Roberto Cremonini et al., "ADES: An Expert System for ATP Design," Sep. 1989. |
Roberto Cremonini et al., "Building and Optimizing an Expert System for ATP Design," IEEE, Sep. 1989, pp. 68-75. |
American Railway Signaling Principles and Practices, Chapter 20, Interlocking Circuits, Published by the Communication and Signal Section, AAR, 1941, pp. 89-93. |
American Railway Signaling Principles and Practices, Chapter XIX, Electric Interlocking, Published by the Communication and Signal Section, AAR, Oct. 1930, pp. 3 and 5. |
American Railway Signaling Principles and Practices, Chapter XVI, Interlocking, Published by the Communication & Signal Section, AAR, Oct. 1952, four pages. |
Brandl et al., "Experience with Safety Certification--As Exemplified by Computer-Assisted Railway Signal Control Systems," Article from Signal & Draht 83 (1991), pp. 1-8. |
Okumura et al., "The Development of an Electronic Interlocking System," Quarterly Reports, vol. 22, No. 4, 1981, pp. 161-167. |
Hill et al., "Modelling Railway Block Signalling Systems Using Discrete-Event Simulation," School of Electrical Engineering, University of Bath, Claverton Down, Bath, UK, pp. 1-9. 1992. |
Lardennois, "Vital Coded Microprocessor Applications to the O'Hare AGT System," 1988 APTA Rapid Transit Conference, Advanced Technology Update Session, Jun. 8, 1988, twelve pages. |