SBIR Phase II: An Economic Optical Fiber Solution to the Last Mile Problem

Information

  • NSF Award
  • 2025972
Owner
  • Award Id
    2025972
  • Award Effective Date
    9/1/2020 - 3 years ago
  • Award Expiration Date
    8/31/2022 - a year ago
  • Award Amount
    $ 992,848.00
  • Award Instrument
    Cooperative Agreement

SBIR Phase II: An Economic Optical Fiber Solution to the Last Mile Problem

This Small Business Innovation Research (SBIR) Phase II project develops a new method to distribute “last mile” fiber optic communication lines. Existing fiber installation methods like trenching require extensive approvals and are labor-intensive, disruptive, and cost-prohibitive, especially in underserved or remote areas. “Last mile” fiber is the most expensive part of any installation with a market valued at over $50 billion. This solution enables a quick, low-cost deployment of optical fiber directly onto pavement without cutting into the surface, effectively turning a barrier into a pathway. This new method will enable ubiquitous fiber optic connectivity and will expand the reach of fiber optic networks through the “last mile”. By lowering fiber deployment costs and improving efficiency, this technology will accelerate the rollout of 5G, enable smart city growth, and deliver broadband access to rural areas. This solution extends the benefits of fast communications to previously inaccessible locations, connecting businesses, homes, hospitals, and schools, providing access to information, knowledge, and opportunity for everyone.<br/><br/>The intellectual merit of this project is to validate a new fiber installation method leveraging existing road networks. Using pavement as the base, low-profile fiber cables are bonded to the surface and protected against traffic and weather by layers of durable coatings. Fiber links can be installed quickly on-demand with an installation machine that requires no digging and minimal disruption. The research objectives of this project are to build and test three prototype machines in the field and to iterate on design. The research includes using the machines to install fiber, test pavement transitions, and compare costs and speed against other installation techniques. The anticipated technical results will expand understanding of machine utility, improve the user interface, verify the suitability, and validate economics.<br/><br/>This award reflects NSF's statutory mission and has been deemed worthy of support through evaluation using the Foundation's intellectual merit and broader impacts review criteria.

  • Program Officer
    Benaiah Schrag
  • Min Amd Letter Date
    9/11/2020 - 3 years ago
  • Max Amd Letter Date
    10/13/2020 - 3 years ago
  • ARRA Amount

Institutions

  • Name
    TRAXyL, Inc.
  • City
    Warrenton
  • State
    VA
  • Country
    United States
  • Address
    6148 Mint Springs Dr.
  • Postal Code
    201874485
  • Phone Number
    7035850269

Investigators

  • First Name
    Phillip
  • Last Name
    Turner
  • Email Address
    phillip@traxyl.com
  • Start Date
    9/11/2020 12:00:00 AM

Program Element

  • Text
    SBIR Phase II
  • Code
    5373

Program Reference

  • Text
    NETWORK SCIENCE & ENGINEERING
  • Code
    7794
  • Text
    Hardware Components
  • Code
    8034