Scaled down, efficient data center

Information

  • Patent Grant
  • 10178810
  • Patent Number
    10,178,810
  • Date Filed
    Friday, December 4, 2015
    9 years ago
  • Date Issued
    Tuesday, January 8, 2019
    5 years ago
Abstract
Systems and methods disclose self-contained data center facility operations, management and build comprising, in the data center facility, installing a plurality of computer servers contained in a corresponding plurality of configurable rack mounted containers, a single or plurality of heat exchangers operatively coupled to the configurable rack mounted containers, and comprised in a thermal heat exchange system which further comprises a closed loop cooling unit. The closed loop cooling unit is caused to absorb heat from the single or plurality of heat exchangers. Additionally, systems and methods disclosed include power management functionality operatively coupled to control functionality, wherein the power management functionality is configured to assess a data center power requirement, and to draw and supply power based on the assessed requirement, and wherein the data center control unit is configured to calculate a data center environment, infrastructure and component condition, and based on the calculated condition, control the environment, infrastructure and component condition for optimal efficiency.
Description
CROSS REFERENCE TO RELATED APPLICATIONS
Background
Field

The present invention relates to low cost, energy efficient data center facilities, intelligent power management, and data recovery facilities.


Related Art

A data center is a facility designed to house, maintain, and power a plurality of computer systems. A conventional data center is constructed entirely on-site with installation of all electrical, mechanical and cooling equipment performed onsite after construction of the data center facility is completed. Traditional data center deployment methods require extensive time for planning and construction. All electrical, mechanical and cooling systems are fabricated and constructed on-site after the construction of the data center facility building has been completed. After the data center construction has been completed, installing racks to house the computer systems is another time-consuming effort that may take additional weeks to complete.


Typical Data Centers are large in surface area and are energy intensive. In some instances, for security or location reasons, or due to space constraints, there is a requirement to have a Data Center that provides communities with dedicated computation resources. There is also a need to have data centers that are energy efficient, and self-contained. Some of the locations where these data centers are deployed include private residences, high-rise buildings, small business parks, ships or other marine vessels, air planes, submarines, and other land, water, air, and space based vessels. In order to increase efficiencies and reduce costs, a number of standalone data center elements need be combined to address demands for compactness and simplicity. In an example embodiment, a heat exchanger is embedded in a closed loop cooling unit piping. In additional embodiments, automation systems that control cooling, power, etc. and that our configured to automate such control based on information gathered via sensors, is configured to automate the control based on algorithmic manipulations. Embodiments disclosed address these and other hitherto unaddressed needs.


Field and Related Art

The described methods and systems include use of everyday appliances such as water heaters, with a heat exchange embedded into pipes or hanging off the water heater, and stripped down automation system that would allow artificial intelligence controlling of a scaled down data center through signal averaging and simulation of the particular building to be a more cost effective solutions.


SUMMARY

The following presents a simplified summary relating to one or more aspects and/or embodiments disclosed herein. As such, the following summary should not be considered an extensive overview relating to all contemplated aspects and/or embodiments.


One general aspect includes a self-sustained, data center facility including: in the computer data center, a plurality of computer servers contained in a corresponding plurality of reconfigurable rack mounted containers; a single or plurality of heat exchangers operatively coupled to the reconfigurable rack mounted containers; a thermal heat exchange system including the single or plurality of heat exchangers, and further including a closed loop cooling means. The self-sustained, data center facility y also includes where the closed loop cooling means is caused to absorb heat from the single or plurality of heat exchangers. The self-sustained, data center also includes a power management unit operatively coupled to a data center control unit. The power management unit is configured to assess a data center power requirement, and to draw and supply power based on the assessed requirement. The self-sustained data center facility also includes a control unit is configured to assess a data center environment, infrastructure and component condition, and based on the assessed condition, control the environment, infrastructure and component condition for optimal efficiency. Other embodiments of this aspect include corresponding computer systems, apparatus, and computer programs recorded on one or more computer storage devices, each configured to perform the actions of the methods.


Implementations may include one or more of the following features. The data center control unit further including a software management suite configured to collect the environment, infrastructure and component condition data via a plurality of wireless sensors, and to automatically enable dynamic data center operation actions for migrating application loads and power loads to another data center, over a network. The facility where the plurality of reconfigurable rack mounted containers is included in a plurality of reconfigurable data center modules. The facility where the data center control unit including the software management suite further includes: a plurality of analytic engines configured to: The facility may also include collect and analyze data from a plurality of infrastructure systems, components, wireless sensors, application services, power distribution components, virtual machines, facility infrastructure and utility energy markets. The facility may also include based on the collected analyzed data, make data center operational state changes for application load balancing or power load balancing across multiple data centers. The facility may also include where data collected from energy markets is used to automatically manage data center and application disaster recovery from utility energy market outages, which includes moving applications and power loads from one data center to another, enabling disaster recovery from utility energy market outages. The facility where the closed loop cooling means includes a water-based closed loop cooling system further including: a single or plurality of filtered water intake pipes and water exhaust pipes; a single or plurality of coolant heat exchange piping, and coolant distribution piping; a coolant distribution unit; and where the coolant distribution unit is caused to circulate coolant through the coolant heat exchange piping, and where water pumped from the surrounding environment through the filtered water intake pipes is caused to absorb heat from the heated coolant via the single or plurality of heat exchangers. The facility where the closed-loop coolant distribution unit is operatively coupled to the data center modules via the single or plurality of heat exchangers. Implementations of the described techniques may include hardware, a method or process, or computer software on a computer-accessible medium.





BRIEF DESCRIPTION OF THE DRAWINGS


FIG. 1 illustrates the components of a data center facility according to an embodiment.



FIG. 2 illustrates cooling management of the data center facility according to an embodiment.





DETAILED DESCRIPTION

While the foregoing written description of the invention enables one of ordinary skill to make and use what is considered presently to be the best mode thereof, those of ordinary skill will understand and appreciate the existence of variations, combinations, and equivalents of the specific embodiment, method, and examples herein. The invention should therefore not be limited by the above described embodiment, method, and examples, but by all embodiments and methods within the scope and spirit of the invention.


An embodiment includes, in a data center, a centralized computer system configured to collect environment, infrastructure and component data. Based on the collected data the computer system is configured to control a water flow and a coolant flow through a closed loop cooling system comprised in a reconfigurable thermal containment system. The system is further configured to control airflow through a thermal airflow system, and to control a single or plurality of virtual machine instances comprised in the data center. Additionally, the system can be configured to collect data from a plurality of energy markets, accordingly control a power supply from a single or plurality of power sources, and based on the collected data, control data center operation state changes.


According to an embodiment, the system is further configured to collect environmental data from a plurality of wireless sensors. Additional configurations allow the computer system to collect infrastructure system and component data from infrastructure elements wherein said infrastructure system and component data comprise air temperature data, air flow data, water temperature data and water flow data.


According to an embodiment the computer system is configured to control the infrastructure system and components' operational states for optimal efficiency.



FIG. 1 illustrates the components of a data center facility according to an embodiment. Data center facility illustrated in FIG. 1 includes power and control unit 101, configurable racks and containers 102 for housing server systems, closed loop-cooling unit 103, and water inlet and outlet pipes 104 coupled to or comprising embedded heat exchange apparatus.


In a preferred embodiment, in said control of airflow, the system is configured to analyze if an ambient air temperature is within a pre-defined range, and based on the analysis, the computer system can automatically make zero or more adjustments to at least one of a computer room air-conditioner (CRAC), a rear door heat exchanger (RDHX), a coolant distribution unit (CDU), a single or plurality of variable frequency drive (VFD) fans and a single or plurality of automated, adjustable flow control valves, to bring the ambient air temperature to within the pre-defined range.


Additional embodiments include configuration capabilities wherein the system is configured to, in the said control of water flow, analyze if the water temperature and water flow is within a pre-defined range, and based on the analysis, make zero or more adjustments to at least one of a coolant distribution unit (CDU), a rear door heat exchanger (RDHX), a single or plurality of automated, adjustable flow control valves, and a single or plurality of variable frequency drive (VFD) pumps to bring the water flow and the water temperature to within the pre-defined range.


An embodiment includes configurations to automatically manage the virtual machine instances, which comprises a capability to kill a single of plurality of virtual servers or banks of physical computer systems during low application loads, and to instantiate the said virtual machines or banks of physical computer systems prior to expected peak loads.


Additional embodiments include communication capability over a network with a plurality of data centers and energy markets. This communication capability provides remote configuration capability as well. Alternate embodiments enable, in control of data center operation state changes, control of at least one of application load balancing and power load balancing across a plurality of data centers over a wired or wireless network.


Embodiments disclosed include, in a data center facility, a centralized computer implemented method comprising, collecting environment, infrastructure and component data. Based on the collected data, the method includes controlling a water flow and a coolant flow through a closed loop cooling unit comprised in a thermal containment system. Further the method comprises controlling airflow through a thermal airflow system, and controlling a single or plurality of virtual machine instances comprised in the data center facility. Additional embodiments include controlling a power supply from a single or plurality of power sources and collecting data from a plurality of energy markets, and based on the collected data, controlling data center operation state changes.


The method further comprises collecting the said environmental data from a plurality of wireless sensors and collecting the said infrastructure system and component data from a single or plurality of infrastructure elements.


In a preferred embodiment, the method optimizes efficiency based on the controlling of the infrastructure system and components' operational states. In controlling virtual machine instances, embodiments are configured for automatically managing the virtual machine instances, killing a single of plurality of virtual servers or banks of physical computer systems during low application loads, and even instantiating the said virtual machines or banks of physical computer systems prior to expected peak loads. In controlling of data center operation state changes, the data center facility is configured for controlling at least one of application load balancing and power load balancing across a plurality of data centers over a wired or wireless network. A plurality of connected graphical user interfaces enable displaying of the collected and analyzed data to a single or plurality of users interconnected over a network. Preferably, the data center facility is configurable over the network.



FIG. 2 illustrates cooling management of the data center facility according to an embodiment. In step 201 water is drawn from a water source by filtered water intake pipes. In step 202 the water flowing through the pipes is caused to absorb dissipated heat captured by the heat exchanger. And in step 203, the heat absorbing water is ejected through water outflow pipes.


Embodiments disclosed include systems and methods for deployment of data center facilities in constrained spaces like private residences, high-rise buildings, small business parks, ships or other marine vessels, air planes, submarines, and other land, water, air, and space based vessels, empowering communities with dedicated computation resources. Embodiments disclosed include systems and methods for extremely cost efficient and energy efficient self-contained data center facilities. Embodiments disclosed include systems and methods for combining standalone data center facility elements to address demands for compactness and simplicity. Embodiments enable embedding of heat exchanger properties in closed loop cooling unit piping. Embodiments further enable automation systems that control cooling, power, etc. and that our configured to automate such control based on information gathered via sensors, and without sensors, are configured to automate the control based on algorithmic manipulations.


Aspects of the present disclosure can be practiced with a variety of computer-system and computer-network configurations, including hand-held devices, multiprocessor systems, microprocessor-based or programmable-consumer electronics, minicomputers, mainframe computers, and the like. In addition, aspects of the present disclosure can be practiced in distributed-computing environments where tasks are performed by remote-processing devices that are linked through a communications network to the data center facility. Aspects of the present disclosure can therefore, be implemented in connection with various hardware, software or combinations thereof, in a computer system or other processing system.


Any of the methods described herein can include machine readable instructions for execution by: (a) a processor, (b) a controller, and/or (c) any other suitable processing device. Any algorithm, software, or method disclosed herein can be embodied in software stored on a tangible medium such as, for example, a flash memory, a CD-ROM, a floppy disk, a hard drive, a digital versatile disk (DVD), or other memory devices, but persons of ordinary skill in the art will readily appreciate that the entire algorithm and/or parts thereof could alternatively be executed by a device other than a controller and/or embodied in firmware or dedicated hardware in a well known manner (e.g., it can be implemented by an application specific integrated circuit (ASIC), a programmable logic device (PLD), a field programmable logic device (FPLD), discrete logic, etc.).


While the foregoing written description of the invention enables one of ordinary skill to make and use what is considered presently to be the best mode thereof, those of ordinary skill will understand and appreciate the existence of variations, combinations, and equivalents of the specific embodiment, method, and examples herein. The invention should therefore not be limited by the above described embodiment, method, and examples, but by all embodiments and methods within the scope and spirit of the invention.

Claims
  • 1. A self-sustained data center facility comprising: in the data center facility, a plurality of computer servers contained in a corresponding plurality of configurable rack mounted containers;a single or plurality of rear door heat exchangers operatively coupled to the configurable rack mounted containers, and comprised in a thermal heat exchange system which further comprises a closed loop coolant distribution unit; a power management unit operatively coupled to a control unit;wherein the power management unit is configured to assess a data center power requirement, and to draw and supply power based on the assessed requirement; andwherein the assessed data center power requirement is based on a calculated data center environment, infrastructure and component condition, calculated by the data center control unit, and based on the calculated condition, the data center control unit is further configured to control the environment, infrastructure and component condition for optimal efficiency; andwherein control of the environment, infrastructure and component condition comprises:analyzing if an ambient air temperature is within a pre-defined range, and based on the analysis, automatically adjusting at least one of a computer room air-conditioner (CRAC), the rear door heat exchangers (RDHX), the coolant distribution unit (CDU), a single or plurality of variable frequency drive (VFD) fans and a single or plurality of automated, adjustable flow control valves, to bring the ambient air temperature to within the pre-defined range; andanalyzing if the water temperature and water flow is within a pre-defined range, and based on the analysis, adjusting at least one of the coolant distribution unit (CDU), the rear door heat exchangers (RDHX), the single or plurality of automated, adjustable flow control valves, and a single or plurality of variable frequency drive (VFD) pumps to bring the water flow and the water temperature to within the pre-defined range.
  • 2. The data center facility of claim 1 wherein the control unit further comprises a software management suite configured to extract the environment, infrastructure and component condition data via a plurality of wireless sensors, and to automatically enable dynamic data center operation actions for migrating application loads and power loads to another data center, over a network.
  • 3. The data center facility of claim 1 wherein the plurality of configurable rack mounted containers are comprised in a plurality of configurable data center modules.
  • 4. The data center facility of claim 1 wherein the control unit comprising the software management suite further comprises: a plurality of analytic engines configured to: collect and analyze data from a plurality of infrastructure systems, components, wireless sensors, application services, power distribution components, virtual machines, facility infrastructure and utility energy markets;based on the collected analyzed data, make data center operational state changes for application load balancing or power load balancing across multiple data centers; andwherein data collected from energy markets is used to automatically manage data center and application disaster recovery from utility energy market outages, which comprises moving applications and power loads from one data center to another, enabling disaster recovery from utility energy market outages.
  • 5. The data center facility of claim 1 wherein the facility is configurable over a secure network.
  • 6. The data center facility of claim 1 wherein the closed loop coolant distribution unit comprises a water-based closed loop cooling system further comprising: a single or plurality of filtered water intake pipes and water exhaust pipes;a single or plurality of coolant heat exchange piping, and coolant distribution piping;andwherein the coolant distribution unit is caused to circulate coolant through the coolant heat exchange piping, and wherein water pumped from the surrounding environment through the filtered water intake pipes is caused to absorb heat from the heated coolant via the single or plurality of heat exchangers.
  • 7. The data center facility of claim 6 wherein the closed-loop coolant distribution unit is operatively coupled to the data center modules via the single or plurality of heat exchangers.
  • 8. In a data center facility, a centralized computer implemented method comprising: collecting environment, infrastructure and component data, and based on the collected data:analyzing if an ambient air temperature is within a pre-defined range, and based on the analysis, automatically adjusting at least one of a computer room air-conditioner (CRAC), a plurality of rear door heat exchangers (RDHX), a coolant distribution unit (CDU), a single or plurality of variable frequency drive (VFD) fans and a single or plurality of automated, adjustable flow control valves, to bring the ambient air temperature to within the pre-defined range; andanalyzing if a water temperature and water flow is within a pre-defined range, and based on the analysis, adjusting at least one of the coolant distribution unit (CDU), the rear door heat exchangers (RDHX), the single or plurality of automated, adjustable flow control valves, and a single or plurality of variable frequency drive (VFD) pumps to bring the water flow and the water temperature to within the pre-defined range;controlling a single or plurality of virtual machine instances comprised in the data center facility;assessing the data center power requirement by a power management unit, and based on the assessed data center power requirement, controlling a power supply from a single or plurality of power sources;wherein the assessed data center power requirement is based on a calculated environment, infrastructure and component condition, calculated by a control unit; andcollecting data from a plurality of energy markets, and based on the collected data, controlling data center operation state changes.
  • 9. The method of claim 8 further comprising: collecting the environmental data from a plurality of wireless sensors; andcollecting the infrastructure system and component data from a single or plurality of infrastructure elements.
  • 10. The method of claim 8 further comprising optimizing efficiency based on the said controlling of the infrastructure system and components' operational states.
  • 11. The method of claim 8 further comprising: in controlling of virtual machine instances, automatically managing the said virtual machine instances;killing a single of plurality of virtual servers or banks of physical computer systems during low application loads; andinstantiating the said virtual machines or banks of physical computer systems prior to estimated peak loads.
  • 12. The method of claim 8 further comprising: in said controlling of data center operation state changes, controlling at least one of application load balancing and power load balancing across a plurality of data centers over a wired or wireless network.
  • 13. The method of claim 8 further comprising displaying of the collected and analyzed data to a single or plurality of users via a single user interface or a plurality of user interfaces interconnected over a network.
  • 14. The method of claim 8 further comprising, configuring the data center facility over a secure network.
US Referenced Citations (37)
Number Name Date Kind
6212895 Richardson Apr 2001 B1
6990395 Ransom et al. Jan 2006 B2
7058710 McCall et al. Jun 2006 B2
7278273 Whitted et al. Oct 2007 B1
7525207 Clidaras et al. Apr 2009 B2
7738251 Clidaras et al. Jun 2010 B2
8359191 Chen et al. Jan 2013 B2
8853872 Clidaras et al. Oct 2014 B2
20020010709 Culbert et al. Jan 2002 A1
20060259201 Brown Nov 2006 A1
20070213000 Day Sep 2007 A1
20070281639 Clidaras et al. Dec 2007 A1
20080209234 Clidaras et al. Aug 2008 A1
20090037268 Zaid et al. Feb 2009 A1
20090083126 Koren et al. Mar 2009 A1
20090084297 Choi et al. Apr 2009 A1
20090126910 Campbell et al. May 2009 A1
20090207567 Campbell et al. Aug 2009 A1
20090295167 Clidaras et al. Dec 2009 A1
20090299824 Barnes Dec 2009 A1
20100030552 Chen et al. Feb 2010 A1
20100298997 Ohba et al. Nov 2010 A1
20110060470 Campbell et al. Mar 2011 A1
20110072293 Mazzaferri et al. Mar 2011 A1
20110207391 Hamburgen et al. Aug 2011 A1
20120042263 Rapaport et al. Feb 2012 A1
20120136998 Hough et al. May 2012 A1
20120166433 Tseng Jun 2012 A1
20120166616 Meehan et al. Jun 2012 A1
20120266007 Menon Oct 2012 A1
20130128455 Koblenz May 2013 A1
20130238795 Geffin et al. Sep 2013 A1
20140006594 Gabriel Jan 2014 A1
20140259618 Rikoski et al. Sep 2014 A1
20150088586 Pavlas Mar 2015 A1
20150121113 Ramamurthy Apr 2015 A1
20160286689 Wu Sep 2016 A1
Foreign Referenced Citations (6)
Number Date Country
2010269641 Dec 2010 JP
2000048288 Aug 2000 WO
2009055368 Apr 2009 WO
2010129341 Nov 2010 WO
2012047746 Apr 2012 WO
2013113138 Aug 2013 WO
Non-Patent Literature Citations (1)
Entry
http://www.nolimitssoftware.com/wp-content/uploads/2013/03/DCIM-Guide.pdf.