Operations Research, V. 35, No. 3, May-Jun., 1987, Scheduling Tasks in a Fabrication/Assembly Process, Bruce Faaland et al, pp. 378-388. |
Working Paper 83-01, Univ. of Wash, DJ-10, Seattle Wa. 98195, Smithfield D: Case and Computer Instructions, W. L. Berry & T. G. Schmitt. |
Naval Res. Logist. Quart., 15, Multiple Factor Rules for Sequencing with Assembly Constraints, Maxwell, W.L. & Mehra, M., pp. 251-254. |
Operations Research, An Introduction, Handy A. Taha, 3rd Edition, 1982. |
Adam, N., and J. Surkis, "A Comparison of Capacity Planning Techniques in a Job Shop Control System," Management Science 23:1011-1015, 1977. |
Aho, A. H., J. E. Hopcroft and J. D. Ullman, The Design and Analysis of Computer Algorithms, Addison-Wesley, Reading, Massachusetts, 1974. |
Anderson, J. C., R. G. Schroeder, S. E. Tupy and White, "A Survey of MRP Implementation and Practice," Production and Inventory Management 23:51-66, 1982. |
Baker, K. R., Introduction to Sequencing and Scheduling, 178-231, 1974. |
Baker, K. R., "Sequencing Rules and Due Date Assignments in a Job Shop," Management Science 30:1093-1104, 1984. |
Balinski, M. L., "On a Selection Problem," Management Science 17:230-231, 1970. |
Browne, J., K. Rathmill and K. E. Stecke, "Classification of Flexible Manufacturing Systems," The FMS Magazine, 114-117, Apr. 1984. |
Chvatal, V., Linear Programming 367-387, W. H. Freeman, New York, 1980. |
Dinic, E. A., "Algorithm for Solution of a Problem of Maximum Flow in a Network with Power Estimation," Soviet Mathematics Doklady 11:1277-1280, 1970. |
Edmonds, J., and R. M. Karp, "Theoretical Improvements in Algorithmic Efficiency for Network Flow Problems," JACM 19:248-264, Apr. 1972. |
Eisner, M. J., and D. G. Severance, "Mathematical Techniques for Efficient Record Segmentation in Large Shared Databases," JACM 23:619-635, 1976. |
Elvers, D. A., "Job Shop Dispatching Rules Using Various Delivery Date Setting Criteria," Production and Inventory Management, 62-70, 4th Qtr. 1973. |
Florian, M., P. Trepant and G. McMahon, "An Implicit Enumeration Algorithm for the Machine Sequencing Problem," Management Science 17:B782-B792, 1971. |
Fong, C. O., and M. R. Rao, "Accelerated Labelling Algorithms for the Maximum Flow Problem with Applications to Transportation and Assignment Problems," Working Paper 7222, Graduate School of Management, University of Rochester, 1974. |
Ford, L. R., and D. R. Fulkerson, "Maximal Flow Through a Network," Canadian Journal of Mathematics 8:399-404, 1956. |
Ford, L. R., and D. R. Fulkerson, Flows in Networks, Princeton University Press, Princeton, New Jersey, 1962. |
Fulkerson, L. R., and G. B. Dantzig, "Computation of Maximal Flows in Networks," Naval Research Logistics Quarterly 2:277-283, 1955. |
Galil, Z., "An OV(V5/3E2/3) Algorithm for the Maximal Flow Problem," Acta Informatica 14:221-242, 1980. |
Galil, Z., and A. Naamad, "An O(EV Log 2V) Algorithm for the Maximal Flow Problem," Journal of Computer and System Sciences 21:203-217, 1980. |
Glover, F., and D. Klingman, J. Mote, and D. Whitman, "Comprehensive Computer Evaluation and Enhancement of Maximum Flow Algorithms," Applications of Management Science 3:109-175, 1983. |
Glover F., D. Klingman, J. Mote, and D. Whitman, "A Primal Simplex Variant for the Maximum Flow Problem," Naval Research Logistics Quarterly 31:41-61, 1984. |
Goldberg, A. V., and R. E. Tarjan, "A New Approach to the Maximum Flow Problem," Proceedings of the 18th Annual ACM Symposium on Theory of Computing, 136-146, 1986. |
Greenberg, H. H., "A Branch-Bound Solution to the General Scheduling Problem," Operations Research 16:353-316, 1968. |
Gusfield, D., C. Martel and D. Fernandez-Baca, "Fast Algorithms for Bipartite Network Flow," Working Paper YALEU/DCS/TR-356, Department of Computer Science, Yale University, 1985 (to appear in SIAM Journal on Computing). |
IBM, Program Product: Capacity Planning --Infinite Loading/Capacity Planning--Finite Loading Application Description, GH20-0627-2, 1970. |
Kanet, J. J., and T. C. Hayya, "Priority Dispatching with Operation Due *Dates in a Job Shop," Journal of Operations Management 2:167-176, 1982. |
Karzanov, A. V., "Determining the Maximum Flow in a Network by the Method of Preflows," Soviet Mathematics Doklady 15:434-437, 1974. |
Kim, K., "On the Maximal Closure Problem" Ph.D. Thesis, University of Washington, Seattle, Washington, 1986. |
Lerchs, H., and I. F. Grossman, "Optimum Design of Open-Pit Mines," Canadian Mining and Metallurgical Bulletin 58:47-54, 1965. |
Malhorta, V. M., M. P. Kumar and S. N. Maheshwari, "An O([V]3) Algorithm for Finding Flows in Networks," Information Processing Letters 7:277-278, 1978. |
Mamer, J. W., and S. A. Smith, "Optimizing Field Repair Kits Based on Job Completion Rate," Management Science 28:1328-1333, 1982. |
Manne, A. S., "On the Job-Shop Scheduling Problem," Operations Research 8:219-233, 1960. |
Maxwell, W. L., and M. Mehra, "Multiple Factor Rules for Sequencing with Assembly Constraints," Naval Research Logistics Quarterly 15:241-254, 1968. |
Nijenhuis, A., and H. S. Wilf, Combinatorial Algorithms for Computers and Calculators, 2d ed., Academic Press, New York, 1978. |
Orlicky, J., Material Requirements Planning, McGraw-Hill, New York, 1972. |
Phillips, S., Jr., and M. I. Dessouky, "Solving the Project Time/Cost Tradeoff Problem Using the Minimal Cut Comcept," Management Science 24:393-400, 1977. |
Picard, J. C., "Maximal Closure of a Graph and Applications to Combinatorial Problems," Management Science 22:1268-1272, 1976. |
Plossl, G. W., and O. W. Wight, "Capacity Planning and Control," Production and Inventory Management 14:31-67, 3d Qtr. 1973. |
Reiter, S., "A System for Managing Job-Shop Production," Journal of Business 39:371-393, 1966. |
Rhys, J. M. W., "A Selection Problem of Shared Fixed Costs and Network Flows," Management Science 17:200-207, 1970. |
Russel, R. A., "A Comparison of Heuristics for Scheduling Projects with Cash Flows and Resource Restrictions," Management Science 32:1291-1300, 1986. |
Russel, R. S., and B. W. Taylor, "An Evaluation of Sequencing Rules for an Assembly Shop," Decision Sciences 16:196-212, 1985. |
Stecke, K. E., and J. Browne, "Variations in Flexible Manufacturing Systems According to the Relevant Types of Automated Materials Handling," Material Flow, vol. 2, 1985. |
Tarjan, R. E., Data Structures and Network Algorithms, Society for Industrial and Applied Mathematics, Philadelphia, 1983. |
Tarjan, R. E., "A Simple Version of Karzanov's Blocking Flow Algorithm," Operations Research Letters 2:265-268, 1984. |
Sculli, D., "Priority Dispatching Rules in Job Shops with Assembly Operations and Random Delays," Omega 8:227-234, 1980. |
Sidney, J. B., "Optimal Single-Machine Scheduling with Earliness and Tardiness Penalties," Operations Research 25:62-69, 1977. |
Smith-Daniels, D. E., and N. J. Aquilano, "Constrained Resource Project Scheduling Subject to Material Constraints," Journal of Operations Management 4:369-387, 1984. |
Thompson, K., "MRP II in the Repetitive Manufacturing Environment," Production and Inventory Management, 4th Qtr, 1983. |
Trevelen, M. D., and D. A. Elvers, "An Investigation of Labor Assignment Rules in a Dual Constrained Job Shop," Journal of Operations Management 6:51-67, 1985. |
Tucker, A., "A Note on Convergence of the Ford-Fulkerson Flow Algorithm," Mathematics of Operations Research 2:143-144, 1977. |
Weingartner, H. M., "Capital Budgeting of Interrelated Projects: Survey and Synthesis," Management Science 12:485-516, 1966. |
Wiest, J. D., "A Heuristic Model for Scheduling Large Projects with Limited Resources," Management Science 13:B359-B377, 1967. |