In oilfield operations, safety systems typically are employed to manage unplanned well events, such as blow outs. For the well-drilling phase of such operations, conventional safety systems may include blow-out preventers (BOPs). BOPs are typically positioned at or above the surface of the formation, directly below the rig floor or at or near the mud line or ground level. BOP configurations such as this have a number of drawbacks.
Positioning a BOP at or above the surface of the formation exposes the BOP to potential damage from external forces that could render the BOP inoperable. For example, weather events can cause damage to a BOP positioned at or above the surface of the formation. Furthermore, human-operated machines or device such as vehicles, cranes, anchors or the like can damage a BOP located at or above the surface of the formation.
Thus, what is needed is an improved safety system for the drilling phase of oil and gas wells.
A more complete understanding of the present disclosure and advantages thereof may be acquired by referring to the following description taken in conjunction with the accompanying figures, wherein:
In the detailed description of the embodiments, like numerals are employed to designate like parts throughout. Various items of equipment, such as pipes, valves, pumps, fasteners, fittings, etc., may be omitted to simplify the description. However, those skilled in the art will realize that such conventional equipment may be employed as desired.
The present disclosure provides a system and method for shutting in a well during the drilling phase of oilfield operations using a shut-in device that is not subject to damage from exposure to weather events, human operations or the like. During the drilling phase of these operations, a well shut-in device is positioned below the surface of the formation in at least one of the wellbore casings before the wellbore depth is extended to reach a portion of the formation that includes a pressurized target substance, such as, for example, oil, natural gas, and/or other hydrocarbons. With the well shut-in device positioned below the surface of the formation, it is not subject to exposure damage from weather events or most human operations. Once the well shut-in device is positioned in at least one of the wellbore casings, drilling is continued into the target portion of the formation that includes the pressurized target substance. If at any time after the well shut-in device is positioned in at least one of the casings, e.g., when the hole is being drilled into the target portion of the formation that includes the pressurized target substance, an emergency occurs that results in an unplanned well event such as a well blow out, the well shut-in device may be actuated to provide a barrier that restricts the pressurized target fluid from moving through a casing passageway to shut off the well.
Referring now to
The formation 200 includes a first portion 200a adjacent the surface 202 that typically does not include a target fluid under enough pressure such that the target fluid will enter the wellbore 203 and a second portion 200b that does include a target fluid that is under enough pressure such that the target fluid will enter the wellbore 203. As is known in the art, various methods may be used to determine a depth into the formation 200 at which a wellbore 203 may be drilled such that target fluid adjacent the wellbore 203 will not be under enough pressure to enter the wellbore 203. An intermediate casing 206 is positioned in the first casing passageway 204a and the wellbore 203 is cemented into place, as illustrated in
The intermediate casing 206 defines a second casing passageway 206a that extends along the length of the intermediate casing 206. A shut-in device 210 is positioned within intermediate casing 206 at a point along its length a distance “A” below the surface 202 of formation 200. While shut-in device 201 may be secured in any manner known in the art, in one embodiment, shut-in device is secured in place by a support 208 that extends from the intermediate casing 206 and into the second casing passageway 206a. In an embodiment, the support 208 may include multiple support members that extend from an inner wall of the intermediate casing 206, or may be a flange, ring, or shoulder formed or otherwise disposed on an inner wall of the intermediate casing 206, and/or a variety of other support structures known in the art. In an embodiment, the distance A is approximately 200 to 800 feet. The shut-in device 210 defines a shut-in passageway 210a that is positioned in a substantially concentric orientation with the second casing passageway 206a. In the illustrated embodiment, the shut-in device 210 includes a shear ram having a plurality of shearing members 210b and 210c that are positioned on opposite sides of the shut-in passageway 210a. An actuation line 212 is coupled to the shut-in device 210 and extends through the second casing passageway 206a and out of wellbore 203. In an embodiment, the shut-in device 210 may be coupled to the intermediate casing 206 (e.g., through the support 208 or other known fasteners) prior to the intermediate casing 206 being positioned and cemented in wellbore 203. In an embodiment, the shut-in device 210 may be positioned in the intermediate casing 206 subsequent to the intermediate casing 206 being positioned and cemented into wellbore 203.
With continued reference to
In another embodiment, one or more casings that may include a production casing 214 are positioned and cemented in wellbore 203 below the intermediate casing 206. The production casing 214 defines a third casing passageway 214a that extends along the length of the production casing 214 and to a wellbore section 216 located adjacent the second portion 206b of the formation 200. At least one of the surface casing 204, the intermediate casing 206, and the production casing 214 defines a casing passageway that extends between the second portion 200b of the formation 200 and the surface 202 of the formation 200. For example, in the illustrated embodiment, the third casing passageway 214a extends between the section 216 of the hole and the second casing passageway 206a, and the second casing passageway 206a extends to the surface 202 of the formation 200.
Referring now to
In an embodiment, the monitoring system 224 monitors each of the first control system 222a, the second control system 222b, and the electrical system 222c in order to determine whether to actuate the shut-in device 210. For example, the monitoring system 224 may not actuate the shut-in device 210 unless each of the first control system 222a, the second control system 222b, and the electrical system 222c has been activated. As discussed above, each of the first control system 222a and the second control system 222b may provide a positive force or pressure to the shearing members 210b and 210c in order to maintain the shearing members 210b and 210c in an open position. The first control system 222a and the second control system 222b may be “activated” when the positive pressure they provide to the shearing members 210b and 210c is released (e.g., automatically or by an operator operating a pressure release member.) Furthermore, the electrical system 222c coupled to the dump valve may not allow the dump valve to operate unless power is shut down. The electrical system 222c may be activated when power is shut down (e.g., automatically or by an operator shutting down power.) Thus, in an embodiment, the monitoring system 224 monitors each of the first control system 222a, the second control system 222b, and the electrical system 222c for activation, and if the pressure is released in the first control system 222a and the second control system 222b while the power is shut down in the electrical system 222c, the positive force or pressure provided to the shearing members 210b and 210c is removed. The actuator 222 provides a redundant system in that if the monitoring system 224 does not determine that each of the first control system 222a, the second control system 222b, and the electrical system 222c are activated, the positive force or pressure provided to the shearing members 210b and 210c is not removed. While one example of a control system for actuating the shut-in device 210 has been described, one of skill in the art will recognize that a variety of other control systems will fall within the scope of the present disclosure.
Upon the release of the positive pressure maintaining shearing members 210b and 210c in an “open” position, the shearing members 210b and 210c extend into the shut-in passageway 210a, as illustrated in
Thus, a drilling phase shut-in device is provided that is positioned below the surface of the formation being drilled such that the shut-in device is substantially immune to damage from weather events or human operated machines or devices operated at or above the surface (or mudline) as the case may be.
Referring now to
In operation, the shearing members 210b and 210c may be actuated substantially as described above to shear the drilling member 220 and provide a barrier in the shut-in passageway 210a and the casing passageway, as illustrated in
Referring now to
In another embodiment, the well shut-in device 210 may include a chemical cutting agent and a sealing agent. In operation, in response to an unplanned event such as a well blow-out, the shut-in device 210 releases the chemical cutting agent into the shut-in passageway 210a. The chemical cutting agent may be any chemical cutting agent known in the art that is operable to cause a reaction that severs the drilling member 220. The well shut-in device 210 then may then release a sealing agent to provide a barrier in the shut-in passageway 210a and the casing passageway substantially as described above, blocking upward migration of fluid in the wellbore below the shut-in device 210. In another embodiment, a chemical cutting agent may be used to sever the drilling member 220, while a mechanical device (e.g., a packer) may be used to provide a barrier in the shut in passageway 210a to block upward migration of fluid in the wellbore below the shut-in device. In an embodiment, chemical cutting may require grabbing and stopping the casing from moving before the chemical cutting agent in released into the shut-in passageway 210a.
With reference to
The method 100 then proceeds to block 106 where a drilling member is positioned in a casing passageway. Subsequent to the positioning of the well cut-off device 210 in the intermediate casing 206, drilling and casing the wellbore continues to a desired depth. Surface and above surface BOPs, such as BOP 218 may be positioned in a manner well known in the art.
The method 100 then proceeds to block 106 where a drilling member is positioned in a casing passageway. Subsequent to the positioning of the well cut-off device 210 in the intermediate casing 206, drilling and casing the wellbore continues to a desired depth. Surface and above surface BOPs, such as BOP 218 may be positioned in a manner well known in the art. The method 100 then proceeds to block 108 where the drill string is severed and a barrier is provided in the casing passageway. In an embodiment, block 108 of the method 100 may be performed at any time after the well shut-in device 210 is positioned in intermediate casing 206 (e.g. before, during, or after drilling into the second portion 200b of the formation 200 using the drilling member 220.)
In step 106, one or more control systems for the wellbore as well as the electrical system for the drilling operations may monitor and a positive force may be applied to shut-in device to maintain the shearing rams in a retracted or “open” position so as to permit operation of the drill string. A predetermined series of events may be programmed into the control system to actuate the control systems in the event of the occurrence of certain conditions. For example, the monitoring system 224 may not actuate the shut-in device 210 unless each of the first control system 222a and the second control system 222b has been actuated and a loss of certain electrical functions for the drilling operation is detected. Redundancy may also be maintained to ensure that the shut-in device is not unnecessarily activated.
Upon activation, the shearing members are caused to sever the drilling member 220 and close off shut-in passageway 210a, blocking upward migration of formation fluids through the wellbore below the shut-in device.
While certain features and embodiments of the present disclosure have been described in detail herein, it will be readily understood that the present disclosure encompasses all modifications and enhancements within the scope and spirit of the following claims. Furthermore, no limitations are intended in the details of construction or design herein shown, other than as described in the claims below. Moreover, those skilled in the art will appreciate that description of various components as being oriented vertically or horizontally are not intended as limitations, but are provided for the convenience of describing the present disclosure
Number | Name | Date | Kind |
---|---|---|---|
1834063 | King et al. | Dec 1931 | A |
1932570 | Black | Oct 1933 | A |
3870098 | Houston | Mar 1975 | A |
4160478 | Calhoun et al. | Jul 1979 | A |
4193455 | Steddum et al. | Mar 1980 | A |
4305565 | Abbe | Dec 1981 | A |
4372378 | Powers, Jr. | Feb 1983 | A |
4446920 | Woytek et al. | May 1984 | A |
4520994 | DeWald | Jun 1985 | A |
4553598 | Meek et al. | Nov 1985 | A |
4588035 | Van Gils et al. | May 1986 | A |
5551665 | Noack et al. | Sep 1996 | A |
5819853 | Patel | Oct 1998 | A |
6102626 | Milberger | Aug 2000 | A |
6125937 | Longbottom et al. | Oct 2000 | A |
6167974 | Webb | Jan 2001 | B1 |
6626244 | Powers | Sep 2003 | B2 |
20080289878 | Livingstone | Nov 2008 | A1 |
Number | Date | Country | |
---|---|---|---|
20130008670 A1 | Jan 2013 | US |