There is increasing demand in the oil and gas industry to develop equipment and methods to enable subsea riser repair. Often, the aging risers to be repaired are disposed in deep water, making them inaccessible to divers. Furthermore, increasing restrictions on the use of divers is making riser repair, even in shallow water, increasingly challenging. Thus efforts are being made to develop techniques for deep water riser repair, utilizing apparatuses which can be hydraulically controlled from a remotely operated vehicle (ROV). The techniques must by design also be sensitive to the often fragile nature of the risers, as well as incorporating contingency measures in the event of a failed repair effort.
In one embodiment, the invention is an apparatus including an external surface portion shaped so as to mate with a docking device, and two half-shells having internal surfaces of semi-circular cross section. The apparatus further includes a plurality of segments arranged inside the two half-shells and including teeth for gripping onto a shaft, and an installation tool operable to cause the two half-shells to close around the shaft, thereby securing the apparatus to the shaft.
Some embodiments of the invention will now be described by way of example only and with reference to the accompanying drawings, in which:
A gripper unit apparatus (GU); alignment, installation and activation (AIA) apparatus; and several methods of use thereof are described in detail below, by way of example, and with reference to the accompanying drawings.
Alignment installation and activation (AIA) apparatus:
According to an exemplary embodiment, the AIA apparatus 100, illustrated in
Non-limiting example dimensions for the AIA apparatus depicted in
Gripper Unit (GU) Apparatus:
An exemplary embodiment of a gripper unit (GU) apparatus 200 is illustrated in
As load is applied to the GU, the slips segments 201 move upwards and inwards relative to the body of the unit 204 and the teeth protrude slightly into the pipe surface 203. The ultimate capacity is limited by the shear strength across the number of teeth activated. The GU also comprises a cap 205 shaped so as to interface with the docking cone 109 of the AIA frame.
As the slips will not engage around the complete circumference of the pipe, this will ensure that all alignment reaction forces introduced into the pipe will be on the part of the pipe that is circumferentially supported by the slip segments. The initial activation of the slip teeth onto the pipe is by mechanical closing of the slip carrier. This is only required to hold the weight of the unit. Thereafter the slips are self-activating. The GU has slips with longitudinal as well as transverse teeth. The longitudinal teeth will determine the torsional capacity of the GU during the subsequent rotational alignment. Some torsional forces may be introduced by the flexible riser, but these are assumed to be low.
To eliminate the need to lock the GU onto the riser pipe while suspended from the crane, with associated risk of introducing vessel dynamic forces to the riser, a light weight unit that can be launched with the ROV is proposed. The weight of the concept unit is about 50 kg.
Certain aspects of the GU include:
The GU has slips with longitudinal as well as transverse teeth. The longitudinal teeth will determine the torsional capacity of the GU during the subsequent rotational alignment.
Springs 202 in the GU ensure that the slip segments will always be forced inwards (towards the pipe). The springs will always try to pull the GU body downwards relative to the slip segments. When the GU body is pulled downwards relative to the slip segments, the slip segments will be forced inwards towards the pipe. Thus the GU will at all times hold onto the pipe. In the event that the GU is subjected to a large upwards force, it might release from the pipe, but once the force is removed the GU will grip back onto the pipe due to the force provided by the springs. From a risk point of view this is a significant advantage as otherwise (i.e. without springs) the GU might fall off the pipe.
The hardened teeth bite into the pipe surface. The tooth profile from the DnV qualified clamps will be utilized. These have been checked against RP-F113 to ensure that the marks left on the pipe surface shall not initiate subsequent fatigue damage.
Non-limiting example dimensions for the GU apparatus depicted in
Other aspects of the GU apparatus as illustrated in
Outline of Procedure for Landing a Component on a Riser:
In the following, an exemplary method for landing and installing a component (e.g. a flange adaptor) on a riser is outlined. The main method steps are depicted, in sequence, in
0) Perform initial cutting of the riser pipe 301; secure the lower section of the riser pipe once cut in a cofferdam provided on the riser tower 302; cut the piggyback straps above the cutting point to allow the bottom end of the upper section of the riser pipe to be moved out from the riser tower; install a riser jacking tool 303 (RJT) on the riser tower, above the cut; jack the bottom end of the upper section of the riser pipe (hereafter referred to as the “riser pipe”) outwards from the riser rower; cut a 2 metre long section from the end of riser pipe; remove pipe coating; and prepare end of pipe.
1) Perform a pre-survey to determine the extent of the lean of the riser tower and identify the heading of a 3 metre long straight section at the bottom of the riser pipe. The readings from a hydro-acoustic position reference transponder and high-precision acoustic position transponder on the riser tower buoyancy tank and remotely operated vehicle should be sufficient for the accuracy required. If the heading identified is within +/−20 degrees error margin, the rotation in the gripper unit (GU) apparatus 200 can correct for it.
2) Perform initial testing of all systems on the deck of the vessel.
3) Launch from the vessel the tool basket containing the GU apparatus 200 and a subsea marker. Alternatively these may be launched with the ROV 304. It should be ensured that the buoyancy tank and dynamic risers are avoided to prevent damage thereto.
4) Mark a 12 o'clock position 1.25 m from the end of the riser pipe. Also mark ROV grabber exclusion zones. The RJT may be retracted slightly to allow the ROV to grab onto the riser tower and be in a more stable position when performing the marking. The distance from the riser pipe end has a tolerance of +/−50 mm that can be corrected using the pull-in cylinders on the AIA frame 100. The distance is measured from the riser pipe end with a prefabricated L-shaped piece of tubing with magnets attaching it to the pipe, while the mark is made with the ROV. The mark is made with a subsea ‘crayon’ type stick. The IKM Technique Subsea Marker (http://www.ikm.com) may be used, for example. Care should be taken to ensure that the lower 250 mm of the riser pipe, and the 250 mm just below the GU apparatus are not be damaged by the ROV 5-function manipulator, as these areas are the primary and contingency sealing areas for the flange adaptor 306.
5) Grip onto the allowed grabbing zone on the pipe with the left hand ROV 5-function ‘grabber’. Install and activate the GU apparatus 200 using the installation tool 260 operated by the ROV's 7-function manipulator, as depicted in
6) Perform vertical pull test on GU apparatus using the ROV. Pull between the left hand grabber and the right hand 7-function manipulators. The left hand grabber may be holding onto the riser pipe below if possible, or the RJT may be used to bring the riser pipe closer to the riser tower thereby allowing the ROV to grab onto another riser tower pipe. This verifies initial engagement of the GU apparatus towards the riser pipe, and starts weight setting the teeth into the riser pipe wall. The vertical pull test is limited by the force capacity of the 7-function manipulator, but is only required to prove initial activation to support the weight of the GU apparatus itself.
7) Check the elevation and heading of the installed GU apparatus. A vertical allowance for incorrect installation may be +/−50 mm as measured from the riser pipe end. Correct installation within this tolerance is deemed to be uncomplicated to achieve with a prefabricated L-shaped measuring tool.
8) Rig the AIA apparatus and connected flange adapter and flexible riser for deployment by the vessel crane. The in-water center of gravity may be calculated to allow a 45 degrees deployment angle with the GU apparatus docking unit aligned with the riser pipe axis. In addition, the AIA apparatus may have an adjustable lifting point, to allow adjustment on site for the correct suspended angle.
9) Deploy and lower the AIA frame and flexible riser to the working depth. The net resultant force from the flexible riser will depend on whether the other end of the flexible riser is suspended from a second crane or winch. The lifting points will be designed in accordance with DnV Offshore standards (available at: https://rules.dnvgl.com/servicedocuments/dnv).
10) Move the AIA apparatus towards the riser pipe between the RJT and the GU apparatus, in one case keeping the load (including the AIA apparatus) under active heave compensation,
11) Guide the AIA apparatus docking slot onto the riser pipe with the ROV and lower the AIA apparatus until the lift rigging 305 is fully slack,
12) Grab onto the ROV panel of the AIA apparatus and close the ‘float’ function valve,
13) Insert 3 hydraulic 6-line stabs into receptacles on the ROV panel on the AIA apparatus. FMC/Oceaneering stabs may be used. All stabs may be delivered with D-handle as well as ‘fishtail’ handle for parallel 3-finger jaw.
14) Operate the pitch cylinder to lift the flange adaptor 306 until it is axially aligned with the riser pipe,
15) Using, for example a level indicator, check that a plane through the axis of the two pull in cylinders is at 90 degrees to the riser bending plane. The ROV panel may have a level gauge to assist the visual indication that the AIA apparatus is correctly aligned.
16) If the angle is offset, operate the rotate cylinder to achieve axial alignment.
17) Stab the, for example Gisma, electrical/signal connector to the AIA apparatus. Tronic connectors may also be used.
18) Increase the hydraulic pressure in the pull-in cylinders of the AIA apparatus until the AIA apparatus starts lifting,
19) Check alignment just before entry of the riser pipe into the flange adaptor. Operate pitch, rotate, and pull-in cylinders to align.
20) Keep lifting the AIA frame using the pull-in cylinders until the riser pipe is fully bottomed out in the flange adaptor. Monitor sensor feedback can be used to monitor this part of the installation. The operator may operate the two pull-in cylinders independently from each other for fine alignment. The operator should continuously monitor the alignment by camera and pressure readings. The pressures should be kept low, only 2-5% above the necessary pressure to lift the suspended weight. If the pull-in stops, that is an indication of jamming and without increasing the pressure, the primary method to resolve it is to identify and lift only with the lowest (most extended) cylinder. The tilt and rotate function of the AIA apparatus can also be used for fine alignment at this stage. The two hydraulic circuits for the pull-in cylinders can also be operated in parallel after a certain engagement has been achieved, utilizing the flange adaptor's self-aligning capability. This may save a small amount of operation time. The cylinder interface to the AIA apparatus can be built with a small degree of flexibility, by rubber bushings or springs. This utilizes the self-alignment capability of the flange adaptor, and may reduce the number of jamming incidents and simplify the task for the operator.
21) Increase the holding pressure in the pull-in cylinders to hold the riser pipe firmly to the flange adapter abutment face. Upon activation of the flange adapter when the balls make initial contact with the surface of the riser pipe, the activation will tend to separate the end of the riser pipe from the abutment face. The pull-in cylinders are dimensioned to counteract that force.
22) Activate the flange adaptor. The 1500 bar pressure for the tensioners is achieved by integrating a hydraulic intensifier on the connector body. The sensors on the tool are linked up to the ROV skid, where the signal from each sensor is multiplexed onto an RS485 serial communication to the topside control unit. Visual indications provide backup for the sensors in the connector.
23) Perform a seal test. The seal test may be carried out with hydraulic oil. The volume to be tested is small and only a very small volume is required to increase the pressure to 350 bar. A very small volume would then be released to the sea upon completion of the seal test. A hydraulic intensifier may be used to provide the pressure for the seal test.
24) Disconnect the hydraulic stabs between the AIA apparatus and the flange adapter.
25) Cut or pull off the sensor cables between the AIA apparatus and the flange adaptor. For cutting, the ROV cable cutter may be used.
26) Unlock the locking-bolt with the ROV handle on the AIA apparatus, and extend the pull-in cylinders approximately 500 mm,
27) Using the pitch cylinders, start pitching the AIA apparatus out, away from the riser pipe,
28) If required, operate the rotate cylinder on the AIA frame back to neutral position to align the key-slots in the docking cone.
29) Operate the pitch cylinder until maximum distance between the AIA apparatus and the flange adaptor is achieved. Disconnect the ROV stabs. Note that an angle greater than 20 degrees can now be achieved as the weight of the flange adaptor and flexible riser has been removed from the AIA apparatus.
30) Lower the crane with a forerunner and hook onto a lift point of the AIA apparatus for recovery of the AIA apparatus back to the surface,
31) Lift the AIA apparatus clear of the GU apparatus.
32) By movement of the vessel and/or crane boom, move the AIA apparatus clear of the riser pipe by a safe distance. The AIA apparatus may also be guided with assistance from the ROV. What constitutes a safe distance may be dependent on weather and vessel station-keeping capability, as well as actual current.
33) Recover the AIA frame back to the vessel deck.
34) Deactivate and recover the GU apparatus to the tooling basket and subsequently recover to the vessel deck.
Although the invention has been described in terms of certain embodiments as set forth above, it should be understood that these embodiments are illustrative only and that the claims are not limited to those embodiments. Those skilled in the art will be able to make modifications and alternatives in view of the disclosure which are contemplated as falling within the scope of the appended claims. Each feature disclosed or illustrated in the present specification may be incorporated in the invention, whether alone or in any appropriate combination with any other feature disclosed or illustrated herein.
Number | Date | Country | Kind |
---|---|---|---|
1517554.0 | Oct 2015 | GB | national |
This application is a national stage filing of International Application No. PCT/EP2016/073778 (Publication No. WO 2017/060291), filed on Oct. 5, 2016, which claims priority to GB Application 1517554.0, filed on Oct. 5, 2015. The entire contents of both of these applications are incorporated by reference herein. The present invention relates to risers, and specifically methods of repair thereof and apparatuses used in the repair thereof.
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/EP2016/073778 | 10/5/2016 | WO | 00 |