When a concrete floor slab intersects a vertical concrete wall in most cases reinforcing steel will stick out of the vertical wall. This steel will later be poured into the intersecting concrete slab. This is done to ensure a good joint and no movement between the vertical wall and the concrete floor. However, this reinforcing steel creates an obstruction to direct vertical movement of the concrete formwork for the next course of the vertical wall.
Previously, either the floor and the wall were poured together, forcing the progress of the vertical walls to be dependent on the progress of the floor slabs, or an expensive reinforcing dowel bar substitute would be placed in the area where the reinforcing was to intersect the concrete slab. These methods are labor intensive and the dowel bar substitute itself is expensive.
The present inventor has recognized that the formwork for the vertical wall must allow for the penetration of the reinforcing steel or rebar and be able to be moved back quickly and easily for multiple reuses. The form must be able to clear the protruding reinforcing steel to be raised to pour a next course.
The present inventor has recognized that scaffold that is part of the self-rising system must allow for the protruding reinforcing steel to pass as the concrete formwork is lifted.
The present inventor has recognized that scaffold access must still be maintained in order to work on the form during the construction sequence.
The present inventor has recognized that a need exists to allow the vertical concrete wall course to be poured and allow protruding rebar for a floor to be poured but still allow the concrete form to be easily stripped and lifted with the current self-lifting forms systems in the market place.
The exemplary embodiment apparatus of the invention includes two forming walls that are positioned at a distance from each other to define a thickness of a vertical structure, such as a wall, to be filled or poured with concrete. At least one of the walls is supported by a frame such that the wall can be translated toward or away from the respective other wall. The apparatus can include a frame wherein the two forming walls are hung from the frame and one of the walls is hung with a rolling connection to be translated toward or away from the respective other wall. The frame can be provided with motive means for raising the forming walls to pour a course or level on top of a previously poured concrete course. The apparatus allows for the pouring of a course having horizontally extending rebar to tie in a floor slab to that course and for the vertical raising of the apparatus to pour a next course on the previously poured course without interference of the apparatus with the extending rebar. To this end, one of the walls that is adjacent to the extending rebar is movable horizontally away from the respective other wall by a distance sufficient to clear the extending rebar.
A workers platform is retractable or foldable to also clear the extending rebar. A forming strip is positioned onto the moving wall to form around the extending rebar and forms part of the forming surface of the movable wall.
When the movable wall is moved away from the respective other wall after the poured concrete between the walls has sufficiently set or cured, the forming strip detaches from the movable wall and is thereafter stripped off of the cured concrete wall and from around the extending rebar.
Numerous other advantages and features of the present invention will become readily apparent from the following detailed description of the invention and the embodiments thereof, and from the accompanying drawings.
While this invention is susceptible of embodiment in many different forms, there are shown in the drawings, and will be described herein in detail, specific embodiments thereof with the understanding that the present disclosure is to be considered as an exemplification of the principles of the invention and is not intended to limit the invention to the specific embodiments illustrated.
This application incorporates by reference U.S. Pat. No. 9,611,663 for “Self-Lifting Concrete Form Adapted To Accommodate Horizontal Reinforcing Steel” and U.S. Pat. No. 8,020,271 for “Self-Raising Form Control System and Method.”
The system includes a frame 26 that has beams 27 supported by a plurality of hydraulic jacks 32. The platform 26 includes an upper platform deck 28 and appropriate railings. A cover 30 can be lifted or pivoted giving access through the platform deck 28 to the work below.
A first forming wall 42 is fixedly hung from the beams 27 at a connection 52. A second forming wall 48 is hung from the beams 27 using a rolling connection 56. The rolling connection includes wheels that roll along a bottom flange 27a of the beam 27. The second wall 48 can be rolled toward and away from the first wall 42. A work platform assembly or scaffold 64 is hung from the frame 26. The scaffold includes at least one vertical members 66 that supports a horizontal support frame 70. A platform 76 is supported on the support frame 70. The vertical member 66 is supported on the beam 27 and includes a rolling connection 80. The rolling connection 80 includes wheels to roll along the bottom flange 27a of the beam 27.
The jacks 32 are supported by brackets 86 that are fastened to a previously poured course or level or vertical section 88.
The state or position of the apparatus 20 in
The second wall 48 has been rolled via the connection 56 toward the first wall 42 until the distance between the walls 42, 48 corresponds to the desired thickness of the course 106. The course 106 has been poured with a top keyway 106b formed by an elongated form block. Typically, rebar (not shown) would extend up through the top of the course 106 to tie the course 106 with the next course to be poured on top of the course 106.
In order to accommodate the rebar 112 extending out of the side of the volume 106a between the walls 42, 48, a forming strip 114 (shown schematically) forms part of the wall 48. The forming strip 114 can be plywood, a wood plank, expanded metal or some other material. The forming strip 114 is provided with holes for passing the horizontal legs of the rebar 112 therethrough.
The forming strip 114 will most likely be somewhat bound to the rebar 112 after the poured concrete sets and it is anticipated that a new forming strip 114a will be needed for each new course and the previous forming strip 114 will need to be stripped from the rebar 112 and the previous course, before a floor slab is poured around the rebar 112.
The rolling connection 80 is driven by a cable 90 fixed to the rolling connection 80. The cable is moved to the right from a box 91, to a box 92 by an electrically driven winding arrangement. The cable shown can be part of an endless loop that is circulated by a sprocket or pulley, driven in rotation by a motor in a forward or reverse direction of circulation depending on which direction the scaffold 64 is to be moved.
The cable 90 can be replaced by a chain drive or a screw drive or a hydraulic cylinder or any other known means of translation movement. A button operated switch 93 controls movement of the cable 90.
At a time after, before, or simultaneously with the movement of the scaffold 64, the wall 48 is moved to the right by the wheels of the rolling connection 56, rolling on the flange 27a. The wall 48 is moved to the right a sufficient distance to clear the horizontal rebar protruding from the course 106 after the concrete has sufficiently cured.
After both the wall 48 and the scaffold 64 have moved to the right (as shown in
Although
A typical construction sequence can be:
self-lifting concrete form is erected;
the scaffold 64 is moved into operating position (see position in
the movable forming wall 48 is spaced from the stationary wall 42 (see position in
a replaceable forming strip 114 is installed in the moving forming wall 48;
reinforcing steel 112 is installed protruding through the replaceable strip 114;
the moving wall 48 is moved toward the wall 42;
concrete is poured between the walls 42, 48;
after the concrete is sufficiently set, the forms are moved, stripped or retracted;
the moving wall 48 is moved back, leaving the protruding reinforcing steel 112 and the replaceable forming strip 114 in place;
the scaffold 64 is retracted in order to clear the protruding reinforcing steel 112;
operating personnel can stand on the platform 76 while this step is performed;
once the protruding reinforcing steel 112 is clear of the moving forming wall 48 and the platform 76, the self-lifting form is operated and lifted to the next course;
once at the next course, the self-lifting concrete form is anchored and aligned for the next pour;
another replaceable strip 114a is put in place in the moving forming wall 48 and the sequence is repeated; and
prior to pouring the concrete floor slab 113, the replaceable strip 114 that was previously poured against, is removed from the protruding reinforcing steel 112.
The system includes a frame 126 that has beams 127 supported by a plurality of hydraulic jacks 32. The first forming wall 42 is fixedly hung from the beams 127 at the connection 52. The second forming wall 48 is hung from the beams 127 using the rolling connection 56 having wheels which roll on the lower flange 127a of the beams 127. The second wall 48 can be rolled toward and away from the first wall 42.
A work platform assembly or scaffold 164 is hung from the frame 126. The scaffold 164 includes a first vertical member 166 fixed to the beam 127 by a fixed connection 167. A second vertical member 170 is supported by the beam 127 by a hydraulic or pneumatic cylinder 172. The hydraulic or pneumatic cylinder 172 has a cylinder body 174 connected to a top end portion 170a of the second vertical member 170 that is above the beam 127, and an extendable rod 176 is pivotally connected to the beam 127 by a pivotal connection 182. The second vertical member is substantially free to raise and lower or pivot, being only constrained by the connection to the hydraulic or pneumatic cylinder 172, and by a connection at its lower end, described below. The hydraulic or pneumatic cylinder 172 can lengthen and pivot, and which alone supports the second vertical member 170 at the top end portion thereof.
The first vertical member 166 is pivotally connected at its lower end by a pivotal connection 190 to a support frame 192. The second vertical member 170 is connected at its lower end to the support frame 192 by a pivotal connection 196. A platform or deck 200 is connected to and supported by the frame 192.
The state or position of the apparatus 120 in
The second wall 48 has been rolled via the connection 56 toward the first wall 42 until the distance between the walls 42, 48 corresponds to the desired thickness of the course 106. The course 106 has been poured with a top keyway 106b formed by an elongated form block. Typically, rebar (not shown) would extend up through the top of the course 106 to tie the course 106 with the next course to be poured on top of the course 106.
The platform 200 is in position beneath the rebar 112 and the wall 48 at a short distance below the wall 48 to allow workers to place and manipulate rebar within the volume 106a.
In order to accommodate the rebar 112 extending out of the side of the volume 106a between the walls 42, 48, a forming strip 114 (shown schematically) forms part of the wall 48. The forming strip 114 can be plywood, a wood plank, expanded metal or some other material. The forming strip 114 is provided with holes for passing the horizontal legs of the rebar 112 therethrough.
The forming strip 114 will most likely be somewhat bound to the rebar 112 and the concrete after the concrete cures and it is anticipated that a new forming strip 114a will be needed for each new course and the previous forming strip 114 will need to be stripped from the rebar 112 and the previous course before a floor slab 113 is poured around the rebar 112.
At the appropriate time thereafter, the floor 113 can be poured with concrete, surrounding and incorporating the extending horizontal rebar 112.
Because of geometry, the vertical member 170 moves upward and also pivots slightly about the pivotal connection 182 as the cylinder 172 is extended in length under hydraulic or pneumatic pressure.
Although
A typical construction sequence can be:
self-lifting concrete form system 120 is erected;
the platform 200 is in operating position (see the position in
reinforcing steel or rebar 112 is installed protruding through the replaceable strip 114;
the moving forming wall 48 is moved toward the wall 42 to form a volume 106a for the course;
concrete is poured between the walls 42, 48;
after the concrete is sufficiently cured, the forms are moved, stripped or retracted;
the moving wall 48 is moved back leaving the protruding reinforcing steel 112 and the replaceable forming strip 114 in place (see the position in
platform 200 is rotated downward using the cylinders 172 in order to clear the protruding reinforcing steel 112;
once the protruding reinforcing steel 112 is clear of the moving forming wall 48 and all the platform 200, the self-lifting form is operated and lifted to the next course;
once on the next course the self-lifting concrete form is anchored and aligned for the next pour;
another replaceable strip 114a is put in place in the moving forming wall 48 and the sequence is repeated; and
prior to pouring the concrete floor slab 113, the replaceable strip 114 that was previously poured against, is removed from the protruding reinforcing steel 112.
From the foregoing, it will be observed that numerous variations and modifications may be effected without departing from the spirit and scope of the invention. It is to be understood that no limitation with respect to the specific apparatus illustrated herein is intended or should be inferred.
Number | Name | Date | Kind |
---|---|---|---|
3779678 | Scheller | Dec 1973 | A |
3930567 | Sims | Jan 1976 | A |
3973885 | Schmidt | Aug 1976 | A |
4016228 | Schmidt | Apr 1977 | A |
4040774 | Scheller | Aug 1977 | A |
4917346 | Mathis | Apr 1990 | A |
5198235 | Reichstein et al. | Mar 1993 | A |
6260311 | Vladikovic | Jul 2001 | B1 |
6276912 | Rock | Aug 2001 | B1 |
6557817 | Waldschmitt et al. | May 2003 | B2 |
8020271 | Baum et al. | Sep 2011 | B2 |
Number | Date | Country |
---|---|---|
2756390 | Jun 1979 | DE |
Number | Date | Country | |
---|---|---|---|
20180334815 A1 | Nov 2018 | US |