Seabed analysis

Abstract
Test equipment is deployed from a floating vessel or the like, the test equipment comprising testing apparatus for determining geotechnical, geophysical, geochemical, geological characteristics, and soil penetrator which forms an exploratory hole. The testing apparatus also includes at least one sensor or sampler. The test equipment being deployed by coiled tubing or the like, the one end of the coiled tubing being attached to the vessel. The test equipment is of sufficient weight to keep itself and the coiled tubing above it substantially vertical. The test equipment is also kept correctly orientated by a structure resting substantially on the seabed. A heave compensatior, such as one or more winching lines at a constant load tension which are attached to and support the coiled tubing. A casing can be attached to the test equipment and introduced to the exploratory hole by the soil penetrator. Such test equipment can be deployed at two separate locations simultaneously from the same vessel.
Description




FIELD OF THE INVENTION




The present invention relates to a method and apparatus for investigating the properties of seabeds.




BACKGROUND OF THE INVENTION




When assessing a sub-sea location for its suitability for oil production, it is important to consider the characteristics of the soil. The type of soil will affect the drilling of the well and the construction of the platform in a profound way. The characteristics of the seabed soils must also be considered in the design, construction and operation of structures found on the seabed, and other construction work, such a laying oil pipes, cables, anchorages and the like. It could even be used for general prospecting and surveying.




A known systems for gathering data involve drilling a borehole in a conventional way, removing the drill string, and then lowering soil analysis equipment into the borehole. It is time consuming and difficult, not merely to remove the drill string but to introduce the soil analysis equipment into the borehole, especially where the location is in deep water. This necessitates the guidance of the soil analysis equipment into the borehole, which is complicated by the swell of the sea, which causes the vessel to rise and fall relative to the seabed.




GB 2 243 173 A discloses a method of reducing this delay and difficulty. After having removed the drill string and drill bit, the drill bit is taken off the drill string, and the soil analysis equipment put on in its place. The solid analysis equipment is then lowered into the borehole upon the drill string. This method is suitable for land, but guiding the drill string back into the borehole is not such an easy matter at sea.




The object of the present invention is to provide an apparatus for investigating soil beneath the seabed in an efficient manner.




SUMMARY OF THE INVENTION




According to the present invention there is provided a method for deploying test equipment from a floating vessel or the like, the test equipment comprising testing apparatus for determining geotechnical, geophysical, geochemical, geological characteristics, and soil penetration means which forms an exploratory hole, the testing apparatus including at least one sensor or sampling means, the test equipment being deployed by coiled tubing or the like, the one end of the coiled tubing being attached to the vessel.




Preferably the test equipment is of sufficient weight to keep itself and the coiled tubing above it substantially vertical.




Preferably the test equipment is kept correctly orientated by a structure resting substantially on the seabed.




According to another aspect of the present invention, there is provided test equipment as defined above.




Methods of testing the soil characteristics will vary for the soil type and application. Testing is intended to encompass such areas as geotechnical, geophysical, geochemical, geological testing. It is also intended to cover methods such as the use of simulators, that is miniature versions of equipment which may be developed in or on the seabed.











BRIEF DESCRIPTION OF THE DRAWINGS




A soil analysis system and apparatus will now be described, by way of example only, and not intended to be limiting, with reference to the drawings, of which;





FIG. 1

shows the apparatus being disposed from a vessel





FIG. 2

shows an alternative embodiment being disposed





FIGS. 3



a


and


3




b


is a side elevation of the sensor means and soil penetration means of this embodiment in more detail,





FIGS. 4



a


and


4




b


is a side elevation of part of the heave compensation means,





FIGS. 5



a


and


5




b


is a side elevation of an alternative embodiment of the sensor means and soil penetration means,





FIG. 6

shows a further embodiment being disposed





FIGS. 7



a


and


7




b


is a side elevation of the sensor means and soil penetration means in more detail,





FIG. 8

is a section of the soil penetration means.





FIGS. 9



a


and


9




b


are a side elevation and a plan view of a another soil penetration means.





FIGS. 10



a


and


10




b


are side elevations showing the drilling process.





FIGS. 11



a


to


11




e


are side elevations and a plan view of a further soil penetration means.





FIG. 12

shows a modification of the deployment of the invention.





FIG. 13

is a section of a further soil penetration means.





FIG. 14

is a section of a further soil penetration means.





FIG. 15

is a section of a further soil penetration means.











DESCRIPTION OF THE PREFERRED EMBODIMENT




Referring to

FIG. 1

, a vessel


10


carrying the soil testing apparatus on board is positioned just above the point of the seabed which is to be analysed. The apparatus


26


is lowered from a gantry


14


upon the deck through a moonpool


15


in the vessel's hull. The apparatus is suspended by a length of coiled tubing (CT)


22


. This CT is stowed upon a nearby reel


12


. The CT is fed off the reel and paid out by an injector on the gantry. The injector releases a sufficient length of CT for the soil testing apparatus to reach the surface of the seabed. The apparatus is in electrical contact with the vessel by a wireline link which runs through the CT.




It is important that when the soil testing apparatus


26


is introduced to the soil that the swell of the sea, and the consequent movement of the vessel, does not cause the sensors contained in the apparatus to be continually pulled upon in an erratic manner. The CT


22


by which the soil testing apparatus is deployed is supported by winch lines attached at a point approximately one third of the distance from the top to the bottom of the CT. The winch lines which suspend the cable are tensioned to a constant load by a constant load means


13


. Between the point at which the CT leaves the vessel and the point at which it is suspended, the CT is sheathed in a flexible guide


18


. This upper section of CT is encouraged to form a curved shape, whilst the lower section of CT, between the point at which the CT is suspended and the soil testing apparatus, is kept taut by additional weights


24


strapped to the CT above the soil testing apparatus.




When the rising and falling of the sea causes the vessel


10


to move, the constant loading means


13


adjust the lengths of the winch lines


16


so as to maintain the point at which the CT


22


is suspended at a constant position with respect to the sea floor. The curvature, and therefore the distance that the upper section of the CT reaches downwards, automatically responds to the change of winch length. The lower section of the CT, and the soil testing apparatus itself, do not then move relative to the sea floor whilst soil analysis is to be performed, and are kept vertical.





FIG. 2

shows an alternative heave control method. For this purpose, the soil testing apparatus


26


is attached to the CT


22


by a telescopic connector and weight indicator. Referring to

FIGS. 3



a


and


3




b,


small movements of the CT relative to the soil testing apparatus can be absorbed by the weight indicator


28


sliding upon the telescopic connector


29


. The apparent weight of the soil testing apparatus measured by the weight indicator


28


is dependent upon the acceleration of the soil testing apparatus imparted by the CT's movement. From this information, the amount of movement of the vessel relative to the seabed may be calculated, and further compensating means used to minimise the movement of the soil testing apparatus.

FIG. 3



b


shows the weight indicator


28


and the telescopic connector


29


in an extended state.




Above the portion of the soil testing apparatus where the sensors


34


and the soil penetration device is located (and which will be further discussed below) weighted portions are included in order to keep the CT taut and the soil testing apparatus substantially vertical. A sleeve


32


may be included upon the soil testing apparatus, so that when the soil testing apparatus is introduced into the soil, loose soil is contained outside the borehole created. The sleeve is disposable, and is allowed to remain in the borehole after the soil testing apparatus eventually removed.




Referring to

FIGS. 4



a


and


4




b,


the gantry is of the compensated deck type, that is, its deck


42


may move upwards and downwards on hydraulic means


44


relative to the vessel's deck


46


. Its movement is controlled by the processed feedback from the weight indicator. There may additionally be a weight indicator upon the gantry to provide data to calculate the vessel's movement in a similar way to the weight indicator located upon the soil testing apparatus. The CT passes over a gooseneck


40


and is paid out by an injector


41


.

FIG. 4



b


shows the hydraulic means


44


in an extended state to raise the gantry.




Referring to

FIGS. 5



a


and


5




b,


the heave compensation means may be entirely in the soil testing apparatus or in the compensating deck. Here is shown a soil testing apparatus having a long telescopic connector


29


upon which slides a weighted member


27


in order to compensate for the vessels movement. Since in this embodiment the compensation means is contained entirely within the testing apparatus, a weight indicator is no longer required. In some instances, it may be that conditions are such that the weight of the testing apparatus along does not keep the testing apparatus sufficiently vertical. Also, when the testing apparatus touches the seabed, the tension in the CT will reduce, which could allow the testing apparatus to topple slightly. The testing apparatus may then have a support frame


31


attached to it, so that as the support frame's base rests horizontally upon the seabed surface, the testing apparatus is vertically constrained by the frame


31


. It may even be desired that the testing apparatus is orientated at an angle to the vertical.




Another alternative embodiment is shown in

FIG. 6

, the CT


22


having buoys


23


strapped to it in a region close to the location of the soil testing apparatus. The vessel does not have to stay directly above the point on the sea bed that it is wished to analyse once the soil testing apparatus has been correctly positioned. The CT above the buoys assumes a curve to accommodate itself between the vessel and the buoys, whether the ship is rising and falling, or drifting horizontally away from the drilling position, proving that the length of CT above the buoys is of sufficient length to reach this far.




Turning now to the soil testing apparatus itself illustrated in

FIGS. 7



a


and


7




b,


the soil testing apparatus comprises a drill bit


36


, instrumentation


50


, weights


30


, and a telescopic connector


29


and weight indicator


28


, the soil testing apparatus being joined to the CT


22


which suspends it by the weight indicator. A wireline


21


inside the CT is connected to the soil testing apparatus so that the data gathered from the instrumentation may be relayed to the vessel above. The constituents of the soil testing apparatus are disposed in a linear manner, aligned to the CT.




Several cylindrical weights


30


are attached below the weight indicator and telescopic connector. The weights ensure that the soil testing apparatus is suspended plumb so that it can be accurately deployed from the vessel, and that it will penetrate the sea floor vertically. The uppermost weight includes an orientation instrument for ascertaining directional information. The weight must be made of a non-magnetic material so that the orientation instrument can function satisfactorily. The orientation instrument may be used to calculate the testing apparatus' position, and its depth of penetration. If the drilling does not proceed vertically downwards, the orientation instrument will indicate the testing apparatus' direction.




Below the weights


30


various instruments are attached. Immediately below the weights is a resistivity and gamma instrument


50


, which measures the electrical resistivity of the soil by means of a probe, and the strength of gamma radiation in the soil by means of a radiation counter. Beneath this is a sonic treatment


52


which determines structural aspects of the soil by the reflection of emitted sound pulses. Other such instruments capable of gathering geotechnical, geophysical, geochemical, and/or geological data relating to the soil may be included similarly aligned in the soil testing apparatus. Included in the drill housing


54


is a side wall/impression block tester. Elements in the side wall/impression block tester extend radially, as shown in

FIG. 7



b,


exerting themselves against the sides walls of the exploratory hole. This gives more data on the stress and strain characteristics of the soil, and can also indicate how cohesive the soil is.




Referring to

FIGS. 8



a


and


8




b,


the drill bit


36


is attached at the lower end of the drill housing


60


. The drill bit


36


is mounted upon a hollow shaft


61


, which is caused to rotate upon bearings


64


by fluid pumped through the CT. All the constituents of the soil testing apparatus are hollow to allow the passage of the fluid, windows such as those


62


included in the drill shaft allow the fluid to flow through the apparatus. Inside the drill housing


60


is included a probe


66


capable of measuring the stress and strain characteristics of the soil through which it passes. The probe's operation described in more detail below.




The soil testing apparatus is lowered upon the CT until it is resting with the drill bit touching the surface of the seabed. This is ascertained by monitoring the weight indicator data for a sharp decrease in the apparent weight, though other methods, such as monitoring the tension of the CT or by using other instruments in the soil testing apparatus.




Upon reaching the sea bed, the heave control means are implemented to keep the soil testing apparatus steady. Fluid is pumped down the CT, causing the drill bit to turn, and the soil testing apparatus is lowered into the sea bed. The drilling may be halted at any time, to allow measurements to be taken. Some measurements may also be taken continuously as the drilling proceeds, depending upon the particular instrument. The penetration depth can be calculated by monitoring the amount of CT paid out after the seabed surface has been reached.




Referring again to

FIGS. 8



a


and


8




b,


valve means may be operated to cause the probe


66


in the drill housing


60


to slide forwards through the housing, and extend out from the openable section


70


in the middle of the drill bit


36


. Sensors


68


at the tip of the probe measure the reactive force encountered when the probe pushes forwards, and from those, deductions can be made of the strength and stiffness characteristics of the soil. The data so gathered is transmitted back to the vessel via the wireline


21


.




Referring to

FIGS. 9



a


and


9




b,


several probes


68


, samplers


69


, or other instruments could be housed in the drill bit housing


69


. An offset exit hole


80


is included in the drill bit


36


, the various instruments being mounted on a revolving mandrel


82


so that by the indexing means


83


revolving the mandrel by a particular increment each instrument in turn is brought into alignment with the exit hole


80


. Visible in the drawing is a sampler for taking a speciment of soil, and a probe. Upon being aligned with the exit hole, valve means are operated to force a particular instrument to extend out of the exit hole. When a measurement has been made, or a sample taken, further valve means are operated to pull the instrument back into the drill bit housing


60


. The instruments could also be extended and retracted by mechanical means rather than hydraulic means. The instruments could also be aligned with the exit hole


80


solely by rotating the drill bit


36


.




A casing could be introduced to the hole as the drilling proceeds. For example, the casing could be supported upon the CT, that is, the CT is threaded through the casing, and the casing pulled down into the exploratory hole upon the advancement of the drill bit. The soil testing apparatus may then be easily withdrawn from the exploratory hole, without the exploratory hole's sides collapsing to impede the withdrawal of the testing apparatus. An alternative method of ensuring that the testing apparatus may always be withdrawn is the inclusion of a back reamer on the testing apparatus, the back reamer re-boring the hole as the testing apparatus is pulled out. Also a release joint may be included above the soil testing apparatus, so that if the testing apparatus gets stuck, it may be sacrificed so that the CT may be retrieved.




Referring to

FIGS. 10



a


and


10




b,


such a casing


90


could form part of a tube


94


concentric with the CT


22


, and extending up to the vessel. In this embodiment, fluid is passed downwards from the vessel through the CT, used for a jet penetration means


37


(an embodiment of which is described below), and returned through the casing


90


and valve system


92


into the tube concentric


22


with the CT and back to the vessel for recirculation. When the testing apparatus is withdrawn from the exploratory hole, the casing


90


is left behind, and the exploratory hole may be subsequently used for other testing purposes. Lubricating fluid, such as fluid containing Bentonite or the like, may also be passed down the CT to be used in conjunction with other soil penetration means such as a hammer bit or a vibrating cone, so that the fluid forms an annulus around the CT as it advances through the soil, thereby reducing the CT's s drag.




Referring to

FIGS. 11



a


to


11




b,


jetting nozzles


102


are situated at the lower end


105


of the testing apparatus. Interspersed with the jetting nozzles


102


are exit holes


104


, leading to barrels


106


housing probes


68


and samplers


69


. As shown in

FIGS. 11



d


and


11




e,


both the probes


68


and the samplers


69


are caused to extend out of the exit holes


104


, by hydraulic means for example. The barrels


106


in which the probes


68


are housed have an additional space


108


for the additional length of wireline


21


needed when the probe


68


is fully extended. In this embodiment, the operation of any individual probe or sampler can be independent of the operation of other probes or samplers.




Guide means may be installed at the exploratory hole so that after the testing apparatus has been removed, other equipment may be introduced to the same hole. If this is to be done, it is preferable that a casing such as that described above is installed. In particular, sonde apparatus may be introduced to the hole to collect seismic data. For some methods of data collection, the casing should not be made of steel.




Several holes may be created by the test equipment in this way. Two or more holes may be used simultaneously to gather data of the surrounding soil. Referring to

FIG. 12

, two testing apparatus


26


,


26


′ are installed in neighbouring holes. In this embodiment, the sonde apparatus is included in the test equipment


26


,


26


′. One testing apparatus


26


creates a sound pulse, for example using a pressurised gas gun, and the other testing apparatus


26


′ receives the sound waves produced by the pulse, so that the information may be analysed to produce seismic data. An array of exploratory holes equipped with sensors and sonde apparatus may be installed in this way, to enable a three dimensional picture of the soil characteristics to be built up. A single testing apparatus may include both a sound pulse generator and a sonde apparatus receiver. The distance separating the two testing apparatus


26


,


26


′ is dependent upon the type of tests desired and the particular sensors used. When used to investigate surface properties, the testing apparatus should be typically separated by approximately 25-50 m, whereas when the testing apparatus are deeper in the soil, in order to gather data for oil exploration for example, the distance would be about 3 miles. Both testing apparatus


26


,


26


′ shown here are kept vertical by two buoys


23


,


23


′. At least one CT


22


will have to bend significantly, having a great bending force exerted over the buoy


23


. A strengthened collar


25


may be used to ensure that the CT in this region does not bend to too great a curvature in this region.




Referring to

FIG. 13

, the soil penetration means is provided by a vibrating cone


112


, which encourages the soil to part and allow the testing equipment to advance by agitating the soil, a channel


14


allows a lubricating fluid such as Bentonite to be deliver to the exploratory hole to reduce the dray of the advancing CT. A coiled wireline


116


is provided to link the instruments behind the cone to the vessel, the wireline uncoiling and extending as the soil penetration means advances.





FIG. 14

shows a drill bit being lowered upon a CT


22


and an inner concentric tube


118


. The drill bit


36


has an opening which allows soil to enter the drill bit, and thence inside the inner bore


120


of the inner tube


118


to the surface. The recovered soil may then be analysed including the differentiation of soil types occurring at different depths. Instruments measuring parameters such as the advancement velocity, thrust, tool rotation, speed, torque and the mud pressure, are included to enable calculation of the depth and location of different soils brought up in the inner tube. Referring to

FIG. 15

, a cutting means


122


, which is caused to turn by a rotating means


124


, may be included in the inner tube


118


. The soil is then broken up and forced out of washports


123


, and then up to the surface vessel through the annulus between the inner tube and the CT.




The drill bit, rather than being rotated by fluid, could instead be electrically powered. The electric power cable could either run inside the CT, or the soil testing equipment could be suspended by an armoured cable.




The method here is suitable not only for the investigation of the properties of the soil close to the surface of the seabed, in preparation for construction or the like on the seabed, but, with a suitable soil penetration means for deep penetration of the seabed, in order, for example, to ascertain the presence of oil reservoirs. In such instances, high powered drill bits, vibrating devices and hammer drill bits (that is, the drill oscillates in a reciprocal fashion) will be necessary in order to penetrate increasing compacted soil and rock. As a greater length CT or outer casing is drag through the soil as the soil penetration means advances, the use of lubricating fluids is helpful in decreasing the drag.




It will be appreciated that although rotating drill bits and fluid jets, which usually result in the removal of soil from the hole, and vibrating devices or hammer drills, which result in the soil being compacted rather than removed, are given here as methods of forming the explanatory hole, other penetration devices could be used.




Naturally, many other types of measuring instrumentation and sample collection means may be incorporated into the soil testing apparatus. Simulators, that is miniature reproductions of actual equipment intended to be used in or on the soil of the sea bed, may be included in the testing apparatus in order to model the behaviour of the actual equipment when used in the same oil. Also, many of the alternatives given here for different aspects of the system may be effectively combined in different permutations. Alternative embodiments using the principles disclosed will suggest themselves to those skilled in the art, and it is intended that such alternatives are included within the scope of the invention, the scope of the invention being limited only by the claims.



Claims
  • 1. A method of deploying test equipment from a floating vessel comprising the steps of:a) lowering a soil testing apparatus at an end of a length of coiled tubing from a floating vessel until said apparatus reaches a seabed; b) driving a powered soil penetrator with a power source on said vessel and by power transmission through said length of coiled tubing, thereby causing said apparatus to penetrate through the soil on said seabed to form an exploratory hole; c) maintaining at least a portion of said length of said coiled tubing straight and vertical from said seabed to a location above said seabed; d) testing a geotechnical, geophysical, geochemical or geological characteristic of said soil in said hole with at least one sensor of said apparatus and transmitting a sampling of said characteristic from said sensor through said coiled tubing to said vessel; and e) maintaining a distance between said location and said seabed constant while a distance from said location to said vessel varies with heaving of said vessel by heave compensation.
  • 2. The method defined in claim 1 wherein said distance between said location and said seabed is maintained constant and said coiled tubing is maintained vertical and straight over said distance between said location and said seabed by weighting the coiled tubing below said location.
  • 3. The method defined in claim 1 wherein said coiled tubing is maintained vertical above said seabed by supporting said coiled tubing on a structure resting on said seabed.
  • 4. The method defined in claim 1 wherein said distance between said location and said seabed is maintained constant while the distance from said location to said vessel is varied with heaving of said vessel by winching in and out lines attached to said coiled tubing at said location from said vessel.
  • 5. The method defined in claim 1 wherein said distance between said location and said seabed is maintained constant while said distance from said location to said vessel is varied and said portion of said length of said coiled tubing is maintained straight and vertical by supporting said coiled tubing at least in part by at least one buoy.
  • 6. The method defined in claim 1 wherein said distance between said location and said seabed is maintained constant at least in part by telescoping a section of said apparatus in another section thereof.
  • 7. The method defined in claim 1 wherein said distance from said location to said vessel is varied with heaving of said vessel by compensating movement of said vessel relative to said apparatus by displacement of a compensating deck supporting said coiled tubing on said vessel.
  • 8. The method defined in claim 1, further comprising the step of guiding a casing into said exploratory hole on said coiled tubing and removing said coiled tubing from said hole leaving said casing in said hole.
  • 9. The method defined in claim 1, further comprising the step of introducing another soil-testing apparatus from said vessel into the soil of said seabed at a location spaced from the first-mentioned apparatus and from a respective length of coiled tubing.
  • 10. The method defined in claim 1, further comprising the step of displacing said sensor into the soil on the seabed from a bottom of said apparatus.
  • 11. The method defined in claim 1, further comprising the step of displacing said sensor laterally on said apparatus into engagement with soil of said seabed surrounding said hole.
Priority Claims (1)
Number Date Country Kind
9909364 Apr 1999 GB
US Referenced Citations (3)
Number Name Date Kind
4755947 Braschler et al. Jul 1988 A
5350018 Sorem et al. Sep 1994 A
5439800 Thompson Aug 1995 A
Foreign Referenced Citations (7)
Number Date Country
1 255 557 Dec 1971 GB
1 271 220 Apr 1972 GB
1 392 967 May 1975 GB
1 448 399 Sep 1976 GB
2 029 963 Mar 1980 GB
2 094 852 Sep 1982 GB
2 243 173 Oct 1991 GB