Self-contained chargeable gas supply system for pneumatic store ejection utilizing a removable, replaceable and on-board rechargeable gas storage vessel

Information

  • Patent Grant
  • 7891350
  • Patent Number
    7,891,350
  • Date Filed
    Thursday, February 5, 2009
    15 years ago
  • Date Issued
    Tuesday, February 22, 2011
    13 years ago
Abstract
A gas supply system for store ejection from a vehicle comprises a receiver assembly, a compressor connected to the receiver assembly, and a gas storage vessel removably coupled to the receiver assembly, wherein the gas storage vessel is capable of receiving and storing pressurized gas from the compressor.
Description
BACKGROUND OF THE INVENTION

1. Technical Field


The present disclosure relates to a gas supply system for pneumatic store ejection, and more particularly, to a self-contained, fast acting, high flow gas supply system for pneumatic store ejection that charges and stores the gas used for store ejection, and also utilizes a replaceable gas storage vessel/bottle that can be charged offline.


2. Discussion of the Related Art


A store is, for example, a bomb, missile, rocket and the like. Pressurized gas has been used to actuate store ejector mechanisms, such as, for example, pistons and suspension and release equipment on bomb racks, to permit forceful ejection of a store while a vehicle is in motion. It is to be understood that a vehicle may be an air, sea, or land vehicle, and the present disclosure will refer to aircraft for ease of description, but is not limited thereto.


In conventional systems, aircraft may be equipped with an on-board compressor for compressing the gas used to actuate the store ejector mechanisms. However, in known systems, the compressor is not a part of a self-contained gas supply system. In addition, while an on-board compressor can recharge the gas-supply system, it is the only available means for charging or recharging the system. Recharging where the compressor is the only option may be a time consuming process, preventing quick mission turnaround.


In many tactical situations, the military wants to fly a bombing mission, return to base, quickly re-load with more bombs, and fly again. However, known gas supply systems and store ejection mechanisms, such as pneumatically powered bomb racks, prevent quick mission turn-around of tactical aircraft. For example, in conventional systems, aircraft must wait until an on-board compressor, for compressing the gas used to actuate the store ejector mechanisms, recharges a gas-supply system. Existing gas supply systems rely only on an onboard recharging system, and due to compressor size, cannot recharge the system in a short time. In addition, existing systems require manual resetting of system components, which also increases turn-around time.


Further, existing systems fail to perform equally well under varied environmental conditions, and may undesirably vary the time to release a store at, for example, different temperatures and air pressures.


Accordingly, there is need for a gas supply system that can operate to desired specifications under all environmental conditions, and a gas supply system with a self-contained compressor design that also provides for automatic resetting of system components and high flow output from replaceable, refillable and reusable gas storage vessels.


SUMMARY OF THE INVENTION

A gas supply system for store ejection from a vehicle, according to an embodiment of the present invention, comprises a receiver assembly, a compressor connected to the receiver assembly, and a gas storage vessel removably coupled to the receiver assembly, wherein the gas storage vessel is capable of receiving and storing pressurized gas from the compressor.


The receiver assembly may include a port for connecting the compressor to the receiver assembly. The gas storage vessel can receive and store pressurized gas prior to being coupled to the receiver assembly. The gas storage vessel may be substantially empty of pressurized gas prior to being coupled to the receiver assembly. The gas storage vessel may be substantially full of pressurized gas prior to being coupled to the receiver assembly. The compressor may be operable only when the gas storage vessel is coupled to the receiver assembly.


The receiver assembly may include a reservoir and the pressurized gas may be received and stored in the reservoir prior to being provided to the gas storage vessel.


The gas supply system may further comprise an outlet port, wherein the pressurized gas is supplied from the gas storage vessel to a store ejection mechanism via the outlet port.


A method for store ejection from a vehicle, in accordance with an embodiment of the present invention, comprises connecting a compressor to a receiver assembly, removably coupling a gas storage vessel to the receiver assembly, and flowing pressurized gas from the compressor to the gas storage vessel.


The method may further comprise storing pressurized gas in the gas storage vessel prior to coupling the gas storage vessel to the receiver assembly and operating the compressor only after coupling the gas storage vessel to the receiver assembly.


The receiver assembly may include a reservoir and the method may further comprise receiving and storing the pressurized gas in the reservoir prior to providing the pressurized gas to the gas storage vessel.


The method may further comprise supplying the pressurized gas from the gas storage vessel to a store ejection mechanism.





BRIEF DESCRIPTION OF THE DRAWINGS

Exemplary embodiments of the present invention will be described below in more detail, with reference to the accompanying drawings, of which:



FIG. 1 is a perspective view of a gas supply system including a gas storage vessel and a receiver assembly, according to an embodiment of the present invention;



FIG. 2 is a front view of the gas supply system, according to an embodiment of the present invention;



FIG. 3 is a right-side view of the gas supply system, according to an embodiment of the present invention;



FIG. 4 is a left side view of the gas supply system, according to an embodiment of the present invention;



FIG. 5 is a left-side view of the gas supply system with an access panel removed to show a shaft and bell-crank, according to an embodiment of the present invention;



FIG. 6 is a left-side view of the gas supply system with a receiver assembly housing removed to show a sequencing valve, according to an embodiment of the present invention;



FIG. 7 is a top view of the gas supply system, according to an embodiment of the present invention;



FIG. 8 is a top view of the gas supply system with an access panel removed to show a switch actuator rod, according to an embodiment of the present invention;



FIG. 9 is a bottom view of the gas supply system, according to an embodiment of the present invention;



FIG. 10 is a rear view of the gas supply system, according to an embodiment of the present invention;



FIG. 11 is a perspective sectional view of the gas supply system prior to actuation, according to an embodiment of the present invention;



FIG. 12 is a right side sectional view of the gas supply system prior to actuation, according to an embodiment of the present invention;



FIG. 13 is a perspective sectional view of the gas supply system prior to actuation and showing a sequencing valve, according to an embodiment of the present invention



FIG. 14 is a right side sectional view of the gas supply system prior to actuation and showing a sequencing valve, according to an embodiment of the present invention;



FIG. 15 is a right side sectional view of the gas supply system after actuation, with an open main valve, according to an embodiment of the present invention;



FIG. 16 is a right side sectional view of the gas supply system after actuation, with an open main valve, and showing a sequencing valve, according to an embodiment of the present invention;



FIG. 17 is a right side sectional view of the gas supply system after actuation, with an open main valve, and showing a sequencing valve, according to an embodiment of the present invention;



FIG. 18 is a right side sectional view of the gas supply system after actuation, with a closed main valve, and showing a sequencing valve, according to an embodiment of the present invention;



FIG. 19 is a right side sectional view of the gas supply system illustrating seals, according to an embodiment of the present invention;



FIG. 20 is a right side sectional view of the gas supply system illustrating a plunger retraction mechanism, according to an embodiment of the present invention; and



FIG. 21 is a block diagram of a gas supply system, according to an embodiment of the present invention.





DETAILED DESCRIPTION OF EXEMPLARY EMBODIMENTS

Exemplary embodiments of the present invention now will be described more fully hereinafter with reference to the accompanying drawings. This invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein.


Turning now to FIGS. 1-21, a gas supply system 10 is shown. The gas supply system includes a gas storage vessel (GSV) 101, and a receiver assembly 200. The GSV 101 is replaceable and is configured to screw into the receiver assembly via, for example, an MS port thread. A detent mechanism may be employed to prevent the GSV 101 from loosening from the receiver assembly 200. The GSV 101 is a replaceable bottle that can be pressurized (charged) offline, for example, on another aircraft, at a land based recharging station, or at a ship based recharging station. Accordingly, a pressurized GSV 101 can be mounted to the receiver assembly 200 and used to supply pressurized gas to a store ejection mechanism. The pressurized GSV 101 can be quickly mounted to the receiver assembly 200 to allow for quick mission turnaround.


The GSV 101 can be made of, for example, stainless steel, and may include a pressure gauge. The pressure gauge may include a built in overpressure venting system (not shown) that will prevent explosive bottle failure in case of fire or other causes of dangerously excessive pressure. The venting system may include, for example, a relief valve.


The receiver assembly includes a housing 201, which includes access panels/covers 204. In some of the views, for example, FIGS. 5, 6, and 8, the access panels/covers 204 and/or the housing 201 have been removed to illustrate some of the inner components of the receiver assembly 200.


All receiver assembly components are housed in the housing 201 and protected from environmental contamination by the access covers 204. The receiver assembly 200 provides pneumatic and electrical connections to the aircraft. For example, the electrical connections receive operating power from, provide gas supply system status to, and receive the launch command(s) from, the aircraft weapons control system. A compressor port 218 connects to the output of a compressor 288 contained within the system 10 to optionally perform a recharging operation of the GSV 101. The port 218 may be connected to an internal check valve in the GSV 101. The pneumatic outlet port 216 connects to the pneumatic inlet on the bomb rack or other store supporter, so that the pressurized gas may operate the store ejection mechanisms of the bomb rack.


The compressor 288 may be used to charge a depleted GSV 101 connected to the receiver assembly 200 with pressurized gas. The pressurized gas is output to a bomb rack or other store supporter, via a pneumatic outlet port 216. Pressurized gas generated by the compressor 288 flows to the GSV 101 and is stored therein. As an alternative, the compressor 288 can provide the pressurized gas to a reservoir connected to the compressor 288 for a first level of storage, and then the pressurized gas can be provided to the GSV 101 from the reservoir. According to an embodiment, the compressor 288, when there is a reservoir, may operate whether or not the GSV is mounted to the receiver assembly 200. Alternatively, when there is not a reservoir, the compressor 288 will not operate unless the GSV 101 is connected to the receiver assembly 200.


The interface between the receiver assembly and the GSV 101 assemblies provides connection for individual, isolated passages between the GSV 101 and the receiver assembly 200. A first passage connects, when actuated, the gas stored in the GSV 101 to the receiver assembly 200 and ultimately, the outlet port 216. A second passage connects the control chamber 110 in the GSV 101 to a sequencing valve 220 (discussed below). A third passage connects the compressor port 218 to a GSV inlet check valve.


When installing a GSV 101 to the receiver assembly 200, or in a normal pre-flight check of the system, a pressure gauge on the GSV 101 is checked to insure that the GSV 101 has the specified pressure to operate the bomb rack. If not yet installed, the GSV 101 is screwed into the receiver assembly mounting thread until it is fully seated (e.g., hand tight). A protruding pin may be positioned on the back of the receiver assembly 200, allowing a visual and/or tactile status check without powering up the aircraft. For example, if a valve actuating system of the receiver assembly is properly armed, the pin protrudes from the housing 201 of the receiver assembly. Conversely, if the valve actuating system of the receiver assembly is not properly armed, the pin will not protrude, signaling that the GSV 101 may have been depleted. The receiver assembly 200 can be re-armed manually and the GSV 101 can be replaced or re-charged.


Gas is stored in the GSV 101, and is released upon actuation of a gas release pilot poppet 102 and a main poppet 104. Low leakage seals 103, 105 and 108 allow long term storage of gas in the charged vessel 101. For example, the GSV 101 may have a 10 year storage life without significant loss of gas pressure. The pilot poppet 102 includes the seal 103 and a back-up ring (not visible in the drawings) positioned in O-ring groove 103g, and the main poppet 104 includes seal 105 and a back-up ring 105b positioned in O-ring groove 105g. The seals and back-up rings, which are made of, for example, rubber, provide a very low leakage seal and plug an orifice in the main valve poppet 104. Since the seals 103 and 105 are pushed into the pressure source and held in the O-ring grooves by the pressurized gas leaving the GSV 101, the seals 103 and 105 are able to perform a dual function of sealing the GSV 101, while also acting as a poppet seats.


Seal 108 is low leakage poppet style check valve seal. Like the seals 103 and 105, the seal 108 is pushed into a pressure source (e.g., pressurized gas coming from a compressor) and held in an O-ring groove by the pressurized gas leaving the pressure source. Like the seals 103 and 105, the seal 108 is able to perform a dual function of sealing, and also acting as a poppet seat. The check valve poppet seal 108 is formed in a conduit 237, which leads to a passage 238 that connects to compressor port 218.


Referring, for example, to FIGS. 11-14, prior to actuation, a plunger 214, which is biased by a spring 217, is held in place by a trigger sear linkage 211. At this point, a pilot valve poppet 102 and a main valve poppet 104 are closed so that no gas is released from the GSV 101.


A command, for example, a bomb drop command from inside the aircraft, is relayed to a solenoid 210, which actuates the trigger sear linkage 211 to release the spring loaded plunger 214. The plunger 214 is held in the retracted position by a trigger linkage 212 that is in turn held in position by a sear linkage and a sear pin that is moveable along its axis. The sear pin is attached to the triggering solenoid 210, but is held in the extended position by a solenoid return spring. This trigger sear linkage 211 holds the plunger 214 retracted until the solenoid 210 is energized.


Upon the launch command, the solenoid 210 is energized, the sear pin retracts, compressing the solenoid return spring, allowing the sear linkage to fold and the plunger 214 to extend, contacting the pilot poppet 102, compressing the pilot poppet return spring 107, and forcing the GSV main poppet 104 forward into the storage vessel 101.


A switch actuator rod 240 is connected to the top of the sear link. The switch actuator rod 240 is part of the electrical control and monitoring system and actuates an electrical switch at each end of the plunger movement. As the plunger 214 begins its extension, the now rotating sear link pushes the switch actuator rod 240, activating a first switch, which energizes a small relay, which in turn removes electrical power from the triggering solenoid 210. The solenoid 210, now de-energized allows the solenoid return spring to extend the sear pin to the side of the sear linkage. Since the sear has already been released, the sear pin simply rests against the side of the sear linkage until the sear linkage and plunger retract.


The spring loaded plunger 214 presses pilot valve 102 inward toward the stored gas pressure, releasing a small amount of high pressure gas into chamber A, which is a closed cavity. The increased pressure in chamber A, which is positioned behind the main valve poppet 104, then acts on the main poppet 104 to push the main poppet 104 inward into the GSV 101 toward the pressure. As a result, the main valve opens, and pressurized gas is released to discharge port 216. From discharge port/outlet fitting 216, the gas travels to the store ejection mechanism to release the store.


Standard O-ring seals 103 & 105 can be used for low leakage valve design. Because the main valve poppet 104 is pushed into the pressure stream from the GSV 101, the O-rings are not forced off, and instead, are held in place by the pressurized gas. In other words, by pushing the poppets 102 and 104 into the pressure source 101, the soft rubber seals 103 and 105 are not stripped from the poppets by the pressure. Use of a soft rubber seal 103/105 allows very low leakage rates, which provides very long storage life, while still allowing quick release of the gas.


According to an embodiment, the main valve poppet 104 has three sets of very low leakage seals with back-up rings, made from, for example, rubber. The main poppet 104 plugs, with a first set of seals 105 and back-up rings 105b, a much larger orifice relative to the pilot valve port directly in the storage vessel 101. A second set of seals 130 and back-up rings 130b with the same diameter as the first set prevents leakage of released gas to the control chamber 110 of the main poppet 104. On the other end of the main valve poppet 104 are a piston and the third set of seals 140 and back-up rings 140b that is about 25% larger in diameter than the first two sets. The main and pilot poppet assembly is retained against vessel pressure by a nut.


The main valve poppet 104 has a stepped diameter. A smaller diameter end SD seals the GSV 101 and a larger diameter end LD seals against chamber A. According to an embodiment, the larger end is about 25% than the end where the seals 105 are located. However, it is to be understood that the ratio of the larger diameter end LD to the smaller diameter end SD may vary depending on different applications, so long as the difference in size in large enough to overcome seal friction and spring force, and push the poppet into the gas source.


More specifically, the gas released by the pilot valve 102 gathers in chamber A and is trapped against this larger diameter of the main valve poppet 104. The larger area due to the larger diameter overcomes the force of the stored gas and the main poppet spring, which can also be used to bias the poppet 104 closed, and forces the poppet 104 inward into the GSV 101. The difference in diameter causes the poppet 104 to move very quickly. For example, approximately 20 milliseconds (ms) or less than 20 ms elapse from actuation of plunger 214 to the high volume release of the stored gas into the outlet fitting 216. The 20 ms period is fast enough so that any increase in the time to more than 20 ms, from plunger actuation to release of stored gas due to environmental conditions, is inconsequential to the overall performance of the system and resulting store ejection.


With the pilot poppet 102 depressed by the plunger 214, high pressure gas starts escaping from the GSV 101 and into chamber A. Gas pressure quickly rises in chamber A and begins acting upon the large diameter end LD of the main valve poppet 104. Since there is a large difference in the area of the large diameter end (piston end) of the main valve poppet 104 versus the end SD plugging the outlet of the GSV 101, the main poppet 104 is forced into the vessel 101, compressing the main valve spring 109, and opening the main valve piston ports to the stored gas. As the main poppet 104 begins to open, the main poppet seal 105 moves off the mating surface of the GSV 101. High pressure gas from the GSV 101 travels down connecting ports in the main poppet 104, opening an accelerator check valve, and instantaneously filling a cavity connected to discharge port 216. At this point, the main poppet 104 quickly travels inward into the GSV 101 to its stop, and less than 20 ms or about 20 ms have elapsed.


The larger diameter end LD of main valve poppet 104 is also sealed against the control chamber 110.


Referring to FIG. 15, after actuation, the plunger 214 retracts, and includes a mechanism that uses a small portion of the released gas to re-cock the plunger 214 and reset the trigger sear release linkage 211 for the next release. More specifically, after actuation, the plunger 214 follows the pilot poppet 102 and main poppet 104 as they retract into the GSV 101. A small amount of high pressure gas from the rapidly pressurizing cavity connected to the discharge port is directed to a small conduit 264 down the center of the plunger 214. Referring to FIG. 20, pressurized gas enters a stepped diameter piston/reversing valve interface 270, from the back of the plunger 214, which has an area approximately equal to the frontal area of the plunger 214. More specifically, the gas enters into area 271 of the piston 270 through ports 265, and then into area 272 through ports 275. The area 272 is approximately equal to the frontal area of the plunger 214. The differential area of the piston 270 generates a force (i.e., the force from the gas in area 272) that opposes the force from the gas pressure in the cavity and prevents the gas pressure from prematurely forcing the plunger 214 to the retracted position. As the plunger 214 reaches the end of its travel (the main valve poppet 104 almost fully retracted), piston face 273 on the back of the plunger 214 strikes a stationary surface 274 within the receiver assembly and opens pressure to the other side of the opposing piston 270. When the piston face 273 strikes the surface 274, the momentum of the plunger 214 and spring 277 opens a reversing valve. As a result, gas quickly builds pressure in a reversing volume 278. This pressure reverses and multiplies the force on the plunger 214 and quickly retracts the plunger 214. Since the sear pin was previously extended, the sear linkage is once again in a position to restrain the plunger 214 after the launch sequence is completed and gas pressure in the cavity returns to pre-launch atmospheric pressure.


As a result, the plunger 214 can be automatically re-cocked by using the gas in the system, thereby eliminating the need to manually re-cock the plunger. Since the gas used to re-cock the plunger 214 is not available after the launching cycle is completer, automatic re-cocking occurs during the launch cycle. Accordingly, the system must compensate for the plunger retracting during the gas release cycle. In other words, there must be a mechanism in place to keep the main poppet 104 open after the plunger 214 is retracted and re-cocked.


A sequencing valve 220 is used to keep the main poppet 104 in the open position after the plunger 214 is retracted and re-cocked. More specifically, a shaft 219 attached to the sear linkage connects to a bell-crank 223 set behind an access panel 204 on the side of the receiver housing 201. As the linkage follows the plunger 214 forward, the shaft 219 and bell-crank 223 rotate, moving a sequencing valve rod 221, and compressing a light spring 227.


For example, referring to FIG. 14, in the pre-actuation position, the sequencing valve rod 221 is in the extended positioned (to the left in the drawing). A sliding valve shroud 229 covers the connecting port 115 to the control chamber 110. At this point, the pilot and main poppets 102, 104 are closed, and the gas in the discharge port 216 is at atmospheric pressure.


Referring to FIG. 16, after actuation, as the sequencing valve rod 221 moves (to the right in the drawing) due to movement of the shaft 219 and rotation of the bell-crank 223, the sliding valve shroud 229 also moves (to the right in the drawing), thereby creating a pathway from port 117 to atmosphere to connecting port 115, so as to connect/vent the main valve control chamber 110 to outside atmosphere.


Pressure (i.e., GSV gas pressure) builds in a trapped volume area 116 to further retract shroud 229 (to the right in the drawing). The pressure to the right of the shroud 229 at area 118 remains at atmosphere. At this point, a pressure differential is created on the main valve poppet 104, whereby the pressure is at atmospheric pressure on one side of the main valve poppet due to the vent to atmosphere, and at gas pressure from the GSV 101 on the other side of the main valve poppet. The pressure differential is in place prior to the retraction of the plunger 214 so that the main valve remains open after the plunger 214 retracts. Once the plunger 214 retracts, the shroud 229 remains open due to the trapped volume in area 116 having high pressure, while pressure on the other side of the shroud 229, at area 118, remains at atmosphere.


As gas pressure is rapidly increasing in the discharge port 216, a port directs a small amount of gas from the discharge port 216 to an opening in the sequencing valve rod 221 aligned with the discharge port 216, and down the rod to the small trapped volume 116 which acts on a piston attached between the sequencing valve rod 221 and the sliding valve shroud 229. This gas retracts the shroud 229 even further, insuring that the GSV main valve control chamber 110 remains at atmospheric pressure during the remainder of the gas delivery event, even though the plunger 214 may have retracted.


Referring to FIG. 17, the plunger 214 has retracted, and gas continues to flow out of GSV 101 through discharge port 216 until the operation of the store ejection mechanism is complete, and then the flow drops to near zero. Although the sequence valve rod 221 extends (back to the left in the drawing) as the plunger 214, retracts, the trapped volume at area 116 keeps the sliding shroud 229 retracted enough to continue to vent the control chamber 110 to atmosphere, thereby keeping the main valve open. At this point, pressurized gas from the system leaks into chamber 119 (to the right of the shroud 229 in the drawing), at least in part due to holes 222 in the sequencing valve rod 221. It is to be understood that in some cases, the control chamber 110 may continue to be vented until well after the launch sequence is completed.


Referring to FIG. 18, due to the pressure increase in chamber 119, bleeding of the trapped volume to atmosphere, and the biased force of shroud spring 230, the shroud 229 is pushed back (to the left in the drawing), thereby blocking the vent to the atmosphere. As a result, the control chamber 110 is re-connected to the discharge port pressure, and pressure in the control chamber increases to above atmosphere to equalize pressure on both sides of the main valve poppet 104 so that the main valve spring 109 can close the main valve. The time for the main poppet 104 to return to its original position and close the main valve can be set so that full drain of gas from the GSV 101 is prevented so that the GSV 101 may be re-used for another bomb drop. Remaining gas in the GSV 101 is saved as pressure downstream of the discharge port 216 bleeds away.


When the shroud 229 shifts, the control chamber 110 is closed to atmospheric pressure by blocking port 115, and then switched to outlet port pressure. With outlet port pressure on both sides of the large piston on the GSV main poppet 104, the poppet 104 closes from the retracted position. This prevents the GSV 101 from losing anymore of the stored gas in the vessel 101. System pressure outside of the bottle 101 now begins to leak out of the system, eventually returning to atmospheric pressure.


A block diagram of the gas supply system 10 is shown in FIG. 21. The gas supply system includes the compressor 288 contained therein to, when necessary, charge the gas supply system 10 with pressurized gas. The compressor 288 is connected to the GSV 101 via the compressor port 218 to supply pressurized gas to the GSV 101. Valves, for example, check valves, can be used to control flow of pressurized gas from the compressor 288 into the GSV 101. The GSV 101 is ultimately connected to the pneumatic outlet port 216, through which pressurized gas is ultimately supplied to the store ejection mechanism. Gas release valves as described above are used to control the release of pressurized gas from the GSV 101 to the outlet port 216. Accordingly, the gas supply system 10 may use pressurized gas generated by the compressor 288 and supplied to the GSV 101, or from a GSV that has been charged offline.


Although exemplary embodiments of the present invention have been described hereinabove, it should be understood that the present invention is not limited to these embodiments, but may be modified by those skilled in the art without departing from the spirit and scope of the present invention, as defined in the appended claims.

Claims
  • 1. A gas supply system for store ejection from a vehicle, comprising: a receiver assembly;a compressor connected to the receiver assembly;a gas storage vessel removably coupled to the receiver assembly, wherein: the gas storage vessel is capable of receiving and storing pressurized gas from the compressor;a poppet located in the receiver assembly and including a ring seal at an end of the poppet sealing a mouth of the coupled gas storage vessel between the gas storage vessel and the receiver assembly; anda pilot poppet positioned in the poppet located in the receiver assembly.
  • 2. The gas supply system of claim 1, wherein the receiver assembly includes a port for connecting the compressor to the receiver assembly.
  • 3. The gas supply system of claim 1, wherein the gas storage vessel receives and stores pressurized gas prior to being coupled to the receiver assembly.
  • 4. The gas supply system of claim 1, wherein the gas storage vessel is substantially empty of pressurized gas prior to being coupled to the receiver assembly.
  • 5. The gas supply system of claim 1, wherein the gas storage vessel is substantially full of pressurized gas prior to being coupled to the receiver assembly.
  • 6. The gas supply system of claim 1, wherein the compressor is operable only when the gas storage vessel is coupled to the receiver assembly.
  • 7. The gas supply system of claim 1, wherein the receiver assembly includes a reservoir and the pressurized gas is received and stored in the reservoir prior to being provided to the gas storage vessel.
  • 8. The gas supply system of claim 1, further comprising an outlet port, wherein the pressurized gas is supplied from the gas storage vessel to a store ejection mechanism via the outlet port.
  • 9. The gas supply system of claim 1, further comprising a poppet seal located between the compressor and the gas storage vessel, wherein the pressurized gas from the compressor is provided to the gas storage vessel when the poppet seal is opened by pushing the poppet seal into a flow of the pressurized gas from the compressor.
  • 10. A method for store ejection from a vehicle, comprising: connecting a compressor to a receiver assembly;removably coupling a gas storage vessel to the receiver assembly;flowing pressurized gas from the compressor to the gas storage vessel; andsealing a mouth of the coupled gas storage vessel between the gas storage vessel and the receiver assembly with a ring seal at an end of a poppet located in the receiver assembly, wherein a pilotpoppet is positioned in the poppet located in the receiver assembly.
  • 11. The method of claim 10, wherein the receiver assembly includes a port for connecting the compressor to the receiver assembly.
  • 12. The method of claim 10, further comprising storing pressurized gas in the gas storage vessel prior to coupling the gas storage vessel to the receiver assembly.
  • 13. The method of claim 12, wherein the gas storage vessel is substantially full of the pressurized gas prior to being coupled to the receiver assembly.
  • 14. The method of claim 10, wherein the gas storage vessel is substantially empty of pressurized gas prior to being coupled to the receiver assembly.
  • 15. The method of claim 10, further comprising operating the compressor only after coupling the gas storage vessel to the receiver assembly.
  • 16. The method of claim 10, wherein the receiver assembly includes a reservoir and the method further comprises receiving and storing the pressurized gas in the reservoir prior to providing the pressurized gas to the gas storage vessel.
  • 17. The method of claim 10, further comprising supplying the pressurized gas from the gas storage vessel to a store ejection mechanism.
  • 18. The method of claim 10, further comprising pushing a poppet seal located between the compressor and the gas storage vessel into a flow of the pressurized gas from the compressor to open the poppet seal and provide the pressurized gas from the compressor to the gas storage vessel.
  • 19. A gas supply system for store ejection from a vehicle, comprising: a receiver assembly;a compressor connected to the receiver assembly;a gas storage vessel removably coupled to the receiver assembly, wherein: the gas storage vessel is capable of receiving and storing pressurized gas from the compressor; anda poppet located in the receiver assembly and including a ring seal at an end of the poppet sealing a mouth of the coupled gas storage vessel between the gas storage vessel and the receiver assembly, wherein the receiver assembly includes a reservoir and the pressurized gas is received and stored in the reservoir prior to being provided to the gas storage vessel.
  • 20. A method for store ejection from a vehicle, comprising: connecting a compressor to a receiver assembly;removably coupling a gas storage vessel to the receiver assembly;flowing pressurized gas from the compressor to the gas storage vessel;sealing a mouth of the coupled gas storage vessel between the gas storage vessel and the receiver assembly with a ring seal at an end of a poppet located in the receiver assembly; andstoring pressurized gas in the gas storage vessel prior to coupling the gas storage vessel to the receiver assembly.
  • 21. A method for store ejection from a vehicle, comprising: connecting a compressor to a receiver assembly;removably coupling a gas storage vessel to the receiver assembly;flowing pressurized gas from the compressor to the gas storage vessel;sealing a mouth of the coupled gas storage vessel between the gas storage vessel and the receiver assembly with a ring seal at an end of a poppet located in the receiver assembly, wherein the receiver assembly includes a reservoir; andreceiving and storing the pressurized gas in the reservoir prior to providing the pressurized gas to the gas storage vessel.
CROSS-REFERENCES TO RELATED APPLICATIONS

This application claims the benefit of U.S. Provisional Patent Application Ser. No. 61/028,436, filed on Feb. 13, 2008, the contents of which are herein incorporated by reference in their entirety. This application is a Continuation-In-Part of U.S. patent application Ser. No. 11/951,637, filed on Dec. 6, 2007, the disclosure of which is herein incorporated by reference in its entirety.

US Referenced Citations (18)
Number Name Date Kind
3319791 Horne May 1967 A
3731905 Piet May 1973 A
3903914 Topham-Clements Sep 1975 A
4173986 Martin Nov 1979 A
4257639 Stock Mar 1981 A
4408722 Frelund Oct 1983 A
4763690 Martin Aug 1988 A
4850392 Crump et al. Jul 1989 A
5628349 Diggins et al. May 1997 A
5687952 Arnold et al. Nov 1997 A
6619325 Gray, Jr. Sep 2003 B2
6745992 Yang et al. Jun 2004 B2
6761333 Foster et al. Jul 2004 B2
6796530 Jakubowski, Jr. et al. Sep 2004 B2
6811123 Foster et al. Nov 2004 B1
6869060 Barber et al. Mar 2005 B2
7270140 Aderholt et al. Sep 2007 B2
20040000343 Turan, Jr. Jan 2004 A1
Foreign Referenced Citations (1)
Number Date Country
112112 Dec 1917 GB
Related Publications (1)
Number Date Country
20090314380 A1 Dec 2009 US
Provisional Applications (1)
Number Date Country
61028436 Feb 2008 US
Continuation in Parts (1)
Number Date Country
Parent 11951637 Dec 2007 US
Child 12366373 US