Claims
- 1. A process for setting up a road transportable concrete railroad tie molding system, comprising the steps of:
- providing a substantially level plant area;
- providing foundation members along a selected stressing bed site at the plant area;
- providing a stressing frame comprised of individual road transportable elongated sub-frame segments that are convertible between inoperative transport conditions and extended operative conditions;
- converting the road transportable sub-frame segments to the inoperative conditions;
- transporting the road transportable sub-frame segments in the inoperative conditions to the stressing plant using a conventional roadway surface vehicle;
- converting the road transportable sub-frame segments to the extended operative conditions;
- mounting the road transportable sub-frame segments to the foundation members in end-to-end, alignment to thereby form the stressing frame with a live end and a dead end;
- providing the road transportable sub-frame segment at the live end of the stressing frame with reinforcing wire tensioners;
- providing the road transportable sub-frame segments at the dead end of the stressing frame with reinforcing wire anchors in axial alignment with the reinforcing wire tensioners;
- positioning a plurality of concrete tie molds having upwardly open elongated mold cavities oriented longitudinally within the stressing frame between the wire tensioners and wire anchors; and
- wherein the step of converting the road transportable sub-frame segments between the inoperative and operative conditions is performed by hinging the sub-frame segments to facilitate folding of portions of the segments about longitudinal hinge axes, and thereby effectively reducing the lateral widths of the sub-frames in the inoperative conditions and increasing the lateral widths in the operative conditions.
- 2. A process for setting up a road transportable concrete railroad tie molding system, as defined by claim 1 including the further step of providing interconnectable electrical resistance curing elements in the sub-frame segments.
- 3. A process for setting up a road transportable concrete railroad tie molding system, as defined by claim 1 including the further step of providing interconnectable electrical resistance curing elements in the sub-frame segments; and
- interconnecting the electrical resistance curing elements.
- 4. A process for setting up a road transportable concrete railroad tie molding system, as defined by claim 1 wherein the step of providing foundation members along a selected stressing bed site at the plant area is performed by providing longitudinal footing members along the prepared stressing bed site.
- 5. A process for setting up a road transportable concrete railroad tie molding system, as defined by claim 1 wherein the step of providing foundation members along a selected stressing bed site at the plant area is performed by providing a pair of parallel footings along the prepared stressing bed site to extend along the full length of the assembled sub-frame segments.
- 6. A process for setting up a road transportable concrete railroad tie molding system, comprising the steps of:
- providing a substantially level plant area;
- providing foundation members along a selected stressing bed site at the plant area;
- providing a stressing frame comprised of individual road transportable elongated sub-frame segments that are convertible between inoperative transport conditions and extended operative conditions;
- converting the road transportable sub-frame segments to the inoperative conditions;
- transporting the road transportable sub-frame segments in the inoperative conditions to the stressing plant using a conventional roadway surface vehicle;
- converting the road transportable sub-frame segments to the extended operative conditions;
- mounting the road transportable sub-frame segments to the foundation members in end-to-end, alignment to thereby form the stressing frame with a live end and a dead end;
- providing the road transportable sub-frame segments at the live end of the stressing frame with reinforcing wire tensioners;
- providing the road transportable sub-frame segment at the dead end of the stressing frame with reinforcing wire anchors in axial alignment with the reinforcing wire tensioners;
- positioning a plurality of concrete tie molds having upwardly open elongated mold cavities oriented longitudinally within the stressing frame between the wire tensioners and wire anchors; and
- wherein the step of providing foundation members along a selected stressing bed site at the plant area is performed by providing a pair of parallel footings along the prepared stressing bed site to extend along the full length of the assembled sub-frame segments.
- 7. A process for setting up a road transportable concrete railroad tie molding system, as defined by claim 6 including the further step of providing interconnectable electrical resistance curing elements in the sub-frame segments.
- 8. A process for setting up a road transportable concrete railroad tie molding system, as defined by claim 6 including the further step of providing interconnectable electrical resistance curing elements in the sub-frame segments; and
- interconnecting the electrical resistance curing elements.
- 9. A process for setting up a road transportable concrete railroad tie molding system, as defined by claim 6 wherein the step of providing foundation members along a selected stressing bed site at the plant area is performed by providing longitudinal footing members along the prepared stressing bed site.
- 10. A process for setting up a road transportable concrete railroad tie molding system, comprising the steps of:
- providing a substantially level plant area;
- providing foundation members along a selected stressing bed site at the plant area;
- providing a stressing frame comprised of individual road transportable elongated sub-frame segments that are convertible between inoperative transport conditions and extended operative conditions;
- converting the road transportable sub-frame segments to the inoperative conditions;
- transporting the road transportable sub-frame segments in the inoperative conditions to the stressing plant using a conventional roadway surface vehicle;
- converting the road transportable sub-frame segments to the extended operative conditions;
- mounting the road transportable sub-frame segments to the foundation members in end-to-end, alignment to thereby form the stressing frame with a live end and a dead end;
- providing the road transportable sub-frame segments at the live end of the stressing frame with reinforcing wire tensioners;
- providing the road transportable sub-frame segment at the dead end of the stressing frame with reinforcing wire anchors in axial alignment with the reinforcing wire tensioners;
- positioning a plurality of concrete tie molds having upwardly open elongated mold cavities oriented longitudinally within the stressing frame between the wire tensioners and wire anchors; and
- providing interconnectable electrical resistance curing elements in the sub-frame segments.
- 11. A process for setting up a road transportable concrete railroad tie molding system, as defined by claim 10 wherein the step of providing foundation members along a selected stressing bed site at the plant area is performed by providing longitudinal footing members along the prepared stressing bed site.
RELATED PATENT DATA
This patent resulted from a divisional application of U.S. patent application Ser. No. 08/731,828, which was filed on Oct. 21, 1996 and now U.S. Pat No. 5,766,648 issued Jun. 16, 1999.
US Referenced Citations (5)
Divisions (1)
|
Number |
Date |
Country |
Parent |
731828 |
Oct 1996 |
|