Claims
- 1. A method for supporting a marine riser from a floating platform wherein said riser extends from said platform to wellhead means on the seafloor and said riser is adapted to be connected and disconnected with respect to said wellhead means, said method comprising:
- providing tensioner means on said platform including pressure fluid actuated means operably interconnected between said riser and said platform for supporting said riser with respect to said platform;
- providing means providing a first predetermined fluid pressure for causing said fluid actuated means to exert a predetermined tension force on said riser while said riser is connected to said wellhead means and to accommodate heaving of said platform relative to said riser;
- providing means for generating a signal of the occurrence of a disconnection of said riser with respect to one of said wellhead means and said tensioner means, respectively;
- maintaining said first predetermined fluid pressure on said fluid actuated means for tensioning said riser means;
- applying a second predetermined fluid pressure acting on said fluid actuated means in response to a signal indicating a disconnection of said riser with respect to one of said wellhead means and said tensioner means, respectively, to act in opposition to said first predetermined pressure to prevent said tensioner means from recoiling in response to a sudden reduction in load on said tensioner means caused by said disconnection of said riser.
- 2. The method set forth in claim 1 wherein:
- said second predetermined fluid pressure is applied to said fluid actuated means in response to a signal indicating a disconnection of said riser from said wellhead means.
- 3. The method set forth in claim 1 wherein:
- said second predetermined pressure is applied to said fluid actuated means in response to a signal indicating a predetermined rate of movement of said tensioner means relative to said platform.
- 4. The method set forth in claim 1 wherein:
- said means providing said first predetermined pressure includes an air over oil reservoir having means for supplying oil to said fluid actuated means from a source of pressure air connected to said reservoir at said first predetermined pressure, and said method includes the step of:
- shutting off said source of pressure air in response to generation of said signal to provide a quantity of pressure air trapped in said reservoir to permit relative motion between said riser and said platform by compressing said quantity of pressure air.
- 5. The method set forth in claim 1 wherein:
- said tensioner means includes means for supplying fluid at relatively low pressure to said fluid actuated means acting in opposition to said first predetermined pressure, and said method includes the step of isolating said means for supplying said fluid at relatively low pressure from said fluid actuated means upon applying said second predetermined fluid pressure to said fluid actuated means.
- 6. A method for supporting a marine riser from a floating platform wherein said riser extends from said platform toward wellhead means on the seafloor and said riser is adapted to be connected and disconnected with respect to said wellhead means; said method comprising:
- providing tensioner means on said platform including pressure fluid actuated means operably interconnected between said riser and said platform for supporting said riser with respect to said platform;
- providing means for applying pressure fluid at a predetermined pressure to said fluid actuated means to support said riser under tension when said riser is connected to said wellhead means;
- maintaining a first predetermined pressure on said fluid actuated means to tension said riser while it is connected to said wellhead means;
- providing a gas charged reservoir which is charged with pressure gas at a second predetermined pressure from a source of pressure gas;
- disconnecting said riser from said wellhead means;
- closing off said source from said reservoir upon disconnection of riser from said wellhead means;
- applying a second predetermined pressure on said fluid actuated means sufficient to cause said riser to retract to an elevated position away from said wellhead means a distance which will permit some vertical movement of said riser without colliding with said wellhead means; and
- adjusting the pressure acting on said fluid actuated means to a pressure which will provide a force acting on said riser sufficient to support said riser in a position suspended from said platform and elevated with respect to said wellhead means by allowing pressure gas in said reservoir to expand until an equilibrium pressure is reached which will cause said fluid actuated means to hold said riser in said suspended position and to permit some excursion of said riser relative to said platform as said platform heaves in response to wave action.
- 7. A method for supporting a marine riser from a floating platform wherein said riser extends from said platform toward wellhead means on the seafloor and said riser is adapted to be connected and disconnected with respect to said wellhead means; said method comprising:
- providing tensioner means on said platform including pressure fluid actuated means operably interconnected between said riser and said platform for supporting said riser with respect to said platform;
- providing means for applying pressure fluid at a predetermined pressure to said fluid actuated means to support said riser under tension when said riser is connected to said wellhead means;
- maintaining a first predetermined pressure on said fluid actuated means to tension said riser while it is connected to said wellhead means;
- disconnecting said riser from said wellhead means;
- applying a second predetermined pressure on said fluid actuated means in opposition to said first predetermined pressure sufficient to cause said riser to retract to an elevated position away from said wellhead means a distance which will permit some vertical movement of said riser without colliding with said wellhead means; and
- adjusting the pressure acting on said fluid actuating means to a pressure which will provide a force acting on said riser sufficient to support said riser in a position suspended from said platform and elevated with respect to said wellhead means and to permit some excursion of said riser relative to said platform as said platform heaves in response to wave action.
- 8. A method for supporting a marine riser from a floating platform wherein said riser extends from said platform toward wellhead means on the seafloor and said riser is adapted to be connected and disconnected with respect to said wellhead means; said method comprising:
- providing tensioner means on said platform including pressure fluid actuated means operably interconnected between said riser and said platform for supporting said riser with respect to said platform;
- providing means for applying pressure fluid at a predetermined pressure to said fluid actuated means to support said riser under tension when said riser is connected to said wellhead means, said means for applying pressure fluid comprising a gas charged reservoir in communication with said fluid actuated means and charged with pressure gas from a source at a first predetermined pressure;
- maintaining said first predetermined pressure on said fluid actuated means to tension said riser while it is connected to said wellhead means;
- disconnecting said riser from said wellhead means;
- applying a second predetermined pressure on said fluid actuated means sufficient to cause said riser to retract to an elevated position away from said wellhead means a distance which will permit some vertical movement of said riser without colliding with said wellhead means; and
- adjusting the pressure acting on said fluid actuated means to a pressure which will provide a force acting on said riser sufficient to support said riser in a position suspended from said platform and elevated with respect to said wellhead means and to permit some excursion of said riser relative to said platform as said platform heaves in response to wave action by isolating said reservoir from said source to trap a quantity of pressure gas in said reservoir upon applying said second predetermined pressure to said fluid actuated means to adjust the pressure acting on said fluid actuated means at an equilibrium condition of suspending said riser.
Parent Case Info
This application is a continuation of application Ser. No. 406,485, filed: Sept. 9, 1982, abandoned, which is a continuation of application Ser. No. 901,520, filed: May 1, 1978, now U.S. Pat. No. 4,351,261.
US Referenced Citations (6)
Continuations (2)
|
Number |
Date |
Country |
| Parent |
406485 |
Aug 1982 |
|
| Parent |
901520 |
May 1978 |
|