The invention relates to a scaffold element, arrangement and method of use of such element and arrangement.
The edge structure, such as the edge beam, of a concrete bridge is often built separately after constructing the deck of the bridge. There thus is a need for a scaffold usable for building the edge structure. The edge structure is also susceptible to damage over time e.g. due to disintegration of the concrete, providing a need to repair the edge structure.
The closest prior art is represented by a scaffold arrangement comprising a casting mould and an access bridge supported onto the same scaffold that is suspended from the edge of the bridge. The arrangement comprises a number of bents arranged at a distance from each other for the length of the area of the bridge that needs repairing and supported onto the edge of the bridge by support members. The access bridge is supported onto the bents in order to form a passage for the duration of the repair period. Mould walls are supported onto the bents in order to form a concrete casting mould for casting the new edge structure for the bridge.
The problem with all known scaffold arrangements is that in order to provide a sufficiently tight mounting, the mounting of the scaffold has required the formation of holes extending through the entire deck of the bridge. In other words, the bents have been suspended by the bars extending through the above-mentioned holes. To mount such scaffolds, the workers have been forced to work for extended periods from underneath the bridge, by means of e.g. a passenger lift or, if possible, a so-called bridge crane positioned onto the deck. Long-term work on/under the bridge with lifting machines disturbs road traffic and often also railway traffic. Moreover, the mounting is difficult in bridges which cross waterways. With the known methods and arrangements, for example the construction of a scaffold arrangement required for repairing the edge beam of a bridge has taken a long time. Long mounting and repair periods hinder the traffic and increase the expenses. Furthermore, the present scaffolds are usually made of timber, so that the scaffolds are disassembled after the work is completed, and only a portion of the stouter timber may be reused, the rest ending up on a landfill site as unserviceable.
An objective of the invention is to eliminate the drawbacks referred to above.
One objective of the invention is to disclose a scaffold element which can be easily mounted so that as short working period as possible from underneath the bridge is required. A further objective of the invention is to disclose a method and an arrangement which enable a considerably faster repair of the edge structure of a bridge compared to the present situation.
Another objective of the invention is to disclose a scaffold element which can be used repeatedly several times in different locations and which can be adapted and adjusted to be suitable for almost all existing bridges.
Yet another objective of the invention is to disclose a scaffold element that enables convenient assembly of mould walls in the vicinity of the edge of a bridge.
Still yet another objective of the invention is to disclose a scaffold element and arrangement that allows easy setup and adjustment of vertical mould walls that may have e.g. a curved shape.
The scaffold element, arrangement and method according to the invention are characterized by what has been presented in the accompanying claims.
An aspect of the invention is a scaffold element adapted to be removably attachable to a bridge, the scaffold element comprising a support member for supporting the scaffold element onto an upper surface of the bridge and a support structure which is secured to the support member and which extends to a distance outside the edge of the bridge and to a distance below the edge of the bridge. The scaffold element is characterized in that it further comprises a longitudinally adjustable support bar pivotally connected to the support structure and being supportable against a lower surface of the bridge and adjustment means for adjustably attaching a vertical mould wall onto the support structure of the scaffold element at a distance outside the edge of the bridge for forming a mould between the wall and the bridge.
In an embodiment, the support structure comprises a column comprising a vertical component. The lower end of the column extends to a distance down from the edge of the bridge.
In an embodiment, the support structure comprises a beam having a horizontal component secured rigidly to the column.
In an embodiment, the support structure comprises adjustment means for adjustably supporting the vertical mould wall e.g. onto the column of the support structure. The adjustment means may be adapted to push the mould wall towards the bridge and suitably maintain the pushing force or pull the mould wall away from the bridge and suitably maintain the pulling force.
In an embodiment, the adjustment means comprises at least one adjustment screw that is supported onto e.g. the column of the support structure, suitably into a horizontal position. Suitably, there are at least two adjustment screws.
The adjustment screw may comprise a holding member for holding securely the mould wall.
In an embodiment, the support structure comprises adjustment means for adjustably supporting a horizontal mould wall onto the horizontal beam of the scaffold element.
In an embodiment, the support structure comprises a vertical beam which may be e.g. substantially vertical and made of e.g. steel and in which beam the lower end can be anchored by support members to the upper surface of the bridge at a distance from the edge of the bridge that needs repairing, the beam extending to a distance above the upper surface of the bridge. The support structure may further comprise an upper horizontal beam in which the first end is rigidly secured to the upper end of the vertical beam and which horizontal beam extends from the vertical beam e.g. substantially horizontally and substantially transversely relative to the longitudinal direction of the bridge in such manner that the second end of the upper horizontal beam extends over the edge of the bridge to a distance from the edge of the bridge. The support structure may yet further also comprise a vertical column, secured vertically at the upper end to the second end of the upper horizontal beam, the lower end of the vertical column extending to a distance down from the edge of the bridge.
The beam having a horizontal component (in the embodiment shown herein referred also as “the lower horizontal beam”) may be rigidly secured to the column having a vertical component and extend from the column e.g. substantially horizontally and substantially transversely relative to the longitudinal direction of the bridge.
The lower horizontal beam may comprise a first beam portion extending from the vertical column to a distance below the bridge, so that said mould walls can be fitted onto the first beam portion. The lower horizontal beam may further comprise a second beam portion extending from the vertical column to an opposite direction relative to the first beam portion and supporting the access bridge.
In one embodiment of the scaffold element, a mounting flange is rigidly secured to the lower end of the vertical beam. The mounting flange comprises long holes which extend substantially transversely relative to the longitudinal direction of the bridge. Anchor bolts can be secured through the long holes to the bridge. In one embodiment of the arrangement, the scaffold element comprises a suspension member which can be grabbed. The suspension member is arranged to be offset from the mass centre of the scaffold element (also referred to as “bent”) so that when lifted by the suspension members, the bents are tilted in such manner that during mounting of the bents, the mounting flange is first supported at the edge to the upper surface of the bridge at a contact point, and when the scaffold element is lowered further the mounting flange turns about said contact point, until it is in alignment with the upper surface and rests against it.
In one embodiment, the scaffold element comprises a holder in which the level can be adjusted vertically and onto which mould walls can be supported.
In one embodiment of the scaffold element, the holder is guided to move vertically in the guidance of the vertical column.
In one embodiment of the scaffold element, the holder comprises an adjustment member for moving the mould walls horizontally. In one embodiment of the scaffold element, the bent comprises a lifting device arranged to operate between the holder and the first beam portion in order to adjust the level of the holder.
In one embodiment of the scaffold element, the lifting device comprises a lifting screw, wherein the holder is arranged onto the upper end of the lifting screw and the lifting screw extends through a hole in the first beam portion. Locking nuts are arranged into the first beam portion in order to lock the lifting screw. In one embodiment of the arrangement, the lifting device is a mechanical or hydraulic jack.
In one embodiment of the scaffold element, the element comprises a vertical support member connected to the upper horizontal beam at a distance from the vertical beam.
In one embodiment of the scaffold element, the vertical support member is adapted to operate as a supporting foot for the bent during mounting.
In one embodiment of the scaffold element, the vertical support member is rigidly secured to the upper horizontal beam.
In one embodiment of the scaffold element, the vertical support member is adapted to move horizontally in the guidance of the upper horizontal beam, and it comprises locking members for detachably locking it to its position. The vertical support member is adapted to touch the surface of the bridge. In an embodiment, the vertical support member is longitudinally adjustable.
In one embodiment, the adjustment means for supporting the vertical mould wall onto the column of the scaffold element are adapted to push the vertical mould wall horizontally towards the bridge or pull the vertical mould wall horizontally away from the bridge.
In an embodiment, the adjustment means comprise at least one adjustment screw that is horizontally supported to the column. The adjustment screw may comprise an attachment member for attaching the vertical mould wall to the screw. Suitably, there are two or more adjustment screws.
One aspect of the invention is a scaffold arrangement comprising at least two scaffold elements placed at a distance from each other. Access bridge element may be supported onto the scaffold elements. Further, the adjustable mould wall elements may be supported onto the plurality of scaffold elements.
In an embodiment, the arrangement comprises a working platform supported onto at least one scaffold element underneath the bridge. The working platform is suitably supported so on the scaffold element or between two scaffold elements that a worker is able to operate the longitudinally adjustable support bar from the platform. Conveniently, the working platform is adapted to be rigid enough to support the weight of a worker, e.g. 100 kg.
In one embodiment, the arrangement comprises a receiving member for receiving the rubble removed from the edge of the bridge. The receiving member can be supported onto the holders.
In one embodiment of the arrangement, the mould walls comprise at least one horizontal mould wall which limits the casting in a downward direction and at least one vertical mould wall which limits the casting in a lateral direction.
In one embodiment of the arrangement, the vertical mould walls comprise a first vertical mould wall for limiting the casting in a first lateral direction, and a second vertical mould wall for limiting the casting in a second lateral direction which is an opposite direction relative to the first lateral direction.
In one embodiment of the arrangement, the second vertical mould wall is connected to the vertical support.
In one embodiment of the arrangement, the arrangement further comprises a horizontal shoring that is detachably supportable onto the adjustment means of horizontal mould wall of two scaffold elements that reside in a distance from each other. The shoring comprises support elements that are longitudinally adjustable. Suitably, the support element comprises a telescopic structure. The horizontal mould wall may be supported on top of the support elements of the shoring.
An aspect of the invention is a method of installing the scaffold element onto a bridge. When installing the scaffold element onto a bridge, the support structure of the scaffold element is fixedly anchored by at least one support member to the upper surface of the bridge at a distance from the edge of the bridge that needs repairing. This method provides the advantage that the scaffold element can be mounted by working from the top of the bridge, which reduces considerably the time required for the repair work. The scaffold element is quickly mounted and disassembled, saving costs and reducing the traffic disturbance. The scaffold element is safe for those trafficking below. There is no disturbance for the traffic below the bridge. There is little or no need to drill thorough holes into the deck of the bridge that would later have to be patched up. Being advantageously metal-structured, the arrangement is strong and it can be used repeatedly several times all over again in different locations and be adapted and adjusted to be suitable for almost all existing bridges.
In one embodiment of the method, the scaffold element of the present invention is moved to its position to the edge of the bridge that needs repairing by lifting it in a tilted position by the suspension members in such manner that the edge of the bridge is set between the mounting flanges and the holders. Then the tilted scaffold element is lowered so that the mounting flange contacts the upper surface of the bridge. The scaffold element is lowered further so that the mounting flange becomes aligned with the upper surface of the bridge. The mounting flange is secured to the upper surface of the bridge by the anchor bolts. The scaffold element is supported onto the lower surface of the bridge by the longitudinally adjustable support bars.
In one embodiment of the method, when the mounting flange is being secured to the upper surface of the bridge, the position of the scaffold element is adjusted by placing wedges between the mounting flange and the upper surface of the bridge.
In one embodiment of the method, a receiving member is arranged onto the holders for receiving the rubble. The holders and the receiving member are lifted by the lifting device in such manner that the receiving member comes close to the edge of the bridge that needs repairing. After that, old concrete is removed from the area to be renewed at the edge of the bridge and the rubble is received onto the receiving member. The rubble is removed from the receiving member and it is carried away along the access bridge.
In one embodiment of the method, the horizontal mould wall and the first vertical mould wall are supported onto the holders, and, optionally, the second vertical mould wall is supported onto the vertical support. The edge of the horizontal mould wall is placed tightly against the lower surface of the bridge. The distance of the first vertical mould wall from the edge of the bridge is adjusted using the adjustment means and, at the lower end, tightly against the horizontal mould wall and it is moved horizontally to a distance from the remaining edge of the bridge after the removal of the old concrete.
In one embodiment of the method, the first vertical mould wall is first attached to the holding members of first and third scaffold elements and then attached to the holding members of a second scaffold element residing between the first and third scaffold elements. The adjustment screws of the second scaffold element are then used to bend the vertical mould wall by pushing or pulling the mould wall. This way the mould wall may be conveniently installed and adapted to form a curve that e.g. matches the curved form of a bridge.
In one embodiment of the method, the vertical support is adjusted horizontally, if such adjusting possibility is arranged, in order to position the second vertical mould wall, and is locked to its position by the locking members. A new edge beam or other edge extension is cast from concrete into the space bounded by the first vertical mould wall, the horizontal mould wall, the optional second vertical mould wall and the remaining edge of the bridge after the removal of the old concrete.
In one embodiment of the method, the holders are lowered by the lifting device after hardening of the cast concrete in order to remove the horizontal mould wall from the cast edge beam or other extension. The support bars are loosened. The anchor bolts are loosened so that the mounting flange can be moved horizontally relative to the upper surface of the bridge. Optionally, the second vertical mould wall is moved away from the cast edge beam etc. by moving the vertical support. The scaffold elements are moved transversely relative to the longitudinal direction of the bridge within the limits set by the long holes of the mounting flange in order to remove the first vertical mould wall from the cast edge beam or other extension.
In one embodiment of the method, the vertical mould walls are removed. Then the holders are lowered by the lifting device and the horizontal mould wall is removed from the holders. The access bridge is removed from the bents. The support members, such as the anchor bolts, are removed. Finally, the bents are moved away from the edge of the repaired bridge by grabbing the suspension members and lifting the bents away from the edge of the bridge.
In the following section, the invention will be described in detail by means of exemplifying embodiments with reference to the accompanying drawing in which
a shows section II-II of
The scaffold elements 2 are supported by support members 3, 4 onto the upper surface close to the edge of the bridge, as will be described below. Mould walls 5, 6, 7 can be supported onto the scaffold elements 2 to form a concrete casting mould for casting a new edge structure for the bridge. The scaffold arrangement also comprises an access bridge 8 supported onto the scaffold elements 2 in order to form a passage and a working platform for the duration of the repair period. The scaffold element 2 comprises in a vertical direction a vertical steel beam 9 in which the lower end 10 can be anchored by the support members 3, 4 to the upper surface 11 of the bridge at a distance from the edge of the bridge that needs to be repaired. The vertical beam 9 extends to a distance above the upper surface 11 of the bridge. The first end 13 of an upper horizontal steel beam 12 is rigidly secured to the upper end of the vertical beam 9. The upper horizontal beam 12 extends from the vertical beam 9 horizontally and substantially transversely relative to the longitudinal direction of the bridge in such manner that the second end 14 of the upper horizontal beam 12 extends over the edge of the bridge to a distance from the edge of the bridge. A vertical steel column 15 is vertically secured at the upper end to the second end of the upper horizontal beam 12. The lower end of the vertical column extends to a distance down from the edge of the bridge. A lower horizontal steel beam 16 is secured rigidly to the vertical column 15 and extends from the vertical column 15 horizontally and substantially transversely relative to the longitudinal direction of the bridge. The lower horizontal beam 16 comprises a first beam portion 17 extending from the vertical column 15 to a distance below the bridge. Said mould walls 5, 6 can be fitted onto the first beam portion 17. A second beam portion 18 of the lower horizontal beam 16 extends from the vertical column 15 to an opposite direction relative to the first beam portion 17. The access bridge 8 is supported onto the second beam portion 18. A longitudinally adjustable support bar 19 is pivotally connected at one end to the first beam portion 17 and at the other end is supportable against the lower surface of the bridge. A flange positioned against the lower surface of the bridge may be connected by joints to the support bar 19.
In one preferred embodiment, the scaffold elements 2 are spaced at intervals of two metres and the access bridge 8 preferably comprises a prefabricated structure, so that for example 4 or 6 metres long access bridge elements 8 can be used, and, correspondingly, the mould walls 5, 6, 7 are preferably mould wall elements having the length of preferably 2 or 4 metres. These can be placed onto the bents, while the ribs are positioned in a staggered configuration. A mounting flange 3 is rigidly secured to the lower end of the vertical beam 9 and is shown from the top in
The receiving member 27 supported onto the holders 26 is able to receive the rubble removed from the edge of the bridge. The receiving member 27 may be a rigid planar body or a flexible piece of tarpaulin cloth. Also the horizontal mould wall 5 supported onto the holders 26 can in principle be applied as the receiving member 27. The holder 26 also comprises an adjustment member 28 for moving the mould wall 5 horizontally. The holder 26 may be a U-shaped steel profile with a wooden beam sliding therein and forming the adjustment member 28. The scaffold element 2 further comprises a lifting device 29 operating between the holder 26 and the first beam portion 17 for adjusting the level of the holder 26. In the embodiment of
As seen from
In the following section, the different steps of the method according to the invention will be described with reference to
In
In accordance with
Then, in accordance with
Then, in accordance with
The invention is not limited merely to the exemplifying embodiments referred to above; instead many variations are possible within the scope of the inventive idea defined by the claims. For example, the support structure of the scaffold element may comprise any suitable shape, including arc, and it may comprise elements not mentioned in this disclosure. Also, although steel is mentioned as a suitable material of a scaffold element, any other suitable material may be used.
Number | Date | Country | Kind |
---|---|---|---|
U20080121 | Apr 2008 | FI | national |
U20080122 | Apr 2008 | FI | national |
U20080123 | Apr 2008 | FI | national |
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCT/FI09/50272 | 4/9/2009 | WO | 00 | 11/28/2010 |