Scaffold conveyor system

Information

  • Patent Grant
  • 6170608
  • Patent Number
    6,170,608
  • Date Filed
    Wednesday, December 2, 1998
    27 years ago
  • Date Issued
    Tuesday, January 9, 2001
    25 years ago
Abstract
A scaffolding system that includes a pair of tower portions, with each tower portion having a proximal section that is held in working relation with a bearing surface and each tower portion having a distal section, a platform, the platform supported by the distal section of each tower portion and the platform selectively movable both toward and away from the bearing surface, and a conveyor, the conveyor positioned on the platform between the pair of tower portions.
Description




BACKGROUND OF THE INVENTION




The present invention generally relates to material handling on scaffolds. More specifically, the present invention relate, to a method of moving material by conveyor along a scaffolding platform that is capable of being raised and lowered with respect to a support surface, such as the ground.




Scaffolding systems are commonly used when maintaining, repairing, or building structural walls, such as masonry walls of buildings, and towers, such as radio or communications towers. On some types of scaffolding systems, the platform that carries the workers and any needed materials is capable of being selectively moved upward or downward, relative to the surface, such as the ground surface, that supports the scaffolding system. While these advances that permit more flexible placement of a platform with respect to the portion of the wall or tower being maintained or constructed are beneficial, further advances are necessary with respect to material handling techniques on these scaffolding platforms.




These scaffolding systems often have platforms that range in length up to 50 or 100 feet or more. Efficient material placement becomes increasingly critical as the length of these platforms increase. For example, when a fork lift places one stack of construction or maintenance materials on the scaffolding platform, workers must then distribute these materials at the required work positions along the length of the platform. This is inefficient from a labor standpoint because one or more workers may be assigned the single task of moving the materials by hand to the required work position. Besides being inefficient, this raises potential safety and health issues due to the requisite lifting and carrying activities on the work platform where walking space is usually at a premium.




Also, the amount of materials that can be positioned on these elongate platforms is limited by weight capacity limitations of the scaffolding systems. For example, though the individual support structures of these scaffolding systems sometimes have capacities of 15,000 pounds or more, the portions of the scaffolding platforms located between the support structures typically have capacities somewhat less than that of the platform proximate the support structure. Indeed, as the length of the platform increases, the capacity of the platform between the support structures typically decreases. Therefore, as the length of the platform increases, the need for more efficient material placement along the length of the platform likewise increases. These platform weight restrictions, especially the decreasing weight capacity of these platforms with increasing length, illustrate why it is not possible to simply create more individual stacks of materials along the length of the platform for purposes of more efficiently distributing the materials with respect to individual work stations on the platform.




Thus, a general need exists for a method of more efficiently placing construction and maintenance materials along the length of scaffolding platforms. This advance is needed to reduce safety and health issues arising from material placement on platforms and to reduce labor requirements during material placement. This advance is also needed to optimize use of the available weight capacities of scaffolding platforms, especially as platform lengths increase and weight-bearing capacities are reduced on the lengthened platforms.




BRIEF SUMMARY OF THE INVENTION




The present invention includes a method of positioning materials on a scaffolding system. The method includes supporting opposing ends of a platform on a pair of tower portions, where each tower portion is held in working relation with a ground surface and the platform is selectively movable both toward and away from ground surface. The method further includes positioning a conveyor on the platform, placing the materials on the conveyor, and operating the conveyor to selectively position the materials along the platform. The present invention further relates to a scaffolding system and other methods of positioning materials on the scaffolding system.











BRIEF DESCRIPTION OF THE DRAWINGS





FIG. 1

is a perspective view of a conveyor mounted on a scaffold in accordance with the present invention.





FIG. 2

is a top plan view of the conveyer and scaffold depicted in FIG.


1


.





FIG. 3

is a perspective view of the conveyor depicted in FIG.


1


.





FIG. 4

is a side plan view of a portion of the conveyor depicted in FIG.


3


.





FIG. 5

is a perspective view of a conveyor mounted on another scaffold in accordance with the present invention.











DETAILED DESCRIPTION




A scaffolding and conveyor system of the present invention is generally depicted at


10


in FIG.


1


. The system


10


includes a scaffold


12


having an elongate work platform


14


and a pair of supports, such as tower portions


16


,


18


. The supports, such as tower portions


16


,


18


, are securely positioned on a bearing surface, such as a ground surface


20


, or a floor or foundation of a building or other structure. The tower portions


16


,


18


are each free-standing and self supporting.




The tower portions


16


,


18


may each include one or more legs


22


. The legs


22


of the tower portion


16


are each secured to a frame


24


and are secured to each other by braces


26


. Likewise, the legs


22


of the tower portion


18


are secured to a frame


28


and are secured to each other by braces


30


. The supports, such as the tower portions


16


,


18


, are balanced and leveled with respect to the ground surface


20


using outriggers


32


that are attached to the frame


28


.




The work platform


14


includes a planar frame (not shown) that is braced by ribbing


34


. The work platform


14


also includes a covering web or layer


36


. The layer


36


provides a planar surface


38


on which workers can walk and place materials and equipment while maintaining or building a structure, such as a wall


40


, or other structure, such as a radio or communication, tower (not shown). The layer


36


may be constructed of any suitable web, sheeting, or planking


42


that is capable of providing the planar surface


38


.




The platform


14


may consist of an end portion


44


, an end portion


46


and a bridge portion


48


. The end portion


44


is secured to the tower portion


16


, and the end portion


46


is secured to the tower portion


18


. The bridge portion


48


has a first end


50


and a second end


52


. The first end


50


of the bridge portion


48


is releasably secured to the end portion


44


of the platform


14


, and the second end


52


of the bridge portion


48


is releasably secured to the end portion


46


of the platform


14


. Though, the tower portions


16


,


18


are each free-standing and self supporting, the tower portions


16


,


18


, the platform


14


, or any other component of the system


10


may be releasably attached to the wall


40


via a suitable brace (not shown) to further stabilize the system


10


.




As best depicted in

FIG. 2

, a plurality of apertures


54


extend through the end portions


44


,


46


of the work platform


14


. The legs


22


of the tower portions


16


,


18


extend through the apertures


54


. The apertures


54


are sized to permit the work platform


14


to closely confront and engage each of the legs


22


. The work platform


14


includes a plurality of drive mechanisms (not shown) proximate the apertures


54


that engage the legs


22


. Returning to

FIG. 1

, the drive mechanisms, which may be electric, hydraulic, pneumatic, or manual, engage the legs


22


to permit selective movement of the platform


14


in the direction of arrow A away from the ground surface


20


or in the direction of arrow B toward the ground surface


20


. The system


10


additionally includes a conveyor


56


that is positioned on the platform


14


for positioning materials from accumulations or stacks


58


,


60


along the platform


14


. The platform


14


also includes railings


62


that may be removed for purposes of accessing the platform


14


and placing materials on the platform


14


.




One example of the scaffold


12


is available from Avant-Garde Engineering (1994) Inc., of L'Assomption (Quebec) Canada as the HYDRO-MOBILE brand of scaffolding. For example, Avant-Garde Engineering sells the tower sections


16


,


18


with attached platform


14


end portions


44


,


46


as individual units and also sells the bridge portion


48


of the platform


14


as an individual unit. The load capacity presently quoted by Avant-Garde Engineering for the tower portion


16


with the attached end portion


44


of the platform


14


is 15,000 lbs. The presently quoted load capacity for the tower portion


16


with the attached end portion


46


of the platform


14


is likewise 15,000 lbs. The load capacities for different lengths of the bridge portion


48


that are available from Avant-Garde Engineering are provided in Table 1 below:












TABLE 1











BRIDGE SPECIFICATIONS














LENGTH




CAPACITY











12′




12,400 lbs.







28′




10,900 lbs.







36′




10,100 lbs.







48′




 8,500 lbs.







56′




 7,700 lbs.















The details provided in Table 1 illustrate that the load bearing capacity of the bridge portion


48


available from Avant-Garde Engineering decreases as the length of the bridge portion


48


increases.




Typically, the tower portions


16


,


18


of the scaffold


12


will have higher load capacities than the bridge portion


48


of the platform


14


. Therefore, though the stack


58


and the conveyor


56


could both be positioned on the bridge portion


48


, the stack


58


is preferably positioned on the end portion


44


of the platform


14


to take full advantage of the distribution potential of the conveyor


56


while minimizing loading of the bridge portion


48


.




The conveyor


56


is preferably capable of reverse operation in the direction of either arrow C or arrow D. This reversible capability of the conveyor


56


permits placement of the accumulation or stack


60


of material on the end portion


46


proximate the tower portion


18


, in addition to placement of the accumulation or stack


58


. This reversible capability of the conveyor


56


maximizes the amount of a single material that can be stockpiled in the accumulations or stacks


58


,


60


on the scaffold


12


. Alternatively, this reversible capability of the conveyor


56


permits the conveyor


56


to serve the dual purpose of distributing one material from the stack


58


along the platform


14


and a different material from the stack


60


along the platform


14


.




The roller conveyor


64


includes a pair of stands


66


, as best depicted in

FIG. 3

, that support the conveyor


64


on the planar surface


38


(not shown in

FIG. 3

) of the work platform


14


(not shown in FIG.


3


). The conveyor


64


also includes a pair of elongate opposing frame members


68


and a pair of end frame members


69


(only one of the end frame members


69


is shown in FIG.


4


). The conveyor


64


includes a plurality of rollers


70


that are rotatably held between the opposing elongate frame members


68


. Construction or maintenance materials, such as concrete blocks


71


, are placed on the rollers


70


for selective positioning along the platform


14


by the conveyor


64


.




The conveyor


64


additionally includes a pair of thrust bearings


72


(only one thrust bearing


72


is shown in

FIG. 3

) that are secured to the end frame members


69


. The conveyor


64


further includes an elongate cylindrical drive member


74


that is rotatably held between the thrust bearings


72


and may be additionally supported by other bearings (not shown) that are secured to the frame of the conveyor


64


. A plurality of cylindrical cross-section drive belts


76


connect the drive member


74


to the individual rollers


70


. The conveyor


64


includes a power supply and control mechanism


78


that drives the elongate cylindrical drive member


74


and consequently also drives the rollers


70


.




Though not depicted, the end frame members


69


may extend above the rollers


70


and thereby form a stop. The stop coupled with slippage of the rotating rollers


70


beneath the construction or maintenance materials, such as the concrete blocks


71


, permits continuous operation of the mechanism


78


. As concrete blocks


71


are removed from the conveyor


64


, additional concrete blocks


71


move along the conveyor


64


to replenish the withdrawn concrete blocks


71


.




As best depicted in

FIG. 4

, a plurality of apertures


82


are included in the frame members


68


. The rollers


70


each have a pair of pins


84


that fit within opposing apertures


82


and permit rotation of the rollers


70


. The pins


84


are spring-loaded to permit depression of the pins


84


into the rollers


70


and removal or replacement of the rollers


70


.




The power supply and control mechanism


78


of the conveyor


64


includes a motor, such as an electric or gasoline-powered motor


80


. The motor


80


includes a drive pulley


86


. The power supply and control mechanism


78


additionally includes a translation gear


88


that is rotatably held by and between two thrust bearings (not shown) that are attached to one of the frame members


68


. The translation gear


88


includes a pair of pulleys


90


,


91


. The radii of the pulleys


90


,


91


may be sized differently to increase or decrease the rotational speed of the rollers


70


relative to the rotational speed of the pulley


86


.




The elongate cylindrical drive member


74


includes a radial recess


92


and a plurality of radial recesses


94


. Additionally, the rollers


70


each include a radial recess


96


. The radii of the pulley


90


and of the radial recess


92


may be sized differently to increase or decrease the rotational speed of the rollers


70


relative to the rotational speed of the pulley


86


. Likewise, the radii of the recesses


92


,


94


may be sized differently to increase or decrease the rotational speed of the rollers


70


relative to the rotational speed of the pulley


86


.




The pulley


86


is attached to the pulley


90


of the translation gear


88


by a belt


97


and the pulley


91


of the translation gear


88


is attached to the elongate cylindrical drive member


74


by a belt


98


which is positioned within the recess


92


of the drive member


74


. Also, each roller


70


is individually attached to the drive member


74


by one of the belts


76


that is positioned in the recess


96


of the roller


70


and in the nearest recess


94


to the particular roller


70


.




In operation, the power supply, such as th(motor


80


, is activated to drive the elongate cylindrical drive member


74


which then drives each of the rollers


70


via the various belts


76


that are individually connected to the individual rollers


70


. As an alternative, the motor


80


may consist of a power supply, such as a reversible direct current electric motor (not shown), that is connected to a source of electric power. The reversible motor permits the power supply and control mechanism


78


to drive the rollers


70


radially in either a direction E or a reverse direction F and thereby permits the conveyor


64


to transport materials either in the direction of the arrow C or in the direction of arrow D, as best depicted in FIG.


2


.




As an alternative to the scaffolding and conveyor system


10


, the present invention may take the form of a scaffolding and conveyor system


110


, as best depicted in FIG.


5


. The scaffolding and conveyor system


110


includes the work platform


14


having the end portions


44


,


46


and the bridge portion


48


. The system


110


additionally includes a scaffold


112


with extendable supports


114


,


116


. The extendable supports


114


,


116


may take the form of any extendable boom, tower or similar structure that is conventionally available. For example, the extendable supports


114


,


116


may constitute telescoping masts or booms


118


,


120


that are secured relative to the bearing surface, such as the ground surface


20


, in any conventional fashion, such as via base plates


122


.




In the system


110


, the work platform


14


has a bottom surface


124


. The supports


114


,


116


each have a distal end


126


and a proximal end


128


. The proximal end


128


of each support


114


,


116


, is stabilized with respect to the bearing surface, such as the ground surface


20


, by the base plates


122


. The distal ends


126


of each support


114


,


116


are attached to the bottom surface


124


of the work platform


14


at the end portions


44


,


46


, respectively. The extendable supports


114


,


116


may be extended or retracted using any suitable source of power, such as hydraulic, electric, pneumatic or mechanical power, to move the work platform


14


either away from the surface


20


in the direction of arrow A or towards the surface


20


in the direction of arrow B.




The system


10


of

FIG. 2

offers various flexibilities as compared to the prior technique of manually positioning materials along the work platform


14


. In operation, materials from the accumulation or stack


58


are positioned on the conveyor


64


. The power supply and control mechanism


78


is then activated to turn the rollers


70


and permit movement of the materials from the stack


58


along the conveyor


64


in the direction of arrow D until the materials reach a desired work position along the platform


14


. Then, the materials are lifted off of the conveyor


64


and placed at the desired work position on the platform


14


. Alternatively, materials from the accumulation or stack


60


may be positioned on the conveyor


64


and moved in the direction of arrow C to the desired work position along the platform


14


. Also, as mentioned, the mechanism


78


may be continuously operated when employing the described stop to continuously replenish materials that are removed from the conveyor


64


.




Additionally, either before, during, or after positioning of materials along the platform


14


using the conveyor


64


, the work platform


14


may be selectively moved in the direction of arrow A away from the ground surface


20


or in the direction of arrow B toward the ground surface


20


, as depicted in FIG.


1


. The movement of the platform


14


may be accomplished by engaging the drive mechanisms (not shown) of the platform


14


with the legs


22


of the structural supports


16


,


18


. Alternatively, the movement of the platform


14


may be accomplished by extending or retracting the extendable supports


114


,


116


, such as the telescoping booms


118


,


120


, as depicted in FIG.


5


.




The system


10


that includes the conveyor


56


permits support of the stacks


58


,


60


of materials on the tower portions


16


,


18


that typically have the highest load bearing capacity, as compared to the load bearing capacity of the bridge portion


48


of the platform


14


. Additionally, placement of the materials from the stacks


58


,


60


onto the conveyor


56


and subsequent operation of the conveyor


56


to transport the materials to the desired position along the platform


14


reduces the labor requirement and reduces the amount of lifting and carrying of materials by material transfer personnel.




Typically, use of the conveyor


56


requires only one operator to both load the materials onto the conveyor


56


and to operate the conveyor


56


for positioning of the materials at the desired position(s) along the platform


14


. The conveyor


56


additionally negates any need of creating multiple piles of space along the work platform


14


proximate the various work stations., thereby reducing clutter on the work platform


14


. Additionally, due to the ease and increased speed of positioning materials along the platform


14


, such as along the bridge portion


48


, and with transferring materials between the end portions


44


and


46


, the system


10


decreases the weight of materials that must be present on the bridge portion


48


at any one time. The system


10


thereby supports efficient maintenance or construction work on the wall


40


and also permits use of longer bridge sections


48


with lower load bearing capacities than would otherwise be attainable without use of the conveyor


56


.




Analogous comments to those provided above with respect to the benefits of the system


10


of

FIG. 2

apply with respect to the system


110


of FIG.


5


.




Although the present invention has been described with reference to preferred embodiments, workers skilled in the art will recognize that changes may be made in form and detail without departing from the spirit and scope of the invention.



Claims
  • 1. A scaffolding system, the scaffolding system comprising:a pair of tower portions, each tower portion having a proximal section that is capable of being held in working relation with a bearing surface and each tower portion having a distal section, at least one of the tower portions comprising a leg; a platform, the platform comprising an upper surface, a lower surface, and an inner surface, the inner surface defining an aperture that extends from the upper surface of the platform to the lower surface of the platform, the leg extending through the aperture of the platform, the platform supported by the distal section of each tower portion, and the platform selectively movable both toward and away from the bearing surface; and a conveyor, the conveyor positioned on the platform between the pair of tower portions.
  • 2. The scaffolding system of claim 1 wherein the platform comprisesa pair of end portions, one end portion secured to one of the tower portions and the other end portion secured to the other tower portion; and a bridge portion, the bridge portion having a distal end and proximal end, the distal end releasably attached to one of the end portions and the proximal end releasably attached to the other end portion.
  • 3. The scaffolding system of claim 2 wherein the conveyor is positioned on the bridge portion of the platform between the end portions of the platform.
  • 4. The scaffolding system of claim 2 wherein the tower portions are each free standing and self supporting.
  • 5. The scaffolding system of claim 1 wherein the platform comprises a planar surface, the conveyor entirely supported by the planar surface.
  • 6. The scaffolding system of claim 1 wherein:the platform comprises a planar surface; the planar surface has a first length and a first width; the conveyor has a second length and a second width; the first length is greater than the second length; and the first width is greater than the second width.
  • 7. The scaffolding system of claim 1 wherein:the platform comprises a planar surface; the planar surface has a first footprint; the conveyor has a second footprint; the first footprint and the second footprint are oriented substantially parallel to each other; and the first footprint of the planar surface is greater than the second footprint of the conveyor.
  • 8. The scaffolding system of claim 1 wherein the scaffolding system is positionable on the bearing surface with the platform oriented substantially parallel to the bearing surface and with the platform entirely located between the conveyor and the bearing surface.
  • 9. A method of positioning materials on a scaffolding system, the method comprising:supporting two opposing ends of a platform on a pair of tower portions, at least one of the tower portions comprising a leg, the platform comprising an upper surface, a lower surface, and an inner surface, the inner surface defining an aperture that extends from the upper surface of the platform to the lower surface of the platform, the log extending through the aperture of the platform, and each tower portion held in working relation with a bearing surface; selectively moving the platform along the leg; positioning a conveyor on the platform; placing the materials on the conveyor; and operating the conveyor to selectively position the materials along the platform.
  • 10. The method of claim 9, the method further comprising positioning the conveyor on the platform between the pair of tower portions.
  • 11. The method of claim 9 wherein operating the conveyor comprises selectively positioning the materials along the platform between the pair of tower portions.
  • 12. The method of claim 9 wherein the bearing surface is a ground surface.
  • 13. The method of claim 9 wherein the platform comprises a pair of end portions and a bridge portion, the method further comprising:securing one end portion to one of the tower portions; securing the other end portion to the other tower portion; releasably attaching a distal end of the bridge portion to one of the end portions; releasably attaching a proximal end of the bridge portion to the other end portion.
  • 14. The method of claim 13 the method further comprising positioning the conveyor on the bridge portion of the platform between the end portions of the platform.
  • 15. The method of claim 9 wherein the tower portions are each free standing and self supporting.
  • 16. The method of claim 9 wherein the platform comprises a planar surface, the conveyor entirely supported by the planar surface.
  • 17. The method of claim 9 wherein:the platform comprises a planar surface; the planar surface has a first length and a first width; the conveyor has a second length and a second width; the first length is greater than the second length; and the first width is greater than the second width.
  • 18. The method of claim 9 wherein:the platform comprises a planar surface; the planar surface has a first footprint; the conveyor has a second footprint; the first footprint and the second footprint are oriented substantially parallel to each other; and the first footprint of the planar surface is greater than the second footprint of the conveyor.
  • 19. The method of claim 9 wherein the scaffolding system is positionable on the bearing surface with the platform oriented substantially parallel to the bearing surface and with the platform entirely located between the conveyor and the bearing surface.
US Referenced Citations (18)
Number Name Date Kind
2590359 Zopf Mar 1952
2613788 McLaughlin Oct 1952
2846275 Esch Aug 1958
3273667 Hiyama et al. Sep 1966
3311191 Hiyama Mar 1967
3529696 Jacobsen Sep 1970
3548970 Hutchens, Sr. Dec 1970
3717220 Donker et al. Feb 1973
3777357 Whitney et al. Dec 1973
4056180 Gunti Nov 1977
4172677 Gunti Oct 1979
4232774 Gunti Nov 1980
4350241 Wenzel Sep 1982
4393969 Woell Jul 1983
4443148 Arnemann Apr 1984
4607574 Richards Aug 1986
4715488 Hewitt et al. Dec 1987
4872542 Enneking Oct 1989
Non-Patent Literature Citations (1)
Entry
Promotional material about Hydro-Mobile Scaffolding System downloaded from Internet Website of Avant-Garde Engineering (www.hydro-mobile.com) on Sep. 2, 1998.