Selective inflow control device, system, and method

Information

  • Patent Grant
  • 12024985
  • Patent Number
    12,024,985
  • Date Filed
    Thursday, March 24, 2022
    2 years ago
  • Date Issued
    Tuesday, July 2, 2024
    8 months ago
Abstract
A first interval inflow control device and a second interval inflow control device are positioned on a production tubing string proximate to a first subterranean interval and a second subterranean interval, respectively. The inflow control devices each include a central bore, a sand screen surrounding an inner tube, a plurality of ports connect the annular space between an inner surface of the sand screen and an outer surface of the inner tube, and a sliding sleeve configured to translate between an open position and closed position. A first shifting tool is configured to engage with and axially translate the sliding sleeve of the first interval inflow control device and a second shifting tool is configured to engage with and axially translate the sliding sleeve of the second interval inflow control device. The second shifting tool has an outer diameter less than the bore of the first interval inflow control device.
Description
TECHNICAL FIELD

This disclosure relates to the production of oil, gas, or other resources from subterranean zones to the surface.


BACKGROUND

Hydrocarbons or other resources in subsurface reservoirs or locations below the Earth's surface can be produced to the surface via wells drilled from the surface to the subsurface locations. After drilling, such wells are completed by installing one or more liners and production tubing to provide a pathway for such resources to flow to the surface. Liners can be cemented into the wellbore by introducing cement into the annular space between the wellbore and the liner or into the annular space between two successive liners. Liners can then be perforated at the downhole location or locations corresponding to the reservoirs or reservoir layers from which production is desired or expected. The produced liquids can flow to the surface via production tubing installed within the liner when completing the well.


To prevent or reduce the migration of sand or other particles from the reservoir to the production tubing, screens or other devices can be installed on the production tubing or on other suitable equipment or locations, as part of the well completion. Also as part of a well completion, inflow control devices or similar devices can be installed on the production tubing to control the flow of fluids into the production tubing. Such devices can be installed to equalizing reservoir inflow along the length of the production tubing, or for other purposes.


SUMMARY

Certain aspects of the subject matter herein can be implemented as a system for selectively controlling flow from different subterranean intervals into a production tubing string positioned within a casing in a wellbore. The system includes a first interval inflow control device configured to be positioned on the production tubing string proximate to a first set of perforations through the casing at a first subterranean interval and a second interval inflow control device configured to be positioned on the production tubing string proximate to a second set of perforations through the casing at a second subterranean interval. The first interval inflow control device and the second interval inflow control device each include a substantially cylindrical sand screen surrounding an inner tube, the inner tube having a central bore fluidically connected to and coaxial with a central bore of the production tubing string. An annular space is formed between an inner surface of the sand screen and an outer surface of the inner tube, and the annular space is fluidically connected to the central bore of the inner tube by a plurality of ports through the wall of the inner tube. A sliding sleeve is positioned within the inner bore and has a substantially cylindrical sleeve bore open to and coaxial with the central bore of the inner tube. The sliding sleeve is configured to translate axially from a first, open position in which the sliding sleeve does not prevent a flow of fluid through plurality of ports and a second, closed position in which the sliding sleeve prevents the flow of fluid through plurality of ports. The system also includes a first shifting tool configured to engage with and axially translate the sliding sleeve of the first interval inflow control device from the first, open position to the second, closed position, and a second shifting tool configured to engage with and axially translate the sliding sleeve of the second interval inflow control device from the first, open position to the second, closed position. The second shifting tool has an outer diameter less than an inner diameter of the sleeve bore of the sliding sleeve of the first interval inflow control device.


An aspect combinable with any of the other aspects can include the following features. The sliding sleeve of the first interval inflow control device can be locked in the first, open position by a shear pin.


An aspect combinable with any of the other aspects can include the following features. The system of claim 2, wherein the shear pin can be configured to be sheared by an application of force by the first shifting tool to the sliding sleeve of the first interval inflow control device.


An aspect combinable with any of the other aspects can include the following features. The sliding sleeve of the second interval inflow control device can be locked in the first, open position by a shear pin.


An aspect combinable with any of the other aspects can include the following features. The shear pin can be configured to be sheared by an application of force by the second shifting tool to the sliding sleeve of the second interval inflow control device.


An aspect combinable with any of the other aspects can include the following features. The sliding sleeve of the first interval inflow control device can further include a shifting profile configured to selectively engage with a corresponding shifting key of the first shifting tool.


An aspect combinable with any of the other aspects can include the following features. The sliding sleeve of the second interval inflow control device can further include a shifting profile configured to selectively engage with a corresponding shifting key of the second shifting tool.


An aspect combinable with any of the other aspects can include the following features. A tubing-casing annulus can be formed by an inner surface of the casing and an outer surface of the production tubing string. The system can also include a first packer positioned on the production tubing string uphole of the first interval inflow control device and configured to selectively isolate the tubing-casing annulus uphole of the first packer from tubing-casing annulus downhole of the upper packer, and a second packer positioned on the production tubing string between the first interval inflow control device and the second interval inflow control device and configured to selectively isolate the tubing-casing annulus below the first packer and above the second packer from the tubing-casing annulus below the second packer.


An aspect combinable with any of the other aspects can include the following features. The second shifting tool can be configured to pass through the first interval control device without engaging with the sliding sleeve of the first inflow control device.


An aspect combinable with any of the other aspects can include the following features. The system can be configured prior to positioning the production tubing string in the wellbore such that, when the production tubing string is positioned in the wellbore, the first interval inflow control device is proximate to the first set of perforations and the second interval inflow control device is proximate to the second set of perforations.


Certain aspects of the subject matter herein can be implemented as a method for selectively controlling flow from different subterranean intervals into a production tubing string positioned within a casing in a wellbore. The method includes passing a shifting tool in a downhole direction through a sliding sleeve of a first interval inflow control device positioned on the production tubing string proximate to a first set of perforations through the casing at a first subterranean interval to engage with a sliding sleeve of a second interval inflow control device positioned on the production tubing string proximate to a second set of perforations through the casing at a second subterranean interval. The first interval inflow control device and the second interval inflow control device each include a substantially cylindrical sand screen surrounding an inner tube, the inner tube having a central bore fluidically connected to and coaxial with a central bore of the production tubing string. An annular space is formed between an inner surface of the sand screen and an outer surface of the inner tube. The annular space is fluidically connected to the central bore of the inner tube by a plurality of ports through the wall of the inner tube, and the sliding sleeve of the first interval inflow control device and the sliding sleeve of the second interval inflow control device each have a substantially cylindrical sleeve bore open to and coaxial with the central bore of the respective inner tube. The method further includes engaging the shifting tool with the sliding sleeve of the second interval inflow control device an axially translating, by the shifting tool, the sliding sleeve of the second interval inflow control device from a first, open position in which the sliding sleeve does not prevent a flow of fluid through the plurality of ports of the second interval inflow control device to a second, closed position in which the sliding sleeve prevents the flow of fluid through the plurality of ports of the second interval inflow control device.


An aspect combinable with any of the other aspects can include the following features. Engaging the shifting tool with the sliding sleeve of the second interval inflow control device can include engaging a shifting key of the shifting tool with a shifting profile of the sliding sleeve of the second inflow control device.


An aspect combinable with any of the other aspects can include the following features. The method can further include shearing, by an application of force to the shifting tool, a shear pin locking the sliding sleeve of the second interval inflow control device in the first, open position by a shear pin.


An aspect combinable with any of the other aspects can include the following features. A tubing-casing annulus can be formed by an inner surface of the casing and an outer surface of the production tubing string. A first packer can be positioned on the production tubing string uphole of the first interval inflow control device which isolates the tubing-casing annulus uphole of the first packer from the tubing-casing annulus downhole of the upper packer. The method can further include actuating a second packer positioned on the production tubing string between the first interval inflow control device and the second interval inflow control device and thereby isolating the tubing-casing annulus below the first packer and above the second packer from the tubing-casing annulus below the second packer.


An aspect combinable with any of the other aspects can include the following features. The passing of the shifting tool in the downhole direction through the sliding sleeve of a first interval inflow control device can be a first instance of an interval isolation sequence and wherein the shifting tool is a second shifting tool. The method can further include a second instance of the interval isolation sequence. The second instance of the interval isolation sequence method can include lowering a first shifting tool in a downhole direction to the sliding sleeve of the first interval inflow control device, engaging the first shifting tool with the sliding sleeve of the first interval inflow control device, and axially translating, by the first shifting tool, the sliding sleeve of the first interval inflow control device from a first, open position in which the sliding sleeve does not prevent a flow of fluid through the plurality of ports of the first interval inflow control device to a second, closed position in which the sliding sleeve prevents the flow of fluid through the plurality of ports of the first interval inflow control device.


An aspect combinable with any of the other aspects can include the following features. Engaging the first shifting tool with the sliding sleeve of the first interval inflow control device can include engaging a shifting key of the first shifting tool with a shifting profile of the sliding sleeve of the first inflow control device.


An aspect combinable with any of the other aspects can include the following features. A tubing-casing annulus is formed by an inner surface of the casing and an outer surface of the production tubing string and a first packer positioned on the production tubing string uphole of the first interval inflow control device can isolate the tubing-casing annulus uphole of the first packer from the tubing-casing annulus downhole of the upper packer. The method can further include actuating a second packer positioned on the production tubing string between the first interval inflow control device and the second interval inflow control device, thereby isolating the tubing-casing annulus below the first packer and above the second packer from the tubing-casing annulus below the second packer.


An aspect combinable with any of the other aspects can include the following features. The second shifting tool can be configured to pass through the first interval control device without engaging with the sliding sleeve of the first inflow control device.


An aspect combinable with any of the other aspects can include the following features. The method can further include, prior to positioning the production tubing string in the wellbore, configuring the production tubing string such that, when the production tubing string is positioned in the wellbore, the first interval inflow control device is proximate to the first set of perforations and the second interval inflow control device is proximate to the second set of perforations.


An aspect combinable with any of the other aspects can include the following features. Actuating the sliding sleeve can be in response to an indication that an amount of water relative to an amount of oil or gas produced from the second subterranean interval has increased.


The details of one or more embodiments are set forth in the accompanying drawings and the description below. Other features, objects, and advantages will be apparent from the description and drawings, and from the claims.





DESCRIPTION OF DRAWINGS


FIG. 1 is a schematic illustration of well system in accordance with an embodiment of the present disclosure.



FIGS. 2A and 2B are schematic illustrations of an inflow control device in accordance with certain embodiments of the present disclosure.



FIGS. 3A and 3B are schematic illustration of shifting tool and sliding sleeve pairs in accordance with certain embodiments of the present disclosure.



FIGS. 4A-4C are schematic illustrations of an operating sequence for selectively controlling flow from subterranean intervals into a production tubing string accordance with an embodiment of the present disclosure.



FIGS. 5A-5C are schematic illustrations of an alternative operating sequence for selectively controlling flow from subterranean intervals into a production tubing string in accordance with an embodiment of the present disclosure.



FIG. 6 is a process flow diagram of a method of selectively controlling flow from subterranean intervals into a production tubing string accordance with embodiments of the present disclosure.





DETAILED DESCRIPTION

The details of one or more implementations of the subject matter of this specification are set forth in this detailed description, the accompanying drawings, and the claims. Other features, aspects, and advantages of the subject matter will become apparent from this detailed description, the claims, and the accompanying drawings.


In accordance with embodiments of the present invention, inflow from different subterranean intervals into a production tubing string of a wellbore can be selectively controlled. In this way, one or more of the subterranean intervals can be selectively isolated and unwanted fluid flow from those subterranean intervals can be selectively reduced or eliminated. In certain circumstances, for example, one or more intervals may begin to produce a higher water content relative to the amount of oil or gas produced, making it desirable to partially or fully shut off fluid flow into the production string from such intervals, temporarily or permanently.


In accordance with some embodiments of the present disclosure, an improved method and system for controlling flow from specific intervals is disclosed. The system and method enable such control to be performed with respect to screened inflow control devices at different levels, simply and economically, thus reducing costly rig time and reducing or avoiding the need to run patches or isolation plugs, or to recomplete the well.



FIG. 1 is a schematic illustration of well system 100 in accordance with an embodiment of the present disclosure. Referring to FIG. 1, well system 100 that includes a substantially cylindrical wellbore 102 extending into the Earth into a subterranean zone 118. In the embodiment shown in FIG. 1, wellbore 102 is drilled through two discrete intervals of subterranean zone 118: first interval 120a and second interval 120b. Second interval 120b in the illustrated embodiment is downhole in wellbore 102 relative to first interval 120a. First interval 120a and second interval 120b can be, for example, different geological formations or different stratigraphic layers within a formation or different hydrocarbon production zones other discrete or otherwise different zones of interest. While FIG. 1 shows two such intervals, well system 100 can include more than two intervals. The intervals and the boundary between them can be substantially horizontal (as shown in FIG. 1) or other than substantially horizontal (for example, closer to vertical than horizontal). Likewise, while wellbore 102 is shown as extending substantially vertically from the surface through first interval 120a and second interval 120b, the concepts described here can be applicable to many different configurations of wells, including vertical, horizontal, slanted, or wells that are otherwise non-horizontal, partially or fully, with respect to the surface and/or with respect to the intervals.


After some or all of the wellbore 102 is drilled, a portion of the wellbore 102 extending into first interval 120a and second interval 120b can be lined with lengths of tubing, called casing or liner. The wellbore 102 can be drilled in stages, the liners can be installed between stages, and cementing operations can be performed to inject cement in stages in the annulus between the liner and inner surface of the wellbore (and/or the annulus between the inner surface of an outer, larger-diameter liner into which the (smaller-diameter) liner has been positioned.


In some embodiments of the present disclosure, a well system (such as well system 100) can be constructed by lowering a first liner into place and then cementing the annulus by injecting a cement slurry downhole through central bore of the liner, such that the cement slurry then travels uphole within the annulus and hardens. After installation and cementing of the first liner, the second, smaller-diameter liner can be lowered within the first liner and the second liner cemented into place. Subsequent liners can likewise be installed in progressively lower sections. Accordingly, in the example well system 100 of FIG. 1, the system 100 includes a first, outer liner 108, defined by lengths of tubing lining an upper portion of the wellbore 102 extending from the surface into the Earth. Outer liner 108 is shown as extending only partially down the wellbore 102. The example well system 100 also includes a second, inner liner 110 positioned radially inward from the outer liner 108 and defined by lengths of tubing that line a lower portion of the wellbore 102 that extends further downhole of the wellbore 102 than the portion of the wellbore into which first liner 108 has been positioned.


After installation of the casing or liner, production tubing string 112 can be installed in wellbore 102 within the liners. Production tubing string 112 can comprise lengths of tubing connected to each other and acts as the primary conduit through which fluids are produced to the surface. The outer surface of production tubing string 112 and the inner surface of the liners forms an annulus 114. In the illustrated embodiment, perforations 116a through liner 110 allow hydrocarbons or other fluids to enter wellbore 102 from first interval 120a, and perforations 116b allow hydrocarbons or other fluids to enter wellbore 102 from second interval 120b. In some embodiments, liner 110 (and/or other liners uphole or downhole of liner 110) can include additional or other perforations corresponding to intervals 120a or 120b or to different or additional subterranean intervals.


In the illustrated embodiment, inflow control devices (ICDs) 130a and 130b are installed on production tubing string 112 and provide a pathway for the fluids entering the wellbore via perforations 116a and 116b to enter production tubing string 112. In the illustrated embodiment, first interval ICD 130a is installed at a location on the tubing string proximate to perforations 116a, and thus is proximate to the flow of fluid 150a from first interval 120a. Second interval ICD 116b is installed at a location on the tubing string proximate to perforations 116b, and the is proximate to the flow of fluid 150b from second interval 120b. ICDs 130a and 130b are described in more detail in reference to FIGS. 2A and 2B. In some embodiments, the well system can include a greater number of ICDs for one or more single intervals and/or additional ICDs corresponding to additional subterranean zones, or more than one ICD per interval.


In the illustrated embodiment, packer 140 is installed on production tubing 112 and when activated, can seal and isolate the annulus 114 above packer 140 from annulus 114 below packer 140. Packer 142 is positioned between first interval ICD 130a and second interval ICD 130b and, when activated, isolate annulus 114 below packer 140 and above packer 142 from annulus 114 below packer 142. In some embodiments, packers 140 and 142 can be mechanical set packers. In some embodiments, packers 140 and/or 142 can be swellable packers or another suitable packer type. In some embodiments, instead of two packers, three or more packers can be installed on production tubing 112 to, for example, isolate the annulus above and below additional ICDs corresponding to additional subterranean intervals.


In accordance with some embodiments of the present invention, ICDs 130a and 130b can be selectively opened and closed, and packers 140 and 142 selectively activated, to selectively permit fluid flow into production tubing 112 from first interval 120a, or from second interval 120b, or from both intervals. Additional ICDs of similar design and configuration as ICDs 130a and 130b and additional packers can in some embodiments be installed on other portions of production tubing 112 to likewise selectively permit fluid flow from all or some of the plurality (for example, three or four or more) subterranean intervals.



FIGS. 2A and 2B are schematic illustrations an ICD in accordance with certain embodiments of the present disclosure. Specifically, FIG. 2A is an external schematic of first interval ICD 130a of FIG. 1, and FIG. 2B shows in internal cross-section of first interval ICD 130a. First interval ICD 130a comprises a main body 200, and can be connected to production tubing at an upper end 202 and a lower end 204. Screen 210 wraps circumferentially around ICD 130 and allows fluid flow into first interval ICD 130a while filtering out sand and other particulate matter. Within main body 200 is substantially cylindrical inner tube 220 having a central bore 222 which is open to and aligns axially with the central bore of the production tubing. The inner surface of screen 210 and the outer surface of inner tube 220 forms an annular space 224, and fluid entering through screen 210 can flow through the annular space and into central bore 222 via ports 226.


First interval ICD 130a further includes a sliding sleeve 250a which has a sleeve inner bore 252 open to and axially aligned with central bore 222. Sleeve 250a is configured to be translated axially (for example, by a shifting tool) from a first position in which ports 226 are not blocked by sleeve 250a to a second position in which ports 226 are blocked by sleeve 250a. Accordingly, in the first position, fluid can flow from annulus 224 to central bore 222, whereas in the second position, fluid cannot flow from annulus 224 to central bore 222. In the illustrated embodiment, sliding sleeve 250a further includes a shifting profile 254a which can selectively engage with a corresponding shifting key of a shifting tool (for example, a shifting tool shown in FIG. 3A), thus locking sleeve 250a with the shifting tool such that sleeve 250a is axially translated by axial translation of the shifting tool.


First interval ICD 130a further includes a shear pin 256a which locks sleeve 250a in the first position until the pin is sheared, for example, by the shifting tool applying sufficient force to shear the pin. In the illustrated embodiment, sleeve 250a further includes a locking ring 258a which can lock sleeve 250a in the second position by latching into recess 230 which extends circumferentially about the inner surface of inner tube 220. In other embodiments, other types of keys, locking profiles, other mechanisms can be used to lock or hold sleeve 250a in the first or second position or in other desired axial positions.


Second interval ICD 130b of FIG. 1 can in some embodiments have the same or substantially the same elements, design and configuration as first interval ICD 130a as shown in FIGS. 2A and 2B. However, described in further detail in reference to FIGS. 3A and 3B, in some embodiments, an inner bore diameter of the sliding sleeve of second interval ICD 130b can have a different (for example, smaller) diameter than inner bore 252A of sliding sleeve 250a of first interval ICD 130a.



FIGS. 3A and 3B are schematic illustration of shifting tool and sliding sleeve pairs in accordance with certain embodiments of the present disclosure. Sliding sleeve 250a of FIG. 3A corresponds to sliding sleeve 250a of first interval ICD 130a of FIG. 1. Sliding sleeve 250b of FIG. 3B corresponds to a sliding sleeve which, in some embodiments, is positioned within second interval ICD 130b (in place of or instead of sliding sleeve 250a).


Referring to FIG. 3A, first interval shifting tool 310a has a lower locking section 312a having an external diameter 316a that is the same or less than the diameter 302A of inner bore 252A of sliding sleeve 250a. First interval shifting tool 310a further includes a shifting key 314a which corresponds to shifting profile 254a of sleeve 250a. Shifting key 314a can selectively engage and lock with shifting profile 254a such that sleeve 250a can be axially translated by axial translation of first interval shifting tool 310a.


Referring to FIG. 3B, sliding sleeve 250b is substantially similar to sliding sleeve 250a except that inner bore 252b of sliding sleeve 250b has a smaller diameter 302b than inner bore 252A of sliding sleeve 250a. Similar to first interval shifting tool 310a, second interval shifting tool 310b has a lower locking section 312b having an external diameter 316b the same or substantially the same as the diameter 302b of inner bore 252b of sliding sleeve 250b. Shifting tool 310b further includes a shifting key 314b which corresponds to shifting profile 254b of sleeve 250b. Shifting key 314b can selectively engage and lock with shifting profile 254b such that sleeve 250b can be axially translated by axial translation of second interval shifting tool 310b.


In the illustrated embodiment, outer diameter 320b of second shifting tool 310b is less than the diameter 302A of sliding sleeve 250a. As described in greater detail in reference to the following figures, second shifting tool 310b can in some embodiments be run axially through sliding sleeve 250a and central bore 222A of first interval ICD 130a, to engage with sliding sleeve 250b of second interval ICD 130b without engaging with sliding sleeve 250a of first interval ICD 130a. Likewise, additional ICDs deployed on production tubing string 112 can be configured with sliding sleeves having progressively smaller diameters to allow for the passage therethrough of shifting tools for the operation of ICDs progressively further downhole.



FIGS. 4A-4C are schematic illustrations of an operating sequence for selectively controlling flow from subterranean intervals into a production tubing string accordance with an embodiment of the present disclosure. In the sequence shown in FIGS. 4A-4C, production from the first interval (but not the second interval) is shut off. In the initial configuration shown in FIG. 4A, sliding sleeve 250a of first interval ICD 130a and sliding sleeve 250b are both in the first, open position, such that produced fluid 150a from first interval 120a and produced fluid 150b from second interval 120b can both flow into production tubing string 112 through first interval ICD 130a and second interval ICD 130b, respectively. Packer 140 is activated (expanded) to the set configuration so as to isolate the tubing-casing annulus uphole of perforations 116a and 116b. Lower packer 142 is in an initial, inactivated (unset) configuration.


If the operator desires to reduce or stop flow into production tubing string 112 from first interval 120a then, as shown in FIG. 4B, the operator can run first interval shifting tool 310a into first interval ICD 130a and lock shifting tool 310a into sliding sleeve 250a. By increasing the force applied to first interval shifting tool 310a, shear pin 256a can be sheared and sleeve 250a axially translated from the first (open) position to the second (closed) position, thereby blocking flow from first interval ICD 130a into production tubing 112. As shown in FIG. 4C, shifting tool 310a can then be removed from the wellbore, allowing flow from downhole of first interval ICD 130a (for example, from second interval 120b via perforations 116b through second interval ICD 130b) to continue. In some embodiments, not shown in FIGS. 4A-4C, subsequent to closing first interval ICD 130a or at another suitable time, lower packer 142 can be expanded (set) so as to seal and isolate that portion of the tubing-casing annulus below upper packer 140 and above packer 142 from that portion of the tubing-casing annulus below lower packer 142, thereby preventing or reducing inflow from interval 120a through second interval ICD 130b.



FIGS. 5A-5C are schematic illustrations of an alternative operating sequence for selectively controlling flow from subterranean intervals into a production tubing string in accordance with an embodiment of the present disclosure. In the sequence shown in FIGS. 5A-5C, production from the second interval (but not the first interval) is shut off. Similar to the sequence described in reference to FIGS. 4A-4C, in the initial configuration shown in FIG. 5A, sliding sleeve 250a of first interval ICD 130a and sliding sleeve 250b are both in the first, open position, such that produced fluid 150a from first interval 120a and produced fluid 150b from second interval 120b can both flow into production tubing string 112 through first interval ICD 130a and second interval ICD 130b, respectively. Packer 140 can be activated (expanded) to the set configuration so as to isolate the tubing-casing annulus uphole of perforations 116a and 116b. Lower packer 142 is in an initial, inactivated (unset) configuration.


If the operator desires to reduce or stop flow into production tubing string 112 from second interval 120b then, as shown in FIG. 5B, the operator can run shifting tool 310b through first interval ICD 130a and into second interval ICD 130b and lock shifting tool 310b into sliding sleeve 250b. By increasing the force applied to shifting tool 310b, shear pin 256b can be sheared and sleeve 250b axially translated from the first (open) position to the second (closed) position, thereby blocking flow from second interval ICD 130b into production tubing 112. As shown in FIG. 5C, lower packer 142 can be expanded (set) so as to seal and isolate that portion of the tubing-casing annulus below upper packer 140 and above packer 142 from that portion of the tubing-casing annulus below lower packer 142. Such packer configuration isolates the tubing-casing annulus that includes first interval ICD 130a and isolates first interval ICD 130a from second interval ICD 130b. Shifting tool 310a can then be removed from the wellbore, thus allowing flow from the first interval 120a via perforations 116a (through first interval ICD 130a) to continue.



FIG. 6 is a process flow diagram of a method of selectively controlling flow from subterranean zones into a production tubing string accordance with embodiments of the present disclosure. The method begins at step 602 in which a production tubing string having a first interval inflow control device and a second interval inflow control device is configured such that, if the production tubing string is positioned in a wellbore within a subterranean zone, the first interval inflow control device is proximate to a first set of perforations corresponding to a first subterranean interval (such as an oil or gas producing interval) of the subterranean zone and the second interval inflow control device is proximate to a second set of perforations corresponding to a second subterranean interval of the subterranean zone downhole of the first subterranean interval. In some embodiments, such as, for example an embodiment wherein a greater number of subterranean intervals are present or a greater number of interval ICDs are desired per interval, more than two interval ICDs can be installed on the production tubing string and accordingly configured. In some embodiments, the production tubing string further includes with one or more packers separating the interval ICDs. In an initial configuration, in some embodiments, only an upper packer uphole of the interval ICDs is set, isolating the annulus uphole of the ICDs from the annulus downhole of the ICDs, and each of the ICDs is in the open position, allowing inflow into the production tubing string from each of the intervals. Other packers below the upper packer and between the interval ICDs can be in the unset (unsealed) position. Proceeding to step 604, the production tubing string is installed in the wellbore.


Proceeding to step 606, hydrocarbons or other resources are produced from the first and second subterranean intervals (and, if applicable, the other intervals) through the production tubing string to the surface. Proceeding to step 608, the operator makes a determination of whether to shut off flow from a subterranean interval and, if so, which interval to shut off. Such determination can be in response to, for example, an indication that water from the interval has increased relative to the production of oil or gas from the interval. If at step 608 the operator determines that such shut off is not desired or necessary, then the method returns to step 606 in which the resources continue to be produced from all of the intervals.


If at step 608 the operator determines that shut-off of the first interval is desired, then the method proceeds to step 610 in which a first interval shifting tool (that is, a shifting tool sized and configured to latch into the sliding sleeve of the first interval ICD) is run into the well and locked into the sliding sleeve of the first interval ICD using a shifting and key mechanism or other suitable mechanism. At step 612, by increasing the force applied to first interval shifting tool, a shear pin holding the sliding sleeve in the first (open) position in sheared and the sleeve axially translated from the first (open) position to the second (closed) position. Proceeding to step 614, the first interval shifting tool is removed from the wellbore, and, at step 616, inflow into the production tubing string continues from the second interval ICD but inflow into the production tubing string from the first interval ICD is shut off by the sliding sleeve of the first interval ICD.


Returning to step 608, if the operator determines that shut-off of the second interval is desired, then the method proceeds to step 618 in which a second interval shifting tool (that is, a shifting tool sized and configured to freely pass through the first interval ICD and latch into the sliding sleeve of the second interval ICD downhole of the first interval ICD) is run into the well and locked into the sliding sleeve of the second interval ICD using a shifting and key mechanism or other suitable mechanism. At step 620, by increasing the force applied to second interval shifting tool, a shear pin holding the sliding sleeve in the first (open) position in sheared and the sleeve axially translated from the first (open) position to the second (closed) position. Proceeding to step 622, the packer between the first interval ICD and the second interval ICD is set (expanded) so as to seal and isolate that portion of the tubing-casing annulus below the second interval ICD from that portion of annulus above the second interval ICD and below the first interval. Proceeding to step 624, the second interval shifting tool is removed from the wellbore, and, at step 626, inflow into the production tubing string continues from the first interval ICD but inflow into the production tubing string from the second interval ICD is shut off by the sliding sleeve of the second interval ICD.


Shear pins 256a and 256b provide a simple and cost-effective mechanism for holding the sliding sleeves in the open position until translation of the sleeves to the closed position is desired. In some embodiments, instead of or in addition to shear pins (which once sheared are not resettable), a resettable latch systems (such as a spring-loaded lock and key mechanism) could be used, thereby enabling multiple or repeated translation and locking/unlocking cycles between the first and second positions.


The term “uphole” as used herein means in the direction along the production tubing or the wellbore from its distal end towards the surface, and “downhole” as used herein means the direction along the production tubing or the wellbore from the surface towards its distal end. A downhole location means a location along the production tubing or wellbore downhole of the surface.


A number of implementations have been described. Nevertheless, it will be understood that various modifications may be made without departing from the spirit and scope of the disclosure. For example, example operations, methods, or processes described herein may include more steps or fewer steps than those described. Further, the steps in such example operations, methods, or processes may be performed in different successions than that described or illustrated in the figures. Accordingly, other implementations are within the scope of the following claims.

Claims
  • 1. A system for selectively controlling flow from different subterranean intervals into a production tubing string positioned within a casing in a wellbore, the system comprising: a first interval inflow control device configured to be positioned on the production tubing string proximate to a first set of perforations through the casing at a first subterranean interval;a second interval inflow control device configured to be positioned on the production tubing string downhole of the first interval control device proximate to a second set of perforations through the casing at a second subterranean interval, wherein the first interval inflow control device and the second interval inflow control device each comprise: a substantially cylindrical sand screen surrounding an inner tube, the inner tube having a central bore fluidically connected to and coaxial with a central bore of the production tubing string, wherein an annular space is formed between an inner surface of the sand screen and an outer surface of the inner tube, and wherein the annular space is fluidically connected to the central bore of the inner tube by a plurality of ports through the wall of the inner tube; anda sliding sleeve positioned within the inner bore and having a substantially cylindrical sleeve bore open to and coaxial with the central bore of the inner tube, the sliding sleeve configured to translate axially from a first, open position in which the sliding sleeve does not prevent a flow of fluid through the plurality of ports and a second, closed position in which the sliding sleeve prevents the flow of fluid through plurality of ports;a first shifting tool configured to engage with and axially translate the sliding sleeve of the first interval inflow control device from the first, open position to the second, closed position; anda second shifting tool configured to engage with and axially translate the sliding sleeve of the second interval inflow control device from the first, open position to the second, closed position, wherein a minimum inner diameter of the sleeve bore of the sliding sleeve of the first interval control device is greater than a maximum inner diameter of the sleeve bore of the second interval control device and the first shifting tool has an outer diameter substantially the same as the minimum inner diameter of the sleeve bore of the sliding sleeve of the first interval control device.
  • 2. The system of claim 1, further including a shear pin configured to releasably lock the sliding sleeve of the first interval inflow control device in the first, open position by a shear pin.
  • 3. The system of claim 2, wherein the shear pin is configured to be sheared by an application of force by the first shifting tool to the sliding sleeve of the first interval inflow control device.
  • 4. The system of claim 3, further comprising a locking ring configured to releasably lock the sliding sleeve of the first interval inflow control device in the second, closed position.
  • 5. The system of claim 1, wherein the sliding sleeve of the second interval inflow control device is locked in the first, open position by a shear pin.
  • 6. The system of claim 5, wherein the shear pin is configured to be sheared by an application of force by the second shifting tool to the sliding sleeve of the second interval inflow control device.
  • 7. The system of claim 1, wherein the sliding sleeve of the first interval inflow control device further comprises a shifting profile configured to selectively engage with a corresponding shifting key of the first shifting tool.
  • 8. The system of claim 1, wherein the sliding sleeve of the second interval inflow control device further comprises a shifting profile configured to selectively engage with a corresponding shifting key of the second shifting tool.
  • 9. The system of claim 1, wherein a tubing-casing annulus is formed by an inner surface of the casing and an outer surface of the production tubing string, and further comprising: a first packer positioned on the production tubing string uphole of the first interval inflow control device and configured to selectively isolate the tubing-casing annulus uphole of the first packer from the tubing-casing annulus downhole of the upper packer; anda second packer positioned on the production tubing string between the first intervalinflow control device and the second interval inflow control device and configured to selectively isolate the tubing-casing annulus below the first packer and above the second packer from the tubing-casing annulus below the second packer.
  • 10. The system of claim 1, wherein the second shifting tool is configured to pass through the first interval control device without engaging with the sliding sleeve of the first inflow control device.
  • 11. The system of claim 1, wherein the system is configured prior to positioning the production tubing string in the wellbore such that, when the production tubing string is positioned in the wellbore, the first interval inflow control device is proximate to the first set of perforations and the second interval inflow control device is proximate to the second set of perforations.
  • 12. A method for selectively controlling flow from different subterranean intervals into a production tubing string positioned within a casing in a wellbore, the method comprising: lowering a first shifting tool in a downhole direction to a sliding sleeve of a first interval inflow control device positioned on the production tubing string proximate to a first set of perforations through the casing at a first subterranean interval;engaging the first shifting tool with a sliding sleeve of the first interval inflow control device;axially translating, by the first shifting tool, the sliding sleeve of the first interval inflow control device from a first, open position in which the sliding sleeve does not prevent a flow of fluid through the plurality of ports of the first interval inflow control device to a second, closed position in which the sliding sleeve prevents the flow of fluid through the plurality of ports of the first interval inflow control device;passing a second shifting tool in a downhole direction through a sliding sleeve of the first interval inflow control device to engage with a sliding sleeve of a second interval inflow control device positioned on the production tubing string downhole of the first interval control device proximate to a second set of perforations through the casing at a second subterranean interval, wherein the first interval inflow control device and the second interval inflow control device each comprise a substantially cylindrical sand screen surrounding an inner tube, the inner tube having a central bore fluidically connected to and coaxial with a central bore of the production tubing string, wherein an annular space is formed between an inner surface of the sand screen and an outer surface of the inner tube, and wherein the annular space is fluidically connected to the central bore of the inner tube by a plurality of ports through the wall of the inner tube, and wherein the sliding sleeve of the first interval inflow control device and the sliding sleeve of the second interval inflow control device each have a substantially cylindrical sleeve bore open to and coaxial with the central bore of the respective inner tube, wherein a minimum inner diameter of the sleeve bore of the sliding sleeve of the first interval control device is greater than a maximum inner diameter of the sleeve bore of the second interval control device and the first shifting tool has an outer diameter substantially the same as the minimum inner diameter of the sleeve bore of the sliding sleeve of the first interval control device; engaging the second shifting tool with the sliding sleeve of the second interval inflow control device; andaxially translating, by the second shifting tool, the sliding sleeve of the second interval inflow control device from a first, open position in which the sliding sleeve does not prevent a flow of fluid through the plurality of ports of the second interval inflow control device to a second, closed position in which the sliding sleeve prevents the flow of fluid through the plurality of ports of the second interval inflow control device.
  • 13. The method of claim 12, wherein engaging the second shifting tool with the sliding sleeve of the second interval inflow control device comprises engaging a shifting key of the second shifting tool with a shifting profile of the sliding sleeve of the second inflow control device.
  • 14. The method of claim 12, further comprising shearing, by an application of force to the second shifting tool, a shear pin locking the sliding sleeve of the second interval inflow control device in the first, open position by a shear pin.
  • 15. The method of claim 14, wherein axially translating the sliding sleeve of the first interval inflow control device from the first, open position to the second, closed position comprises engaging the first interval control device into a locking ring configured to releasably lock the sliding sleeve of the first interval inflow control device in the second, closed position.
  • 16. The method of claim 12, wherein a tubing-casing annulus is formed by an inner surface of the casing and an outer surface of the production tubing string and wherein a first packer positioned on the production tubing string uphole of the first interval inflow control device isolates the tubing-casing annulus uphole of the first packer from the tubing-casing annulus downhole of the upper packer, and further comprising actuating a second packer positioned on the production tubing string between the first interval inflow control device and the second interval inflow control device and thereby isolating the tubing-casing annulus below the first packer and above the second packer from the tubing-casing annulus below the second packer.
  • 17. The method of claim 12, wherein engaging the first shifting tool with the sliding sleeve of the first interval inflow control device comprises engaging a shifting key of the first shifting tool with a shifting profile of the sliding sleeve of the first inflow control device.
  • 18. The method of claim 12, wherein a tubing-casing annulus is formed by an inner surface of the casing and an outer surface of the production tubing string and wherein a first packer positioned on the production tubing string uphole of the first interval inflow control device isolates the tubing-casing annulus uphole of the first packer from the tubing-casing annulus downhole of the upper packer, and further comprising actuating a second packer positioned on the production tubing string between the first interval inflow control device and the second interval inflow control device and thereby isolating the tubing-casing annulus below the first packer and above the second packer from the tubing-casing annulus below the second packer.
  • 19. The method of claim 12, wherein the second shifting tool is configured to pass through the first interval control device without engaging with the sliding sleeve of the first inflow control device.
  • 20. The method of claim 12, further comprising, prior to positioning the production tubing string in the wellbore, configuring the production tubing string such that, when the production tubing string is positioned in the wellbore, the first interval inflow control device is proximate to the first set of perforations and the second interval inflow control device is proximate to the second set of perforations.
  • 21. The method of claim 12, wherein actuating the sliding sleeve is in response to an indication that an amount of water relative to an amount of oil or gas produced from the second subterranean interval has increased.
US Referenced Citations (262)
Number Name Date Kind
1843217 Fletcher Feb 1932 A
2874781 McGaffey Feb 1959 A
3104549 Humbert et al. Sep 1963 A
3316767 Liebert May 1967 A
3373608 Ketelsen Mar 1968 A
4051723 Head et al. Oct 1977 A
RE31186 Rosenweig Mar 1983 E
4517846 Harrison et al. May 1985 A
4676313 Rinaldi Jun 1987 A
4757314 Aubin Jul 1988 A
4777833 Carpenter Oct 1988 A
4901018 Lew Feb 1990 A
4965996 Morris Sep 1990 A
5067345 Mougne Nov 1991 A
5090250 Wada Feb 1992 A
5139089 Wacker Aug 1992 A
5164897 Clark Nov 1992 A
5259239 Gaisford Nov 1993 A
5392648 Robertson Feb 1995 A
5417118 Lew et al. May 1995 A
5586310 Sharman Dec 1996 A
5854991 Gupta et al. Dec 1998 A
5871047 Spath et al. Feb 1999 A
5975204 Tubel et al. Nov 1999 A
6006831 Schlemmer et al. Dec 1999 A
6046685 Tubel Apr 2000 A
6085599 Feller Jul 2000 A
6106032 Och Aug 2000 A
6163257 Tracy Dec 2000 A
6237424 Salmasi et al. May 2001 B1
6356844 Thomas et al. Mar 2002 B2
6463807 Feller Oct 2002 B1
6516275 Lazaratos Feb 2003 B2
6549879 Cullick et al. Apr 2003 B1
6626048 Dam Es et al. Aug 2003 B1
6719056 Hoffman et al. Apr 2004 B2
6747372 Gilbreth et al. Jun 2004 B2
6882904 Petrie et al. Apr 2005 B1
6920799 Schulz Jul 2005 B1
6931324 Taner et al. Aug 2005 B2
6950825 Chang et al. Sep 2005 B2
7015800 Lesesky et al. Mar 2006 B2
7088639 Wells et al. Aug 2006 B2
7259688 Hirsch et al. Aug 2007 B2
7265544 Keese Sep 2007 B2
7376517 Rickett May 2008 B2
7469188 Wee Dec 2008 B2
7478024 Gurpinar et al. Jan 2009 B2
7493140 Michmerhuizen et al. Feb 2009 B2
7536547 Van Den Tillaart May 2009 B2
7540202 Bier Jun 2009 B2
7555389 Cavalca et al. Jun 2009 B2
7557701 Nunnazaki Jul 2009 B2
7574907 Maute Aug 2009 B2
7584165 Buchan Sep 2009 B2
7644290 Ransom et al. Jan 2010 B2
7653936 Oberst Jan 2010 B2
7739359 Millet et al. Jun 2010 B1
7828065 Ross Nov 2010 B2
7933989 Barker et al. Apr 2011 B1
7937222 Donadille et al. May 2011 B2
7940302 Mehrotra et al. May 2011 B2
8039991 Wakitani et al. Oct 2011 B2
8051722 Voigt et al. Nov 2011 B2
8102238 Golander et al. Jan 2012 B2
8195590 Storek Jun 2012 B1
8271212 Sai et al. Sep 2012 B2
8280635 Ella et al. Oct 2012 B2
8312320 Almadi Nov 2012 B2
8323392 Jones et al. Dec 2012 B2
8334775 Tapp et al. Dec 2012 B2
8359171 Bleys et al. Jan 2013 B2
8365250 Denny Jan 2013 B2
8365612 Izumi Feb 2013 B2
8543716 Rashidi Sep 2013 B1
8631877 Gewily Jan 2014 B2
8667091 Almadi Mar 2014 B2
8732106 Presgraves et al. May 2014 B1
8746337 Grigsby et al. Jun 2014 B2
8750513 Renkis Jun 2014 B2
8757273 Themig et al. Jun 2014 B2
8761911 Chapman et al. Jun 2014 B1
8792115 Harano Jul 2014 B2
8803077 Schmidt Aug 2014 B2
8875379 Maute Nov 2014 B2
8884759 Oktem et al. Nov 2014 B2
8887241 Britton et al. Nov 2014 B2
8972742 Troncoso Pastoriza et al. Mar 2015 B2
8985215 Tips et al. Mar 2015 B2
8991505 Fleckenstein et al. Mar 2015 B2
9031820 Frederick May 2015 B2
9147174 Glickman et al. Sep 2015 B2
9208676 Fadell et al. Dec 2015 B2
9210179 Mevec et al. Dec 2015 B2
9396599 Malhotra Jul 2016 B1
9467472 Weiner et al. Oct 2016 B2
9506325 Fould et al. Nov 2016 B2
9699768 Werb Jul 2017 B2
9745833 Carvajal et al. Aug 2017 B2
9760075 Fisher-Rosemont Sep 2017 B2
9951583 Gosselin et al. Apr 2018 B2
10125586 Balan et al. Nov 2018 B2
10133831 Carvajal et al. Nov 2018 B2
10330511 Alkhabbaz et al. Jun 2019 B2
10462884 Jayawardena et al. Oct 2019 B2
10514415 Jayawardena et al. Dec 2019 B2
10551047 Treible, Jr. et al. Feb 2020 B2
10563483 Steele Feb 2020 B2
10570716 Balan et al. Feb 2020 B2
10590741 Van Der Veen Mar 2020 B2
10677034 Balan et al. Jun 2020 B2
10677035 Balan et al. Jun 2020 B2
11341830 Al-Yousef et al. May 2022 B2
20020152053 Roy et al. Oct 2002 A1
20030117298 Seely Jun 2003 A1
20040035578 Ross Feb 2004 A1
20040045368 Schoeb Mar 2004 A1
20040098592 Taki May 2004 A1
20040188710 Koren et al. Sep 2004 A1
20050015624 Ginter et al. Jan 2005 A1
20050184084 Wells Aug 2005 A1
20050193832 Tombs et al. Sep 2005 A1
20050228683 Saylor et al. Oct 2005 A1
20060032547 Rossi Feb 2006 A1
20060060352 Vidrine Mar 2006 A1
20060085174 Hemanthkumar Apr 2006 A1
20060086497 Ohmer et al. Apr 2006 A1
20060107061 Holovacs May 2006 A1
20070016389 Ozgen et al. Jan 2007 A1
20070018009 Choi et al. Jan 2007 A1
20070126576 Script et al. Jun 2007 A1
20070163359 Nielsen Jul 2007 A1
20070193834 Pai Aug 2007 A1
20070198223 Ella et al. Aug 2007 A1
20070198234 Zangi et al. Aug 2007 A1
20080061984 Breed et al. Mar 2008 A1
20080109883 Hernoud et al. May 2008 A1
20080109889 Bartels et al. May 2008 A1
20080139195 Marsyla et al. Jun 2008 A1
20080228908 Link Sep 2008 A1
20080251260 Ross et al. Oct 2008 A1
20080274766 Pratt et al. Nov 2008 A1
20090012631 Fuller Jan 2009 A1
20090037607 Farinacci et al. Feb 2009 A1
20090089108 Angell et al. Apr 2009 A1
20090138353 Mendelson May 2009 A1
20090141896 McCown Jun 2009 A1
20090164188 Habashy Jun 2009 A1
20090210081 Sustaeta Aug 2009 A1
20090224930 Burza Sep 2009 A1
20090326826 Hull et al. Dec 2009 A1
20100023269 Yusti et al. Jan 2010 A1
20100097205 Script Apr 2010 A1
20100097886 Day et al. Apr 2010 A1
20100228584 Nash Sep 2010 A1
20100231410 Seisenberger Sep 2010 A1
20100292857 Bose et al. Nov 2010 A1
20100299125 Ding et al. Nov 2010 A1
20110042083 Sierra et al. Feb 2011 A1
20110066454 Rosauer et al. Mar 2011 A1
20110071963 Piovesan et al. Mar 2011 A1
20110074551 Higashionji Mar 2011 A1
20110136463 Ebdon Jun 2011 A1
20110178977 Drees Jul 2011 A1
20110181426 Bucciero et al. Jul 2011 A1
20110288692 Scott Nov 2011 A1
20110296377 Morozov et al. Dec 2011 A1
20120016649 Thambynayagam et al. Jan 2012 A1
20120022700 Drees et al. Jan 2012 A1
20120059634 Bouzarkouna Mar 2012 A1
20120060030 Lamb Mar 2012 A1
20120063354 Vanga et al. Mar 2012 A1
20120084400 Almadi et al. Apr 2012 A1
20120162423 Xiao Jun 2012 A1
20120172085 Vuppu Jul 2012 A1
20120307051 Welter Dec 2012 A1
20130035920 Al-Shammari Feb 2013 A1
20130085687 Danov et al. Apr 2013 A1
20130086650 Soundrapandian et al. Apr 2013 A1
20130088429 Yang Apr 2013 A1
20130103749 Weth et al. Apr 2013 A1
20130110411 Black et al. May 2013 A1
20130136597 Hansen et al. May 2013 A1
20130151020 Manninen et al. Jun 2013 A1
20130162405 Forster Jun 2013 A1
20130212259 Rankov et al. Aug 2013 A1
20130247117 Yamada Sep 2013 A1
20130282641 Martin et al. Oct 2013 A1
20130319687 Huh Dec 2013 A1
20140019768 Pineau et al. Jan 2014 A1
20140046863 Gifford et al. Feb 2014 A1
20140083766 Tips Mar 2014 A1
20140089671 Logue Mar 2014 A1
20140118239 Phillips May 2014 A1
20140139681 Jones, Jr. et al. May 2014 A1
20140150549 Rieger et al. Jun 2014 A1
20140156584 Motukuri et al. Jun 2014 A1
20140170025 Weiner et al. Jun 2014 A1
20140180658 Rossi Jun 2014 A1
20140230057 Berger Aug 2014 A1
20140240088 Robinette Aug 2014 A1
20140251627 Holderman Sep 2014 A1
20140254799 Husted Sep 2014 A1
20140261791 Grabau et al. Sep 2014 A1
20140280953 Brzozowski et al. Sep 2014 A1
20140310059 Ellis Oct 2014 A1
20140337086 Asenjo et al. Nov 2014 A1
20140340222 Thornton Nov 2014 A1
20140342373 Viovy et al. Nov 2014 A1
20140345876 Coon Nov 2014 A1
20150074023 Gu Mar 2015 A1
20150075800 Allen Mar 2015 A1
20150109104 Fadell Apr 2015 A1
20150116111 Foster Apr 2015 A1
20150137967 Wedig May 2015 A1
20150152035 Shin et al. Jun 2015 A1
20150168573 Zhang et al. Jun 2015 A1
20150195789 Yoon Jul 2015 A1
20150218916 Richards Aug 2015 A1
20150220321 Jung Aug 2015 A1
20150370934 Pride et al. Dec 2015 A1
20160006745 Furuichi Jan 2016 A1
20160091623 Yu et al. Mar 2016 A1
20160100437 Amstrong et al. Apr 2016 A1
20160123111 Kim May 2016 A1
20160153263 Jannise et al. Jun 2016 A1
20160178772 Carter Jun 2016 A1
20160206136 Storek Jul 2016 A1
20160234239 Knapp et al. Aug 2016 A1
20160259637 Kumar Sep 2016 A1
20160259647 Kim et al. Sep 2016 A1
20160282881 Filippov Sep 2016 A1
20160305217 Patel Oct 2016 A1
20160379211 Hoyos Dec 2016 A1
20170031840 Cawse et al. Feb 2017 A1
20170034193 Schulman et al. Feb 2017 A1
20170053224 Duca et al. Feb 2017 A1
20170061715 Busch-Sorensen Mar 2017 A1
20170114619 Conn et al. Apr 2017 A1
20170184659 Jayawardena et al. Jun 2017 A1
20170284191 Martin Oct 2017 A1
20170289812 Werb Oct 2017 A1
20170321547 Enkababian et al. Nov 2017 A1
20170353491 Gukal Dec 2017 A1
20170356780 Smith et al. Dec 2017 A1
20180092331 Zuidhof Apr 2018 A1
20180156437 Freer et al. Jun 2018 A1
20180171761 Schneider et al. Jun 2018 A1
20180188403 Halsey et al. Jul 2018 A1
20180230780 Klenner Aug 2018 A1
20190149894 Weatherhead et al. May 2019 A1
20190159322 Jayawardena et al. May 2019 A1
20190234603 Treible, Jr. et al. Aug 2019 A1
20190295207 Day Sep 2019 A1
20190318170 Rokade et al. Oct 2019 A1
20190340909 Nguyen et al. Nov 2019 A1
20200199984 Wright et al. Jun 2020 A1
20210014308 Larsson Jan 2021 A1
20210084436 Sutherland Mar 2021 A1
20220044538 Al-Yousef et al. Feb 2022 A1
20220298897 Al Sulaiman et al. Sep 2022 A1
20230287783 Al Madan Sep 2023 A1
Foreign Referenced Citations (46)
Number Date Country
2719792 Jun 2015 CA
2802988 Oct 2015 CA
2856274 Mar 2016 CA
2899222 Jan 2017 CA
102520388 Jun 2012 CN
102754105 Oct 2012 CN
203322437 Dec 2013 CN
103842615 Jun 2014 CN
105493100 Apr 2016 CN
105706089 Jun 2016 CN
0770856 Sep 2003 EP
1612741 Jan 2006 EP
1832548 Dec 2007 EP
2396273 Dec 2011 EP
2951720 Dec 2015 EP
3135858 Mar 2017 EP
3196716 Jul 2017 EP
2950993 Apr 2011 FR
1493527 Nov 1977 GB
2580470 Jul 2020 GB
H 07152789 Jun 1995 JP
2014119266 Jun 2014 JP
WO 2006059057 Jun 2006 WO
WO 2009000283 Dec 2008 WO
WO 2013044300 Apr 2013 WO
WO 2013130551 Sep 2013 WO
WO 2014144917 Sep 2014 WO
WO 2014168617 Oct 2014 WO
WO 2015016932 Feb 2015 WO
WO 2015058134 Apr 2015 WO
WO 2015167935 Nov 2015 WO
WO 2016010813 Jan 2016 WO
WO 2016073267 May 2016 WO
WO 2016097998 Jun 2016 WO
WO 2016186627 Nov 2016 WO
WO 2017040457 Mar 2017 WO
WO 2017074883 May 2017 WO
WO 2017111964 Jun 2017 WO
WO 2017151838 Sep 2017 WO
WO 2017165949 Oct 2017 WO
WO 2018045255 Mar 2018 WO
WO 2018111103 Jun 2018 WO
WO 2018132786 Jul 2018 WO
WO 2018207123 Nov 2018 WO
WO 2019099038 May 2019 WO
WO 2019211764 Nov 2019 WO
Non-Patent Literature Citations (48)
Entry
U.S. Appl. No. 17/728,184, filed Apr. 25, 2022, Al-Yousef et al.
“IsoRite Isolated Multilateral Completion Systems: For Multilateral Wells that Require Re-Entry Capability to Access the Lateral,” Halliburton, Completion Solutions, Multilateral Systems, 2018, 3 pages.
“SLIC: Selective Lateral Intervention Completion System,” Schlumberger, 2019, 2 pages.
Abdel-Basset et al., “Chemical and Mechanical Water Shut-Off in Horizontal Passive ICD Wells; Experience and Lessons Learnt in Giant Darcy Reservoir,” IPTC-20210-MS, International Petroleum Technology Conference (IPTC), presented at the International Petroleum Technology Conference, Dhahran, Saudi Arabia, Jan. 13-15, 2020, 29 pages.
Abubaker et al., “Technology Trial Review: Selective Coiled Tubing Re-Entry of Two Open Hole Multilateral Wells Using Intelligent Electromechanical Arm,” SPE-182996-MS, Society of Petroleum Engineers (SPE), presented at the Abu Dhabi International Petroleum Exhibition & Conference, Abu Dhabi, UAE, Nov. 7-10, 2016, 14 pages.
Ali et al., “Constraining Interwell Water Flood Imaging with Geology and Petrophysics: An Example from the Middle East,” Paper presented at the 2009 SPE Middle East Oil & Gas Show and Conference, Bahrain, Mar. 15-18, 2009, SPE 120558, 11 pages.
Al-Khaldy et al., “First-Ever Level 4 Multilateral Well in North Kuwait Successfully Completed, Improves Oil Production,” SPE-171792-MS, Society of Petroleum Engineers (SPE), presented at the Abu Dhabi International Petroleum Exhibition and Conference, Abu Dhabi, UAE, Nov. 10-13, 2014, 12 pages.
Alkhatib et al., “Robust Quantification of Uncertainty in Heterogeneity for Chemical EOR Processes: Applying the Multi-Level Monte Carlo Method,” Paper presented at the SPE Middle East Oil & Gas Show and Conference, Bahrain, Mar. 8-11, 2015, 21 pages.
Almadi, “Intelligent Field Infrastructure Adoption: Approach and Best Practices,” SPE 150066, Society of Petroleum Engineers (SPE), presented at the SPE intelligent Energy International Conference, Mar. 27-29, 2012, 12 pages.
Arukhe et al., “Technology Evolution in a Giant Saudi Aramco's Field Development,” WPC-21-0182, Work Petroleum Congress (WPC), presented at the 21st World Petroleum Congress, Moscow, Russia, Jun. 2014, 17 pages.
Boman, “IoT Technology to Reduce Need for Oil, Gas Workers Offshore,” Oct. 14, 2016, rigzone.com (online), retrieved from URL <https://www.rigzone.com/news/oil_gas/a/147044/iot_technology_to_reduce_need_for_oil_gas_workers_offshore/>, 5 pages.
Canaz, “Planar and Linear Feature-Based Registration of Terrestrial Laser Scans with Minimum Overlap Using Photogrammetric Data,” Masters Thesis, University of Calgary, Dec. 2012, 142 pages.
Cohen, “Reducing Business Surprises through Proactive, Real-Time Sensing and Alert Management,” EESR Workshop on End-to-End, Sense-and Respond Systems, Applications and Services, 2005, 6 pages.
Ertekin et al., “Artificial Intelligence Applications in Reservoir Engineering: A Status Check,” Energies, Jul. 2019, XP055776157, 12(15): 2897, 22 pages.
Falcone et al., “Model Predicts More Accurate PI Over a Field's Life,” Oil and Gas Journal, Pennwell Houston, Texas, vol. 99, No. 12, Mar. 19, 2001, 5 pages.
Giles, “Multilevel Monte Carlo path simulation,” Operations Research, 56(3), May-Jun. 2008, 607-617, 12 pages.
Gokce et al., “Vision-Based Detection and Distance Estimation of Micro Unmanned Aerial Vehicles,” Sensors, 2015, 15:23805-23846, 42 pages.
Hale, “Evaluating safety management and culture interventions to improve safety: Effective intervention strategies,” Safety Science, Oct. 2010, 48:8 (1026-1035), 10 pages.
Halliburton [online], “Digital Twin Implementation for Integrated Production & Reservoir Management,” iEnergy, 2018, retrieved on Sep. 27, 2019, retrieved from URL: <https://www.ienergy.community/Portals/1/IenergyDocs/Marketing/DigitalTwin_Integrated_Reservoir_Production.pdf>, 17 pages.
Huia et al., “Prediction of Safety Objective of an Enterprise using Fuzzy Neural Network,” International Symposium on Safety Science and Engineering in China, Procedia Engineering, 43: 162-167, 2012, 6 pages.
Husain et al., “Quantifying the Intelligent Field Added Values,” SPE 167439, Society of Petroleum Engineers (SPE), presented at the SPE Middle East Intelligent Energy Conference and Exhibition, Oct. 28-30, 2013, 9 pages.
Li et al., “A Comparative Study of the Probabilistic-Collocation and Experimental-Design Methods for Petroleum-Reservoir Uncertainty Quantification,” SPE Journal, vol. 16, No. 2, Jun. 2011; pp. 429-439, 11 pages.
Liang et al., “Crosswell Electromagnetic Inversion Constrained by the Fluid-Flow Simulator,” Paper presented at the SPE Annual Technical Conference and Exhibition, Florence, Italy, Sep. 19-22, 2010; 11 pages.
Marsala et al., “3D inversion practice for crosswell electromagnetic surveys in horizontal wells in Saudi Arabia,” 85th Annual International Meeting, SEG, 2015; 4 pages.
Marsala et al., “Crosswell electromagnetic induction between two widely spaced horizontal wells: Coiled-tubing conveyed data collection and 3D inversion from a carbonate reservoir in Saudi Arabia,” 85th Annual International Meeting, SEG, 2015; 4 pages.
Marsala et al., “Crosswell Electromagnetic Tomography: from Resistivity Mapping to Interwell Fluid Distribution,” Paper presented at the International Petroleum Technology Conference in Kuala Lumpur (IPTC 12229), 2008; 6 pages.
Marsala et al., “First Borehole to Surface Electromagnetic Survey in KSA: Reservoir Mapping and Monitoring at a New Scale,” Paper presented at the SPE Annual Technical Conference and Exhibition (SPE-146348), Denver, Colorado, Oct. 30-Nov. 2, 2011, 9 pages.
Marsala et al., “Fluid Distribution Inter-Well Mapping in Multiple Reservoirs by Innovative Borehole to Surface Electromagnetic: Survey Design and Field Acquisition,” Paper presented at the International Petroleum Technology Conference (IPTC-17045), Beijing, China, Mar. 26-28, 2013; 4 pages.
Memon et al., “Distributed control system for process control using intelligent agents,” WSEAS Transactions on Systems, retrieved from URL <:https://www.researchgate.net/publication/270214069_Distributed_control_system_for_process_control_using_intelligent_agents>, retrieved on May 17, 2019, available on or before Mar. 1, 2006, 10 pages.
Mohaghegh, “Reservoir simulation and modeling based on artificial intelligence and data mining (AI&DM),” Journal of Natural Gas Science and Engineering, Aug. 2011, 3(6): 697-705, XP028125623, 9 pages.
offshore-technology.com (online), “Take Control: Smart Valves Step Forward,” retrieved from URL <http://www.offshore-technology.com/features/feature2034/>, Jun. 18, 2008, 6 pages.
Petrie et al., “Chapter 1: Introduction to Laser Ranging, Profiling, and Scanning,” Topographic Laser Ranging and Scanning: Principles and Processing, 2008, 29 pages.
Petrie et al., “Chapter 3: Terrestrial Laser Scanners,” Topographic Laser Ranging and Scanning: Principles and Processing, 2009, 43 pages.
Putra et al., “Recovering Well Productivity in Banyu Urip Field,” SPE Asia Pacific Oil & Gas Conference and Exhibition, Jakarta, Indonesia, Oct. 22-24, 2013, SPE 165793, Oct. 22, 2013, 8 pages.
pyimagesearch.com [online], Rosebrock, “Find distance from camera to object/marker using Python and OpenCV,” Jan. 2015, retrieved on Oct. 21, 2020, retrieved from URL <https://www.pyimagesearch.com/2015/01/19/find-distance-camera-objectmarker-using-python-opencv/>, 109 pages.
Reneke et al., “Research Roadmap for Smart Fire Fighting NIST SP 1191,” National Institute of Standards and Technology, Jun. 2015, 1-247.
Saeed et al., “Multilateral Reentry System for Well Surveillance: Design, Implementation and Summary of 40 Jobs Performed in Fields,” SPE-199849-MS, Society of Petroleum Engineers (SPE), presented at the SPE/ICOTA Well Intervention Conference and Exhibition, The Woodlands, Texas, Mar. 24-25, 2020, 9 pages.
Saumya et al., “Saturation Forecast Using Machine Learning: Enabling Smarter Decision-Making Capabilities,” SPE-197419-MS, Society of Petroleum Engineers, Nov. 2019, XP055796992, 10 pages.
Sawyer et al., “A simulation-based spreadsheet program for history matching and forecasting shale gas production” SPE 57439, Oct. 1999, 8 pages.
Siu et al., “Re-Engineering the Well Calibration Procedure for a Large Number of High Productivity Wells,” SPE 66385, Proceedings of SPE Reservoir Simulation Symposium, Jan. 1, 2001, 14 pages.
slb.com [online], “Discovery MLT, Multilateral reentry system,” available on or before Feb. 24, 2021, retrieved from URL <https://www.slb.com/well-intervention/coiled-tubing-intervention/mechanical-intervention/discovery-mlt-multilateral-reentry-system>, 3 pages.
Storey, “Building a Maintenance Management Program for Valves,” Control Engineering, controleng.com (online), retrieved from URL <http://www.controleng.com/industry-news/single-article/building-a-maintenance-management-program-for-valves/20afd59f11c5dec4ec222cc79937e40b.html>, Apr. 17, 2014, 3 pages.
Sudakov et al., “Artificial Neural Network Surrogate Modeling of Oil Reservoir: A Case Study,” Springer International Publishing, Cham, Advances in Neural Networks—ISNN 2019, Lecture Notes in Computer Science, Jun. 2019, 11555: 232-241.
Tatang et al., “An efficient method for parametric uncertainty analysis of numerical geophysical models,” Journal of Geophysical Research, vol. 102, No. D18, Sep. 27, 1997; pp. 21,925-21,932.
Vaferi et al., “Hydrocarbon reservoir model detection from pressure transient data using coupled artificial neural network-Wavelet transform approach,” Applied Soft Computing, Elsevier, Amsterdam, NL, Jun. 2016, XP029661645, 47: 63-75, 13 pages.
Wilt et al., “Monitoring a Water Flood of Moderate Saturation Changes with Crosswell Electromagnetics (EM): A Case Study from Dom Joao Brazil,” Paper presented at the SEG Las Vegas 2012 Annual Meeting, 2012; 4 pages.
Xindi et al., “Comprehensive Review of Water Shutoff Methods for Horizontal Wells,” Petroleum Exploration and Development, Dec. 2017, 44:6 (1022-1029), 8 pages.
PCT International Search Report and Written Opinion in International Appln.. No. PCT/US2023/015931, dated May 10, 2023, 15 pages.
Related Publications (1)
Number Date Country
20230304385 A1 Sep 2023 US