The present invention relates to protective covering of roofs and walls of built structures by polymer sheeting and, more particularly, to the temporary covering of damaged or under construction roofs, or as permanent sarking under roof covering or wall cladding.
The use of polymer sheeting for the protection of damaged roofs, or for weatherproofing buildings under construction, is known and was described for example in AU2009200232 and PCT/AU2009/000685 by the present inventor and the text of which is incorporated in this specification.
U.S. Pat. No. 6,425,213 (cited against an applicant's U.S. application Ser. No. 12/995,966) also describes a system of wrapping a building in a water impermeable layer but relies on the application of successive overlapping strips which are not secured one to another and would be liable to dislodgement in high wind conditions, and moreover is not for the repair of damaged roofs but as proofing against flooding.
Roofs are of course susceptible to damage from high winds, rain or hail. Tiled roofs for example may have a considerable area of tiles either damaged from hail impact, or dislodged completely as the result of high intensity storms. Shingled roofs are liable to be similarly damaged, and even metal sheeted roofs may suffer partial or total removal of one or more sheets. Damage to roofs may also be caused by the impact of falling trees, large branches, or other objects made airborne under high wind conditions.
Storm or impact damage cannot usually be immediately repaired so that to prevent further or potential damage to the interior of the building, temporary covering must be provided. Typically canvas (or similar material) tarpaulins are placed over the damaged part of the roof and secured to the structure by ropes.
One disadvantage of this method of temporary covering is the difficulty of adequately securing a tarpaulin to the roof so that they remain very vulnerable to dislodgement should high winds prevail or recur and often require continuing attention and adjustment. Moreover, they are heavy and awkward to position, posing occupational health and safety issues. A further disadvantage is that they are expensive to acquire and bulky to store, and if the many roofs are damaged in one storm event, the number of tarpaulins available may be inadequate.
Buildings under construction, particularly timber framed, brick clad dwellings, are frequently constructed in a sequence where the timber frame, including that of the roof, is completed a considerable time before the roof cladding can be added. A disadvantage of this construction technique is that during this period the timber of the structure, which may even include timber or particle board flooring, is liable to deterioration from water and sun. A further disadvantage of this sequence of construction is that, if rain intervenes at the time further internal work is scheduled, the lack of roof covering may cause considerable delay and financial loss.
A system of covering a roof with a film of material for the purpose of preventing damage from wind shear was disclosed in US 2005/0217202, although again this is therefore not directed at the covering after storm damage. Moreover this US application teaches a method of application of the film from a roll of film hoisted up onto the roof surface, the film being unrolled in situ with overlapping edges of the film being secured by the application of adhesive tape. Rolls of film are heavy and in practice the manipulation of a roll of film and the edge taping required on even an intact roof surface is extremely difficult, if not dangerous and is completely impractical for application to the roof framing of an uncompleted building.
It is known for both damaged roofs and uncompleted framed roofs, to prepare sufficiently assembled strips of film at ground level for subsequent application to the roof, as disclosed in the present applicant's patent AU2008203409. In practice however, it has been found that the sealing of an extensively damaged roof, or the covering of a roof still under construction by a continuous sheet of film material, can lead to unacceptable stress at the seams and attached edges of the sheet. This stress is due to wind action both passing over the sheet surface, and acting on the sheet from below.
A further problem, not previously addressed, is that even at ground level, the assembly of a number or adjoining sheets of polymer film into a sheet large enough to cover a roof, especially in the case of storm damage, wind conditions make the control of adjoining sheets extremely difficult. U.S. Pat. No. 4,872,941 discloses system for assembling by welding a horizontally overlapping sheets of thermoplastic, but this involves a large, cumbersome wheeled machine which travels over the sheets. Another overlap welding arrangement is disclosed in U.S. Pat. No. 3,257,257 which again involves the use of a welding machine travelling along the overlap between adjacent sheets. Apart from the relatively complicated machine, the system relies on a well-defined trench built into a supporting surface for accommodating a conveyor belt system and is thus completely unsuited to on site use.
There is thus a need for simple, readily portable but efficient equipment to control overlapping sheets laid out on a ground surface at the site of application. In particular, for heat welding to provided consistent and strong joints, that simple equipment must provide for a controlled application of heat to the overlap portions of adjoining sheets applied at a predetermined rate.
There is also a need to affix thin polymer sheeting to damaged roofs and uncompleted framed roofs so as to resist lifting forces imparted by wind.
It is an object of the present invention to address or at least ameliorate some of the above disadvantages.
The term “comprising” (and grammatical variations thereof) is used in this specification in the inclusive sense of “having” or “including”, and not in the exclusive sense of “consisting only of”.
The above discussion of the prior art in the Background of the invention, is not an admission that any information discussed therein is citable prior art or part of the common general knowledge of persons skilled in the art in any country.
According to one broad from of the invention there is provided a system for providing covers over at least a portion of a surface area of a built structure; the system including a film of polymer material stretching over the surface area of the built structure; the film formed as a sheet or an assembly of lengths of the polymer material; the film retained on the surface area by wrapping a trailing edge of the film of polymer batten and material around length of a securing the batten to the built structure.
Preferably, the polymer material is heat shrinkable polymer material.
Preferably, the film of polymer material is stretched over the at least a portion of the surface area of the built structure; the portion of the surface area comprising a roof surface of the built structure.
Preferably, the length of batten secured to the roof surface of the built structure.
Preferably, the film of polymer material is formed as an assembly of lengths of the polymer material by applying heat to overlap portions between adjoining lengths of the polymer material.
Preferably, the heat is applied to the overlap portions while the overlap portions are secured in contact between a supporting surface and a guide rail assembly.
Preferably, the polymer material is low density polyethylene.
Preferably, the polymer material is low density polyethylene containing shrinking resins.
Preferably, the film of polymer material is in the form of a sheet.
Preferably, the film of polymer material has a thickness in the range between 100 and 500 microns.
Preferably, the film of polymer material has a thickness of 200 microns.
Preferably, the film of polymer material is provided with a heat reflective surface.
Preferably, the film of polymer material is manufactured from a blend of LDPE resin and LLDPE resin.
Preferably, the film of polymer material is manufactured from a blend of LDPE resin and LLDPE resin in the ratio of 65% LDPE and 35% LLDPE.
Preferably, the film of polymer material includes UV screen additive.
Preferably, the film of polymer material has a minimum ultimate tensile strength 1000 pound per yard (450 kg per meter).
Preferably, after the film of polymer material is stretched over the surface area of the built structure and retained on the surface area heat is applied to at least portions of the film of polymer material so as to induce shrinking of the film of polymer material thereby to tighten the film of polymer material into conformity with the surface area.
According to another broad form of the invention there is provided a method of covering a surface area of a built structure; the method including the steps of:
Preferably, the polymer material is heat shrinkable polymer material.
Preferably, the film of polymer material is stretched over the at least a portion of the surface area of the built structure; the portion of the surface area comprising a roof surface of the built structure.
Preferably, the length of batten secured to the roof surface of the built structure.
Preferably, the film of polymer material is formed as an assembly of lengths of the polymer material by applying heat to overlap portions between adjoining lengths of the polymer material.
Preferably, the heat is applied to the overlap portions while the overlap portions are secured in contact between a supporting surface and a guide rail assembly.
Preferably, the polymer material is low density polyethylene.
Preferably, the polymer material is low density polyethylene containing shrinking resins.
Preferably, the film of polymer material is in the form of a sheet.
Preferably, the film of polymer material has a thickness in the range between 100 and 500 microns.
Preferably, the film of polymer material has a thickness of 200 microns.
Preferably, the film of polymer material is provided with a heat reflective surface.
Preferably, the film of polymer material is manufactured from a blend of LDPE resin and LLDPE resin.
Preferably, the film of polymer material is manufactured from a blend of LDPE resin and LLDPE resin in the ratio of 65% LDPE and 35% LLDPE.
Preferably, the film of polymer material includes UV screen additive.
Preferably, the film of polymer material has a minimum ultimate tensile strength 1000 pound per yard (450 kg per meter).
Preferably, after the film of polymer material is stretched over the surface area of the built structure and retained on the surface area heat is applied to at least portions of the film of polymer material so as to induce shrinking of the film of polymer material thereby to tighten the film of polymer material into conformity with the surface area.
According to another broad form of the invention there is provided a method of securing a film of polymer material over a roof; the method including the steps of:
Preferably, the polymer material is a heat shrinkable polymer material.
Preferably, edges of the overhang are wrapped at least twice around the battens or furring strips.
According to another broad form of the invention there is provided a method of mechanically joining overlapping edges of adjoining lengths of polymer material on a roof; the method including the steps:
Preferably, the polymer material is a heat shrinkable polymer material.
According to another broad form of the invention there is provided a method of providing covers over at least a portion of a roof of a storm damaged built structure comprising the steps of:
Preferably, the heat shrinkable film is provided with a heat reflecting surface, the heat shrinkable film forming a heat reflective layer under a roof cladding.
Preferably, the method further comprises the step of cutting the sheet of film from a roll of heat shrinkable film before said step of applying the sheet of film over the portion of the roof.
Preferably, the cutting step further comprising cutting the sheet of film at a different location than the structure.
Preferably, the sheet of film further includes a first lateral edge and a second lateral edge by which the sheet of film is bonded by the leading edge, the trailing edge, the first lateral edge and the second lateral edge; the method further including attaching the first lateral edge and the second lateral edge to the structure and heating the film to cause the film to conform to the portion of the roof.
Preferably, the composite sheet of film comprises at least a first sheet of film and a second sheet of film; the first sheet of film is bonded to the second sheet of film by applying heat to adjacent respective first and second lateral edges; the first and second lateral edges of the composite sheet of film attached to respective third and fourth edges of the structure; heating the film to cause the film to conform to the roof.
According to another broad form of the invention there is provided a method of covering at least a portion of a roof of a structure comprising the steps of:
Preferably, the cutting step comprising cutting the sheet of film at a location different than the structure.
Preferably, the portion of the roof is damaged leaving the structure open to the ingress of water.
Preferably, the attaching step comprises:
Preferably, the sheet of film further includes a first lateral edge and a second lateral edge by which the sheet of film is bonded by the leading edge, the trailing edge, the first lateral edge and the second lateral edge; the method further including attaching the first lateral edge and the second lateral edge to the structure and heating the film to cause the film to conform to the portion of the roof.
Preferably, the composite sheet of film comprises at least a first sheet of film and a second sheet of film; the first sheet of film is bonded to the second sheet of film by applying heat to adjacent respective first and second lateral edges; the first and second lateral edges of the composite sheet of film attached to respective third and fourth edges of the structure; heating the film to cause the film to conform to the roof.
According to another broad form of the invention there is provided a method of covering at least a portion of a roof of a structure comprising the steps of:
Preferably, the portion of the roof is damaged leaving the structure open to the ingress of water.
Preferably, the attaching step comprises:
Preferably, the sheet of film further includes a first lateral edge and a second lateral edge by which the sheet of film is bonded by the leading edge, the trailing edge, the first lateral edge and the second lateral edge; the method further including attaching the first lateral edge and the second lateral edge to the structure and heating the film to cause the film to conform to the portion of the roof.
Preferably, the composite sheet of film comprises at least a first sheet of film and a second sheet of film; the first sheet of film is bonded to the second sheet of film by applying heat to adjacent respective first and second lateral edges; the first and second lateral edges of the composite sheet of film attached to respective third and fourth edges of the structure; heating the film to cause the film to conform to the roof.
According to another broad form of the invention there is provided a method of providing covers over at least a portion of a roof of a storm damaged built structure comprising the steps of:
According to another broad form of the invention there is provided a method of covering at least a portion of a roof of a structure comprising the steps of:
According to another broad form of the invention there is provided a method of covering at least a portion of a roof of a structure comprising the steps of:
Accordingly, in a first broad form of the invention, there is provided a system for providing covers for surface areas of built structures; the system including a film of heat shrinkable material for stretching and heat shrinking over one or more of the surfaces of the built structure; the film formed as a sheet comprising an assembly of lengths of the heat shrinkable material prepared on a supporting surface; characterized in that the sheet is prepared by applying heat to overlap portions between adjoining lengths of the heat shrinkable material while the overlap portions are secured in contact between the supporting surface and a guide rail assembly laid over the overlap portions; the overlap portions welded together by a heat gun moveable along the guide rail assembly at a predetermined distance above the overlap portions.
Preferably, the supporting surface is a ground surface.
Preferably, the supporting surface is a surface of a supporting element placed on a ground surface.
Preferably, the guide rail assembly comprises spaced apart guide rail elements interconnected at their outer ends by connecting elements.
Preferably, the guide rail elements are provided with inward facing recesses.
Preferably, spacing between the guide rail elements is in the range of 15 to 30 mm.
Preferably, the supporting element comprises a length of heat resistant material.
Preferably, the supporting element is provided with a length of rope or cable attached to one end of the supporting element; the length of rope or cable being at least the length of a length of overlap of two adjoining lengths of the heat shrinkable material.
Preferably, a heat gun is provided with a heat directing shroud; width of the heat directing shroud sized so as to fit between edges of the recesses provided in the guide rail elements of the guide rail assembly.
Preferably, a length of the heat directing shroud is sized to provide fusion of a portion of the overlap of the two adjoining lengths of heat shrinkable material in a predetermined time.
Preferably, consistency and quality of a weld is ensured by separation between the heat gun and the overlap of material and a predefined rate of travel of the heat gun along the guide rail.
Preferably, undersides of the rail elements of the guide rail assembly are provided with strips of a heat insulating material.
Preferably, at least one air vent is provided in any of the lengths of heat shrinkable material; the air vent comprising an aperture and an overlying cover.
Preferably, three sides of material comprising the overlying cover overlap three edges of the aperture and are welded to the surface of the length of heat shrinkable material; a fourth side of the overlying cover overlapping a fourth edge of the aperture by at least 300 mm.
In another broad form of the invention, there is provided a method of preparing a film of material for covering surfaces of a built structure; the film comprising an assembly of lengths of heat shrinkable material; the method including the step of applying heat along an overlap between adjoining lengths of the heat shrinkable material; characterized in that the application of heat is guided by a guide rail assembly; the guide rail assembly placed over a section of overlap lying on an elongate supporting element positioned on a ground surface.
Preferably, the method includes the steps of:
Preferably, subsequent overlap portions of the two adjoining lengths of heat shrinkable material are fused together by the steps of:
Preferably, the guide rail assembly comprises two spaced apart guide rail elements interconnected at their outer ends by connector elements.
Preferably, at least one air vent is provided in at least one length of the heat shrinkable material; the air vent comprising a pre-cut aperture in the length of heat shrinkable material and a cover; three sides of the cover overlapping three edges of the aperture and welded to the length of heat shrinkable material; a fourth side of the cover over lapping a fourth edge of the aperture by at least 300 mm.
In a further broad form of the invention, there is provided a method of preparing an assembly of sheets of a heat shrinkable material on a ground surface; the assembly of sheets prepared for covering one or more surfaces of a built structure; the method including locating overlapping lengths of adjacent strips of the heat shrinkable material between a supporting surface and a guide rail assembly placed over the overlapping lengths; a heat source movable along the guide rail assembly at a predetermined rate heat welding the overlapping lengths to form the assembly of sheets.
Preferably, the heat source is a heat gun mounted on a trolley adapted for movement along rails comprising the guide rail assembly.
Preferably, the trolley is powered to give a controlled rate of movement along the rail system.
In another broad form of the invention, there is provided a method of covering a storm damaged area of a roof of a built structure; the method includes the step of preparing an assembly of sheets of a heat shrinkable material on a ground surface; the method including sequentially applying the steps of:
Preferably, the method includes the further steps of:
Preferably, the guide element is a guide rail assembly; the guide rail assembly structured to constrain movement of the heat source along the portion of the overlap at a predetermined separation above the heat shrinkable material.
In another broad form of the invention, there is provided a method of preparing a sarking layer for a built structure; the sarking layer comprising an assembly of sheets of a heat shrinkable material; the method including the steps of:
In still a further broad form of the invention, there is provided a method of temporarily waterproofing a storm damaged area of a roof of a built structure by securing an assembly of sheets of heat shrinkable material to at least a portion of the roof surface; the assembly of sheets prepared by heat welding overlap portions of adjoining sheets; the method including the steps of securing sequential overlap portions of the adjoining sheets between a supporting surface and a guide rail assembly, and passing a heat source along the guide rail assembly.
Preferably, the method includes the further steps of:
In still a further broad form of the invention, there is provided a method of preparing and securing an assembly of sheets of heat shrinkable material over a damaged section of a roof surface; the method including the steps of:
Preferably, the supporting surface is a ground surface.
Preferably, the supporting surface is the upper surface a length of heat resistant material substantially coextensive with the guide rail assembly.
Preferably, the length of heat resistant material is pulled from the first portion of the overlap to subsequent portions of the overlap by a rope or cable extending from the length of heat resistant material.
In another broad form of the invention, there is provided a kit for temporary repair of a storm damaged roof or other surface of a built structure; the kit comprising a box enclosing at least one roll of heat shrinkable material, a heat source and a guide rail assembly.
Preferably, the roll or rolls of heat shrinkable material are rotatably mounted within the box enabling lengths of the heat shrinkable material to be drawn from the box for use.
Preferably, the heat shrinkable material is wound onto the roll or rolls in a twice folded state; the width of the heat shrinkable material when spread out after cutting from a roll approximately equal to three times the width of the roll.
Preferably, adjacent lengths of the heat shrinkable material are spread on a supporting surface with a predetermined overlap of one length of the heat shrinkable material over the other; the guide rail assembly positioned over a first overlap portion of the overlap and the heat source moved along the guide rail assembly to weld the adjoining lengths along the first overlap portion.
Embodiments of the present invention will now be described with reference to the accompanying drawings wherein:
The roof cover system of the present invention provides for a system and method for covering a damaged or uncompleted roof of a building. The system uses a heat shrinkable film, preferably a low-density polyethylene containing shrinking resins, UV inhibitors, anti brittling compounds, fire retardant additives and strengtheners for tear resistance. The film is preferably between 100 and 500 microns in thickness, though most preferably 200 microns, and is provided in rolls of various widths and lengths. In at least one preferred form of the film, it is provided with a heat reflective surface. A preferred specification for the film is given at the end of the description.
With reference now to
If required, sharp edges protruding from the roof surface may first be covered with suitable wadding and adhesive tape to prevent possible tearing of the film during application.
The extent of roof to be covered is measured and the most suitable available width roll of the heat shrinkable film selected. Film is cut to one or more lengths sufficient to extend from one edge of the roof to an opposite edge. With reference to
The leading edge of the film is now passed over the roof to the opposite edge (not shown) of the roof and the leading edge of the film secured to the opposite side eaves in similar manner to that already described. If the outer side edge of the length of film adjoins an edge of the roof, this may be similarly secured under the eaves along that side of the roof. Alternatively, the leading edge of the film may be secured to the barge or fascia boards.
In one form heat is now applied to the film at the underside of the eaves 24 with a heat gun (not shown) to cause the film 18 to shrink securely around the batten and the undersides of the eaves. The heat gun, now attached to an extension arm (not shown), is then used to apply heat to at least a region around the perimeter of the film 18 stretched over the roof surface, causing it to tightly conform to the surface and covering missing or cracked tiles 12.
If the extent of the damage requires, successive lengths of film can be applied side by side. In a preferred form the film can be applied side by side with an overlap of preferably 150 to 300 mm. In a preferred form heat is applied along these overlaps to seal the edges of the adjoining lengths together.
Valley areas and other discontinuities in the roof surface can be accommodated by cutting film to suit the area involved and heat sealing to adjoining film length edges. Vertical roof penetrations, such as chimney stacks ventilators and the like, are sealed by preferably a 300 mm rise of film. Edges of riser sections of film can be taped or cable-tied to the penetration.
By the above means, a damaged roof can be rapidly and securely covered to prevent water ingress and damage to the inside of the building. Unlike tarpaulins which are difficult to secure and remain liable to dislodgement in high winds, the heat shrinkable film by conforming closely to the roof surface, provides a secure seal over the damage until permanent repairs can be made.
In a second preferred embodiment of the invention, a damaged section of a roof to be temporarily protected prior to permanent repair, is again covered by a heat shrinkable film. In this embodiment however, the method of application is different.
Instead of attempting to apply individual lengths of film, attaching a length at a first end to the eaves at one side of the roof, stretching the length over the roof to be attached at the eaves at the opposite side, and taping the edges of adjoining lengths of film together, the method of this embodiment, with reference to
This assembled sheet is now pulled up onto the roof, positioned so as to cover the damaged area and outer ends fastened in similar manner as previously described above.
An advantage of this method is that there is no need to lift a relatively heavy roll of heat shrinkable material onto the roof and unroll it one what may be quite steep surfaces. Moreover it has been found in practice that the arrangement described in the first preferred embodiment above of taping the edges of adjoining lengths of the material together on the roof is both difficult and dangerous. This is especially so if the damage to the roof is extensive and perhaps been rendered structurally unsafe. The method of the present described embodiment minimises activity on the roof surface, requiring only that one edge of the sheet of material be carried over the roof from a first edge to an opposite edge.
In a third preferred embodiment of the invention, a heat shrinkable film may be applied to the roof framing of an uncompleted building. In this embodiment as shown in
In this embodiment also, lengths of film are prepared from suitable width rolls sufficient to stretch from one side of the roof to an opposite side. In this case the trailing and leading edges of the length of film are preferably attached by means of battens 20 fixed to the underside of the outer ends 26 of rafters 28, that is between the outer ends of the rafters 28 and the wall frame 30.
The heat shrinkable film 18 in this embodiment, is provided with a heat reflecting inner surface 32 so that the film 18 forms a permanent sarking layer behind the wall cladding or under the roof cladding, either tiles 34, as shown in
The weatherproof nature of the heat shrinkable material applied in this way provides for internal work on the building to continue in the event of inclement weather, thus increasing productivity and economy of construction.
It will be understood that the method of application described in the second preferred embodiment above is also, indeed perhaps even more so, applicable to the present embodiment. In this case manipulating a roll of material and taping edges of lengths of material together over the open framework of the roof of a building under construction is even more difficult so that assembly on the ground, perhaps into a number of sheets, prior to placement over the roof framing, is clearly advantageous.
In each of the above described embodiments, the sheet of material may be further prepared, as shown in
In one preferred form the vent 100 is pre-formed of low density polyethylene and provided with a self adhesive base 114. To apply the vent 100 after the aperture has been prepared, a protective cover 116 is peeled off the adhesive layer of base 114 and the vent 100 pressed into position.
These vents allow the exhalation of air from underneath the sheet of material, either as a result of higher air pressure arising within the roof space, for example through rising warm air or through the ingress of wind, or due to negative pressure above the sheet material.
In the above described embodiments, in those cases where two or more adjoining lengths of heat shrinkable material were described as assembled into a sheet on a ground surface, the lengths of material were secured together by adhesive tape. While this can be adequate for temporary cover of a storm damaged structure for example, a stronger and, where required, a far stronger and more permanent solution is the heat welding of adjoining lengths of material along an overlap.
Nevertheless, prior to welding, it is preferable to hold the edge of the uppermost sheet of the overlap in place by adhesive tape to prevent problems in windy conditions.
With reference now to
As shown in
As shown in
The guide rail assembly 220 comprises two, spaced apart, rigid rail elements 222 and 224, preferably 1m in length but may be provided in various lengths, for example 300, 600 or 1200 mm. The rail elements 222 and 224 are interconnected at their outer ends by connection cross members 226 and 228. Preferably, the end profiles of the rail elements 222 and 224 are as shown in
A heat gun 232 (partly shown in
The heat gun 232 with its attached shroud 234 in drawn along the guide rail assembly 220 at an even rate, thus fusing that length of overlap 216 covered by the rail assembly. In one preferred arrangement, the heat gun may be mounted on a trolley (not shown) which traverses the guide rail. The heat gun may be moved along the guide rail manually, or the trolley could be powered to give a controlled rate of movement.
The arrangement of the guide rail which controls the separation of the heat gun from the material, combined with a predefined rate of travel, assures the consistency and quality of the weld.
The supporting element 200 is then drawn with the rope or cable 210 into a next position along the sheet overlap and the guide rail assembly 220 repositioned accordingly. Heat is then applied to this next length of the overlap, and the process repeated until the required length of sheet assembly is reached.
In an alternative arrangement, the sheets of material may be laid out over a suitable ground surface such as for example a nearby car park or a suitably flat area of lawn. In this instance, the overlap portion is again secured prior to the welding process by the placement of the guide rail assembly over the overlap portion and the heat source applied as described above. After welding this first overlap portion, the guide rail assembly is positioned over a next overlap portion until a required length of sheet assembly is reached.
The air vents 100 referred to above and shown in
The arrangement of this preferred embodiment allows for very secure, watertight and relatively accurate joining of adjoining lengths of the heat shrinkable material. The portion of overlap to be joined is held securely by the weight of the guide rail assembly while the guide rail profiles both a guide and control of the application of fusing heat.
The assembly of sheets is prepared for fastening to the roof by adding securing battens at least along two opposing edges after pulling the assembly up onto the roof surface to cover the damaged areas. The battens are then mechanically secured either to the eaves of the roof, the facia boards or, if the damage is restricted to a relatively small area of the roof, to battens of the roof structure.
In this latter case and for a tiled roof as shown in
The heat shrinkable material, guide rail assembly, heat gun, tape and associated tools may be provided in kit form. In a preferred arrangement shown in
Preferably, the heat shrinkable material is wound onto the rolls 40 folded as shown in
It will be understood that the procedure of the assembly of lengths of the heat shrinkable material as described for this embodiment may equally be applied for the assembly of sheets of heat shrinkable material intended to form a sarking layer for the roof or walls of a building where the sarking layer is secured to the roof and wall framing before applying the roof and wall cladding.
With reference to
If required, sharp edges protruding from the roof surface may first be covered with suitable wadding and adhesive tape to prevent possible tearing of the film during application.
The extent of roof to be covered is measured and the most suitable available width roll of the heat shrinkable film selected. Film is cut to one or more lengths sufficient to extend from one edge of the roof to an opposite edge. With reference to
The leading edge of the film is now passed over the roof to the opposite edge (not shown) of the roof and the leading edge of the film secured to the opposite side eaves in similar manner to that already described. If the outer side edge of the length of film adjoins an edge of the roof, this may be similarly secured under the eaves along that side of the roof. Alternatively, the leading edge of the film may be secured to the barge or fascia boards.
In a preferred form no heat is applied to the film. The film is secured around the batten and the undersides of the eaves to tightly conform to the surface and covering missing or cracked tiles 12.
If the extent of the damage requires, successive lengths of film can be applied side by side. In a preferred form the film can be applied side by side with an overlap of preferably 150 to 300 mm. In a preferred form no heat is applied along these overlaps.
Valley areas and other discontinuities in the roof surface can be accommodated by cutting film to suit the area involved and mechanically fixed to adjoining film length edges. Vertical roof penetrations, such as chimney stacks ventilators and the like, are sealed by preferably a 300 mm rise of film. Edges of riser sections of film can be taped or cable-tied to the penetration.
With reference now to
In this preferred arrangement, the material 300 is drawn over the perimeter guttering 304, before edges of the overhang being wrapped at least partially, but more preferably at least twice, around a batten or furring strips 306, which is then secured to the facia or barge board 308.
Although the embodiment has been described in
Turning now to
As shown in
The edge 314 of the second of the overlapping edges of length 310B is then similarly wrapped around the second batten or furring strip 318, and this second batten or furring strip placed beside the first, lying over the polymer material of the first length 310A. This batten or furring strip 318 is then similarly secured either by driving a screw 322 through the wrapped material, batten and roof cladding into the substructure element. Alternatively, the second batten may be secured to the first.
In use, one or more kits are transported to a site where damage to a roof has occurred. The damaged area is measured and the number of lengths to cover the width and the length of the lengths of material determined. These lengths are drawn from the kit box and an initial two lengths placed side by side on the supporting surface, which may be directly on the ground or on a supporting element, with the required overlap, and the overlap welded as described above.
The welding process described in this embodiment of the invention has been proven to provide extremely strong welds, well able to withstand any conceivable wind load when applied to a roof or to the structure of a building under construction, as attested by the extract from a laboratory test report shown in
A blend of LDPE resin & LLDPE resin (suitable resin examples Dowlex 2645 liner low density polyethylene (LLDPE) with a relative density of 0.918 & melt index of 0.85 mixed with Dow 303E low density polyethylene (LDPE) with a relative density 0.922 & melt index of 0.30. Best performance is a mixture of 65% LDPE & 35% LLDPE.
In a preferred form, the material for the protective covering may be a blend of LDPE resin & LLDPE resin. The material may include additives to improve its UV stability and flame retardant properties.
One example of the material specification is listed as follows:
Number | Date | Country | Kind |
---|---|---|---|
2008202416 | Jun 2008 | AU | national |
2008203409 | Jul 2008 | AU | national |
2008101060 | Oct 2008 | AU | national |
2009200232 | Jan 2009 | AU | national |
Number | Date | Country | |
---|---|---|---|
Parent | 18338015 | Jun 2023 | US |
Child | 18762777 | US | |
Parent | 17519787 | Nov 2021 | US |
Child | 18338015 | US | |
Parent | 12995966 | May 2011 | US |
Child | 15783813 | US |
Number | Date | Country | |
---|---|---|---|
Parent | 15783813 | Oct 2017 | US |
Child | 17519787 | US |