Abstract
A method is disclosed for deploying a suction pile anchor in which flood valves are opened on the top of a suction pile and the suction pile anchor is off loaded from the anchor boat and lowered it to the sea floor. The suction pile anchor is set down and the rate of feed is adjusted to match the rate of self-penetration. An ROV with pump capability closes the flood valves on the top of the suction pile and attaches to the pumping port of the suction pile. The pump of the ROV operates to draw down the suction pile to full depth and brings the first load line connection and the attached first end of the load line well below the mudline while the second load connection at the second end of the load line is supported above the mudline. The ROV disconnects from the pump port and connects a mooring line to second the load connection. Another aspect of the present invention is a suction pile system having a suction pile with an ROV compatible pressure port and a flood valve at the top. A load support system includes a first load connection on the side of the suction pile with a load line connected to the first load connection. A second, ROV accessible load connection is provided at the distal end of the load line.
Description




BACKGROUND OF THE INVENTION




The present invention relates to a method and system for securing offshore vessels and structures and, more particularly, to anchoring offshore drilling and/or production vessels in relation to the ocean floor.




Surface facilities must be maintained in position over a well site for offshore drilling operations and often for production operations. This often requires the deployment of an array of mooring lines, each anchored to the seabed with a pile foundation or the like. Installing such foundation elements for secure anchorage is time consuming and requires considerable offshore equipment.




Another problem arising in deepwater is that the spread of these mooring lines can be substantial and anchor structures are widely placed over a leasehold or even into adjacent lease blocks and the mooring arrays of adjacent blocks can overlap. Further, the sequential steps in development such as exploration wells, test wells, satellite subsea wells, etc. can each leave foundation elements until the seafloor actually becomes crowded in relation to the necessary infrastructure for working offshore prospects.




Suction anchors as disclosed in U.S. Pat. No. 4,318,641 have been known as a method for installing tubular elements into the seabed. This provides an alternative to driving or drilling and grouting piles and provides opportunity for easier installation, but the installation is remains equipment intensive and does not facilitate foundation removal.




Thus, there remains a need for a method and system for anchoring offshore structures and vessels which further facilitates ease of deployment with a minimum of equipment.




A SUMMARY OF THE INVENTION




One aspect of the present invention is a method for deploying a suction pile anchor in which flood valves are opened on the top of a suction pile and the suction pile anchor is off loaded from the anchor boat and lowered it to the sea floor. The suction pile anchor is set down and the rate of feed is adjusted to match the rate of self-penetration. An ROV with pump capability closes the flood valves on the top of the suction pile and attaches to the pump port of the suction pile. The pump of the ROV operates to draw down the suction pile to full depth and brings the load pad-eye and the attached first end of the load line well below the mudline while the load connection at the second end of the load line is supported above the mudline. The ROV disconnects from the pump port and connects a mooring line to the load connection.




Another aspect of the present invention is a suction pile system having a suction pile with an ROV compatible pressure port and a flood valve at the top. A load support system includes a first load connection on the side of the suction pile with a load line connected to the first load connection and a second load connection connected to the end of the load line. An installation support system is included having an installation connection on the top of the suction anchor pile.











A BRIEF DESCRIPTION OF THE DRAWINGS




The brief description above, as well as further objects and advantages of the present invention, will be more fully appreciated by reference to the following detailed description of the preferred embodiments which should be read in conjunction with the accompanying drawings in which:





FIG. 1

is a side elevational view of a drilling rig moored with suction pile anchors in accordance with the present invention;





FIG. 2

is a side elevational view of a suction pile anchor in accordance with one embodiment of the present invention;





FIG. 2A

is a side elevational view of a suction pile anchor in accordance with another embodiment of the present invention;





FIG. 3

is a top elevational view of a work deck of an anchor-handling vessel;





FIG. 4

is a perspective view of a suction pile being off-loaded from the word deck;





FIG. 5

is side elevational view of a suction pile anchor at the shallow staging area;





FIG. 6

is a perspective view of an ROV orienting the suction pile anchor;





FIG. 7

is a perspective view of an ROV closing flood valve on the top of a suction pile;





FIG. 8

is a perspective view of a ROV engaging the pump port of a suction pile anchor;





FIG. 9

is a side elevational view of a suction pile anchor installing into the ocean floor;





FIG. 10

is a perspective view of an ROV changing line connections on the suction pile anchor;





FIG. 11

is a side elevational view of a grabber latch and a main mooring wire extension;





FIG. 12

is a side elevational view of the play out of a primary mooring line;





FIG. 13

is a side elevational view of installation of a buoy to the primary mooring line;





FIG. 14

is a side elevational view of steps connecting a mooring line to a rig;





FIG. 15

is a side elevational view of steps connecting a mooring line to a rig;





FIG. 16

is a side elevational view of an alternate deployment of a suction pile anchor;





FIG. 17

is side elevational view of initial steps in removing a mooring line from the rig;





FIG. 18

is a side elevational view of steps to retrieve buoys from the mooring system;





FIG. 19

is a side elevational view of retrieving the rig mooring line and beginning retrieval of the intermediate mooring line;





FIG. 20

is a side elevational view of the retrieval of the intermediate mooring line;





FIG. 21

is a side elevational view of preparations to retrieve the primary mooring line; and





FIG. 22

is a side elevational view of primary mooring line retrieval.











A DETAILED DESCRIPTION OF ILLUSTRATIVE EMBODIMENTS





FIG. 1

illustrates one application of the present invention. Here the suction pile anchors


10


secure a truss spar configuration mobile offshore drilling unit (“MODU”)


12


in position over well site


14


at ocean floor


16


. Each suction pile anchor is securely set within the ocean floor and is connected to MODU


12


through mooring or load lines


18


. The use of taut line moorings may reduce the mooring spread. Further, buoys


20


may be included into the mooring lines.





FIG. 2

illustrates a suction pile anchor


10


installed in ocean floor


16


. The suction pile anchor has a suction pile


22


, here in the form of a closed top cylinder. A first load connection


24


, here provided by load pad-eyes


24


A, is provided on the side of the suction pile, positioned to be away from the ends of the suction pile and well below the mud line on deployment. Under load conditions with this configuration, the load will be resisted most efficiently against the mud.




Flooding ports or valves


26


and pump or pressure port or valve


28


are provided through or adjacent the closed top of suction pile


22


. Further, these valves are designed to be actuatable with a remotely operated vehicle (“ROV”), not shown. An installation connection


30


is also provided at the top of the suction pile. Here the installation connection includes a lowering and lifting sling


32


.




A load line or main mooring wire extension


32


is connected to the first load connection and provides an ROV operable second load line connection


34


above mudline


16


A of ocean floor


16


. In

FIG. 2

, main mooring wire extension


32


holds second load line connection


34


in an accessible position through the inherent stiffness of the wire rope over short distances and a load line keeper or wire grabber latch


36


.





FIG. 2A

illustrates an alternative embodiment in which the accessibility of second load line connection


34


above the mudline is secured with a buoy


38


attached to the main mooring wire extension.

FIGS. 3-22

illustrate an installation, deployment into mooring system, and retrieval of suction pile anchors.

FIGS. 3-15

illustrate suction pile anchor installation and mooring system deployment.

FIGS. 16-22

illustrate retrieval procedures, but his discussion also references installation procedure illustrations as retrieval is, in large measure, the reversal of the installation, deployment steps.





FIG. 3

illustrates the work deck of an anchor handling vessel


40


equipped to deliver and deploy four suction pile anchors


10


per excursion. The suction pile anchors are locked into cradles or transport slots


42


and in which horizontal skids


44


provide stability for controlled deployment of the suction pile anchors. Wire


46


is spooled onto winches provided on the deck of anchor handling vessel


40


.




Fully loaded, the vessel travels to the installation site and the first suction pile anchor


10


is positioned for deployment. Preferably, this is with a two-way, hydraulically powered track roller assembly


43


which facilitates rapid, smooth suction pile positioning. Referring to

FIG. 4

, the suction pile anchor smoothly rolls from the vessel, over stern roller


48


, and into the water with flooding valves


62


open. At this stage, an overboarding wire


58


supports the weight of suction anchor pile


10


. After the anchor clears the stern roller, its weight is accepted by deployment wire


59


connected to lowering and lifting sling


66


, see FIG.


5


. Descent of the suction pile anchor pauses at a shallow staging station below anchor handling vessel


40


and an ROV


60


is launched from the vessel to disconnect the overboarding hook from the sling.




Descent resumes and ROV


60


follows as suction pile anchor


10


is lowered to a bottom staging station point very near seafloor


16


. The suction pile anchor has a tendency to rotate during descent and the ROV may need to properly orient suction pile anchor


10


such that first load connection


24


is aligned with the intended mooring line orientation. See FIG.


6


. The suction pile anchor is then lowered for self-penetration under its own weight into the upper silt line of seafloor


16


and into clay muck. In this interval, the play out of deployment were


59


is monitored so that it does not exceed the rate of self-penetration.




At this point ROV


60


attaches itself to the top of suction pile anchor


10


and closes flooding valves


26


. See FIG.


7


. Continuing with

FIG. 8

, the ROV then engages pump valve


28


pumps within the ROV begin evacuating water within suction pile


22


and deployment wire


59


plays out with suction pile anchor penetration. The ROV continues monitoring the penetration rate, attitude (leveling), and pressure deferential. See FIG.


9


. Once full penetration is then achieved, the ROV closes the pump valve and disengages from the suction pile anchor. Next, the remote operating vehicle assists in the release of the ROV operable subsea connector


64


from the lowering and lifting sling


66


. The ROV maneuvers the subsea connector to second load line connection


34


a top main mooring wire extension


32


and attaches it. The subsea connector can be a keyhole-slot engagement secured with a keeper gate across the opening which can be manipulated by pulling on handles


68


in shifting the subsea connector. See FIG.


10


.




Once the connection of the main lowering wire or deployment wire


59


to the second load line is secure, the ROV


60


disengages wire grabber latch


36


on the upper portion of the suction pile anchor. See FIG.


11


. The ROV then returns to the installation or anchor-handling vessel


40


at the surface. The installation vessel then plays out main mooring wire


59


to seafloor


16


(see

FIG. 12

) along a predetermined bearing while driving forward and pulling main mooring wire extension


32


taut through the muck. A syntactic foam buoy block and sling assembly


70


is installed into the main mooring wire and the assembly is lowered with the deployment wire. Buoy assembly


70


suspends the end of the wire above seafloor


16


where it remains accessible for recovery and deployment into a mooring array.




In the procedure of this embodiment, ROV


60


is deployed to disconnect deployment hook


72


, and both the hook and the ROV are recovered to the vessel and the vessel proceeds to install the next suction pile anchor. This process is repeated until all suction pile anchors are set.





FIG. 14

illustrates the connection of mooring lines from a suction pile anchor to a drilling unit, here in the form of a semisubmersible drilling vessel, rig


78


. The anchor-handling vessel arrives loaded with wire and buoys to complete the mooring system for rig


78


. Recovery hook


72


is dropped and the ROV deployed to connect the lift wire


59


to the predeployed main mooring wire section. Terminal buoy


70


may be provided with a transponder to facilitate location and hook-up. The lift wire is retrieved to anchor handling vessel


40


and intermediate segment of mooring wire


74


is installed. The intermediate wire is then deployed into the water and syntactic foam buoys


76


are connected and deployed overboard. An upper winch wire


82


is connected to buoys


76


and played out while anchor handling vessel


40


back into rig


78


to receive the rig wire


80


. The vessel heaves back and rig wire


80


is connected to buoys


76


. The buoys and rig wire are lowered with a j-lock chaser


84


, allowing the rig to pre-tension the wire. Vessel


40


then returns to rig


78


, lowering the wire, and allowing j-lock chaser


84


to disengage. The procedure is repeated for each additional anchor.




As an alternative, the use of subsea wire socket connector


64


(recall

FIG. 10

) which is well suited to ROV operation makes it possible to predeploy suction anchors with no main mooring wires. See FIG.


15


. This enables the anchor handling vessel


40


to deploy a suction pile


10


, disconnect all lines with an ROV


60


and proceed with setting other suction pile anchors. Later the anchor-handling vessel returns to install the mooring wire. This optional procedure is useful when a time constraints exist. A vessel


40


can be loaded with four suction pile anchors


10


and only one deployment wire


59


. Sets of four or eight suction pile anchors are installed in batch operations and as are mooring lines after the array of anchors has been set.




Anchor handling vessel


40


returns to location when drilling and/or production operations are over and it is time to mover rig


78


. Vessel


40


lowers a recovery hook


86


on line


59


, and ROV


60


is deployed to connect the recovery hook to recovery sling


88


below buoy assembly


76


. See FIG.


17


. Rig


78


then slacks off rig mooring line


80


, line


59


is taken in, and the anchor-handling vessel heaves the first buoy of assembly


76


on deck using recovery sling


88


. See FIG.


18


. The second buoy is decked in a similar manner, and secured. Rig wire


80


is disconnected from buoy assembly


76


and anchor handling vessel


40


returns the rig mooring wire to rig


78


. See FIG.


19


. Thereafter, recover of intermediate mooring extension wire


74


proceeds with vessel


40


backing up and winching line


74


aboard over the stern roller. See FIG.


20


.




It may be desirable to disconnect rig


78


and to retrieve intermediate mooring lines


74


in batch operations, doing this stage for each suction anchor pile


10


before returning to retrieve primary mooring wires


59


in a subsequent batch operation. In such batch operations, anchor handling vessel


40


returns primary mooring line


59


the seafloor


16


with a syntactic buoy


70


in place with a recovery sling


90


. See FIG.


21


. Again, it may prove convenient to provide buoy


70


with a transponder to facilitate ROV location.




Primary mooring wire recovery operations begin with deployment of ROV


60


and a retrieval line


57


from anchor handling vessel


40


. See FIG.


21


. The ROV inserts hook


92


at the end of recovery wire into the eye of the recovery sling


90


attached to main mooring wire


59


. Backing up, the vessel uses its winch to retrieve first retrieval wire


57


and then primary mooring wire


59


over the stern roller until the vessel is over suction pile anchor


10


and primary mooring wire


59


is substantially vertical. See FIG.


22


. The line is then aligned with the entrapment slot, part of keeper


36


on suction pile anchor


10


. Recall FIG.


11


. Once wire


59


is guided into keeper or latch


36


, ROV


60


engages the lock.




ROV


60


then disconnects subsea connector


64


from the second load connection


34


on main mooring extension


32


and connects line


59


to lowering and lifting sling


66


presented by suction pile anchor


10


. ROV


60


connects to pump port


28


and the pump system of the ROV injects water back into suction pile anchor


10


. While water flows into the suction pile, the ROV directs the winch to begin lifting wire


59


. Suction pile anchor


10


is raised in this manner until its bottom is within in close proximity of the silt line. The ROV disengages from pump port


28


and opens flood valves


62


. Recall

FIGS. 7-9

. Retrieval resumes and suction pile anchor


10


is lifted to the surface staging position near the anchor-handling vessel


40


. The vessel lowers a tail-boarding hook on line


58


and ROV


60


inserts it into the recovery sling. Recall FIG.


5


. The weight of suction pile anchor


10


is accepted by line


58


which is connected to a winch line and ROV


60


is recovered. Vessel


40


proceeds slowly astern as the suction pile anchor is drawn to the roller to ensure proper skid alignment. The anchor handling vessel then progresses forward and water action on the anchor assists in orienting the anchor with the track roller as the winch heaves to board the suction pile anchor which is brought to rest in cradle. Recall

FIGS. 4 and 3

. The suction anchor vessel proceeds to the next anchor, repeating the recovery procedure.




Another type of batch operations may particularly facilitate developing a deepwater hydrocarbon reservoirs with drilling operations for a plurality of satellite subsea wells at adjacent sites. In this method a deepwater-drilling rig with dynamic positioning capabilities is deployed. The deepwater drilling capabilities of the vessel is enhanced with a mooring system deployment beginning with setting a minimum array of suction pile anchors, e.g., four, and connecting mooring lines from the deepwater drilling rig prior to beginning drilling operations at a first site. Drilling is initiated relying, in part, on the vessel's dynamic positioning system while the anchor handling vessel returns for more suction pile anchors to complete the full complement of suction pile anchors. Returning, the vessel completes the mooring installing, e.g., another four for a total of eight suction pile anchor, and connecting mooring lines from the deepwater drilling rig during drilling operations at the first site.




The anchor handling vessel then returns for another load of suction pile anchors, setting a minimum array of suction pile anchors at a subsequent site while drilling operations are ongoing at the first site. Thereafter, when drilling is complete at the first site, drilling operations cease, the mooring lines are disengaged from the suction anchor piles, and the deepwater drilling rig moves to the subsequent site where it is connected to the minimum array of suction pile anchors already installed at that site. Additional suction pile anchors are retrieved from the first site and installed the subsequent site while drilling operations are ongoing. After the full complement of mooring lines are attached at the subsequent site, the remaining suction pile anchors are retrieved and installed for a minimum support at the next site, as the process repeats.




It will be seen that the present invention is particularly well adapted for use with mobile offshore drilling units or MODUs such as SPAR structures that may be deployed for predrilling deepwater prospects or used for developing satellite sites. For such applications, rapid deployment, retrieval and redeployment is particularly beneficial and the repetitious nature of the application accentuates the economics of minimizing the equipment demands. However, other applications, including those combining long term production or combining drilling and production, may benefit from the present invention.




An illustrative embodiment has been described using a single handling vessel. However, embodiments of the improved suction pile anchors and mooring systems can be deployed using two boats, a second assisting to drag the suction pile anchor off the first and to assist with lowering.




Further, variations are intended with additional capacities and capabilities of anchor handling vessels. Various mooring configurations may also be deployed, with or without buoys, taut, catenary, or combined.




Other modifications, changes, and substitutions are also intended in the foregoing disclosure. Further, in some instances, some features of the present invention will be employed without a corresponding use of other features described in these illustrative embodiments. Accordingly, it is appropriate that the appended claims be construed broadly and in a manner consistent with the spirit and scope of the invention herein.



Claims
  • 1. A method for deploying a suction pile anchor, comprising:opening valves on the top of a suction pile; offloading the suction pule anchor from an anchor boat and lowering the suction pile anchor to a sea floor with a cable; setting the suction pile anchor down, adjusting the rate of feed to the cable to match the rate of self-penetration of the suction pile anchor into the sea floor; closing the valves on the top of the suction pile with an ROV; attaching the ROV with pump capability to a pressure port of the suction pile; operating a pump of the ROV to draw down the suction pile to full depth, bringing a load pad-eye and an attached first end of a load line well below a mudline of the sea floor; supporting a load connection at a second end of the load line above the mudline utilizing a keeper on the side of the suction pile; disconnecting the ROLV from the pressure port; and connecting a mooring line to the load connection with the ROV.
  • 2. The method for deploying the suction pile anchor in accordance with claim 1, further comprising:disconnecting the mooring line from the load connection with the ROV; connecting the ROV to the pressure port of the suction pile anchor; and pumping fluid into the suction anchor pile through the pressure port.
  • 3. The method for deploying the suction pile anchor in accordance with claim 2 wherein pumping fluid comprises pumping seawater into the suction pile anchor.
  • 4. The method for deploying the suction pile anchor in accordance with claim 2 wherein pumping fluid comprises injecting air into the suction pile anchor.
Parent Case Info

This application claims the benefit of Provisional application No. 60/063,976 filed Nov. 1, 1997.

US Referenced Citations (69)
Number Name Date Kind
1694051 Bardon Dec 1928 A
3051117 Hunter Aug 1962 A
3066371 Mullens Dec 1962 A
3263641 Stimson Aug 1966 A
3295489 Bossa Jan 1967 A
3361200 Chambers Jan 1968 A
3411473 Mott et al. Nov 1968 A
3431879 Westling Mar 1969 A
3496900 Mott et al. Feb 1970 A
3540396 Bossa Nov 1970 A
3572041 Graaf Mar 1971 A
3602174 Gorman Aug 1971 A
3703151 Clement Nov 1972 A
3831387 Rolleman Aug 1974 A
3846991 Wisotsky Nov 1974 A
3851492 Cannon et al. Dec 1974 A
3927636 Childers et al. Dec 1975 A
3928982 Lacroix Dec 1975 A
3931782 Childers et al. Jan 1976 A
3967572 Lea Jul 1976 A
4024718 Roche et al. May 1977 A
4067282 Guinn et al. Jan 1978 A
4086866 Nixon May 1978 A
4164195 Frigeni Aug 1979 A
4215544 Stanwick Aug 1980 A
4222591 Haley Sep 1980 A
4257721 Haynes Mar 1981 A
4270480 Hancock et al. Jun 1981 A
4318641 Hogervorst Mar 1982 A
4347012 Glidden Aug 1982 A
4432671 Westra et al. Feb 1984 A
4435108 Hampton Mar 1984 A
4439068 Pokladnik Mar 1984 A
4471709 Chun Sep 1984 A
4476802 Poldervaart et al. Oct 1984 A
4509448 Pease et al. Apr 1985 A
4516882 Brewer et al. May 1985 A
4575282 Pardue, Sr. et al. Mar 1986 A
4601608 Ahlstone Jul 1986 A
4620820 Collipp Nov 1986 A
4625673 Faller et al. Dec 1986 A
4635728 Harrington Jan 1987 A
4674918 Kalpins Jun 1987 A
4683832 Dysarz Aug 1987 A
4687377 Langner Aug 1987 A
4721415 Shatto Jan 1988 A
4724789 Van Den Haak Feb 1988 A
4733993 Andréasson Mar 1988 A
4784528 Spalding et al. Nov 1988 A
4830541 Shatto May 1989 A
4940362 Paulshus et al. Jul 1990 A
5041038 Poldervaart et al. Aug 1991 A
5069580 Herwig et al. Dec 1991 A
5159891 Lohr et al. Nov 1992 A
5168823 Sheppard, Jr. Dec 1992 A
5390618 Wolff et al. Feb 1995 A
5480521 Snyder et al. Jan 1996 A
5615630 Eronen et al. Apr 1997 A
5704307 Treu et al. Jan 1998 A
5704732 Horton, III Jan 1998 A
5836061 Castillo et al. Nov 1998 A
5855178 Treu et al. Jan 1999 A
5915326 Karal Jun 1999 A
5927904 Treu et al. Jul 1999 A
5979353 Borseth Nov 1999 A
5992060 Treu et al. Nov 1999 A
6003466 Dove et al. Dec 1999 A
6009825 Fulton et al. Jan 2000 A
6106198 Borseth Aug 2000 A
Foreign Referenced Citations (7)
Number Date Country
011894 Jun 1980 EP
2503084 Oct 1982 FR
610714 May 1978 SU
610714 Jun 1978 SU
797955 Jan 1981 SU
9520075 Jul 1995 WO
9964684 Dec 1999 WO
Non-Patent Literature Citations (31)
Entry
Listing of Possible Suction Anchor Installations Using ROV Pumping Devices, undated.
Dr. Tom R. Guttormsen, Saga Petroleum ASA, “Installation and Retrieval of Suction Anchors”, undated.
StatOil List—Suction Anchor Installations, 2000.
Samy Alhayari, Single Buoy Moorings Inc., Innovative Developments in Suction Pile Technology OTC Proceedings, 1998 Offshore Technology Conf., pp. 1-21.
Mark E. Riemers et al, Examining the Development and Capabilities of the Alternative Suction Embedded Anchor (SEA) in Deep and Ultra Deepwater, Suction Pile Technology, pp. 1-9, undated.
Per Sparrevik, “Suction Anchor Piles”, Preprint-Mooring and Anchoring Conf., Aberdeen, 10-11 J 1996, pp. 1-9.
“Suction Anchor Installation Services from NGI-FRAMO”, pp. 1-4, 1999.
J. L. Colliat et al, “Design and Installation of Suction Anchor Piles at a Soft Clay Site in Gulf of Guinea”, Offshore Technology Conf., 1996, pp. 325-337.
D. Hagen et al, “Innovative Suction Anchor Design and Installation”, Offshore Technology Conf. 1998, pp. 1-15.
Peter Dove and Helge Roraas, Aker Marine Contractors, “Experience With The Installation of De Water Polyester Moorings and New Generation Anchors”, Nov. 1999, pp. 1-10.
Per Sparrevik and Frank Myrvoll, “How Suction Anchors Have Advanced”, Norwegian Geotechnical Inst., Jun. 1997.
C. Chimisso et al., “Deepwater FPSO for Aquila Field Development in the Adriatic”, OTC 8808, 1998, pp. 259-267.
Telefax memo from Aker Omega Marine, Inc. to Shell Offshore, Inc. dated May 7, 1991.
Telefax memo from Aker Omega Marine, Inc. to Shell Offshore, Inc. dated Jun. 17, 1991.
Peter G. S. Dove et al, Aker Marine Contractors, Pre-Set Moorings Provide Less Costly Alternative to DP in Ultra-Deepwater, Offshore, May 1997, pp. 76-80.
Thomas M. Fulton, “Why Mobile Drilling Units Will Be Able to Moor in 10,000 ft. Depths”, Offshore, Apr. 1997.
J. R. Hogervorst, “Field Trails With Large Diameter Suction Piles”, Offshore Technology Conf., 1980.
“Taut Legs Tested In Rig Role”, Offshore Engineer, Nov., 1996.
“Moorings Descend Deeper”, Offshore Engineer, Mar. 1997.
D. Senpere & G. A. Auvergne, Suction Anchor Piles—A Proven Alternative to Driving or Drilling, Offshore Technology Conf., 1982.
S. Fines & O. J. Stove, “Snorre TLP Tethers and Foundation”, Offshore Technology Conf., 1991.
Hans P. Christophersen, “The Non-Piled Foundation Systems of the Snorre Field”, Society for Underwater Technology, 1993.
J. L. Colliat et al, “Caisson Foundations As Alternative Anchors for Permanent Mooring of a Process Barge Offshore Congo ”, Offshore Technology Conf., 1995.
J. L. Colliat et al, Design and Installation of Suction Anchor Piles at a Soft Clay Site in the Gulf of Guinea, Offshore Technology Conf., 1996.
Per Sparrevik, “Suction Anchor Piles”, Mooring and Anchoring Conf., Aberdeen , Jun. 1996.
Sherif El-Gharbawy, The Application of Suction Caissons for Deepwater Mooring Offshore West Africa, 3rd Annual Pennwell Offshore W. Africa Conf. (Abidjan), Mar. 1999.
Sherif L. El-Gharbawy, “Suction Anchor Installations for Deep Guld of Mexico Applications”, Offshore Technology Conference, May 1999.
PTC/EP 98/07012 (TH0945 PCT) Search Report dated Feb. 8, 1999.
T.S. Olberg et al, “Full Scale Field Trial of Taut Leg Mooring Using Fiber Rope and Suction Anchor attached to a Semi Submersible Drilling Unit” IBC Tech Serv Worldwide Deepwater Technology Conf., Feb. 1997.
T.S. Olberg, “Field Trial for Taut Leg Moorings”, Journal of Offshore Technology, May 1997.
T.S. Olberg, Full Scale Field Trial of Taut Leg Mooring Using Fiber Rope and Suction Anchor Attached to a Semi-Submersible Drilling Unit, Offshore Technology Conference, May 1997.
Provisional Applications (1)
Number Date Country
60/063976 Nov 1997 US