Abstract
A retrofit reinforcing structure addition and method for an existing gravity spread foundation for a wind turbine or the like having a central pedestal and a spread section is provided. The retrofit structure addition includes a collar formed around the pedestal of the spread foundation. The collar is formed by a shape sustaining member, such as a CMP, placed around the pedestal to define an annular ring between the CMP and the pedestal that is filled with cementitious material. Radial bolts extend horizontally through the collar and into the side of the pedestal. Soil and/or rock anchor bolts extend vertically through the collar, the spread portion of the foundation and into the underlying soil and/or rock substrate. The radial and anchor bolts are post-tensioned to ensure that the cementitious material of the collar remains in compression and the bolts are always in static tension, strengthening the original gravity spread foundation and extending the fatigue life thereof.
Description
BACKGROUND OF THE INVENTION
Field of the Invention

The present invention is related to the field of foundations for the support of tall, heavy and/or large towers and, more particularly, to a retrofit structure addition and method for reinforcing existing concrete gravity spread foundations currently used to support wind turbines and similar structures, especially those foundations which have failed or are failing due to long term dynamic fatigue.


Description of the Related Art

Concrete gravity spread foundations are often used to support turbines in the 1.5 megawatt (MW) range of which there are several thousand in the U.S. Conventional gravity spread foundation construction relies on reinforced concrete theory and designs which is inappropriate for very dynamic structures like a wind turbine. As a result, these gravity spread foundations are susceptible to long term fatigue failures which can result in collapse of the foundation. Such collapses have been known to occur after as few as 8 to 13 years, well before the expiration of turbine life which is on the order of 20-25 years or more. Therefore, there is a need for a structure and method by which gravity spread foundations may be reinforced to extend their fatigue life well beyond the turbine life.


SUMMARY OF THE INVENTION

In view of the foregoing, the present invention is directed to a retrofit spread foundation reinforcing structure and method for restoring the integrity of existing gravity spread foundations and extending the useful life thereof. The retrofit spread foundation reinforcing structure includes a generally cylindrical shape sustaining member forming an annular cementitious reinforcing collar addition positioned around the central pedestal and above the expanded base or horizontal spread section of an original gravity spread foundation. The shape sustaining member forming the annular collar addition may be embodied as a corrugated metal pipe (CMP) having a diameter greater than the diameter of the pedestal. A ring of cementitious material is poured into and fills the annular area between the outer side of the central pedestal and the surrounding shape sustaining member or CMP. The collar addition thus fully encircles and confines the central pedestal with the base of the collar pressing against the upper surface of the horizontal spread section of the already existing spread foundation adjacent to the engaging interface between the bottom of the pedestal and the top of the spread foundation below the pedestal. A plurality of radially extending bolts extend horizontally through the CMP and cementitious ring of the collar and into the pedestal of the original foundation. Soil and/or rock anchor bolts are placed to extend vertically from the top of the cementitious ring of the collar addition down through the horizontal spread section and into the underlying soil and/or rock substrate beneath the spread section. The terms “soil and/or rock anchor bolts” or “anchor bolts” are used herein for ease of description and are understood by those skilled in the art to include tensioning and/or connecting anchors embodied as bolts as well as anchors having tensioning and/or connecting components other than bolts.


The radial bolts and soil and/or rock anchor bolts are post-tensioned in the manner described in my earlier patents, U.S. Pat. Nos. 7,533,505, 5,826,387, 6,672,023, and 7,155,875, all of which are hereby incorporated by reference in their entirety as if fully set forth herein and sometimes are referred to herein as “my prior patents”, to place the entire foundation under high unit compression loading in both the horizontal and vertical directions which strengthens the cold joint interface between the pedestal and the spread section. The soil and/or rock anchor bolts are tightened so as to exceed the maximum uplift expected from overturning forces of the wind turbine structure on the foundation. As a result, the entire foundation with the reinforcing collar addition is able to withstand the various loads with the concrete thereof always remaining in compression and the bolts always in static tension.


Accordingly, it is an object of the present invention to provide a retrofit spread foundation reinforcing structure addition and method that restores the integrity of existing gravity spread foundations and extends the useful life thereof for many additional years.


Another object of the present invention is to provide a retrofit spread foundation reinforcing structure addition in accordance with the preceding object that includes a reinforcing collar positioned around the central pedestal and above the expanded base or horizontal spread section of a gravity spread foundation.


A further object of the present invention is to provide a retrofit spread foundation reinforcing structure addition in accordance with the preceding objects in which the collar includes a CMP having a diameter greater than an outer diameter of the pedestal to encircle the pedestal, an area between the CMP and the pedestal being filled with cementitious material to define an annular ring bounded on an outer perimeter by the CMP, the base of the collar resting on, or pressing against, the upper surface of the horizontal spread section of the foundation.


Yet a further object of the present invention is to provide a retrofit spread foundation reinforcing structure addition in accordance with the preceding objects that includes post-tensioned soil and/or rock anchor bolts extending vertically from the top of the cementitious annular ring of the collar down through the horizontal spread section of the foundation and into the underlying soil and/or rock substrate.


Still a further object of the present invention is to provide a retrofit spread foundation reinforcing structure addition in accordance with the preceding objects that includes post-tensioned radially extending bolts that extend horizontally through the CMP and annular cementitious collar and into the pedestal of the foundation.


Another object of the present invention is to provide a retrofit spread foundation reinforcing structure addition in accordance with the preceding objects that, when installed on an existing gravity spread foundation, places the retrofit portion of the foundation under high unit compression loading through tightening of the anchor bolts so as to exceed the maximum internal tension expected from overturning forces of the wind turbine structure on the foundation.


Yet another object of the present invention is to provide a retrofit spread foundation reinforcing structure addition in accordance with the preceding objects that may be efficiently installed in support of gravity spread foundations of various configurations.


Still another object of the present invention is to provide a method of installing a retrofit spread foundation reinforcing structure addition in accordance with the preceding objects that includes placement of a CMP around the base of the pedestal of a spread foundation structure and filling the annular area between the CMP and the pedestal with cementitious material to form a collar that encircles and supports the spread foundation pedestal.


Yet a further object of the present invention is to provide a method of installing a retrofit spread foundation reinforcing structure addition in accordance with the preceding objects in which soil and/or rock anchor bolts are installed vertically through the collar and horizontal spread section of the original foundation and into the underlying soil and/or rock substrate either before or after the cementitious material is poured into the annular ring between the CMP and the pedestal to reinforce the cold joint engaging interface between the bottom of the pedestal and the upper surface of the central part of the spread section below the pedestal.


Another object of the present invention is to provide a method of installing a retrofit spread foundation reinforcing structure addition in accordance with the preceding objects in which the anchor bolts are post-tensioned in a specified sequence to place uniform tension on the foundation.


These together with other objects and advantages which will become subsequently apparent reside in the details of construction and operation as more fully hereinafter described and claimed, reference being had to the accompanying drawings forming a part hereof, wherein like numerals refer to like parts throughout.





BRIEF DESCRIPTION OF THE DRAWINGS


FIG. 1 is a front view of a wind turbine supported on a conventional gravity spread foundation with the retrofit spread foundation reinforcing structure addition installed thereon in accordance with the present invention.



FIG. 2 is a sectional side view of one type of conventional concrete gravity spread foundation.



FIG. 3 is a top view of the conventional spread foundation shown in FIG. 2.



FIG. 4 is a sectional side view of the conventional spread foundation shown in FIG. 2 with the retrofit spread foundation reinforcing structure addition installed thereon in accordance with the present invention.



FIG. 5 is a top view of the conventional spread foundation reinforced with the retrofit spread foundation reinforcing structure addition shown in FIG. 4.



FIG. 5A is a side cutaway view of the collar showing the radial bolts and strand hoops.



FIGS. 6A-6C are top cutaway views of each of three respective layers of radial bolts as installed according to the retrofit structure and method of the present invention. FIG. 6D is an isolated top view of the existing spread foundation tower base flange as shown in relationship to the radial bolts in FIGS. 6A-6C.



FIGS. 7A and 7B are side views of the three radial bolt layers shown in FIGS. 6A-6C showing the vertical spacing in their layered configuration as when installed.



FIG. 7C is an enlarged view of a radial bolt like those shown in FIGS. 7A and 7B.



FIG. 7D is an enlarged view of the coupler for the radial bolts shown in FIGS. 7A-7C.



FIG. 8 shows a soil and/or rock anchor bolt in a partial cutaway view of one side of the original foundation as retrofitted with the reinforcing structure addition of the present invention.



FIG. 8A is an enlarged view of the drill hole sleeve and foam fill used when the reinforcing collar is constructed before the anchor bolts are in place.



FIG. 9 is an enlarged view of Detail 9 shown in FIG. 5, without the radial bolts inserted in the radial bolt holes, depicting the manner in which the drill holes for the anchor bolts are spaced from the three radial bolt layers shown in FIGS. 6A-6C, 7A and 7B and staggered radially with respect to each other.



FIG. 10 is a top view of the circumference of the retrofit collar showing the soil and/or rock anchor bolt locations and a preferred sequence order for tensioning the soil and/or rock anchor bolts when installing the collar.





DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

Although only one preferred embodiment of the invention is explained in detail, it is to be understood that the embodiment is given by way of illustration only. It is not intended that the invention be limited in its scope to the details of construction and arrangement of components set forth in the following description or illustrated in the drawings. Also, in describing the preferred embodiments, specific terminology will be resorted to for the sake of clarity. It is to be understood that each specific term includes all technical equivalents which operate in a similar manner to accomplish a similar purpose.


As shown in FIG. 1, the present invention is directed to a foundation collar reinforcing structure addition, generally designated by reference numeral 10, for a conventional existing gravity spread foundation generally designated by reference numeral 12. The gravity spread foundation 12 includes an expanded base or horizontal spread section 14 and a central pedestal 16 upon which a tall and/or heavy tower such as a wind turbine, generally designated by reference numeral 18, is supported. The reinforcing structure addition 10 according to the present invention includes an annular collar 20, positioned around the central pedestal 16 and above the expanded base or horizontal spread section 14 of the gravity spread foundation 12 to confine the pedestal. The reinforcing structure addition 10 also exerts compressive force to strengthen the engaging interface 17 which is a cold joint between the bottom of the pedestal and the top of the central part of the spread section under the pedestal 16.


As shown in isolation in FIGS. 2 and 3, the horizontal spread section 14 of the existing gravity spread foundation 12 extends outwardly on all sides of the pedestal 16 and may be octagonal as shown in FIG. 3, or other shapes such as circular, square and the like. The tower 18 is secured to the pedestal 16 with a plurality of tower anchor bolts 19 that are secured at their lower ends to an embedment ring 21 as is known in the art and described in my prior patents.


As best shown in FIG. 4, the collar 20 as positioned around the central pedestal 16 and above the expanded base or horizontal spread section 14 of the gravity spread foundation 12, includes a shape sustaining member, generally designated by reference numeral 15, around its outer perimeter and a ring of cementitious material 24. The shape sustaining outer member 15 is preferably embodied as a corrugated metal pipe (CMP) 22 and will be referred to as such hereinafter. However, other perimeter forming structures could be used as long as such alternate structures properly define the periphery of the ring of cementitious material and provide for post tensioning of the radial bolts and the soil and/or anchor bolts as discussed herein.


The CMP 22 is generally constructed of a plurality of sections that are bolted together to form a circle or a generally circular ring. The diameter of the CMP 22 is greater than the diameter of the foundation pedestal 16 and defines the outer perimeter of the ring of cementitious material 24 which is poured into and fills the annular area, generally designated by reference numeral 26, between the outer side of the pedestal 16 and the CMP 22. The collar 20 thus fully encircles the central pedestal 16 with the base 28 of the collar 20 resting on the upper surface 30 of the horizontal spread section 14 of the foundation 12 (see FIG. 4). As measured from the outer side surface of the pedestal to the CMP, the width or thickness of the cementitious annular collar when completed is preferably about 3.5′.


Alternatively, the collar 20 does not have to rest directly on the upper surface 30 of the spread section 14 of the foundation since a layer of material could be interposed between the collar and the top of the spread section. However, the collar must press against the spread section 14 in accordance with the present invention.


The upper surface 81 of the collar bounded by the CMP 22 is preferably about level with the upper surface 83 of the foundation pedestal 16. The top and bottom of the CMP are preferably cut to form a plane that varies no more than about +/−2″ from level. The diameter of the CMP is generally between about 19′ and about 25′, with a CMP pipe tolerance for out of roundness of about 3″.


A plurality of radially extending bolts generally designated by reference numeral 40 with strand hoops 44 extend horizontally through the CMP 22 and the cementitious material 24 of the annular ring 26 of the collar 20 and into the pedestal 16 of the foundation 12 as can be seen in FIGS. 4, 5 and 5A. The upper and lower bolt layers are circumferentially reinforced by the wire tied strand hoops 44 at about 6″ intervals. The innermost ends generally designated by reference numeral 42 of the radial bolts 40 are received into holes 58 drilled into the side of the pedestal 16 while the length of the radial bolts that extends through the cementitious ring 26 is preferably enclosed within a sleeve 68 (see FIGS. 7A-7D) to prevent the bolts from bonding with or adhering to the cementitious material 24 when poured and cured. The radial bolts 40, which anchor the collar 20 to the pedestal 16 of the foundation 12, are post-tensioned once the cementitious material has hardened, preferably to about 40% of their ultimate strength. Preferably, washers fitting into the corrugation of the CMP and having a flat outer surface to contact the tensioning nuts are placed against the outer side of the CMP for proper tensioning of the radial bolts, as is known in the art. Alternatively or additionally, tension plates may be placed on the inside or the outside of the CMP for the same purpose.


As shown in FIGS. 6A, 6B and 6C, there are preferably three layers of radial bolts 40 including a top layer 50, a middle layer 52 and a bottom layer 54. The radially extending bolts 40 in each layer are on substantially the same plane and equidistantly spaced from one another like the spokes of a wheel. As between layers, the bolts in each layer are offset with respect to the bolts in the other layers so that, if the three layers were placed directly on top of one another, none of the bolts of one layer would be in vertical alignment with the bolts in the adjacent layers. In addition, the radial bolts are positioned so as not to interfere with the tower anchor bolts 19 in the existing tower base flange 56 shown in isolation in FIG. 6D.


As shown in FIGS. 7A and 7B, the radial bolt layers 50, 52, 54 are vertically spaced from one another with the area between and around the layers being filled with the cementitious material 24 of the annular collar 20. The vertical spacing between the layers is preferably about between about 12″ and about 18″, and more preferably about 18″. The diameter of the radial bolts 40 is preferably between about 1″ and about 2″.


The radial bolts 40 are preferably inserted into core holes 58 that are drilled into the side of the central pedestal of the existing gravity spread foundation to a depth of between about 36″ to about 60″, and preferably about 54″. The diameter of the radial bolt core holes 58 descends in increments as the drilling approaches the center of the pedestal. The core hole at the CMP and inward for about 3″ has a diameter of about 2.5″. For the next approximately 21″, the core hole has a diameter of about 2″. The final 30″ or so of the hole has a diameter of about 1.75″. The innermost ends 42 of the radial bolts 40 are preferably secured within the drilled foundation core holes 58 with an adhesive such as epoxy 41 that is inserted into the holes during installation of the radial bolts. Preferably the part 62 of the radial bolts that extends through the collar is covered with a sleeve 68 having a length of between about 15″ and about 26″, and preferably about 21″.


As shown in the embodiment of FIGS. 7C and 7D, the radial bolts include two parts. The collar embedded part 62 of the radial bolts 40 is preferably joined with the foundation embedded sleeved part 60 of the radial bolts 40 by a coupler 64. The coupler 64 is preferably enclosed within a sleeve 66 having a diameter of about 2.5″ and a length of about 4″. The collar portion 62 of the radial bolts is preferably between about 4′ and about 5′ in length, and more preferably about 4.5′, and preferably is also encased within a sleeve 68 to prevent engagement of the radial bolt with the cementitious material. After tensioning, the outer ends 70 of the radial bolts extend approximately 12″ beyond the outer perimeter of the collar CMP 22, although the length of the projecting ends 70 may be greater or lesser as needed for the particular foundation being reinforced.


As shown in FIGS. 4, 5 and 8, a plurality of soil and/or rock anchor bolts 80 are placed to extend vertically from the upper surface 81 of the cementitious annular ring 26 of the collar 20 down through the horizontal spread section 14 of the gravity spread foundation and into the underlying soil and/or rock substrate 90. The soil and/or rock anchor bolts 80, or anchors, are between about 25′ and about 40′ in length, and preferably are about 30′ in length. The upper end of the anchor bolts is preferably enclosed within a sleeve 82 to prevent engagement of the bolt with the cementitious material in a “no bond” area 97 (see FIG. 8). The extent of the “no bond” area 97 is defined by the sleeve 82 that is preferably at least 10′ in length. The sleeve 82 extends substantially through the height of the collar 20, through the spread section 14 of the foundation and about two to three feet into the underlying soil and/or rock substrate 90. In the embodiment shown, the distance from the upper surface 81 of the collar to the bottom 101 of the spread section is approximately 7.5′, with the 10′ sleeve extending about an additional 2.5′ into the underlying substrate. The lower bonded area 85 of the anchor bolts, below the horizontal spread section 14 and extending into the underlying soil and/or rock substrate 90, is generally between about 14′ and about 30′ in length, and is preferably about 19′ in length. The total embedment length of the soil and/or rock anchor bolts 80, including the bonded 85 and “no bond” 97 areas, is generally on the order of between about 24′ and about 39′, and preferably is about 29′. Following construction of the collar, the soil and/or rock anchor bolts are post-tensioned in the “no bond” area to about 60% of their ultimate strength.


If the cementitious material of the retrofit collar addition is to be poured before the soil and/or rock anchor bolts are drilled, tubular PVC sleeves 88 about 6″ in diameter are placed vertically in the excavated region for the anchor bolts (see FIGS. 8 and 8A) and secured for the concrete pour. Once the cementitious material is set, the soil and/or rock anchor bolts are drilled down through the hollow center of the PVC sleeves 88 and, to prevent water entry, the upper 3″ of the drill hole sleeve 88 is filled with foam 91 as shown in FIG. 8A.


The anchor bolts are drilled in holes 100 in between adjoining radial bolt holes 58 in each radial bolt layer as shown in FIG. 9 such that the anchor bolts 80 and the radial bolts 40 inserted in the holes 58 do not interfere with one another. The diameter of the drill hole 100 for the rock anchor bolts is between about 4″ and about 6″, and is preferably about 5.5″. When the anchor bolts are in place in the drill holes 100, grout is poured into the annular space 71 around the lower end of the anchor bolts in the bonded area 85 and in the annular space 73 between the outer surface of the sleeves 82 and the inner surface of the PVC tubes 88 in the “no-bond” area 97. The anchor bolts 80 are post-tensioned in the manner described in my prior patents to place the entire collar 20 and spread foundation 12 under high unit compression loading.


A preferred sequence for tensioning of the anchor bolts is shown in FIG. 10. As shown, the first and second bolts to be tensioned are on opposite sides of the collar, and the third and fourth bolts to be tensioned are on opposite sides that are 90° out from the first and second bolts. The soil and/or rock anchor bolts 80 are tensioned in opposing pairs as set forth in FIG. 10 to ensure even and uniform tension on the collar. The soil and/or rock anchor bolts may be part of rock anchors, soil anchors, helical anchors and the like, depending upon the makeup of the underlying support substrate.


The soil and/or rock anchor bolts, in conjunction with the collar that supports and contains the pedestal, serve to reinforce and strengthen the cold joint engaging interface 17 between the bottom of the pedestal and the top of the spread section under the pedestal. With the radial bolts horizontally securing the collar to the pedestal, and the anchor bolts providing a vertical connection of the collar to the spread section, the reinforcing addition of the present invention effectively provides compressive force on the engaging interface 17 to increase the strength, stiffness and load bearing capacity of the spread foundation.


A preferred construction sequence for constructing the reinforcing collar according to the present invention is as follows:

    • 1) construct temporary turbine supports (temporary guys or brackets);
    • 2) excavate soil from atop the spread foundation for construction of retrofit collar; pile soil adjacent to the retrofit excavation;
    • 3) expose rebar at radial bolt and rock anchor locations;
    • 4) core two 2″ diameter holes 24″ long into foundation pedestal for each bolt;
    • 5) expand the 2″ core to 2.5″ for the first 3″ of the core;
    • 6) drill 1.75″ hole with percussion drill beyond the 2″ cored hole to within about 30″ of the center of the pedestal for each radial bolt; radial bolt holes extend about 1″ beyond the end of the 0.5″ radial bolt;
    • 7) inject approximately 30 cubic inches of epoxy into the back of the holes drilled for the radial bolts;
    • 8) insert into each radial bolt hole the 1.5″ grade 75 all thread radial bolt with PVC sleeve sealed at the end of the PVC to the bolt with epoxy;
    • 9) turn the couplers onto the bolt;
    • 10) turn into the coupler the sleeved outer 4.5′ of 1.5″ grade 75 all thread bolt with wire tied strand hoops on the upper and lower radial bolt circles;
    • 11) insert multi-plate CMP sections over radial bolts and bolt CMP sections together;
    • 12) place half oval washers over radial bolts into the CMP depressions; turn nuts onto the radial bolts and snug against the washers;
    • 13) place 6″ PVC tubes vertical for rock anchors to be drilled through and secure for concrete pour;
    • 14) pour concrete retrofit;
    • 15) drill and install rock anchors, centralized, and grouted in place in the bond and “no bond” areas, upper ends of said rock anchors being enclosed within a sleeve in the “no bond” area;
    • 16) post-tension radial bolts;
    • 17) install rock anchor plates grouted in place; and
    • 18) post-tension rock anchors.


The steps to be undertaken with respect to a wind turbine installed on an existing gravity spread foundation before and after installing the reinforcing collar according to the present invention are as follows:

    • 1) coordinate retrofit foundation work with electrical work;
    • 2) verify turbine de-energized before any work is begun;
    • 3) provide backup power generator to allow for control of the wind turbine in an idling condition;
    • 4) disconnect cables from transformers;
    • 5) temporarily remove and store the transformer for reinstallation;
    • 6) demolish the transformer concrete pad, if necessary to remove the pad;
    • 7) temporarily remove the existing stairs and store for reinstallation;
    • 8) demolish the existing stair landing concrete slab, if necessary;
    • 9) locate grounding wires and protect during excavation; if necessary reroute or disconnect and reinstall grounding wires as needed;
    • 10) control water that enters the excavation and the turbine pad;
    • 11) remove anchor bolt caps and grout from caps and bolt threads;
    • 12) relax the tower anchor bolts and thoroughly clean the threads;
    • 13) maintain tower anchor bolt nuts in a tight and snug condition; tighten with impact wrench to snug condition;
    • 14) repair or reinstall ground wires as required;
    • 15) route or reroute conduit as required;
    • 16) remove the temporary supports after the retrofit foundation has been constructed complete in place and concrete cured;
    • 17) construct new support slab and conduit vault for transformer, if required;
    • 18) restore anchor bolt tension;
    • 19) reinstall tower access stair; and
    • 20) reinstall transformer and connect the electrical cables.


The anchor bolts are tightened so as to exceed the maximum internal tension expected from overturning forces of the wind turbine structure on the foundation. As a result, the entire foundation with the reinforcing collar is able to withstand the various loads with the concrete thereof always remaining in compression and both the radial and the soil and/or rock anchor bolts always in static tension. As a result, the reinforcing structure addition according to the present invention can extend the life of an original gravity spread foundation that would otherwise have failed or is failing by at least an additional 20-25 years.


The present invention is also directed to a method of modifying an existing gravity spread reinforced concrete foundation, increasing the foundation stiffness and the rotational stiffness of the entire wind turbine structure. Modifying the existing gravity spread foundation also increases the turbine resistance to overturn and extends the foundation life by at least an additional 25 years, which is the expected turbine life.


The present invention also includes a method of modifying an existing shallow gravity spread foundation to a deep foundation, alleviating a number of potential failures found in connection with shallow foundations. These failures can include overturn, frost heave, erosion and scour, differential settlement, tilting, foundation/soil gapping, flooding, vertical seismic acceleration, horizontal seismic acceleration, liquefaction, collapsible soils and expansive soils.


Finally, the present invention provides a method of restoring integrity and continued use to a failed or failing concrete gravity spread foundation. As evident from the foregoing description, the retrofit reinforcement structure addition including the collar with radial bolts and soil and/or rock anchor bolts extending horizontally and vertically through the collar, respectively, serves to reinforce, strengthen and provide compressive force upon the engaging interface between the bottom of the pedestal and the top of the spread section under the pedestal. When restored and supported by the retrofit reinforcement structure addition of the present invention, the useful life of an otherwise failed or failing gravity foundation is extended for at least an additional 25 years which is the expected turbine life period.


The foregoing descriptions and drawings should be considered as illustrative only of the principles of the invention. The invention may be configured in a variety of shapes and sizes and is not limited by the dimensions of the preferred embodiment. Numerous applications of the present invention will readily occur to those skilled in the art. Therefore, it is not desired to limit the invention to the specific examples disclosed or the exact construction and operation shown and described. Rather, all suitable modifications and equivalents may be resorted to, falling within the scope of the invention.

Claims
  • 1. A method of modifying an existing gravity spread reinforced concrete foundation having a pedestal having two sides and a spread section supporting a wind turbine structure to increase foundation stiffness, rotational stiffness of the wind turbine structure, and turbine resistance to overturn, said method comprising the steps of confining the pedestal with a reinforcing structure that surrounds the pedestal, and reinforcing the pedestal and an engaging interface between the pedestal and the spread section using the reinforcing structure, wherein said steps of confining and reinforcing include the steps of: drilling a plurality of horizontally extending core holes in the sides of the pedestal for a plurality of horizontally extending sleeved radial bolts having non-sleeved inner ends;inserting the non-sleeved inner ends of the sleeved radial bolts into said horizontally extending core holes in the sides of the pedestal;securing the non-sleeved inner ends of the horizontally extending radial bolts in the core holes with an adhesive;encircling the pedestal with a shape-sustaining member to define an annular ring between an outer side surface of the pedestal and the shape-sustaining member, said horizontally extending sleeved radial bolts extending through said annular ring and said shape-sustaining member;filling the annular ring with a cementitious material to form a collar, said horizontally extending sleeved radial bolts being embedded in said collar with ends thereof extending beyond an outer surface of said shape-sustaining member, a base of the collar pressing on an upper surface of the spread section of the gravity spread reinforced concrete foundation; andpost-tensioning the horizontally extending sleeved radial bolts at the ends thereof.
  • 2. The method as set forth in claim 1, wherein, before said step of filling the annular ring with cementitious material, said step of reinforcing includes the steps of: placing PVC tubes vertically in said annular space and securing said tubes for pour of said cementitious material.
  • 3. The method as set forth in claim 2, further comprising, after pouring and curing of said cementitious material, the step of drilling a plurality of vertically extending rock and/or soil anchor bolts through said tubes in said collar and into an underlying rock and/or soil substrate beneath said spread section, upper ends of said anchor bolts extending above an upper surface of said collar for post-tensioning thereof.
  • 4. The method as set forth in claim 1, wherein said step of drilling a plurality of horizontally extending core holes in the sides of the pedestal includes drilling holes at three vertically spaced levels such that radial bolts fitted in said holes form an upper generally horizontal radial bolt layer, a middle generally horizontal radial bolt layer and a lower generally horizontal radial bolt layer, radial bolts in said upper, middle and lower layers being vertically offset from one another.
  • 5. The method as set forth in claim 4, further comprising the step of the circumferentially reinforcing the upper and lower bolt layers with wire-tied strand hoops at about 6″ intervals.
US Referenced Citations (67)
Number Name Date Kind
732485 Wight Jun 1903 A
969039 Cowles Aug 1910 A
1139384 Taf May 1915 A
1189459 Lundin Jul 1916 A
1529895 Chance et al. Mar 1925 A
1647925 May Nov 1927 A
2377055 Thornley May 1945 A
2625815 Black Jan 1953 A
2971295 Reynolds Feb 1961 A
3646748 Lang Mar 1972 A
RE27732 Van Buren Aug 1973 E
3798868 Loranger Mar 1974 A
3927497 Yoshinaga et al. Dec 1975 A
4043133 Yegge Aug 1977 A
4051661 Leprohon, Jr. et al. Oct 1977 A
4068445 Bobbitt Jan 1978 A
4092811 Lin et al. Jun 1978 A
4197695 Hughes et al. Apr 1980 A
4247225 Chickini, Jr. et al. Jan 1981 A
4866903 Ferstay Sep 1989 A
4887691 Rotondo Dec 1989 A
5218805 Rex Jun 1993 A
5505033 Matsuo et al. Apr 1996 A
5586417 Henderson et al. Dec 1996 A
5623792 Crumpacker Apr 1997 A
5761875 Oliphant Jun 1998 A
5826387 Henderson et al. Oct 1998 A
5966882 Naito Oct 1999 A
6102118 Moore Aug 2000 A
6659691 Berry Dec 2003 B1
6665990 Cody et al. Dec 2003 B1
6672023 Henderson Jan 2004 B2
6705058 Foust et al. Mar 2004 B1
6782667 Henderson Aug 2004 B2
7155875 Henderson Jan 2007 B2
7533505 Henderson May 2009 B2
7618217 Henderson Nov 2009 B2
7707797 Henderson May 2010 B2
7905069 Lockwood Mar 2011 B1
8720139 Henderson May 2014 B2
9096986 Henderson Aug 2015 B2
9340947 Henderson May 2016 B2
9481973 Henderson Nov 2016 B2
9783950 Henderson Oct 2017 B2
10640995 Phuly May 2020 B2
20020050110 Ytterberg May 2002 A1
20020095878 Henderson Jul 2002 A1
20020124502 Henderson Sep 2002 A1
20020152695 Gilsdorf Oct 2002 A1
20040261340 Behlinger et al. Dec 2004 A1
20050005562 Henderson et al. Jan 2005 A1
20060048471 Lee Mar 2006 A1
20110173897 Schneider Jul 2011 A1
20120047830 Phuly Mar 2012 A1
20120070233 Wang et al. Mar 2012 A1
20120151860 Li Jun 2012 A1
20120266447 Diaz-Vallellanes Oct 2012 A1
20120291394 Tooman Nov 2012 A1
20120314540 Alter Dec 2012 A1
20130129474 Schacknies et al. May 2013 A1
20130255169 Henderson Oct 2013 A1
20140260023 Henderson Sep 2014 A1
20140260223 Long et al. Sep 2014 A1
20150075099 Pantelides Mar 2015 A1
20150376859 Phuly Dec 2015 A1
20180264680 Phuly Sep 2018 A1
20200032478 Rajewski Jan 2020 A1
Foreign Referenced Citations (29)
Number Date Country
2551712 Jun 2012 CA
2754577 Jun 1979 DE
10105472 Aug 2002 DE
202012006606 Nov 2012 DE
0160135 Nov 1985 EP
1526278 Apr 2005 EP
2833029 Jun 2003 FR
60-92518 May 1985 JP
61-109826 May 1986 JP
64-71987 Mar 1989 JP
4-353117 Dec 1992 JP
5-311678 Nov 1993 JP
H5-311678 Nov 1993 JP
8-338034 Dec 1996 JP
9-256390 Sep 1997 JP
11-181797 Jul 1999 JP
2001-200582 Jul 2001 JP
2002-061201 Feb 2002 JP
2003-013442 Jan 2003 JP
2003-232046 Aug 2003 JP
2005-220554 Aug 2005 JP
2010-65454 Mar 2010 JP
20010057453 Jul 2001 KR
WO 8403531 Sep 1984 WO
WO 0227105 Apr 2002 WO
WO 02099204 Dec 2002 WO
WO 2011029994 Mar 2011 WO
WO 2012037450 Mar 2012 WO
WO 2012062425 May 2012 WO
Non-Patent Literature Citations (47)
Entry
Declaration of Dr. John T. Bryant in Support of Petition for Inter Partes 7,618,217 (filed Sep. 9, 2021).
Declaration of Dr. John T. Bryant in Support of Petition for Inter Partes 7,533,505 (filed Sep. 9, 2021).
Declaration of Dr. John T. Bryant in Support of Petition for Inter Partes 7,707,797 (filed Sep. 9, 2021).
Newman, Morton. Structural Details for Concrete Construction. McGraw Hill Book Company, 1998.
Peck et al. Foundation Engineering, Second Edition, John Wiley & Sons, 1953.
Federal Highway Administration Transportation. Geotechnical Engineering Circular N. 4, Ground Anchors and Anchored Systems, Jun. 1999.
Petition for Inter Partes Review of U.S. Pat. No. 7,533,505 filed Sep. 10, 2021.
Petition for Inter Partes Review of U.S. Pat. No. 7,618,217 filed Sep. 10, 2021.
Petition for Inter Partes Review of U.S. Pat. No. 7,70,797 filed Sep. 10, 2021.
Post-Tensioning Manueal, Fifth Edition, Post-Tensioning Institute, 1990.
Prestressed Concrete, PCA America's Cement Manufacturers, 1916.
Kelley, A. Short History of Unbounded Post—Tensioning Specifications, Concrete Repair Bullentine, Jul./Aug. 2001.
Design Examples: Attachment 8.
Nigels, McLeod C. Prestressed Concrete Tension Piles and Their Connections, PCI Journal, Jul.-Aug. 1988.
Reflections on the Beginnings of Prestressed Concrete in America, The Prestressed Concrete Institute, 1981.
U.S. Department of Transporation Federal Highway Administration. Post-Tensioning Tendon Installation and Grouting Manual, Version 2.0, May 2013.
Aschenbroich, Horst. Dipl. Ing. A Post Tensioned Micropile Foundation System with Groutable Void Forms (GVF).
Aschenbroich, Horst, Dipl. Ing. Micro Pile Reinforcement Systems and Corrosion Protection, 2001.
Deformation of Reinforced Concrete Anchor Foundations in the Far Norht, Plenum Publishing Corporation, 1991.
Crabtree et al. The Strengthening of Transmission Tower Foundations Using Grouted Anchor Bars.
Kim, Nak-Kyung. Performance of Tension and Compression Anchors in Weathered Soil. Journal of Geotechnical and Geoenvironmental Engineering, Dec. 2003.
Dams—Innovations for Sustainable Water Resources, 22nd Annual USSD Conference San Diego, California, Jun. 24-28, 2002.
Prestressed Concrete Bridges.
Wind Turbine Anchoring Solutions, Peikko Group, Concrete Connections.
Standard Specification for Steel Strand, Uncoated Seven-Wire for Prestressed Concrete, ASTM International.
Allam et al. Crack width evaluation for flexural RC members. Alexandria Engineering Journal, (2012) 51, 211-220.
Svensson, Henrick. Design of Foundations for Wind Turbines, 2010.
Eurooppalainetekninen hyväksyntä. ETA-10/02; European Technical Approval. VTT Expert Services Oy. Issued Apr. 21, 2011.
Bruce et al. Foundation Rehabilitation of the Pocomoke River Bridge, Maryland, Using High Capacity Preloaded Pinpiles, The Conference on Bridges official proceedings. Jun. 4-6, 1984.
Peikko's Foundation Solution Chosen for Wing for Wing Park to be Built in Hamina, Finland. https://web.archive.org/web/20111228043258/http://www.peikko.com/news/n=Peikko%27s+Foundation+Solution+choses+for+Wind+Park+to+be+builtin+in+Hamina%2c+Finland.
Hevosselkä Wind Park, Tervola, Finland. https://www.peikko.com/reference/hevosselka-wind-park.
Loflin, Bryan J. Bond and Material Properties of Grade 270 and Grade 300 Prestressing Strands. Jun. 10, 2008.
Peikko to supply the wind turbine tower foundation solution to Finnish Muukko wing park. https://web.archive/org/web/20121001214327/http://www.peikko.com/news/n=Peikko+to+supply+the+wing+turbine+tower+foundation+solution+to+Finnish+Muukko+wing+park.
Muukko Wind Park, Lappeenranta, Finland. https://www.peikko.com/reference/muukko-wind-park/.
Mäkelänkangas Wind Park, Hamina, Finland. https://www.peikko.com/reference/makelakangas-wind-park/.
https://web.archive.org/web/20121003065612/http://www.peikko.com:80/news/year=2012.
Peikko and Enercon to Expand Their Cooperation. Press Release Apr. 5, 2011. https://web.archive/org/web/20110814012119/http://www.peikko.com/news/n=Peikko+and+Enecon+to+expand+their+cooperation.
Peikko to supply the wind turbine tower foundation solution to Finnish Muukko wind park. https://www.peikko.cz/novinky/peikko-to-supply-the-wind-turbine-tower-foundation-solution-to-finnish-muukko-wind-park-2/.
Peikko Group: Product Catalogue. Jul. 2, 2012.
Aschenbroich, Horst Dipl.Ing. Reinforcement of dams in Canada and the USA. Www.contechsystems.com.
https://web.arcive.org/web/20121003064830/http://www.peikko.com/news/year=2012/month=05.
Wind Turbines Uljabuouda, Sweden, Project Story in PeikkoNews Feb. 2009. https://web.archive.org/web/20120320121335/http:www.peikko.com/reference-main/references/rg=Power+Plants+and+LInes/r=Wind+Turbines+Ulkabuouda+%2C+Sweden.
A unique turnkey solution for wind turbine tower foundations. https://web.archive.org/... b/20120403071116/http://www.peikko.com/solutions-category/solutions/s=A+unique+turnkey+solution+for+wind+turbine+tower+foundations/SID=24072976.
Clemence, Samuel P., Uplift Behavior of Anchor Foundations in Soil. Proceedings of a session sponsored by the Geotechnical Engineering Division of the American Society of Civil Engineers in conjunction with the ASCE Convention in Detroit, Michigan. Oct. 24, 1985.
Benefits for wind energy specialist. https://web.archive/org/web/20121030175316/http://www.peikko.com/group/t=Wind+Energy+Specialist.
Affidavit of Josef Alter in U.S. Appl. No. 11/428,778, dated Jun. 2, 2009.
Video by Peiiko Group uploaded to YouTube on Apr. 13, 2012. https://urldefense.com/v3/...https://youtu.be/i7K-ayGWfh4...;IUrcuqBw...IQ13puXZHUFb4eyZpuDPdTKr3XTjcljoqtpuEEdpwCGStoa9L6X9-0D1V2Ngk3NmsUcbQ51S.
Related Publications (1)
Number Date Country
20220356669 A1 Nov 2022 US
Provisional Applications (2)
Number Date Country
62211158 Aug 2015 US
62060743 Oct 2014 US
Divisions (2)
Number Date Country
Parent 15585775 May 2017 US
Child 16775369 US
Parent 14870955 Sep 2015 US
Child 15585775 US
Continuations (1)
Number Date Country
Parent 16775369 Jan 2020 US
Child 17874395 US