BACKGROUND OF THE INVENTION
The invention resides in an in-situ erected self-supporting communication tower constructed by means of interconnecting tubular members through their flattened ends in such a manner that, as a whole, forms a tower of a desired height, capable of holding the necessary communication equipment. Prior art towers are generally constructed with structural steel angles or pipes welded or bolted together into several sections of about 15 to 20 feet each, which are hot-dipped galvanized after fabrication and are transported for erection to the tower's chosen location.
In the communication industry the service providers must maintain a network of towers spread across their coverage area. The location of towers could be in remote places of difficult access for the erection equipment and precarious transportation of the voluminous pre-fabricated tower sections. The present invention greatly facilitates fabrication, transportation, erection and reduces cost, making it a good product to be used by the increasing worldwide communication industry.
SUMMARY OF THE INVENTION
The present invention is a frame structure constructed by means of interconnecting vertical, horizontal and diagonal elements by their ends, forming a self-supported communication tower of triangular section. The elements may be steel bars, pipes, tubing, beams, angles, carbon fiber pipes or tubing, or any other convenient structural member. For the illustrations and description of the present invention, aluminum tubular members with their ends flattened are used because of their added advantage of light weight, ease of transportation and erection and corrosion resistance. It is particularly advantageous, according to the invention, that the tower is erected in situ as several single tubular elements which are interconnected and bolted together form a layer where the installing operator can place a removable platform, resting on the finished section, to install the next staggered upper section.
BRIEF DESCRIPTION OF THE DRAWINGS
FIG. 1. Is an elevation of the tapered Tower indicating by pointing arrows the 4 types of Nodes, and different types of elements.
FIG. 2. Is an isometric view of the tetrahedral base footing of the tower depicting 3 layers.
FIG. 3. Shows the 4 types of Nodes that comprise the tower each described in FIG. 3.1; FIG. 3.2; FIG. 3.3 and FIG. 3.4.
FIG. 4. Shows the equilateral bracing tubular elements of the tower.
FIG. 5. Is a typical tapering section.
FIG. 6. Shows the erection platform
FIG. 7. Is a plan view of the concrete foundation.
DETAILED DESCRIPTION
The invention will be described in great detail with certain degree of particularity and referring primarily on the use of aluminum tubes flattened at their ends, bended at certain angles and bolted together to form a tower. It is clear that many changes may be made, especially in the selection of the elements, bars, tubes structural steel angles, beams; and also in details of arrangements and construction sequence. This should not depart from the spirit and scope of the invention.
FIG. 1. Shows an elevation of a three tapered sections tower # 10,11,12 whose dimensions, height and sections will be determined by the specific structural calculation to support the loads required for its final use. For high towers the base and foundation is a six (6) fixed points as shown on FIG. 1, and FIG. 7. For shorter towers the foundation could only be a three (3) fixed points at level 1 of the elevation drawing on FIG. 1. To differentiate Nodes from element members, Nodes are shown on FIG. 1, with a numbered pointing arrow from 1 to 4.
FIG. 2. Is an isometric drawing of the tetrahedron footing section of the tower and its connection to the first triangular section. As indicated on FIG. 2, layers have been defined for better understanding. Layer “A” is the base of the tetrahedron that is connected to the concrete foundation footing. Layer “B” shows the diagonal tubular elements of the tetrahedron on top of which layer “C” is connected and constitutes the first level of the vertical tower. The isometric drawing on FIG. 2 is marked with numbers 5,6,7 to facilitate viewing. The number 7, are the nine (9) bottom tubular members of layer “A”; the number 6 are the nine (9) diagonal tubular members of layer “B” and the number 5 are the three (3) members of layer one “C”.
FIG. 3. are detailed drawings of the four (4) different Nodes of the tower. All Nodes are formed by connecting several members together by their flattened end portion which have bored or punched holes so as to accommodate studs inserted therein.
FIG. 3.1 is a detailed drawing of Node 1 showed in FIG. 1 and FIG. 2. There are three (3) Nodes number one (1), located at the connection of the triangular vertical section of the tower with the tetrahedral base. Node 1 is formed by seven (7) tubular elements fastened together at their flattened ends by means of one (1) stud, two (2) washers and two (2) nuts. This is the only Node that joints together seven different elements: a vertical tower leg # 8, two horizontal bracing elements # 5, three tetrahedral elements # 6a,6b,6c and one diagonal anti-torsion element # 9. To fastened the elements studs are used because they permits the connection of elements coming from both sides; while head bolts need to receive elements from one side only making it more difficult to assemble a Node. Note that the studs on the vertical section of the tower are horizontally oriented, while on the tetrahedral base bolts are vertically oriented; therefore, a transition is made as shown on the details drawings of the tetrahedral diagonal tubular members numbered 6a,6b,6c. Elements 6a and 6c have the flattened ends rotated 30 degrees and element 6b has the flattened end rotated 90 degrees in order to make the transition from horizontal oriented tower studs to vertical studs of the footing connection.
FIG. 3.2. Is a detail drawing of Node 2 as shown on FIG. 1 and FIG. 2. There are three (3) Nodes number two (2), located at the bottom of the tetrahedron external base and are formed by three (3) tubular members: two (2) horizontal # 7 and one (1) diagonal # 6b, joined together by the stainless steel anchor bolt # 13 embedded in the concrete base footing. To prevent cathode corrosion a stainless steel bearing plate # 15 is used to separate the aluminum tubing from the concrete as shown on FIGS. 3.2 and 3.3.
Also, aluminum washers are used to assure a leveled base.
FIG. 3.3 is a detailed drawing on Node 3. There are three (3) Nodes number three (3), located at the bottom of the tetrahedral base, and are formed by six 6 tubular members: four (4) horizontal # 7 and two (2) diagonals # 6a and 6c; also joined together by stainless steel anchor bolt # 13 attached to the bearing plate with washers in the same fashion as Node 2.
In order to assure a level plane at layer “A”, see FIG. 2. and FIG. 3.2. supplemental washers #14 are placed at the bottom of the connection between the tetrahedral base and the foundation anchor bolts #13 in all three (3) Nodes. (1,2,3).
FIG. 3.4. Is a detailed drawing of Node 4. There are three (3) Nodes number four (4) per level of the vertical tower, see FIG. 1, consisting of six (6) tubular elements: two (2) vertical # 8, called vertical legs; two (2) diagonals # 9 called anti-torsion diagonals, and two (2) horizontal # 5 called horizontal bracing, all tubular members. This type of Node is repeated through all levels of the tower.
FIG. 4. shows a cross section of the three (3) horizontal bracing elements # 5 that form the equilateral section of the tower by joining together two vertical legs # 8, two anti-torsion diagonals # 9 with two horizontal bracing elements # 5. It is of great importance to connect symmetrically all the elements as shown on FIG. 4. At center two # 8, bracing them two #9 and bracing them two # 5. Depending on the specific tower dimensions there may be tapered sectors, (see FIG. 5) which are formed by interconnecting a larger equilateral triangle section with a smaller upward triangle section by means of three (3) vertical legs members # 8a which are tilted inward to a small angle as shows on FIG. 5.
The erection sequence is as follows:
Once the reinforce concrete base FIG. 7. and anchor stainless steel bolts # 13 are in place, the prefabricated tetrahedral elements forming the tower base are interconnected as described in the previous Nodes explanations and figures. First the horizontal tubular elements are connected to the anchor bolts # 13 placing them on top of the stainless steel bearing plate # 15 and using leveling washers # 14 where needed to assure that the nine (9) horizontal elements # 7 are leveled. Next the nine (9) diagonal elements of the tetrahedron 6a,6b,6c are also connected to the nine (9) anchor bolts. These diagonals tetrahedral leg elements are placed over the horizontal elements using a clock wise mode (see Node 3), first the diagonal leg coming from the right and on top of the diagonal coming from the left. Once all nine (9) diagonal legs 6a, 6b, 6c are in place they are interconnected at layer “A” as shown on FIG. 3.1 Node one (1). The vertical leg elements of the tower # 8 and the diagonal anti-torsion lateral elements # 9 shown on Node one (1), FIG. 3.1 going toward the upper level, are placed with the exact direction toward their final position on the upper level before tightening the nuts; this is to assure that they reach Node 4 in FIG. 3.4, on the upper level, in the correct position to allow joining all other elements of the upper Node 4 without needing to loosen nuts on the lower level. This procedure will allow to place the erection platform # 18 on top of a secure three horizontal bracing elements # 5 located on the lower level for erection crew to stand on and finalize connections on the upper level (see FIG. 6). It is of great importance to connect the anti-rotation diagonal members # 9 in a zigzagging manner in all three faces of the tower to assure lateral stability as shown on FIG. 1. This procedure is repeated until the tower reaches its final height. It is important to interconnect the tubular element in all Nodes 4FIG. 3.4 using the same sequence to assure verticality; in other words, the two vertical elements one coming from the lower level and the other going up to the upper level at the center of the Node, braced by the two anti-torsion diagonals #9 and finally braced by the two horizontal bracings #5 as shown on FIG. 3.4. It is very important to place the vertical leg elements in a staggered fashion from one level to the next to assure verticality. If required for a specific tower design, a tapered section can be installed in the same way described but with vertical legs 8a with a small inward angle to connect with the upper level section having smaller triangular bracing section as shown on FIG. 5.