Being the first global telecom success, GSM has the biggest footprint on earth, its commercial success not only because it has the longest history in operation, but also the cheapest handset that meets the voice call demands as well as its well-known SMS. Its major update GPRS, and EGPRS, also started mobile internet, which pave the way for 3G 4G and 5G.
The telecom market had been moved further to 5G, but GSM is still there in most part of the world. There are still over 1 billion people globally had never owned a mobile phone, and GSM service for them is still a great improvement for their life and work. GSM is still needed in many least developed countries (listed as LDCs by UN). To them get connected enables many great opportunities. It would jump start new economic growth and make many to have better and happier lives.
However, GSM terrestrial network establishment in LDC would not be so easy, as it needs to start with telecom fixed line network infrastructure. Some places have no electricity, and only started to have solar power. There is no fixed line communication system at all for most people, and electricity coverage is not 100%. Many places also have issues maintaining the safety of the cables, equipment and the assets doted sparsely.
Standard GSM User Equipment (UE), such as a GSM handset or GSM phone, communicates with a GSM base station (BTS) having ground-based cell towers that are within close range, typically up to 35 km and for extended TA feature 120 km. It does not communicate with a satellite, because of, for example, issues of the latency caused by the distance between base station-satellite-UE and the Doppler effect cause by the satellite at the speed of 7 km/sec to 8 km/sec, where intolerable latency and the Doppler effect with dynamic change as satellite flies over the UE being served by the satellite and on the earth, including the flying aircraft.
What is needed is a satcom GSM system directly talking to the GSM handsets which may be charged by solar power without relying on power grid and ground level telecom infrastructure over the country. To make it work, the BTS SW modification together with the latency normalization and Doppler compensation will be the necessary, which are disclosed in this filing.
In the present disclosure application, the innovative modifications to base transceiver station (BTS), the GSM base station, housed in gateway sites, and a new sat RAN satellite beam handover mechanism allow a constellation of satellites with large enough phase array directly talk to the GSM handsets which may be charged by solar power without relying on mains electricity and ground level telecom infrastructure over the country or region. BTS/Core network (CN) satcom GSM of the present disclosure can directly talk to commercial unmodified GSM UEs for voice and data call.
The accompanying drawings are incorporated in and constitute a part of this specification. It is to be understood that the drawings illustrate only some examples of the disclosure and other examples or combinations of various examples that are not specifically illustrated in the figures may still fall within the scope of this disclosure. Examples will now be described with additional detail using the drawings, in which:
U.S. patent application Ser. No. 17/583,992 discloses satellite radio access network (Sat RAN) beam and gateway seamless handover, the content of which is hereby incorporated by reference in its entirety.
The satcom GSM is based on GSM 3GPP specs as it aims to work with standard GSM phones user equipment (UE). The details of the global-system-for-mobiles (GSM) are fully described in 3GPP specs. The GSM frame structure is observed to let all the commercial GSM handsets work with satcom GSM. Below are the key innovative modifications on GSM BTS that enable the satcom GSM. For the efficiency of the description the text will avoid stating the terrestrial network (TN) GSM system details but focusing on the changes. Here the mobile subscriber (MS) is equivalent to user equipment (UE).
The GSM frame structure is shown in GSM 05.01, Digital cellular telecommunications system (Phase 2+); Physical layer on the radio path; General description (GSM 05.01) (etsi.org), GSM Technical Specification, Global System for Mobile Communications, Version 5.0.0, May 1996 (herein, the “GSM Specification”), the entire content of which is hereby incorporated by reference.
Observing the GSM specs as shown in
In an example embodiment, a large phase array can be used to deliver hundreds of electronically steerable beams to provide 3GPP radio access network (RAN) services to the cells fixed on the ground, for instance as shown in U.S. Pat. Nos. 11,159,228 and 10,979,133, which are hereby incorporated by reference. Delay normalization can be applied. Doppler compensation can be applied. A satellite beam handover with the BTS farm in the satellite GW sites can be enabled.
It should be noted that a normal phone on airborne plane can also be tracked and served by the satellite; and to sat RAN system, it is a moving cell configuration and can be served just as easy as a ground cell, as long as it is arranged. Or, are ground cells fixed on a surface of earth that includes land and ocean.
A diagrammatic representation of time frame structures is illustrated in
One hyperframe is subdivided in or corresponds to 2048 superframes, and a superframe has a duration of 6.12 seconds, and has 1326 TDMA frames. The superframe is the least common multiple of the time frame structures. The superframe is itself subdivided in multiframes, and two types of such multiframes exist in the system. A superframe has or corresponds to fifty-one 26-frame multiframes and twenty-six 51-frame multiframes. The 26-frame multiframe has a duration of 120 ms and comprises 26 TDMA frames. The 26-frame multiframe is used to carry TCH (and SACCH/T) and FACCH. The 51-frame multiframe has a duration of 235.4 ms (3060/13 ms) and comprises 51 TDMA frames. The 51-frame multiframe is used to carry BCCH, CCCH (NCH, AGCH, PCH and RACH) and SDCCH (and SACCH/C). A TDMA frame has a duration of approximately 4.62 ms, and comprising eight time slots. One TDMA frame has 8 time slots (120/26 or 4.615 ms), and one time slot has 156.25 bit durations (15/26 or 0.577 ms), where 1 bit duration is 48/13 or 3.69 μs.
The RTT for the feeder links and service links, up and down, can be compensated to the longest one, e.g., 40 ms, then for GSM frame length, the closet one is 9 TDMA frames, or 72 time slots that provide about RTT 41.5 ms, by, e.g., a routing-and-compensating device 10 (
Satellite (such as 20A, 20B in
The delay normalization is made to the longest delay path in the system plus the time for the signal processing, which for LEO satellite can be 20 ms for DL and UL. So an example friendly number to the BTS software modification is 72 GSM time slots which are 9 GSM TDMA frames as shown in
The GPRS RLC layer HARQ can tolerate 40 ms in packet data call without any modification. GPRS USF takes 1 to 4 bursts to decode, then BTS expects UE UL in the next frame, that is only 4.615 ms, as UE Tx will take 20 ms to reach BTS PCU and that needs modification on the BTS side. NAS timer is usually multiple of 15 seconds which is okay for long RTT around 40 ms.
To resolve the issues, two steps or processes can be performed are needed, which includes, step 1, normalizing the delay to make them a constant delay; and step 2, modifying the BTS software (SW) or program instructions to adapt to the constant delay. The BTS can include, for example, one or more processing devices configured to perform functions or processes for BTS, such as to perform functions or processes that are adapted to the constant delay according to the modified BTS software (SW) or modified program instructions. The modified BTS software (SW) or program instructions may be, for example, stored on a memory device of the BTS.
A routing-and-compensating device 10 (
Making various delay a constant would greatly simplify the changes, and more importantly this enables both BTS and UE satellite transparent. For example, for both BTS and UE being satellite transparent, there is no need for BTS and UE to know which satellite and gateway (e.g., gateway antenna) to connect. In some examples, the effect is that BTS and UE don't even know there are satellite and gateway antenna involved. In some examples, timing advance, a standard mechanism to deal with UEs in various position of a cell, can handle the delay variations only up to 70 microseconds.
Delay can be, for example, a function of ephemeris of satellite, GW or GWS positions and earth rotation, and/or cell location; and artificial delays may be introduced or added for delay normalization by a processing device in a routing-and-compensating device 10 (
The routing-and-compensating device 10 can include, for example, a routing device configured to perform routing, so as to provide right channel signals for two antennas 14A and 14B and BTS (such as 12A and 12B), and/or one or more compensating devices to normalize delay for each beam center and compensate Doppler effect for each beam center dynamically, and provide the normalized delays and compensated frequencies to the respective BTS. The one or more compensating devices may include, for example, one or more processing devices.
Each UE (or MS) has different delay, such variations at off-center locations that are off-center with respect to cell centers are small (e.g., of the order of roaming in a smaller—23 km—terrestrial cell—well within 3GPP spec defined working range.)
The Doppler compensation may be performed by one or more processing devices of the routing-and-compensating device 10, such as FPGA or ASIC signal processing device. In some examples, Doppler pre-compensation is performed on DL, and post-compensation is performed on UL, by the one or more processing devices of routing-and-compensating device 10, according to satellite ephemeris and latitude-longitude-altitude (i.e., lat-lon-alt) of gateway antenna of the GWS 31 and the cell location. The pre-compensation is the process adding the opposite frequency offset before Doppler effect occurs, and post-compensation is the process adding the opposite frequency offset after Doppler effect occurs.
Doppler effect is related to the speed, direction angle changes and/or relative positions. So over the satellite path (or a period that pass over a UE), Doppler effect can be different naturally. The Doppler compensation (such as pre-compensation, post-compensation) can compensate Doppler variation during satellite pass, dynamically.
In some examples, the abrupt Doppler shift during handover can be compensated by one or more processing devices of the routing-and-compensating device 10 to be within the GSM spec, as the compensation details can be pre-arranged or pre-configured, before the satellite pass.
The pre-compensation is on a beam-to-beam basis and is based on beam-center coordinates (lat-lon). Small residual Doppler left based on UE position are within GSM spec.
To enable satellite mobility, the present disclosure provides a method of performing BHO in the satcom system.
The satellites 20A, 20B have RAN (radio access network) signal FoV 50A, 50B on the Earth surface, respectively. The setting satellite 20A has a setting FoV 50A, and can communicate with UEs directly (e.g., without a ground cell tower and without any modification to the normal GSM UEs or phones) in their cells 51 in FoV 50A with serving beams on DL and UL. The rising satellite 20B has a rising FoV 50B, and can communicate with UEs directly (e.g., without a ground cell tower and without any modification to the normal GSM UEs or phones) in their cells 52 in FoV 50B with serving beams on DL and UL. The setting and rising FOVs 50A and 50B overlap (or at least partially overlap) in the overlapping area 50AB. The setting satellite 20A is setting, i.e., leaving the current footprint 50A for the ground station antenna 14A, and the rising satellite is rising or ascending, serving the footprint 50B for the ground station antenna 14B. In accordance with one embodiment, BHO occurs for the cells 51h located inside the overlapping FOV area 50AB.
Satellites 20A, 20B are linked to the routing-and-compensating device 10, via gateway antennas 14A, 14B. The processing devices of BTS 12A, 12B control communication with the UEs via the satellites 20A, 20B on the GSM control channel (see
The first satellite 20A is setting, i.e., leaving the current footprint 50A for the ground station antenna 14A, and the second satellite 20B is rising or ascending, serving the footprint 50B for the ground station antenna 14B.
The cells 51h in the overlapping area 50AB go through a satellite beam handover (BHO) for active UEs in HO cells 51h, e.g., in one or more HO cells 51h. That is, as the cells 51 enter the overlapping area 50AB, a satellite beam handover process is triggered to switch communication for those overlapping cells 51h from the setting satellite beams 16h to the rising satellite beams 17h. It is noted that beams 16h and 17h are slightly different from other beams of 16 and 17, as beams 16h and 17h are from the same BTS 12A in BHO, which used to be associated with the setting satellite 20A, but in beam HO (BHO), the BTS 12A is associated with both setting and rising satellites 20A and 20B. The beam 16h keeps the same as beam 16, keeping the base-station-colour-code (BCC) 13A(1); however its top priority is not on data traffic, but the active UEs HO to beam 17h which is newly started by the same BTS 12A on another RF port 12A(2) with a different BCC 13A(2) via rising satellite 20B. Beam 17h is newly added to the rising satellite beams and 16h and 17h coexist for the BHO period. Hence the BHO only happens in satellites' overlapping cells 51h of the setting satellite 20A and the rising satellite 20B. The HO beam 17h keeps the same configuration for user traffic and becomes one of the beams 17.
In operation, the cells 51, 52 in the FOV of each satellite 20A, 20B communicate with a respective BTS 12A, 12B over a designated RF port. Specifically, the cells 51 in the FoV 50A for the setting satellite 20A communicate over a first beam 16 via the setting satellite 20A. The setting satellite 20A communicates with one or more first BTS (e.g., eNodeBs) 12A of cluster 12CA at the gateway site 31 over a primary RF Transmit/Receive (TRx) port 12A(1), via the first GW antenna 14A. And the cells 52 in the FOV 50B for the rising satellite 20B communicate over a second beam 17 via the rising satellite 20B. And the rising satellite 20B communicates with one or more second BTS (e.g., eNodeBs) 12B of cluster 12(CB) over a primary RF TRx port 12B(1), via the second antenna 14B. Each BTS may communicate with a single cell 51, 52.
A smooth and seamless BHO is triggered as cells enter the overlapping region 50AB. In the beam HO moment, the two RF ports (such as 12A(1) and 12B(1)) are utilized separately, but for simplicity we just illustrate SIMO (Single Input Multiple Output) configuration for both satellites. Cells 51, 52 in non-overlapping areas are using just one of the two RF TRx ports 12A(1), 12B(1), and each footprint has their own beams 16, 17 for normal user data traffic operation. BTS 12B has primary RF TRx port 12B(1) with first BCC 13B(1) and secondary RF TRx port 12B(2) with second BCC 13B(2).
The BTS 12A switch on the second RF port 12A(2) with the second BCC 13A(2) for beam 17h, while keeping beam 16h still via the first RF port 12A(1) with the first BCC 13A(1) (702 of
In response to that all active UEs in the active cell 51h are handed over to new beam 17h, the BTS 12A (e.g., eNodeB or baseband unit (BBU) of BTS) behind the two overlapping beams 16h and 17h switches off (or controls to switch off) the old beam 16h (703 of
The coexisting beams 16h and 17h from two RF ports 12A(1) and 12A(2) via two GW antennas 14A, 14B and two satellites 20A and 20B can improve the reliability of the BHO. BTS 12A switches off beam 16h only when beam 17h has taken over, and further BHO may not change BTS (e.g., eNodeB or BBU of BTS) for the cell, so all the active UEs context are kept and seamlessly take effect as needed, as it is the same BTS before and after BHO. After the BHO, beam 17h becomes 17, UEs 30h are back to generic UEs 30 until the next BHO.
For more details of BHO, references can be made to U.S. patent application Ser. No. 17/583,992, noting that physical cell ID (PCI) used in LTE scenarios is replaced with BCC for GSM scenarios. For example, PCI 13A(1) can be replaced with BCC 13A(1), PCI 13A(2) can be replaced with BCC 13A(2), PCI 13B(1) can be replaced with BCC 13B(1), and PCI 13B(2) can be replaced with BCC 13B(2).
During the preparation phase (
The first challenge of satcom technology talking to GSM UEs (or MS s) is to provide cells just like terrestrial network (TN) deployment as the GSM UE knows it, as the mobility, paging and location area are all cell based. Although satcom avoids the need of infrastructure and equipment like towers, antennas on the ground, the BTS is still needed in the BTS farm on gateway site to provide beams from satellite for cells 51 and 52 under FOV of satellites 20A, 20B, as shown in
Example first innovative solutions of the satcom GSM to the first challenge are described as follow.
In some examples, ground gateway sites (GWSs), such as GWS 31 shown in
In certain examples, each satellite 20A or 20B has large enough number of phase array antenna elements (such as antenna elements 603), which have enough elements to form a few hundred beams for Tx and Rx to serve many cells in satellite FoV on the Earth surface; as satellites pass the cells 51, 52, each cell gets a serving beam, and satellites are tracking the cells during their passes or paths (22) over each ground cell.
In another example, there are enough satellites orbiting in LEO and distributed in multiple orbital planes to cover the whole earth surface in dynamic fashion. Setting satellites (such as 20A) can handover the services to rising satellites (such as 20B) smoothly without interruption.
GWS (such as 31) can then send the many DL signals to the satellites with specific packing order to let satellites arrange the beams and deliver them to the pre-arrange fixed cells, where many beams are formed for delivery of each DL for the cells.
With the same phase arrays (or the same phase array antenna elements), the Rx beams for each cell can be formed and each cell's UL signals are received in the similar way for BTS (such as 12A, 12B).
To enable satcom to work with un-modified GSM phones, modifications are required on the BTS side specially to handle the additional latency caused by the long RF path of feeder link and service link of 700 km LEO orbit, compared to its normal operation working with a tower at no more than 10 Km.
The second challenge is the latency caused by the distance between GWS-satellites-UE, where the latency may be about 5 to 16 ms, and changing dynamically as satellite flies over the cells as indicated by
Example second innovative solutions to the second challenge can include getting the longest RF path latency and count the delay of various factors, including but not limited to the following.
Information about each satellite and earth cell, such as their position (Latitude, Longitude, height) are well captured and fully under GWS control.
BTSs (Such as 12A, 12B) generate the DL signals in IQ form and pass them to routing-and-compensating device 10 and antennas 14A and 14B to pass them to serving satellites (such as 20A, 20B), and serving satellites pass them to UEs in respective cells (such as 51, 52). UL signals come back from UEs in cells (such as 51, 52) to serving satellites (such as 20A, 20B), and to antennas 14A and 14B and the routing-and-compensating device 10, and further to BTSs (Such as 12A, 12B).
In some examples, according to the beam's position, different amount of artificial delay is introduced, and the delay is normalized by a delay and doppler compensator of routing-and-compensating device 10, using complex unit with the required phase to produce the product on each IQ, so as to have constant delay and expected frequency observed by BTS (such as 12A, 12B). For example, depending on the position of the satellite (such as 21A, 20B) and position (e.g., elevation from the ground) of GW antenna (such as 14A, 14B) of GWS 31 and UE, the latency or delay can vary. Artificial delay can be added, such that the compensated or normalized delay has the same value (or approximately same value) as seen by the BTS (such as 12A, 12B), regardless of satellite position. Then the constant delay can be handled by BTS software (SW) modifications, so that the delay issue is simplified and BTS does not need to consider where the satellite is on LEO. All the BTSs can work in the same or similar way regardless where satellites are. The residual delay differences are small and within spec defined range as shown in
The residual timing differences can be handled with the normal timing advance (TA) control of BTS (such as 12A, 12B), because the residual timing differences are within the tolerance of the BTS. Accordingly, the implementation is simplified and the signal processing is streamlined.
In some examples, for a cell size of 48 km, since the normal 3GPP TA range are for (or correspond to) up to 35 km, an elevation angle of acos(35/48)=43.183° can make the beam differential TA in 35 km for 48 km cell size, where the elevation angle is an angle between ground and the beam from the satellite to the cell. For an elevation angle larger than 43.183°, the beam differential TA is still within the normal 3GPP TA range. For an elevation angle smaller than 43.183°, an extended TA range needs to be used. The normal 3GPP relevant RAT TA range and/or the extended TA (for GSM) range can be used by BTS (such as 12A, 12B).
The amount of delay may be configured by delay compensator of the routing-and-compensating device 10, e.g., by FPGA processing device and memory holding the IQ signals for the required amount of time, so that UE at each cell center has a mid TA value, which is a midpoint value of a range of TA value, such as a 3GPP TA range.
For Sync mechanism of the system, DL/UL follow the GPS Clock and is sync to UTC as LTE does (as performed or controlled by BTS).
In some examples, changes are made to BTS to accommodate the gateway-satellite-UE long RF path delay (as normal DL and UL would be kept as 3 time slots as usual). One of the required changes is in the timers. The BTS's timer is set, such that the BTS may set a longer gap from the Tx to the expected Rx signal from UE UL, e.g., 41.5 ms+3 timeslot period. In some examples, a one-way gap may be 20 ms.
With the fixed latency (a few GSM frames), the extra long RACH delay can be further handled, where BTS (such as 12A, 12B) may waste (or skip) first a few RACHs and respond to the later ones. GSM timer on BTS side for receiving the RACH can be set long enough so that there is no problem. The good thing about GSM RACH for satcom GSM is that they start with the strongest power level so that satellites would not miss them. In some examples, the power level may be 30 dBm. Accordingly, the satellites (such as 20A, 20B) are able to hear the RACH and respond within the period of timer setting (e.g., 15 seconds).
The third challenge is the Doppler effect due to the satellite speed of 7 km/sec to 8 km/sec as shown in
The GWSs (such as 31) can be configured to compensate the Doppler effect for the DL and UL signals for each cell location as shown in
On the return journey for UE UL signals, GWS can do the same (or similarly) for BTS DL signal in Doppler effect compensation and delay normalization.
The fourth challenge is the handling of USF. In TN deployment, BTS would expect the UL Tx on the very next frame, but for the long RF path in satcom case, it will take much longer time. Thus, on packet data for GPRS/EGPRS, we can modify the BTS software to expect the UL signal with the extra normalized delay time. Such change can properly adjust the RTT latency issue here. In certain example, the BTS software can be modified to expect the UL signal with the extra normalized delay time, so as to match with or be compatible with the extra normalized delay time.
The fifth challenge is the beam tracking of ground cells, beam handover from satellite to satellite and gateway handover. This is due to low earth orbit (LEO) satellites are rotating around the earth and earth self-rotation. The solution is a combination of below build-in capabilities in the satcom GSM system.
The satellites (such as 20A, 20B) can include massive phase array (or phase array antenna elements) with beamforming capability dynamically steering the beams as the relative position between the ground cells and their serving satellites changes, so the cells being served are tracked as long as the cells are in the FOV of satellites.
Satellites' FoV (e.g., 50A, 50B) overlap among themselves in overlap areas (such as 50AB) to cover the area being served, leaving no gap on the ground where services are needed.
When a cell is shifting out of FoV 50A of the setting satellite 20A, it is also entering FOV 50B of the rising satellite 20B. Beam handover between two satellites 20A, 20B is performed during the cell is in the overlapping area 50AB of the two satellites 20A, 20B.
Each BTS has two BCCs, 13A(1) and 13A(2), as shown in
After taking the measurement report from the UE in the overlapping area of the setting and rising satellites 20A and 20B, the BTS can use the rising satellite 20B to continue the service to the UE. Beam HO is accomplished seamlessly.
Referring to
Core NW support to the GW/BTS are assumed (or provided) for CS and PS services, just like TN deployment. The GW HO (i.e. GHO) can go through three phases as shown in
The 6th challenge is the UE mobility support, where cell handover between two cells whose BTS are in two gateway sites far away from each other (e.g., 1000 km away). Although this is a standard feature of GSM specs, the enabling mechanism in satcom need specific inter gateway links as shown in
In the present disclosure, with the resolutions and improvements in BTS/Core network, satcom GSM can directly talk to commercial GSM UEs for voice and data call.
In certain examples, in the satellite communication system of present disclosure, gateway placement is such that the satellites serving cells of the gateways have the line of sight (LOS) to the gateways for smooth GW HO.
Thus, the present disclosure provides a GSM satellite communication system 5 in communication with a first satellite 20A having a first field of view 50A including a first plurality of cells 51 in which a first plurality of UE 30 are located. The UE 30 are in direct communication with the first satellite 20A. The system 5 includes a first feeder link 14 and a first tracking antenna 14A configured to communicate with the plurality of active UEs 30 via the first satellite 20A directly serving the first plurality of cells 51. The system 5 also has a first BTS 12A (e.g., a first processing device) configured to communicate with the plurality of active UEs 30; a routing-and-compensating device (e.g., a second processing device) configured to normalize delay for a plurality of beam centers of the first plurality of cells 51, and provide the normalized delay to the first BTS 12A. The routing-and-compensating device 10 can enable the BTS 12A to tolerate communications with UE 30 via the first satellite 20A, by normalizing delays and compensating Doppler effect and providing normalized delays and compensated frequencies to BTS 12. In the present disclosure, residual timing differences within a cell 51 can be handled with the normal timing advance (TA) control of BTS 12A, because the residual timing differences after the delay normalization are within the tolerance of the BTS 12A. The advantage of the sat RAN design is to make the sat RAN two technologies transparent to each other, i.e., the BTS (or eNB and gNB) and UE do not need to manage which satellite and gateway they need to talk to, while satellite technology does not need to manage the RAN details, but the provision of the RF condition as a communication condition. The physical enabling mechanism for the direct link between the satellites and UEs is or includes the large enough phase array on the satellite. BTS and UE just perform their modem operation as normal, provided BTS (or eNB and gNB) has the modifications needed to handle long RTT for tens of milliseconds.
In describing the illustrative, non-limiting embodiments illustrated in the drawings, specific terminology will be resorted to for the sake of clarity. However, the disclosure is not intended to be limited to the specific terms so selected, and it is to be understood that each specific term includes all technical equivalents that operate in similar manner to accomplish a similar purpose. Several embodiments are described for illustrative purposes, it being understood that the description and claims are not limited to the illustrated embodiments and other embodiments not specifically shown in the drawings may also be within the scope of this disclosure.
This application is a continuation of U.S. application Ser. No. 17/959,040, filed Oct. 3, 2022, which is a continuation of U.S. application Ser. No. 17/666,234, filed Feb. 7, 2022, issued as U.S. Pat. No. 11,463,159 on Oct. 4, 2022, which claims the benefit of U.S. Provisional Application No. 63/146,322, filed Feb. 5, 2021, and the benefit of U.S. Provisional Application No. 63/165,404, filed Mar. 24, 2021, the entire contents of which are hereby incorporated by reference herein.
Number | Name | Date | Kind |
---|---|---|---|
5552798 | Dietrich et al. | Sep 1996 | A |
5918157 | Wiedeman et al. | Jun 1999 | A |
5943324 | Ramesh | Aug 1999 | A |
8914022 | Kostanic et al. | Dec 2014 | B2 |
11031999 | Liu et al. | Jun 2021 | B1 |
11159228 | Avellan et al. | Oct 2021 | B2 |
11463159 | Yu et al. | Oct 2022 | B2 |
20040207556 | Spilker et al. | Oct 2004 | A1 |
20060154660 | Waugh et al. | Jul 2006 | A1 |
20170289939 | Hreha et al. | Oct 2017 | A1 |
20170290012 | Hreha et al. | Oct 2017 | A1 |
20190053234 | Cui et al. | Feb 2019 | A1 |
20190238216 | Avellan et al. | Aug 2019 | A1 |
20200259575 | Bai | Aug 2020 | A1 |
20210029658 | Mahalingam et al. | Jan 2021 | A1 |
20220086713 | Määttänen | Mar 2022 | A1 |
20220240151 | Yu et al. | Jul 2022 | A1 |
Number | Date | Country |
---|---|---|
1091506 | Apr 2001 | EP |
2020074747 | Apr 2020 | WO |
Entry |
---|
Giordani, Marco, and Michele Zorzi. “Non-terrestrial networks in the 6G era: Challenges and opportunities.” IEEE Network 35.2 (2020): 244-251. (Year: 2020). |
Office Action issued in corresponding Japanese Patent Application No. 2023-546564, mailed Feb. 16, 2024, 8 pages. |
Caini, Carlo, et al. “A spectrum-and power-efficient EH F mobile satellite system to be integrated with terrestrial cellular systems.” IEEE Journal on selected areas in communications 10.8 (1992): 1315-1325. (Year: 1992). |
International Search Report and Written Opinion for PCT/US2022/015502, dated May 2, 2022, 19 Pages. |
“Digital Cellular Telecommunications System (Phase 2+); Physical Layer on the Radio Path; General Description (GSM 05.01)”, GSM—Global System for Mobile Communications, European Telecommunications Standards Institute, May 1996, 20 Pages. |
Morant , et al., “Experimental Demonstration of MM-Wave 5G NR Photonic Beamforming Based on ORRs and Multicore Fiber”, IEEE Transactions on Microwave Theory and Techniques, 67.7, 2019; pp. 2928-2935. |
Number | Date | Country | |
---|---|---|---|
20240031013 A1 | Jan 2024 | US |
Number | Date | Country | |
---|---|---|---|
63165404 | Mar 2021 | US | |
63146322 | Feb 2021 | US |
Number | Date | Country | |
---|---|---|---|
Parent | 17959040 | Oct 2022 | US |
Child | 18479913 | US | |
Parent | 17666234 | Feb 2022 | US |
Child | 17959040 | US |