, which should be interpreted to fall within the scope of the following claims and their equivalents.
Number | Date | Country | Kind |
---|---|---|---|
109131757 | Sep 2020 | TW | national |
The present invention claims priority to U.S. 63/029,714 filed on May 26, 2020 and claims priority to TW 109131757 filed on Sep. 15, 2020.
Number | Name | Date | Kind |
---|---|---|---|
9831776 | Jiang et al. | Nov 2017 | B1 |
9917517 | Jiang et al. | Mar 2018 | B1 |
20090097280 | Wu et al. | Apr 2009 | A1 |
20210175805 | Mercer | Jun 2021 | A1 |
20210288581 | Zhu | Sep 2021 | A1 |
Number | Date | Country | |
---|---|---|---|
20210376717 A1 | Dec 2021 | US |
Number | Date | Country | |
---|---|---|---|
63029714 | May 2020 | US |