Self-Stabilizing Underground Excavation Cross Section

Information

  • NSF Award
  • 9060994
Owner
  • Award Id
    9060994
  • Award Effective Date
    1/1/1991 - 33 years ago
  • Award Expiration Date
    9/30/1991 - 32 years ago
  • Award Amount
    $ 50,000.00
  • Award Instrument
    Standard Grant

Self-Stabilizing Underground Excavation Cross Section

This SBIR Phase I research will experimentally and analytical evaluate the load bearing capacity of different borehole breakouts, and the feasibility of using such configurations as an excavation shape. If tunnels or underground excavations incorporate a cross- sectional shape similar to a stable breakout, the cost of support and long term maintenance could be greatly reduced or possibly eliminated.

  • Program Officer
    Ritchie B. Coryell
  • Min Amd Letter Date
    12/17/1990 - 33 years ago
  • Max Amd Letter Date
    12/17/1990 - 33 years ago
  • ARRA Amount

Institutions

  • Name
    TerraTek, Inc.
  • City
    Salt Lake City
  • State
    UT
  • Country
    United States
  • Address
    400 Wakara Way
  • Postal Code
    841081292
  • Phone Number
    8015842407

Investigators

  • First Name
    Ziqionq
  • Last Name
    Zheng
  • Start Date
    1/1/1991 12:00:00 AM