This disclosure relates to wellbores, particularly, to casing installed in wellbores.
Wellbores in an oil and gas well are filled with both liquid and gaseous phases of various fluids and chemicals including water, oils, and hydrocarbon gases. The fluids and gasses in the wellbore can be pressurized. A cased wellbore is a wellbore that has been sealed from the Earth and various sub-surface formations of the Earth. The cased wellbore can be sealed from the formations of the Earth by one or more casing tubulars. The annulus between the casing tubulars and the formations of the Earth can be filled with cement to seal the casing tubular to the formation of the Earth and prevent pressurized water, oil, and hydrocarbon gasses from flowing through the annulus to a surface of the Earth. The cement sealing the annulus can become cracked due to temperature or pressure cycles, inadequate cementing procedures, or downhole tools impact the casing causing vibration. The casing tubular can corrode or become damaged, creating a fluid pathway from the fluid filled wellbore through the casing tubular into the cracked cement in the annulus through which the pressurized liquids and gases can leak. The pressurized water, oil, and hydrocarbon gasses can subsequently leak to the surface of the Earth. Alternatively or in addition, the cracked cement can deteriorate the structural integrity of the wellbore.
This disclosure describes technologies related to methods for sealing cracked cement in a wellbore casing. Implementations of the present disclosure include a method for sealing a cracked casing cement. In a wellbore in which a casing is deployed, the casing and the wellbore define an annulus sealed with a casing cement. The method vibrating a portion of the casing cement adjacent an outer wall of the casing. The portion of the casing cement includes multiple discrete cracks. Vibrating the casing cement connects the discrete cracks to form a crack network.
In some implementations, the portion of the casing cement adjacent the outer wall of the casing includes the casing cement in direct contact with the outer wall of the casing.
In some implementations, vibrating the portion of the casing cement includes applying a vibration to an inner wall of the casing adjacent the portion of the casing cement. The casing transmits the vibration to the portion of the casing cement. Applying the vibration can include determining a contact frequency and a contact force to repetitively vibrate the casing at the contact frequency and the contact force. The contact frequency and the contact force enlarge and connect the discrete cracks to create the crack network.
In some implementations, vibrating the portion of the casing cement includes impacting the casing with an impactor to vibrate the portion of the casing cement in the annulus. Vibrating the portion of the casing cement in the annulus can create vibration in a vicinity of the casing where a vibration tool contacts the casing. Impacting the casing with the impactor can include mechanically impacting the casing with the impactor. Impacting the casing with the impactor can include fluidically impacting the casing with the impactor.
In some implementations, the method can further include perforating the casing to remove a portion of the casing to fluidically couple the casing to the crack network. The casing is perforated with a casing tool to remove the portion of the casing.
The method includes, after vibrating the casing cement to form the crack network, injecting a sealant into the crack network through the casing. The sealant seals the crack network. Injecting the sealant can include fluidically coupling a sealing tool to the crack network through the casing. The sealing tool injects the sealant into the crack network. Injecting the sealant can include flowing the sealant through the sealing tool. Injecting the sealant can include injecting the sealant into the crack network to create a sealed crack network. Injecting the sealant can include fluidically decoupling the sealing tool from the sealed crack network.
In some implementations, the method can further include, after injecting the sealant into the crack network, patching the casing to further seal the crack network. Patching the casing can include attaching a patch to an inner wall of the casing adjacent to the crack network to seal the crack network.
Further implementations of the present disclosure include a wellbore tool. The wellbore tool includes a vibration sub-assembly includes a first vibration head to repetitively contact a casing of a wellbore. The casing and the wellbore define an annulus sealed with a casing cement. A portion of the casing cement adjacent an outer wall of the casing include multiple discrete cracks. The vibration sub-assembly can include a second vibration head.
The wellbore tool includes a vibration drive operatively coupled to the vibration sub-assembly to operate the first vibration head to create vibration in a portion of the casing and a vicinity of the casing where the first vibration head contacts the casing. The vibration drive can include a power source to supply power to the vibration sub-assembly. The vibration drive can to operate the first vibration head to repetitively contact the casing at a contact frequency and a contact force. The vibration drive can include a wedge operatively coupled to the first vibration head and the second vibration head. The wedge moves the first vibration head and the second vibration head to contact the casing. The vibration drive can include multiple springs operatively coupled to the first vibration head and the second vibration head. The springs move the first vibration head and the second vibration head out of contact with the casing.
The wellbore tool includes a tool body to accept the vibration sub-assembly and the vibration drive. The tool body is disposed in the wellbore. The tool body includes a first opening to pass the first vibration head through the first opening to repetitively contact the casing. The tool body can include a third opening to pass the second vibration head through a third opening to repetitively contact the casing.
In some implementations, an anchor is mechanically coupled to the tool body to optionally engage the tool body to the casing. When the anchor is disposed within the tool body, the tool body includes a second opening to pass the anchor through the second opening to engage the tool body to the casing.
The details of one or more implementations of the subject matter described in this disclosure are set forth in the accompanying drawings and the description below. Other features, aspects, and advantages of the subject matter will become apparent from the description, the drawings, and the claims.
Like reference numbers and designations in the various drawings indicate like elements.
The present disclosure relates to sealing casing cement that seals an annulus defined by an inner wall of a wellbore and a casing tubular disposed within the wellbore. The casing cement includes multiple cracks. Sealing the casing cement includes filling the multiple cracks. To seal the cracks, the casing cement is first vibrated to enlarge and subsequently connect the cracks to create a crack network. Then, a sealant is injected into the crack network through the casing tubular to fill the multiple cracks. In this manner, the sealant seals the crack network.
Implementations of the present disclosure realize one or more of the following advantages. Sealing cracks in casing cement can be simplified and quality of sealing can be improved. In some instances, if cracks in casing cement need to be sealed, the casing in the region of the cracked cement must be completely removed, the cracked cement removed, the section re-cemented, and a liner placed across the section to seal the cracks. By implementing techniques herein, such complex removal and replacement operations can be avoided. Additionally, structural integrity of the wellbore can be preserved. Also, environmental safety can be improved. Cracks in casing cement can allow pressurized fluids and gasses from formations of the Earth to leak to the surface through the cracks. By implementing techniques herein, the cracked casing cement can be sealed to prevent contaminating the surface of the Earth surrounding the wellbore. Environmental remediation cost and time can be reduced by minimizing the amount of hydrocarbons that may be leaked through the cracked casing cement to the surface. Additionally, personnel safety can be improved. Personnel exposure to leaked hazardous pressurized fluids and gasses can be decreased. Leaking pressurized fluids and gasses through cracked casing cement to improve environmental safety and personnel safety can be achieved. Other advantages include increasing wellbore production longevity. A cracked wellbore cement can be sealed, extend operation well lifetime so a leaking wellbore does not need to be plugged and abandoned before the end of its production life. Well stability can be maintained or improved by sealing the cracks in the cement.
A casing 106, for example, a hollow tubular member, can be positioned in the wellbore 100 to conduct the fluids and the gasses through the casing 106. The casing 106 can be a metal tubular, such a steel. Multiple steel tubulars can be coupled together to form the casing 106. The outer surface of the casing 106 and an inner surface 140 of the wellbore 100 define an annulus 110. The annulus 110 can be filled with cement 112. When filled, the cement 112 is free of cracks. Over time, cracks 114 form in the cement 112. The cracked cement 112 no longer seals the annulus 110 of the wellbore 100 from the surface 102 of the Earth.
The cracks 114 can occur in cement 112 for one or multiple reasons. For example, cracks 114 can occur due to an inadequate cement completion process. An incorrect cement physical and chemical composition for a given wellbore condition can result in casing cement cracking. Additionally, improper cement pumping parameters during a wellbore completion process can result in casing cement cracking. Also, casing cement can crack due to long term casing corrosion. Casing cement can crack due to changes in temperature or pressure. Casing cement can crack due to formation 104 failure. Additionally, casing cement can be damage through intervention activities, such as fracturing the formations 104 of the Earth. The casing cement damage occurs at the metallic casing and cement interface such that relative ‘movement’ of the metallic casing due to temperature change, pressure change, formation stress change on the casing, and/or the difference in mechanical properties between the casing and cement (for example, the coefficient of expansion, the toughness, or the ductility). This type of failure occurs during the life of a well whereas issues such as poor cement job are identified immediately or early on the well completion.
In some cases, a portion of the cracks 114 in the cement 112 can be concentrated in the immediate region around the entire circumference of the casing 106 allowing hydrocarbons or water to flow to the surface 102 of the Earth. Such concentration of the cracks 114 can be due to an expansion/contraction of the casing 106.
The cracks 114 can be micro-channels. Micro-channels can allow for the migration of hydrocarbons and water to migrate to the surface 102 of the Earth through the cement 112. Over time, micro-channels can form and expand due to pressure or temperature cycles (for example, the effect of such cycles on the material of the casing 106) or damage from completion operations, resulting in increased hydrocarbon leakage. The micro-channels can connect to one another, and then up to the surface 102. A crack can be an isolated micro-channel that is not connected to another crack. Alternatively or in addition, some of the cracks can be interconnected to form a channel which does not extend to the surface 102. The cracks 114 can be detrimental to wellbore stability and need to be filled to safely continue wellbore 100 operation. However, because the micro-channels are small, not entirely interconnected gaps, some of which are concentrated in the region between the casing 106 or a liner (not shown) and the surrounding cement 112 in the annulus 110, filling in all or substantially all (for example, at least 85% or more) of the cracks 114, particularly, in the region between the casing 106 and the surrounding cement 112 can be difficult. The importance of a crack 114 size is the ability of pump a cure into the cracks 114. The smaller the crack 114 the harder it becomes and less likely to achieve full penetration into the crack 114. Making the cracks 114 bigger allows for full penetration of the cure. The cure can be an ultra-fine cement or a polymeric resin of low viscosity.
A tool 142 can be positioned within the casing 106 in the region of the cracks 114 to seal the cracks 114. The region of the cracks 114 can be located by performing a logging operation to identify the leak zone. For example, an ultrasonic or acoustic logging operation can be performed. Additionally, confirmation of a leak zone is also done by punching holes in a casing at intervals and testing to see if pressure communication between the holes exists. The various implementations of the tool 142 are described later.
The vibration sub-assembly 204 includes a first vibration head 210a to repetitively contact the casing 106 to vibrate the casing 106. The first vibration head 210a vibrates the portion of the casing 106, which transmits the vibration to the cement 112 in the vicinity of the casing 106 where the first vibration head 210a contacts the casing 106. The first vibration head 210a can have a flat, rounded, single point, or multi-pointed head to impact the casing.
The first vibration head 210a is mechanically coupled to a first vibration drive receiver 212a. The vibration drive 206 moves a driving wedge 222 (described later) axially in the direction of arrow 216 to displace the first vibration drive receiver 212a. Displacing the first vibration drive receiver 212a moves the first vibration head 210a radially in the direction of arrow 214a.
The first vibration head 210a is positioned within the tool body 208. The tool body 208 surrounds and holds the vibration sub-assembly 204 and the vibration drive 206. The tool body 208 is configured to be disposed within the casing 106. For example, the tool body 208 protects the vibration sub-assembly 204 and the vibration drive 206 from wellbore conditions such as, for example, heat, liquid, or corrosive chemicals The tool body 208 has a first opening 218a to allow a portion of the first vibration head 210a to pass through the tool body 208 to repetitively contact the casing 106.
The vibration drive 206 is operatively coupled to the vibration sub-assembly 204 to operate the first vibration head 210a to create vibration in the portion of the casing 106 and the vicinity of the casing 106 where the first vibration head 210a contacts the casing 106. The vibration drive 206 is contained within the tool body 208 and mechanically coupled to the tool body 208. The vibration drive 206 moves towards (downwards) the vibration heads 210a and 210b such that the vibration heads 210a and 210b are deployed to contact the casing 106. The vibration drive 206 can include an internal slide mechanism (not shown) to guide the movement and direction a driving wedge 222.
The vibration drive 206 includes the driving wedge 222. The driving wedge 222 is shaped to contact the first vibration drive receiver 212a and repetitively move the first vibration drive receiver 212a radially in the direction of an arrow 214a. The driving wedge 222 can be shaped, for example, as an isosceles triangle, an equilateral triangle, a cone, or a frustoconical shape. The drive wedge 222 is a coned cam such that as it is rotated by a power source 226 it imparts a linear motion to the vibration heads 210a and 210b. The driving wedge 222 is connected to the power source 226 by a vibration drive linkage 224. The vibration drive linkage 224 mechanically couples the driving wedge 222 to the power source 226.
The power source 226 is a rotational motor. The rotational motor can be either electrically or hydraulically powered. Alternatively, the power source 226 can be a linear drive that imparts a vibration directly to the driving wedge 222. When the power source 226 is a liner motor, the driving wedge 222 is a true wedge (as opposed to a cam). The linear drive power source can be electrically or hydraulically powered.
The vibration sub-assembly 204 can include a first spring 220a to return the vibration heads to a reset position for the vibration drive 206 to repetitively cycle the first vibration head 210a to impact the casing 106. The first spring 220 can be one or multiple springs. The first spring 220a is coupled to the first vibration head 210a. When the driving wedge 222 is driven axially in the direction of arrow 216, the first vibration head 210a is driven radially, and the first spring 220a compresses. When the driving wedge 222 is drawn back axially in the opposite direction of arrow 216, the first spring 220a expands and return the first vibration head 210a radially in the direction of arrow 214b and out of contact with the casing 106. The first spring 220a forces the first vibration head 210a to retract into the tool body 208 when the driving wedge 222 is retracted (the vibration stops). The first spring 220a holds the first vibration head 210a against the moving driving wedge 222 and continually retract vibration head 210a. The first spring 220a maintains the first vibration head 210a in contact with the driving wedge 222.
The vibration tool 202 can contain multiple vibration heads. For example, the vibration tool 202 can include two, three, four, or five vibration heads. As shown in
The second vibration head 210b is positioned within the tool body 208. The tool body 208 has a second opening 218b to allow a portion of the second vibration head 210b to pass through the tool body 208 to repetitively contact the casing 106.
The vibration drive 206 is operatively coupled to the vibration sub-assembly 204 to operate the second vibration head 210b to create vibration in the portion of the casing 106 and the vicinity of the casing 106 where the second vibration head 210b contacts the casing 106. The driving wedge 222 is shaped to contact a second vibration drive receiver 212b and repetitively move the second vibration drive receiver 212b radially in the direction of arrow 214b.
The vibration sub-assembly 204 can include additional springs to return the vibration heads to a reset position for the vibration drive to repetitively cycle the second vibration head 210b to impact the casing 106. A second spring 220b can be coupled to the second vibration head 210b. When the driving wedge 222 is driven axially in the direction of arrow 216, the second vibration head 210b is driven radially, and the second spring 220ba compresses. When the driving wedge 222 is drawn back axially in the opposite direction of arrow 216, the second spring 220b expands and return the second vibration head 210b radially in the direction of arrow 214b and out of contact with the casing 106.
The power source 226 supplies power to the vibration sub-assembly 204. The power source 226 provides the motive force to operate the driving wedge 222. The power source 226 can be a hydro-mechanical source. For example, a hydro-mechanical power source can use a fluid flow from the 102 surface or an internal fluid source (not shown) can be used to power hydraulic valves (not shown) or hydraulic motors (not shown) to move the driving wedge 222. Alternatively, the power source 226 can be an electro-mechanical power source. For example, an electro-mechanical power source can use electrical energy from stored energy in a battery pack, generated electrical energy from downhole turbines, or conveyed electrical energy from a power cable 228 to power the driving wedge 222. The electro-mechanical power source can include electric motors with an offset mass, electromagnetic linear actuators, piezo-electric actuators, or memory wire actuators to actuate the driving wedge 222. The power cable 228 can include a control cable. The control cable carries control signals between an operator and the vibration tool 202.
The power cable 228 and the control cable can be contained within a downhole conveyer 234. The vibration tool 202 is coupled to the downhole conveyer 234. The downhole conveyer 234 conducts the vibration tool 202 into the casing 106 to the region of the cement 112 with cracks 114. The downhole conveyer 234 can be, for example, production tubing, wireline, or coiled tubing.
The vibration drive 206 drives the first vibration head 210a and the second vibration head 210b to repetitively contact the casing 106 at a contact frequency and a contact force. The contact frequency and the contact force are sufficient induce a mechanical vibration in the casing that is of a magnitude and an amplitude to increase the cracks 114 size and length in the cement in the region in the immediate vicinity of the outer wall of the casing and to interconnect the cracks. The first vibration head 210a and the second vibration head 210b to repetitively contact the casing 106 with the contact force at the contact frequency to break down of the cracks 114 without causing damage to the casing 106 and other completion components (not shown) contained within the wellbore 100.
The contact frequency can be a low to medium frequency vibration. The low to medium frequency vibrations are shallow, in that they vibrate the casing 106 and cement 112 only in the region near where the vibration heads 210a and 210b contact the casing 106. The low to medium frequency vibrations do not have deep penetration of destructive vibration into the cement, in that they do not carry a long way, causing damage to other wellbore 100 completion components. The low to medium frequency vibrations excite the casing 106 locally to cause the cracks 114 at the interface of the casing 106 and the cement 112 to break down.
The vibration tool 202 can include a first anchor 230a to selectively engage the vibration tool 202 to the casing 106. The first anchor 230a is mechanically coupled to the tool body 208. The anchor can include teeth 232 to engage the casing 106. The first anchor 230a can be positioned in the interior of the tool body 208. The tool body 208 has a third opening 218c and to pass the first anchor 230a through the tool body 208 to engage the casing 106.
The same downward movement of the vibration drive 206 to actuate the driving wedge 222 moves an anchor wedge 236 coupled to the anchor wedge by an anchor linkage 238. The anchor wedge 236 moves the first anchor 230a to engage with the casing 106. The first anchor 230a includes a first anchor spring 240a such that retraction of the anchor wedge 236 would cause the first anchor 230a to retract (disengage from the casing 106). Alternatively, a linear motor can push the first anchor 230a out of the tool body 208. Alternatively, the first anchor 230a can be positioned exterior to the tool body 208 or in a recess (not shown) of the tool body. The vibration tool 202 can include multiple anchors. For example, the vibration tool 202 can include two, three, four, five, or more anchors. As shown in
Alternatively, the anchors 230a and 230b can be a slip (not shown). The slip is a circular wedge mechanically coupled to and contained with the tool body 208. The slip is deployed from within the tool body 208 to contact the casing 106. The slip is deployed by moving an opposing wedge (not shown), also inside the tool body 208.
As shown in
The driving wedge 222 then returns to the position shown in
The perforation assembly 500 is placed in the casing 106. The perforation tool 502 then perforates the casing 106 in the vicinity of the crack network 538. The perforation assembly 500 is then removed from the casing 106.
The sealing assembly 600 includes a sealing tool 602 to flow a sealant 604 into the crack network 538. The sealing tool 602 includes a ported conduit 612 for the fluid to flow through ports 606 into a void 618 defined by a first sealing element 608, a second sealing element 610, and the casing 106. The first sealing element 608 and the second sealing element 610 engage the interior surface 412 of the casing 106 to prevent fluid flow across the first sealing element 608 and the second sealing element 610. The first sealing element 608 and the second sealing element 610 can be packers or bridge plugs.
The sealant 604 sets (cures) in the crack network 538. The setting of the sealant 604 in the crack network 538 prevents fluid from flowing in the crack network 538. The sealant 604 can be a polymeric or cement.
The sealing assembly 600 is operated as follows to seal the crack network 538. The sealing assembly 600 is disposed in the casing 106 in the vicinity of the crack network 538 by the downhole conveyor 634. The first sealing element 608 and the second sealing element 610 of the sealing tool 602 are engaged to the interior surface 412 of the casing 106. The sealant 604 flows down the downhole conveyor from the surface in the direction of arrow 614. The sealant 604 enters the ported conduit 612, then exits the ported conduit through the ports 606 in the direction of arrow 616 into the void 618. The sealant 604 flows from the void 618 into the crack network 538. The sealant 604 sets (cures) in the crack network 538 to create a sealed crack network (shown in
The second vibration tool 400 includes a ported conduit 404 for the fluid to flow through ports 406 into a void 418 defined by a first sealing element 408, a second sealing element 410, and the casing 106. The first sealing element 408 and the second sealing element 410 engage the interior surface 412 of the casing 106 to prevent fluid flow across the first sealing element 408 and the second sealing element 410. The first sealing element 408 and the second sealing element 410 can be packers or bridge plugs.
The second vibration tool 400 is operated as follows to enlarge and connect the cracks 114 in the cement 112 to create a crack network (not shown). The second vibration tool 400 is disposed in the casing 106 in the vicinity of the cracks 114 by the downhole conveyor 434. The first sealing element 408 and the second sealing element 410 are engaged to the interior surface 412 of the casing 106. The cyclically pressurized fluid 402 flows down the downhole conveyor from the surface in the direction of arrow 414. The cyclically pressurized fluid 402 enters the ported conduit 404, then exits the ported conduit through the ports 406 in the direction of arrow 416 into the void 418. The fluid can be cyclically pressurized. The pressure maximum is less than the coiled tubing component and casing 106 maximum pressure ratings. Cyclically pressurizing the fluid 402 vibrates the casing 106. The vibration of the casing 106 vibrates the cracked cement 112, enlarging and connecting the cracks 114 to create a crack network (not shown). The first sealing element 408 and the second sealing element 410 are disengaged from the interior surface 412 of the casing 106. The second vibration tool 400 is removed from the casing 106 by the downhole conveyor 434.
Vibrating the portion of the casing cement can include applying a vibration to an inner wall of the casing adjacent the portion of the casing cement. The casing transmits the vibration to the portion of the casing cement. A contact frequency and a contact force can be determined to repetitively vibrate the casing at the contact frequency and the contact force. The contact frequency and the contact force enlarge and connect the discrete cracks to create the crack network.
An impactor can impact the casing to vibrate the portion of the casing cement in the annulus. Vibrating the portion of the casing cement in the annulus can create a vibration in a vicinity of the casing where a vibration tool contacts the casing. The impactor can mechanically impact the casing. The impactor can fluidically impact the casing.
At 804, prior to injecting the sealant into the crack network, the casing is perforated to remove a portion of the casing with a perforation tool to fluidically couple the hollow casing to the crack network.
At 806, after vibrating the casing cement to form the crack network, a sealant is injected into the crack network through the casing. The sealant seals the crack network. A sealing tool can be fluidically coupled to the crack network through the casing. The sealing tool injects the sealant into the crack network. The sealant flows through the sealing tool. The sealant injected into the crack network creates a sealed crack network. The sealing tool is then fluidically decoupling from the sealed crack network.
At 808, after injecting the sealant into the crack network, the casing can be patched to further seal the crack network. A patch can be attached to an inner wall of the casing adjacent to the crack network to seal the crack network.
Sealing a single annulus in a single casing has been shown. This can be done with multiple casings, disposed one within the other. The multiple casings define multiple annuli which are then each filled with cement. Multiple casings are used to complete the wellbore 100 to seal off selected regions as the wellbore 100 depth from the surface 102 of the Earth progressively increases.
In some cases, as described earlier and shown in
A method to seal a single annulus in a single casing has been shown. In a wellbore in which multiple casings, for example, a first casing and a second casing defining multiple annuli, are deployed as previously described in
Vibrating the first portion of the first casing cement and/or the second portion of the second casing cement can include applying a vibration to a first inner wall of the first casing adjacent the first portion of the first casing cement and/or to a second inner wall of the second casing adjacent the second portion of the second casing cement. The second inner wall of the second adjacent casing can be accessed by first perforating the casing 106 and cement 112 as previously described. The first casing and the second casing each transmit the vibration to the first portion of the first casing cement and the second portion of the second casing cement, respectively. A contact frequency and a contact force can be determined to repetitively vibrate the first casing and the second casing at the contact frequency and the contact force. The contact frequency and the contact force enlarge and connect the discrete cracks to create the first crack network and the second crack network.
An impactor can impact the casing to vibrate the first portion of the first casing cement in the first annulus and pass through the perforations to impact the second portion of the second casing cement in the second annulus. Vibrating the first portion of the first casing cement in the first annulus and the second portion of the second casing cement in the second annulus can create a vibration in a vicinity of the first casing and the second casing where a vibration tool contacts the second casing. The impactor can mechanically impact the second casing. The impactor can fluidically impact the second casing.
Prior to injecting the sealant into the first crack network and the second crack network, the first casing and the second crack network are perforated to remove a first portion of the first casing and a second portion of the second casing to fluidically couple the hollow casing to the first crack network and the second crack network. A perforation tool can perforate the first casing with to create a first perforated portion and the second casing to create a second perforated portion. The perforation tool is a mechanical drilling tool that can mechanically drill a side hole into the casing and the cement behind the casing. These perforation tool can be hydraulically or electrically powered. In some cases, as described earlier and shown in
After vibrating the first casing cement to form the first crack network and the second casing cement to form the second crack network, a sealant is injected into the first crack network through the first casing and the second crack network through the second casing. The sealant seals the first crack network and the second crack network. The sealing tool can be fluidically coupled to the first crack network through the first perforated portion of the first casing and to the second crack network through the second perforated portion of the second casing. The sealing tool injects the sealant into the first crack network and the second crack network. The sealant flows through the sealing tool. The sealant injected into the first crack network and the second crack network to create a sealed crack network. The sealing tool is then fluidically decoupling from the sealed crack network.
After injecting the sealant into the first crack network and the second crack network, the second casing can be patched to further seal the crack network. A patch can be attached to an inner wall of the second casing adjacent to the crack network to seal the crack network.
Although the present implementations have been described in detail, it should be understood that various changes, substitutions, and alterations can be made hereupon without departing from the principle and scope of the disclosure. Accordingly, the scope of the present disclosure should be determined by the following claims and their appropriate legal equivalents.
Number | Name | Date | Kind |
---|---|---|---|
381374 | Hine | Apr 1888 | A |
774519 | Greenaway | Nov 1904 | A |
2368424 | Reistle | Jan 1945 | A |
2604181 | Basham | Jul 1952 | A |
2667932 | Bodine, Jr. | Feb 1954 | A |
2782857 | Clark et al. | Feb 1957 | A |
2784787 | Matthews et al. | Mar 1957 | A |
2890752 | Cron et al. | Jun 1959 | A |
3026936 | Teplitz | Mar 1962 | A |
3093192 | Allen | Jun 1963 | A |
3228470 | Papaila | Jan 1966 | A |
3244230 | Sharp | Apr 1966 | A |
3285778 | Hauk | Nov 1966 | A |
3369605 | Donaldson et al. | Feb 1968 | A |
3386514 | Weber | Jun 1968 | A |
3497011 | Weber et al. | Feb 1970 | A |
3601197 | Ayers et al. | Aug 1971 | A |
3656550 | Wagner, Jr. et al. | Apr 1972 | A |
3695356 | Argabright et al. | Oct 1972 | A |
3866682 | Jones et al. | Feb 1975 | A |
3882937 | Robinson | May 1975 | A |
3937283 | Blauer et al. | Feb 1976 | A |
3980136 | Plummer et al. | Sep 1976 | A |
4044833 | Volz | Aug 1977 | A |
4106562 | Barnes et al. | Aug 1978 | A |
4157116 | Coulter | Jun 1979 | A |
4216829 | Murphy | Aug 1980 | A |
4340405 | Steyert | Jul 1982 | A |
4476932 | Emery | Oct 1984 | A |
4493875 | Beck et al. | Jan 1985 | A |
4532992 | Coenen et al. | Aug 1985 | A |
4660643 | Perkins | Apr 1987 | A |
4705113 | Perkins | Nov 1987 | A |
4836284 | Tinker | Jun 1989 | A |
4846277 | Khalil et al. | Jul 1989 | A |
5018578 | El Rabaa et al. | May 1991 | A |
5069283 | Mack | Dec 1991 | A |
5394339 | Jones | Feb 1995 | A |
5394942 | Catania | Mar 1995 | A |
5529123 | Carpenter et al. | Jun 1996 | A |
5604184 | Ellis et al. | Feb 1997 | A |
5613555 | Sorem et al. | Mar 1997 | A |
5912219 | Carrie et al. | Jun 1999 | A |
6032539 | Liu | Mar 2000 | A |
6207620 | Gonzalez et al. | Mar 2001 | B1 |
6250387 | Carmichael et al. | Jun 2001 | B1 |
6263970 | Blanchet | Jul 2001 | B1 |
6347675 | Kolle | Feb 2002 | B1 |
6419730 | Chavez | Jul 2002 | B1 |
6585046 | Neuroth et al. | Jul 2003 | B2 |
6729409 | Gupta et al. | May 2004 | B1 |
6766856 | McGee | Jul 2004 | B1 |
6776231 | Allen | Aug 2004 | B2 |
6776235 | England | Aug 2004 | B1 |
6883605 | Arceneaux et al. | Apr 2005 | B2 |
6988552 | Wilson et al. | Jan 2006 | B2 |
7001872 | Pyecroft et al. | Feb 2006 | B2 |
7044220 | Nguyen et al. | May 2006 | B2 |
7063150 | Slabaugh et al. | Jun 2006 | B2 |
7096943 | Hill | Aug 2006 | B2 |
7134497 | Chatteiji et al. | Nov 2006 | B1 |
7210528 | Brannon et al. | May 2007 | B1 |
7252146 | Slabaugh et al. | Aug 2007 | B2 |
7255169 | van Batenburg et al. | Aug 2007 | B2 |
7281580 | Parker et al. | Oct 2007 | B2 |
7281581 | Nyuyen et al. | Oct 2007 | B2 |
7334635 | Nguyen | Feb 2008 | B2 |
7334636 | Nguyen | Feb 2008 | B2 |
7422060 | Hammami et al. | Sep 2008 | B2 |
7424911 | McCarthy et al. | Sep 2008 | B2 |
7426961 | Stephenson et al. | Sep 2008 | B2 |
7434623 | Von Gynz-Rekowski | Oct 2008 | B2 |
7451812 | Cooper et al. | Nov 2008 | B2 |
7472751 | Brannon et al. | Jan 2009 | B2 |
7516787 | Kaminsky | Apr 2009 | B2 |
7571767 | Parker et al. | Aug 2009 | B2 |
7581590 | Lesko et al. | Sep 2009 | B2 |
7610962 | Fowler | Nov 2009 | B2 |
7647971 | Kaminsky | Jan 2010 | B2 |
7677317 | Wilson | Mar 2010 | B2 |
7735548 | Cherewyk | Jun 2010 | B2 |
7767628 | Kippie et al. | Aug 2010 | B2 |
7803740 | Bicerano et al. | Sep 2010 | B2 |
7918277 | Brannon et al. | Apr 2011 | B2 |
8002038 | Wilson | Aug 2011 | B2 |
8006760 | Fleming et al. | Aug 2011 | B2 |
8066068 | Lesko et al. | Nov 2011 | B2 |
8100190 | Weaver | Jan 2012 | B2 |
8104537 | Kaminsky | Jan 2012 | B2 |
8119576 | Reyes et al. | Feb 2012 | B2 |
8127850 | Brannon et al. | Mar 2012 | B2 |
8205675 | Brannon et al. | Jun 2012 | B2 |
8408305 | Brannon et al. | Apr 2013 | B2 |
8490700 | Lesko et al. | Jul 2013 | B2 |
8584755 | Willberg et al. | Nov 2013 | B2 |
8636065 | Lesko et al. | Jan 2014 | B2 |
8727008 | Krpec | May 2014 | B2 |
8757259 | Lesko et al. | Jun 2014 | B2 |
8763699 | Medvedev et al. | Jul 2014 | B2 |
8936083 | Nguyen | Jan 2015 | B2 |
8985213 | Saini et al. | Mar 2015 | B2 |
9080440 | Panga et al. | Jul 2015 | B2 |
9085727 | Litvinets et al. | Jul 2015 | B2 |
9095799 | Packard | Aug 2015 | B1 |
9097094 | Frost | Aug 2015 | B1 |
9109429 | Xu et al. | Aug 2015 | B2 |
9114332 | Liu | Aug 2015 | B1 |
9181789 | Nevison | Nov 2015 | B2 |
9328282 | Li | May 2016 | B2 |
9447673 | Medvedev et al. | Sep 2016 | B2 |
9523268 | Potapenko et al. | Dec 2016 | B2 |
9670764 | Lesko et al. | Jun 2017 | B2 |
9725639 | Vo et al. | Aug 2017 | B2 |
9725645 | Monastiriotis et al. | Aug 2017 | B2 |
9757796 | Sherman et al. | Sep 2017 | B2 |
9777562 | Lastra et al. | Oct 2017 | B2 |
9816365 | Nguyen et al. | Nov 2017 | B2 |
9845670 | Surjaatmadja et al. | Dec 2017 | B2 |
9863230 | Litvinets et al. | Jan 2018 | B2 |
9863231 | Hull | Jan 2018 | B2 |
9902898 | Nelson et al. | Feb 2018 | B2 |
9903010 | Doud et al. | Feb 2018 | B2 |
9909404 | Hwang et al. | Mar 2018 | B2 |
9945220 | Saini et al. | Apr 2018 | B2 |
9976381 | Martin et al. | May 2018 | B2 |
9995125 | Madasu et al. | Jun 2018 | B2 |
10001769 | Huang et al. | Jun 2018 | B2 |
10012054 | Ciglenec | Jul 2018 | B2 |
10030495 | Litvinets et al. | Jul 2018 | B2 |
10047281 | Nguyen et al. | Aug 2018 | B2 |
10077396 | Nguyen et al. | Sep 2018 | B2 |
10087364 | Kaufman et al. | Oct 2018 | B2 |
10100245 | Bulekbay et al. | Oct 2018 | B1 |
10208239 | Ballard | Feb 2019 | B2 |
10352125 | Frazier | Jul 2019 | B2 |
10421897 | Skiba et al. | Sep 2019 | B2 |
10450839 | Bulekbay et al. | Oct 2019 | B2 |
10508517 | Bulekbay et al. | Dec 2019 | B2 |
10550314 | Liang et al. | Feb 2020 | B2 |
10655443 | Gomma et al. | May 2020 | B2 |
10836956 | Bulekbay et al. | Nov 2020 | B2 |
10858578 | Bulekbay et al. | Dec 2020 | B2 |
10883042 | Bulekbay | Jan 2021 | B2 |
20020043507 | McCulloch | Apr 2002 | A1 |
20030132224 | Spencer | Jul 2003 | A1 |
20040173244 | Strothoff et al. | Sep 2004 | A1 |
20050097911 | Revellat | May 2005 | A1 |
20050126784 | Dalton | Jun 2005 | A1 |
20050137094 | Weaver et al. | Jun 2005 | A1 |
20050194147 | Metcalf et al. | Sep 2005 | A1 |
20060035808 | Ahmed et al. | Feb 2006 | A1 |
20060073980 | Brannon et al. | Apr 2006 | A1 |
20060144619 | Storm | Jul 2006 | A1 |
20070012437 | Clingman et al. | Jan 2007 | A1 |
20070215355 | Shapovalov | Sep 2007 | A1 |
20080135242 | Lesko | Jun 2008 | A1 |
20080149329 | Cooper | Jun 2008 | A1 |
20080153718 | Heidenfelder et al. | Jun 2008 | A1 |
20080223579 | Goodwin | Sep 2008 | A1 |
20090044945 | Willberg et al. | Feb 2009 | A1 |
20090151944 | Fuller et al. | Jun 2009 | A1 |
20090298720 | Nguyen et al. | Dec 2009 | A1 |
20100043823 | Lee | Feb 2010 | A1 |
20100282468 | Willberg et al. | Nov 2010 | A1 |
20100323933 | Fuller | Dec 2010 | A1 |
20120018143 | Lembcke | Jan 2012 | A1 |
20120097392 | Reyes et al. | Apr 2012 | A1 |
20120112546 | Culver | May 2012 | A1 |
20120125618 | Willberg | May 2012 | A1 |
20120247764 | Panga | Oct 2012 | A1 |
20120305247 | Chen et al. | Dec 2012 | A1 |
20130032549 | Brown et al. | Feb 2013 | A1 |
20130161003 | Mikhailovich et al. | Jun 2013 | A1 |
20130260649 | Thomson | Oct 2013 | A1 |
20130312977 | Lembcke | Nov 2013 | A1 |
20130341027 | Xu et al. | Dec 2013 | A1 |
20140000899 | Nevison | Jan 2014 | A1 |
20140131040 | Panga | May 2014 | A9 |
20140144633 | Nguyen | May 2014 | A1 |
20140144634 | Nguyen | May 2014 | A1 |
20140144635 | Nguyen | May 2014 | A1 |
20140290943 | Ladva | Oct 2014 | A1 |
20140296113 | Reyes | Oct 2014 | A1 |
20140352954 | Lakhtychkin et al. | Dec 2014 | A1 |
20150047846 | Oort | Feb 2015 | A1 |
20150071750 | Foster | Mar 2015 | A1 |
20150083420 | Gupta et al. | Mar 2015 | A1 |
20150211346 | Potapenko | Jul 2015 | A1 |
20150259593 | Kaufman et al. | Sep 2015 | A1 |
20150369028 | Potapenko | Dec 2015 | A1 |
20160153274 | Hull et al. | Jun 2016 | A1 |
20160208591 | Weaver et al. | Jul 2016 | A1 |
20160215604 | Potapenko et al. | Jul 2016 | A1 |
20160319189 | Dusterhoft | Nov 2016 | A1 |
20160347994 | Purdy et al. | Dec 2016 | A1 |
20170066962 | Ravi et al. | Mar 2017 | A1 |
20170121593 | Pantsurkin | May 2017 | A1 |
20170138190 | Elkatatny et al. | May 2017 | A1 |
20180202278 | Nelson et al. | Jul 2018 | A1 |
20180230361 | Foster | Aug 2018 | A1 |
20180244981 | Panga et al. | Aug 2018 | A1 |
20180328156 | Slater | Nov 2018 | A1 |
20180334612 | Bulekbay et al. | Nov 2018 | A1 |
20190055818 | Bulekbay | Feb 2019 | A1 |
20190264095 | Qu et al. | Aug 2019 | A1 |
20190323320 | Bulekbay et al. | Oct 2019 | A1 |
20190345377 | Haque et al. | Nov 2019 | A1 |
Number | Date | Country |
---|---|---|
2013206729 | Apr 2015 | AU |
104727799 | Jun 2015 | CN |
102777138 | Jan 2016 | CN |
306546 | Mar 1989 | EP |
2920435 | Aug 2007 | FR |
239998 | Sep 1925 | GB |
2063840 | Jun 1981 | GB |
WO 1992019838 | Nov 1992 | WO |
WO 2006108161 | Oct 2006 | WO |
WO 2016108161 | Oct 2006 | WO |
WO 2009018536 | Feb 2009 | WO |
WO 2010026553 | Mar 2010 | WO |
WO 2015012818 | Jan 2015 | WO |
WO 2015071750 | May 2015 | WO |
WO 2016032578 | Mar 2016 | WO |
WO 2017040553 | Mar 2017 | WO |
WO 2017164878 | Sep 2017 | WO |
Entry |
---|
“Echo Dissolvable Fracturing Plug,” EchoSeries, Dissolvable Fracturing Plugs, Gryphon Oilfield Solutions, Aug. 2018, 1 page. |
“Terv Alloy Degradable Magnesium Alloys,” Terves Engineered Response, Engineered for Enhanced Completion Efficiency, Feb. 2018, 8 pages. |
Alipour-Kivi et al, “Automated Liquid Unloading in Low-Pressure Gas Wells Using Intermittent and Distributed Heating of Wellbore Fluid,” SPE 100650, Society of Petroleum Engineers (SPE), presented at the SPE Western Regional/AAPG Pacific Section/GSA Cordilleran Section Joint Meeting, 2006, 6 pages. |
Ansari et al., “Innovative Planning and Remediation Techniques for Restoring the Well Integrity by Curing High Annulus-B Pressure and Zonal Communications,” IPTC-18894-MS, International Petroleum Technology Conference (IPTC), presented at the International Petroleum Technology Conference, Nov. 14-16, 2016, 24 pages. |
Barree et al., “Realistic Assessment of Proppant Pack Conductivity for Material Selection,” SPE-84306-MS, Society of Petroleum Engineers (SPE), presented at the Annual Technical Conference, Oct. 5-8, 2003, 12 pages. |
Clifton, “Modeling of In-Situ Stress Change Due to Cold Fluid Injection,” SPE 22107, Society of Petroleum Engineers (SPE), presented at the International Arctic Technology Conference, May 29-31, 1991, 13 pages. |
Corona et al., “Novel Washpipe-Free ICD Completion With Dissolvable Material,” OTC-28863-MS, Offshore Technology Conference (OTC), presented at the Offshore Technology Conference, Apr. 30-May 3, 2018, 10 pages. |
Gil et al., “Wellbore Cooling as a Means to Permanently Increase Fracture Gradient,” SPE Annual Technical Conference and Exhibition, San Antonio, Texas, Sep. 24-27, 2006, published Jan. 1, 2006, 9 pages. |
Gillard et al., “A New Approach to Generating Fracture Conductivity,” SPE-135034-MS, Society of Petroleum Engineers (SPE), presented at the SPE Annual Technical Conference and Exhibition held in Florence, Italy, Sep. 20-22, 2010, 13 pages. |
glossary.oilfield.slb.com [online], “Underbalance,” retrieved on Apr. 12, 2019, retrieved from URL http://www.glossary.oilfield.slb.com/Terms/u/underbalance.aspx, 1 pages. |
Gomaa et al., “Acid Fracturing: The Effect of Formation Strength on Fracture Conductivity,” SPE 119623, Society of Petroleum Engineers (SPE), presented at the SPE Hydraulic Fracturing Technology Conference, Jan. 2009, 18 pages. |
Gomaa et al., “Computational Fluid Dynamics Applied to Investigate Development and Optimization of Highly Conductive Channels within the Fracture Geometry,” SPE-179143-MS, Society of Petroleum Engineers (SPE), presented at the SPE Hydraulic Fracturing Technology Conference, Texas, Feb. 9-11, 2016, 18 pages. |
Gomaa et al., “Improving Fracture Conductivity by Developing and Optimizing a Channels Within the Fracture Geometry: CFD Study,” SPE-178982-MS, Society of Petroleum Engineers (SPE), presented at the SPE International conference on Formation Damage Control in Layfayette, Feb. 24-26, 2016, 25 pages. |
hub.globalccsinstitute.com [online], “2.1 the Properties of CO2,” available on or before Oct. 22, 2015, via Internet Archive: Wayback Machine URL <https://hub.globalccsinstitute.com/publications/hazard-analysis-offshore-carbon-capture-platforms-and-offshore-pipelines/21-properties-co2>,12 pages. |
Jensen, “Thermally induced hydraulic fracturing of cold water injectors,” WPC-26154, World Petroleum Conference (WPC), 14th World Petroleum Congress, May 29-Jun. 1, 1994, 2 pages. |
Kern et al., “Propping Fractures with Aluminum Particles,” SPE-1573-G-PA, Society of Petroleum Engineers (SPE), Journal of Petroleum Technology, Jun. 1961, 13:6 (583-589), 7 pages. |
Masa and Kuba, “Efficient use of compressed air for dry ice blasting,” Journal of Cleaner Production, 111:A, Jan. 2016, 9 pages. |
Mayerhofer et al., “Proppants? We Don't Need No Proppants,” SPE-38611, Society of Petroleum Engineers (SPE), presented at the SPE Annual Technical Conference and Exhibition, 457-464, Oct. 5, 1997, 8 pages. |
Meyer et al., “Theoretical Foundation and Design Formulae for Channel and Pillar Type Propped Fractures—A Method to Increase Fracture Conductivity,” SPE-170781-MS, Society of Petroleum Engineers (SPE), presented at SPE Annual Technical Conference and Exhibition, Amsterdam, The Netherlands, Oct. 27-29, 2014, 25 pages. |
Mueller et al., “Stimulation of Tight Gas Reservoir using coupled Hydraulic and CO2 Cold-frac Technology,” SPE 160365, Society of Petroleum Engineers (SPE), presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, Oct. 22-24, 2012, 7 pages. |
Palisch et al., “Determining Realistic Fracture Conductivity and Understanding its Impact on Well Performance—Theory and Field Examples,” SPE-106301-MS, Society of Petroleum Engineers (SPE), presented at the 2007 Hydraulic Fracturing Technology Conference, College Station, Texas, Jan. 29-31, 2007, 13 pages. |
Praxair, “Carbon Dioxide, Solid or Dry Ice, Safety Data Sheet P-4575,” Praxair, Jan. 1, 1997, 7 pages. |
princeton.edu [online], “Bernoulli's Equation,” available on or before Jul. 24, 1997, via Internet Archive: Wayback Machine URL <https://www.princeton.edu/˜asmits/Bicycle_web/Bernoulli.html>, 5 pages. |
Singh et al., “Introduction to an Effective Workover Method to Repair Causing Leak,” SPE-194654-MS, Society of Petroleum Engineers (SPE), presented at the SPE Oil and Gas India Conference and Exhibition, Apr. 9-11, 2019, 7 pages. |
Soreide et al., “Estimation of reservoir stress effects due to injection of cold fluids: an example from NCS,” ARMA 14-7394, American Rock Mechanics Association, presented at the 48th US Rock mechanics/Geomechanics Symposium, Jun. 1-4, 2014, 7 pages. |
Takahashi et al., “Degradation Study on Materials for Dissolvable Frac Plugs,” URTEC-2901283-MS, Unconventional Resources Technology Conference (URTC), presented at the SPE/AAPG/SEG Unconventional Resources Technology Conference, Jul. 23-25, 2018, 9 pages. |
Tinsley and Williams, “A new method for providing increased fracture conductivity and improving stimulation results,” SPE-4676-PA, Society of Petroleum Engineers (SPE), Journal of Petroleum Technology, 27:11 (1317-1325), 1975, 7 pages. |
Van Poollen et al., “Hydraulic Fracturing—Fracture Flow Capacity vs Well Productivity,” SPE-890-G, Society of Petroleum Engineers (SPE), Petroleum Transactions AIME, 213: 91-95, 1958, 5 pages. |
Van Poollen, “Productivity vs Permeability Damage in Hydraulically Produced Fractures,” SPE-906-2-G, Society of Petroleum Engineers (SPE), presented at Drilling and Production Practice, New York, New York, Jan. 1957, 8 pages. |
Vincent, “Examining our Assumptions—Have oversimplifications jeopardized our ability to design optimal fracture treatments,” SPE-119143-MS, Society of Petroleum Engineers (SPE), presented at the SPE Hydraulic Fracturing Technology Conference, The Woodlands, Jan. 19-21, 2009, 51 pages. |
Vincent, “Five Things you Didn't Want to Know about Hydraulic Fractures,” ISRM-ICHF-2013-045, presented at the International Conference for Effective and Sustainable Hydraulic Fracturing, an ASRM specialized Conference, Australia, May 20-22, 2013, 14 pages. |
Weinstein, “Cold Waterflooding a Warm Reservoir,” SPE 5083, Society of Petroleum Engineers (SPE), presented at the 49th Annual Fall Meeting of the Society of Petroleum Engineers of AIME, Oct. 6-9, 1974, 16 pages. |
Williams et al., “Acidizing Fundamentals,” Society of Petroleum Engineers of AIME, Jan. 1979, 131 pages. |
Yu et al., “Chemical and Thermal Effects on Wellbore Stability of Shale Formations,” SPE 71366, Society of Petroleum Engineers (SPE), presented at the 2001 SPE Annual Technical Conference and Exhibition, Sep. 30-Oct. 3, 2001, 11 pages. |
Number | Date | Country | |
---|---|---|---|
20220307338 A1 | Sep 2022 | US |