Abstract
A method and apparatus for mounting a water heater on the roof of a building or at another location outside of the building. A roof curb surrounds a hole in the roof, and a base member is mounted to the roof curb. Alternatively, the base member is mounted on a concrete pad at ground level. A water tank is mounted to the base member with the longitudinal axis of the water tank extending horizontally. Support rails are mounted to the base member, and wedge-shaped supports are mounted to the support rails. The wedge-shaped supports are interconnected with tank mounted brackets that are mounted to the sides of the water tank. Thermally insulated spacers are interposed between the wedge-shaped supports and the tank mounting brackets.
Description




FIELD OF THE INVENTION




The invention relates to water heaters, and more particularly to water heaters adapted to be mounted on the roof of a building.




BACKGROUND




It is known to provide a water heater within a building, and to mount other equipment (e.g., HVAC equipment) on the roof of a building. A primary concern with rooftop equipment is the load imposed on the roof by the weight of the equipment. Most rooftop equipment is supported on the roof by a roof curb. The roof curb provides a weather-tight seal between the equipment and the roof, and distributes the weight load of the equipment to the building's roof. The roof curb also prevents leakage of water into the building and equipment in the event of a roof flood. Roof curbs are typically built to match the pitch of the roof so that the equipment mounts on a level surface. Rooftop equipment is typically raised to the roof with a crane and set on the roof curb. A foam sealing tape is often used between the bottom of the equipment and the roof curb to provide a weather-tight seal.




Many commercial buildings include a wall around the rooftop to screen the rooftop equipment from view. Much of the HVAC equipment currently installed on rooftops is enclosed in a rectangular cabinet, and has a sufficiently low profile to be not visible from the ground level.




SUMMARY




The present invention identifies several advantages to providing a water heater on the roof of a building. In commercial applications, one factor affecting many aspects of some businesses, and particularly retail and restaurant businesses, is floor space. Moving a water heater out of a building and positioning it on the building's roof may permit more floor space to be used for conducting business. In addition to potentially freeing up floor space and the need for a separate boiler room in a building, the present invention provides other advantages over interior water heaters. For example, the design of interior water heaters must account for such considerations as flooding, CO generation, interior noise, some fire hazards arising from flammable vapors, building depressurization, and exhaust venting. While interior water heaters are sometimes limited to a significant degree by such design concerns, a rooftop water heater embodying the present invention is typically not affected to the same extent. This may make design and maintenance of the rooftop water heater simpler and cheaper in some instances when compared to the design and maintenance of interior water heaters.




Several design parameters are imposed on the design of a rooftop water heater by weather conditions and the expectations of potential purchasers of such water heaters. The water heater must first account for weather conditions not normally encountered by interior water heaters. It would be desirable to mount the water heater on a weather-tight roof curb that would support the water heater above expected water levels in the event of a roof flood. The roof curb would also provide the required weight load distribution to the roof. Because roof curbs are already used to support other rooftop equipment, it is convenient to use a roof curb to support a rooftop water heater as well.




To maintain the aesthetics of their buildings, purchasers would likely want equipment that cannot be ordinarily seen from the ground level. The water heater therefore must have a sufficiently low profile and be of substantially the same height as most HVAC equipment to meet the expected demands of purchasers.




In light of the foregoing considerations, the present invention provides a rooftop water heater that includes a water tank mounted on a base member which is in turn mounted on a roof curb. The base member includes a drain communicating with the building's sewage system so that water leaking or otherwise flowing out of the water tank is drained away from the water heater without causing damage to the roof or the water heater itself. A pair of rails may be mounted under the base member such that the water heater and base member may be moved with a fork lift. The rails also include holes for accepting the hooks of a lifting crane for raising the water heater to the roof of the building.




The water tank is preferably generally cylindrical in shape with a longitudinal axis extending substantially horizontally. In this regard, the tank has a low profile compared to a tank having its longitudinal axis extending vertically. A head encloses one end of the tank. A plurality of water pipes extend up through the roof curb and through a water pipe aperture in the base member. A vertical wall surrounds the water pipe aperture. A grommet fits over the vertical wall and seals the water pipes with respect to the base member.




A plurality of panels, including a cabinet door and a top, are preferably interconnected with and supported by the base member to substantially weather-tightly enclose the water tank. The top and cabinet door may be removed from the other panels to permit access to the water tank.




A U-shaped flue tube is preferably contained within the water tank. A baffle or turbulator is positioned within one of the legs of the U-shaped flue tube. The ends of the flue tube extend through the head of the tank. The legs each include a longitudinal axis, and the longitudinal axes together define a flue plane that may be disposed substantially vertically, or may be angled with respect to vertical. Preferably, the flue plane is angled in the range of 30-60° with respect to vertical.




The water heater also includes inlet and outlet tubes for providing cold water to the tank and drawing hot water from the tank, respectively. The inlet and outlet tubes extend substantially the entire inside length of the tank, and preferably include a plurality of apertures facing in a single direction. The outlet tube is positioned in the top portion of the tank with its apertures facing up while the inlet tube is positioned in the bottom portion of the tank with its apertures facing down. Preferably, the inlet and outlet tubes extend through the head of the tank, but in an alternative construction, the inlet and outlet tubes include elbows that extend through the tank shell.




Other features and advantages of the invention will become apparent to those skilled in the art upon review of the following detailed description, claims, and drawings.











BRIEF DESCRIPTION OF THE DRAWINGS





FIG. 1

is a perspective view of a water heater embodying the present invention.





FIG. 2

is a view of the water heater of

FIG. 1

from a different perspective.





FIG. 3

is an exploded view of the cabinet of the water heater of FIG.


1


.





FIG. 4

is a perspective view of the tank assembly of the water heater of FIG.


1


.





FIG. 5

is a schematic illustration of the piping system associated with the tank assembly of FIG.


4


.





FIG. 6

is a cross-section view taken along line


6





6


in FIG.


4


.





FIG. 7

is a perspective view of the tank assembly of

FIG. 4

with selected elements removed for the purpose of illustration.





FIG. 8

is an exploded view of the tank assembly of

FIGS. 4 and 7

.





FIG. 9

is an end view of the tank assembly of

FIGS. 4 and 7

.





FIG. 10

is a side cross-section view of the tank assembly taken along line


10





10


in FIG.


9


.





FIG. 11

is a view of the outlet tube taken along line


11





11


in FIG.


10


.





FIG. 12

is an end view of a tank assembly of an alternative construction.





FIG. 13

is a side cross-section view taken along line


13





13


in FIG.


12


.











Before one embodiment of the invention is explained in detail, it is to be understood that the invention is not limited in its application to the details of construction and the arrangements of the components set forth in the following description or illustrated in the drawings. The invention is capable of other embodiments and of being practiced or being carried out in various ways. Also, it is understood that the phraseology and terminology used herein is for the purpose of description and should not be regarded as limiting. The use of “including” and “comprising” and variations thereof herein is meant to encompass the items listed thereafter and equivalents thereof as well as additional items. The use of “consisting of” and variations thereof herein is meant to encompass only the items listed thereafter. The use of letters to identify elements of a method or process is simply for identification and is not meant to indicate that the elements should be performed in a particular order.




DETAILED DESCRIPTION




The present invention is embodied in a water heater including a cabinet


10


illustrated in

FIGS. 1-3

and a tank assembly


14


illustrated in

FIGS. 4-13

. A first construction of the tank assembly


14


is illustrated in

FIGS. 4-11

. With particular reference to

FIGS. 9 and 10

, the tank assembly


14


includes a tank


18


having a substantially cylindrical shape and a horizontally-extending longitudinal axis


22


. The tank


18


includes a shell


24


that is closed at one end by a head


26


. A U-shaped flue tube


30


is positioned within the tank


18


. The U-shaped flue tube


30


includes two legs


31


,


32


communicating through a curved or bent portion


33


. The legs


31


,


32


terminate in a burner end


34


and an exhaust end


38


, respectively, both of which extend through the head


26


.




Turning to

FIGS. 1-3

, the cabinet


10


is mounted on a roof curb


42


on a rooftop


46


of a building, and encloses the tank assembly


14


. The cabinet


10


is generally rectangular in shape, having its major axis extending generally horizontally. In this regard, the cabinet


10


has a generally low profile and is similar to other rooftop units such as typical HVAC (e.g., air conditioning) units. As used herein, “low profile” means that the rooftop water heater cabinet


10


cannot typically be seen by a person of average height standing at ground level from a distance of about one city block. The low profile therefore permits the unit to be mounted on a rooftop without detracting from the aesthetics of the building. Roof rails and a pitch pocket or small roof curb may be used as an alternative mounting structure to the roof curb


42


illustrated.




As seen in

FIG. 3

, the cabinet


10


includes two side panels


50


,


54


arranged generally parallel to each other and at right angles to a third side panel or end panel


58


. A second end panel or cabinet door


62


is releasably attached at right angles to the two side panels


50


,


54


and generally parallel to the end panel


58


. The door


62


includes a cutout


66


and a recessed or raised handle


70


to facilitate removal of the door


62


from the rest of the cabinet


10


without the use of tools. An upper panel or top


74


is releasably affixed to the top edges of the other panels


50


,


54


,


58


,


62


of the cabinet


10


. The top


74


is preferably removable from the rest of the cabinet


10


without the use of tools. Preferably the door


62


and top


74


are locked to the other panels


50


,


54


,


58


to resist tampering with the tank assembly


14


.




A base member


78


supports the cabinet panels


50


,


54


,


58


,


62


,


74


and provides the bottom of the cabinet


10


. The base member


78


is supported by the roof curb


42


, and a foam tape or other sealing member is preferably interposed between the roof curb


42


and the base member


78


to create a water-tight seal therebetween. A pair of rails


82


are mounted to the underside of the base member


78


and straddle the roof curb


42


. The rails


82


define channels along their lengths into which the prongs of a conventional fork lift may be inserted for lifting and lowering the water heater, and also include slots


86


to insert the forklift prongs transverse to the channels. The rails


82


also include apertures


90


for attaching the hooks of a lifting crane to facilitate lifting the water heater to the roof


46


of the building.




When the top and door


74


,


62


are removed, the tank assembly


14


is sufficiently exposed to permit a service technician to perform service on the water heater. An electrical disconnect button


94


(

FIG. 1

) is mounted to one of the side panels


50


. The disconnect button


94


permits the service technician to conveniently connect and disconnect power to the water heater while the technician is on the rooftop


46


. An electrical outlet


98


(

FIG. 1

) is also provided to accommodate a service technician's power tools and electric lights. Another feature of the water heater is the provision of local and remote controllers


99


,


100


, respectively, that include thermostats. The local controller


99


may be mounted on the side panel


50


as illustrated, or it may be mounted within the cabinet


10


. The remote controller


100


is mounted in a desirable place within the building. The local and remote controllers


99


,


100


each include a digital display of the water temperature within the tank


18


, and permit adjustment of the temperature. Thus, the water heater may be monitored and controlled from both the rooftop


46


and from within the building. This arrangement creates convenience for both the building owner or occupant within the building and a service technician on the rooftop


46


.




The cabinet panels


50


,


54


,


58


,


62


,


74


are joined together around the tank assembly


14


in a weather-tight fashion. As used herein, “weather-tight” means that rain or other precipitation falling on the cabinet


10


from above are substantially prevented from entering the cabinet


10


and interfering with the operation of the water heater. For example, one of the side panels


54


includes an air inlet vent


102


that opens downwardly to cause precipitation to run off the cabinet


10


, and the other side panel


50


includes a downwardly-opening exhaust vent


106


. In addition to being weather-tight, the edges of the cabinet panels


50


,


54


,


58


,


62


,


74


are preferably substantially water-tightly joined to each other (e.g., by welding or with gasket material) to resist or prevent water from entering the cabinet


10


and interfering with the operation of the water heater.




Turning now to

FIG. 4

, the tank assembly


14


will be discussed in more detail. A fan or combustion blower


110


communicates with the air inlet vent


102


through an inlet duct


112


to deliver air from outside the cabinet


10


to a gas fuel burner


114


positioned at the burner end


34


of the flue tube


30


. Gas fuel is also delivered to the burner


114


via a gas pipe


118


and regulator


122


. The burner


114


causes combustion of the air and gas fuel, and the products of combustion are forced through the flue tube


30


by the combustion blower


110


. The products of combustion heat the water in the tank


18


through the wall of the flue tube


30


, and then exit the exhaust end


38


of the flue tube


30


. The exhaust vent


106


communicates with the exhaust end


38


of the flue tube


30


through an exhaust duct


123


to permit the spent products of combustion to be exhausted to the surrounding atmosphere.




With additional reference to

FIG. 8

, a baffle or turbulator


124


is positioned within one of the legs


31


,


32


of the U-shaped flue tube


30


, and preferably in the upper leg


32


. The legs


31


,


32


each include a longitudinal axis


125


(FIG.


10


), and the longitudinal axes


125


together define a flue plane FP (

FIG. 9

) that may be disposed substantially vertically, or may be angled with respect to vertical an angle labeled α. Preferably, the angle α is between 30-60° with respect to vertical.




Referring to

FIGS. 8-11

, an inlet tube


126


and outlet tube


130


are also mounted in the head


26


, and extend substantially parallel to the longitudinal axis


22


of the tank


18


. The inlet tube


126


is positioned in the bottom portion of the tank


18


below the longitudinal axis


22


, and the outlet tube


130


is positioned in the top portion of the tank


18


above the longitudinal axis


22


. Preferably, the inlet tube


126


, outlet tube


130


, and longitudinal axis


22


of the tank


18


are aligned parallel to each other in a vertical plane. This arrangement is made possible in part because the flue plane angle α is greater than zero (i.e., the flue plane FP is non-vertical), which moves the legs


31


,


32


of the flue tube


30


from a position in which they would interfere with the extension of the inlet and outlet tubes


126


,


130


. The tubes


126


,


130


are substantially identical to each other and preferably have a length


132


(

FIG. 11

) slightly shorter than or substantially the same as the interior length


134


of the tank


18


so that cold water is provided and hot water is removed along the entire interior length


134


of the tank


18


. The preferred length


132


is between about 37 and 38 inches, but the length


132


will vary depending on the dimensions of the water tank


18


. A threaded end


138


is attached at one end of the tubes


126


,


130


. The threaded end


138


is threaded into a threaded spud


142


in the tank head


26


, and includes additional threads to receive a nipple, water pipe, or other plumbing fixture. In a less preferred embodiment, one or both of the tubes


126


,


130


may be significantly shorter than illustrated, or the outlet tube


130


may be removed, leaving only the conventional spud


142


to which the building's hot water pipe communicates.




The end


146


opposite the threaded end


138


is closed. The tubes


126


,


130


include a plurality of holes, apertures, or openings


150


along their lengths. The tubes


126


,


130


preferably have an outer diameter of about one inch, with the holes


150


having a diameter of about 0.25 inches. The hole spacing


154


is preferably about five inches, with the last hole being spaced from the closed end


146


a distance


158


of about 0.5 inches.




In the illustrated construction, all of the openings


150


in the inlet tube


126


face down and all of the openings


150


in the outlet tube


130


face up. Thus, the inlet tube


126


directs cold water toward the bottom of the tank


18


and the outlet tube


130


draws hot water from the top of the tank


18


. This is advantageous because the hottest possible water is drawn from the top by the outlet tube


130


while the inlet tube


126


introduces cold water directly at the bottom of the tank


18


. The inlet tube


126


therefore evenly distributes water at the bottom of the tank to minimize mixing and thereby maximize heated water drawn from the tank


18


. In alternative less preferred constructions, the openings


150


may be arranged around the periphery of the tubes


126


,


130


instead of opening in only one direction.




As can be seen in

FIGS. 3

,


4


, and


6


, the base member


78


includes a water pipe aperture


162


surrounded by a vertical wall


166


. Four water pipes


168




a


,


168




b


,


168




c


,


168




d


(collectively referred to as


168


) extend up from the building, through the roof curb


42


, and through the aperture


162


, and communicate with the water tank


18


. A grommet


170


includes apertures


174


water-tightly slip fit around the water pipes


168


, and has a depending wall


178


(

FIG. 6

) water-tightly slip fit over the vertical wall


166


. The grommet


170


therefore provides a water-tight seal between the pipes


168


and the base member


78


. Suitable clamps


182


can be employed to further tighten the grommet


170


around the vertical wall


166


and pipes


168


.





FIGS. 4-6

illustrate the piping system associated with the tank assembly


14


. One of the water pipes


168




a


provides cold water to the water inlet tube


126


. Another water pipe


168




b


removes hot water from the tank


18


through the outlet tube


130


, and this hot water is used for dishwashers and other applications requiring very hot water (e.g., between about 120° F. and about 150° F., or a higher temperature if necessary). Another water pipe


168




c


communicates with a mixing valve


186


, and delivers a mixture of hot water and cold water to the warm water faucet of the building's bathrooms and kitchen sink.




The last water pipe


168




d


communicates between the building's hot water pipes and a circulation pump


190


. The circulation pump


190


performs two functions. First, the circulation pump


190


is turned on by the controller


99


(

FIG. 1

) each time the combustion blower


110


is turned on, and remains active for a set period of time (e.g., about nine minutes) after the combustion blower


110


is turned off. A bypass valve


191


is actuated to route water from the outlet tube


130


, through the circulation pump


190


, and back into the tank


18


through the inlet tube


126


. In this manner, the circulation pump


190


causes hot water to be drawn off the top of the water tank


18


through the outlet tube


130


and recirculated through the cold inlet tube


126


to even out the temperature of the water in the tank


18


and reduce the effects of stacking.




The second function of the circulation pump


190


is to maintain a supply of hot water in the pipes of the building. A thermostat


192


(

FIG. 5

) may be employed to determine when the temperature in the building's hot water pipes has dropped below an desired temperature (e.g., when a hot water draw has not occurred for an extended period of time). In this case, the bypass valve


191


is turned to permit the circulating pump


190


to circulate the water in the building's hot water pipes into the inlet pipe


126


, which forces hot water out the outlet pipe


130


and into pipe


168




b


. The hot water replaces the water in the building's hot water pipes. The piping system also includes check valves CV and an adjustable gate valve GV (which may be replaced with a fixed valve). The gate valve GV may be used to control the flow rate of recirculated water into and out of the water tank


18


.




Referring again to

FIG. 3

, the base member


78


also includes a drain opening


194


that receives a drain member


198


. The drain member


198


communicates with a drain pipe


202


(shown in phantom in

FIGS. 1

,


2


, and


4


) in the building, and the drain pipe


202


communicates with the building's sewage system. The drain opening


194


is the only opening in the base member


78


through which water is permitted to flow in the event of a water leak within the cabinet


10


. Thus, any water flowing freely within the cabinet


10


drains through the drain opening


194


and is routed to the building's sewage. The tank assembly


14


also includes a drain valve


204


(

FIG. 5

) that permits the tank


18


to be drained. The valve


204


is preferably positioned over the drain opening


194


.




As seen in

FIGS. 4 and 8

, the water heater also includes a temperature and pressure valve


206


, which opens in the event the temperature of the water in the tank


18


becomes too high, or if unacceptable pressure levels are present within the tank


18


. A hose or pipe


210


extends down from the temperature and pressure valve


206


, and terminates above the drain opening


194


. Water is drained from the top of the tank


18


and is fed into the building's sewage system in the event of an overtemperature or overpressure condition in the tank


18


.




Referring again to

FIGS. 7 and 8

, the water tank assembly


14


also includes a pair of support rails


214


extending transverse to the longitudinal axis


22


of the tank


18


, and a pair of wedge-shaped supports


218


welded or otherwise affixed to each support rail


214


. Tank mounting brackets


222


are attached (e.g., welded) to the tank


18


, and a thermally insulated spacer


226


is interposed between the tank mounting brackets


222


and the wedge-shaped supports


218


. Suitable fasteners couple the supports


218


to the brackets


222


. The tank


18


is surrounded with insulation


230


to reduce heat loss from the tank


18


to the ambient air. The head


26


includes an access opening


234


for cleaning the tank


18


and for applying a glass coating to the inside of the tank


18


during manufacture. An access cover


238


is mounted over the opening


234


and a gasket


242


is employed to prevent leakage of water through the access opening


234


. A thermostat and/or an anode tube are mounted in spuds


246


in the access cover


238


.




An alternative construction of the tank assembly


14


is illustrated in

FIGS. 12 and 13

. Here the flue plane FP is substantially vertical, and alternative inlet and outlet tubes


254


,


258


, respectively, are positioned below and above, respectively, the flue tube


30


. A 90° elbow


262


is provided on both the inlet and outlet tube


254


,


258


so that the tubes communicate with the building's pipes through the cylindrical shell


24


of the tank


18


and through the insulation


230


, rather than through the head


26


.



Claims
  • 1. A method for mounting a water heater on the roof of a building having a plumbing system, the method comprising:cutting a hole in the roof; securing a roof curb to the roof and around the hole; providing a water tank having a longitudinal axis; securing the water tank to the roof curb with the longitudinal axis of the water tank extending horizontally; extending the plumbing system through the hole; and interconnecting the plumbing system to the water tank.
  • 2. The method of claim 1, wherein securing the water tank includes securing a base member to the roof curb and supporting the water tank on the base member.
  • 3. The method of claim 2, further comprising creating a water-tight seal between the base member and the roof curb with a sealing member.
  • 4. The method of claim 2, wherein the base member overhangs the sides of the roof curb, the method further comprising securing a pair of rails to the underside of the base member such that the pair of rails straddle the roof curb when the base member is secured to the roof curb.
  • 5. The method of claim 4, further comprising, prior to securing the water tank, inserting at least one of a prong of a conventional fork lift and a hook of a lifting crane into apertures defined by each of the rails, and raising and lowering the water heater with at least one of the fork lift and crane.
  • 6. The method of claim 2, wherein securing the tank includes providing first and second wedge-shaped supports each having a ramped surface, interconnecting the wedge-shaped supports to the base member with the ramped surfaces facing each other, positioning the tank between the wedge-shaped supports, and interconnecting the tank to the ramped surfaces of the wedge-shaped supports to support the tank.
  • 7. The method of claim 6, wherein securing the tank further includes mounting to the base member a support rail generally transverse to the longitudinal axis of the water tank, and wherein interconnecting the wedge-shaped supports includes mounting the wedge-shaped supports to the rail.
  • 8. The method of claim 6, wherein interconnecting the tank to the ramped surfaces includes interposing thermally insulated spacers between the ramped surfaces and the tank.
  • 9. The method of claim 8, wherein the tank includes a rounded surface, wherein positioning the tank includes positioning the rounded surface between the ramped surfaces, and wherein interconnecting the tank to the ramped surfaces further includes securing mounting brackets to the rounded surface and fastening the mounting brackets to the ramped surfaces with the insulated spacers interposed between the brackets and the ramped surfaces.
  • 10. The method of claim 1, further comprising installing a local controller adjacent to the water tank; installing a remote controller within the building; operably interconnecting the respective local and remote controllers to the water heater; and monitoring and controlling the water heater with the local controller when on the rooftop and with the remote controller when in the building.
  • 11. The method of claim 1, further comprising surrounding the water tank with a cabinet and providing an electrical outlet in the cabinet.
  • 12. The method of claim 1, further comprising weather-tightly securing a cabinet around the water heater.
  • 13. The method of claim 12, further comprising removing at least one of a cover and a door of the cabinet without the use of tools to gain access to the water heater.
  • 14. The method of claim 12, further comprising surrounding the water tank with insulation inside of the cabinet.
  • 15. A building comprising:a roof; a hole in said roof; a plumbing system including a plurality of pipes extending upwardly through said hole; a roof curb mounted on said roof around said hole; a base member mounted generally horizontally on said roof curb over said hole; and a water tank having a longitudinal axis and mounted to said base member such that said longitudinal axis of said water tank is substantially horizontal, said water tank being in fluid communication through said base member with said plurality of pipes to provide heated water to said building.
  • 16. The building of claim 15, further comprising first and second support rails secured to said base member and extending generally perpendicular to said longitudinal axis, and first and second pairs of wedge-shaped supports, each wedge-shaped support having a ramped surface, said first and second pairs of wedge-shaped supports being mounted to said first and second support rails, respectively, with the ramped surface of each wedge-shaped support facing the ramped surface of the wedge-shaped support with which it is paired, wherein said tank is mounted to said ramped surfaces of said wedge-shaped supports.
  • 17. The building of claim 16, wherein said water tank includes a rounded surface positioned between said wedge-shaped supports in each pair, and wherein said rounded surface is mounted to said ramped surfaces.
  • 18. The building of claim 16, further comprising tank mounting brackets secured to said water tank and interconnected with said ramped surfaces; and thermally insulated spacers interposed between said tank mounting brackets and said ramped surfaces.
  • 19. The building of claim 15, further comprising a sealing member secured between the base member and the roof curb to create a water-tight seal therebetween.
  • 20. The building of claim 15, wherein said base member overhangs the sides of said roof curb, and wherein said water heater further includes a pair of rails secured to the underside of the base member and straddling the roof curb.
  • 21. The building of claim 20, wherein said support rails define apertures adapted to receive at least one of a prong of a conventional fork lift and a hook of a lifting crane.
  • 22. The building of claim 15, further comprising a cabinet around said water tank and secured to the base member, said cabinet weather-tightly enclosing said water tank.
  • 23. The building of claim 22, wherein the cabinet includes at least one of a removable cover and a removable door that is removable from the rest of the cabinet without the use of tools.
  • 24. The building of claim 22, further comprising insulation within said cabinet and surrounding the water tank.
  • 25. A support structure for a water heater, the support structure comprising:a generally horizontal base member; first and second generally parallel support rails mounted on top of said base member; a pair of wedge-shaped supports mounted on top of each support rail, each wedge-shaped support including a ramped surface facing the ramped surface of the other wedge-shaped support on the same support rail; a thermally insolated spacer mounted on each said ramped surface; four mounting brackets mounted on the water heater, each mounting bracket being aligned with one of said wedge-shaped supports; and a fastener mounting said mounting bracket to a respective wedge-shaped support with a respective spacer interposed between said mounting bracket and said wedge-shaped support.
  • 26. The support structure of claim 25, wherein the water heater includes a tank having a longitudinal axis, and wherein said wedge-shaped supports support the tank such that the longitudinal axis is generally horizontal.
  • 27. The support structure of claim 25, wherein the water heater includes a water tank having a rounded surface, and wherein said mounting brackets are mounted to the rounded surface and the rounded surface is positioned between the ramped surfaces of said pairs of wedge-shaped supports.
  • 28. The support structure of claim 25, further comprising a cabinet mounted to said base member and weather-tightly enclosing the water heater.
  • 29. The support structure of claim 25, further comprising lifting rails mounted under said base member and adapted to interface with at least one of a fork lift and a lifting crane to facilitate moving said water heater and support structure.
CROSS-REFERENCE TO RELATED APPLICATIONS

This application is a continuation of U.S. application Ser. No. 09/732,472, filed Dec. 7, 2000, the entire contents of which are incorporated by reference herein.

US Referenced Citations (21)
Number Name Date Kind
1847431 Hanna Mar 1932 A
3028843 Carlson et al. Apr 1962 A
3903868 Salvo Sep 1975 A
4232656 Teagan Nov 1980 A
4414464 Cloutier Nov 1983 A
4497281 Markus Feb 1985 A
4501232 Gordbegli et al. Feb 1985 A
4771762 Bridegum Sep 1988 A
4785792 Saint Laurent Nov 1988 A
4809523 Vandenberg Mar 1989 A
4867106 Staats Sep 1989 A
4875465 Kramer Oct 1989 A
4917077 Scanferla Apr 1990 A
4938204 Adams Jul 1990 A
4981112 Adams et al. Jan 1991 A
5582026 Barto, Sr. Dec 1996 A
5713310 Lemke Feb 1998 A
5749415 Dinh May 1998 A
5761379 Lannes Jun 1998 A
5915960 Check et al. Jun 1999 A
6062174 Abe May 2000 A
Foreign Referenced Citations (1)
Number Date Country
2000304351 Nov 2000 JP
Continuations (1)
Number Date Country
Parent 09/732472 Dec 2000 US
Child 10/274183 US