1. Field of Invention
The present disclosure relates in general to monitoring fatigue loading in a component of a wellhead system by sensing a magnetized portion of the component. The disclosure further relates to magnetizing the component in strategic locations and disposing sensors proximate the magnetized locations.
2. Description of Prior Art
Wellheads used in the production of hydrocarbons extracted from subterranean formations typically comprise a wellhead assembly attached at the upper end of a wellbore formed into a hydrocarbon producing formation. Wellhead assemblies usually provide support hangers for suspending strings of production tubing and casing into the wellbore. A string of casing usually lines the wellbore, thereby isolating the wellbore from the surrounding formation. The tubing typically lies concentric within the casing and provides a conduit therein for producing the hydrocarbons entrained within the formation. A production tree is usually provided atop a wellhead housing, and is commonly used to control and distribute the fluids produced from the wellbore and selectively provide fluid communication or access to the tubing, casing, and/or annuluses between strings of concentric tubing and casing.
Wellhead housings, especially those subsea, typically include an outer low pressure housing welded onto a conductor pipe, where the conductor pipe is installed to a first depth in the well, usually by driving or jetting the conductor pipe. A drill bit inserts through the installed conductor pipe for drilling the well deeper to a second depth so that a high pressure housing can land within the low pressure housing. The high pressure housing usually has a length of pipe welded onto its lower end that extends into the wellbore past a lower end of the conductor pipe. The well is then drilled to its ultimate depth and completed, where completion includes landing casing strings in the high pressure housing that lines the wellbore, cementing between the casing string and wellbore wall, and landing production tubing within the production casing.
Once in operation, forces externally applied to the wellhead assembly such as from drilling, completion, workover operations, waves, and sea currents, can generate bending moments on the high and low pressure housings. As the widths of the low and high pressure housings reduce proximate attachment to the conductor pipes, stresses can concentrate along this change of thickness. Over time, repeated bending moments and other applied forces can fatigue load components of the wellhead assembly. Thus the safety of using a wellhead after ten years of operation is sometimes questioned; which can lead to the expensive option of replacing the aged wellhead. Moreover, the inability to directly measure wellhead fatigue sometimes requires a higher class welding connection, which can be unnecessarily expensive. Monitoring fatigue in a wellhead assembly remains a challenge for the industry. Strain gages have been used for measuring strain in a wellhead assembly, but they often become detached when subjected to the harsh environment within a wellhead assembly. Excessive wires/cables were hard to handle for sensor communication under the subsea environment. Finite element models have been used for fatigue analysis, but most require a transfer function to extrapolate the measured load of riser which is connected to the wellhead. The lack of the real fatigue data from the field had contributed to the uncertainty of the finite element analysis result.
Disclosed herein is a method and apparatus for wellbore operations that includes a real time analysis of fatigue loading of components of a wellhead assembly. In one example a method of operating a wellbore includes sensing a magnetic field that intersects a portion of a tubular that is in the wellbore and that forms part of a wellhead assembly. Variations in the magnetic field are identified that are from loads applied to the tubular, and fatigue loading on the tubular is estimated based on the applied loads. The method can included magnetizing a selected portion of the tubular to form magnetic field. In this example, the magnetized portion of the tubular resembles an oval shape. Further, the oval shape can have an elongate side oriented in a direction that is parallel with an axis of the wellbore, oblique with an axis of the wellbore, or perpendicular with an axis of the wellbore. Optionally, the step of sensing includes providing a sensor in the magnetic field and monitoring an output of the sensor. The sensor can be part of a sensor system with a plurality of sensors connected by a sensing line, and wherein the sensors sense a change in the magnetic field. The sensing line can be made up of an optical fiber, electrical line, cable, or combinations thereof; and the sensors can be magneto-optic sensors, solid state magnetic sensors, inductive sensors, or combinations thereof. In an example, the change in the magnetic field is a change in the magnitude of the magnetic field. Also, an operating life of the tubular can be estimated based on the information gathered. The tubular can be a component of the wellhead assembly, such as a low pressure housing, a low pressure conductor pipe; a high pressure housing, a high pressure conductor pipe, a casing hanger, a tubing hanger, a length of casing, or a length of production tubing.
In a further embodiment, a method of wellbore operations includes sensing a characteristic of a magnetic field from a magnetized portion of a tubular that is in the wellbore and that forms part of a wellhead assembly, identifying changes in the characteristic of the magnetic field that are caused by a stress in the tubular, estimating real time fatigue damage to the tubular based on the identified changes in the characteristic of the magnetic field, and preparing a real time structural confirmation analysis of the tubular. A fatigue failure of the tubular can be estimated from the collected information, as well as a prediction of a residual life of the tubular. Moreover, a different wellhead assembly can be designed based on changes in the characteristic of the magnetic field that are caused by stresses experienced by the tubular over time. In one example, the magnetized portion of the tubular is strategically disposed proximate a change in thickness of the tubular, proximate a weld in the tubular, or both.
Further disclosed herein is a wellhead assembly that includes a tubular with magnetized locations strategically positioned thereon and that form magnetic fields, where the magnetic fields project outward from the tubular. A sensor system is included that is made up of sensors disposed in the magnetic fields and that generate signals in response to changes in the magnetic fields. An intelligent information processing system is included that is in communication with the sensor system; which can include a processor for correlating the changes in the magnetic fields to loads experienced by the tubular.
Some of the features and benefits of the present invention having been stated, others will become apparent as the description proceeds when taken in conjunction with the accompanying drawings, in which:
While the invention will be described in connection with the preferred embodiments, it will be understood that it is not intended to limit the invention to that embodiment. On the contrary, it is intended to cover all alternatives, modifications, and equivalents, as may be included within the spirit and scope of the invention as defined by the appended claims.
The method and system of the present disclosure will now be described more fully hereinafter with reference to the accompanying drawings in which embodiments are shown. The method and system of the present disclosure may be in many different forms and should not be construed as limited to the illustrated embodiments set forth herein; rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey its scope to those skilled in the art. Like numbers refer to like elements throughout.
It is to be further understood that the scope of the present disclosure is not limited to the exact details of construction, operation, exact materials, or embodiments shown and described, as modifications and equivalents will be apparent to one skilled in the art. In the drawings and specification, there have been disclosed illustrative embodiments and, although specific terms are employed, they are used in a generic and descriptive sense only and not for the purpose of limitation.
Shown in perspective view in
A sensor system 20 is shown mounted adjacent the tubular 10 that includes sensors 22 disposed proximate to the magnetized areas 18. Embodiments exist wherein each magnetized area 18 includes a corresponding sensor 22, but not shown herein for the sake of clarity. In the example of
As noted above, the magnetized areas 18 are strategically located on the tubular 10 in locations that may be of interest to assess applied loads onto the tubular 10, which in one case may be adjacent a box/pin connection 25 shown formed on conductor portion 14. As is known, conductor 14 can be formed from a string of individual segments S1, S2 connected by box/pin connection 25. Welds 28 are shown connecting the individual box and pin portions 26, 27 to adjacent conductor segments S1, S2; magnetized areas 18 are shown provided adjacent welds 28.
Referring now to
Coaxially disposed within low pressure tubular 42 is a high pressure tubular 52 that includes a high pressure housing 54 shown set coaxially within low pressure housing 44. Similar to the low pressure tubular 42, a conductor 55 depends downward from high pressure housing 54 into wellbore 46. A weld 50 connects an upper end of conductor 55 with a transition 56, which couples to a lower end of high pressure housing 54. Similar to transition 49, high pressure transition 56 has a thickness that reduces with distance from high pressure housing 54. Further in example of
Further in the example of
An information handling system (IHS) 66 is schematically illustrated in
Still referring to
In one example of operation, the magnetized areas 18 may be formed onto the wellhead members (i.e. tubulars 10, 30, 42, 52, hangers 72, 76, casing 74 and/or tubing 78) by applying a pulse of high current with electrodes (not shown) that are set onto the particular wellhead member. This example is sometimes referred to as electrical current pulse magnetization. Strategic placement of the electrodes can form shapes of the magnetized areas as desired. In the examples of
One example of calibrating a sensor system 20 (
The present invention described herein, therefore, is well adapted to carry out the objects and attain the ends and advantages mentioned, as well as others inherent therein. While a presently preferred embodiment of the invention has been given for purposes of disclosure, numerous changes exist in the details of procedures for accomplishing the desired results. For example, the apparatus and method described herein can be used to monitor fatigue in a structure or material of any shape, that can be magnetized or have a portion that emits a magnetic field; and is not limited to material disposed in a wellbore or used in conjunction with wellbore operations. These and other similar modifications will readily suggest themselves to those skilled in the art, and are intended to be encompassed within the spirit of the present invention disclosed herein and the scope of the appended claims.
Number | Name | Date | Kind |
---|---|---|---|
2001023 | Howell et al. | May 1935 | A |
2814019 | Bender | Nov 1957 | A |
3255627 | Doig et al. | Jun 1966 | A |
3359791 | Pantages | Dec 1967 | A |
3376921 | Manry et al. | Apr 1968 | A |
3686942 | Chatard et al. | Aug 1972 | A |
3693419 | De Pierre et al. | Sep 1972 | A |
3817094 | Montgomery et al. | Jun 1974 | A |
3824851 | Hagar et al. | Jul 1974 | A |
3917230 | Barron | Nov 1975 | A |
3936231 | Douglas | Feb 1976 | A |
3938381 | Rundell et al. | Feb 1976 | A |
4015469 | Womack et al. | Apr 1977 | A |
4042123 | Sheldon et al. | Aug 1977 | A |
4090405 | McKee | May 1978 | A |
4109969 | Reinecke | Aug 1978 | A |
4123115 | King | Oct 1978 | A |
4138882 | Lockery et al. | Feb 1979 | A |
4139891 | Sheldon et al. | Feb 1979 | A |
4194393 | Boley | Mar 1980 | A |
4365509 | Cornelis | Dec 1982 | A |
4409824 | Salama et al. | Oct 1983 | A |
4507055 | Fair | Mar 1985 | A |
4626954 | Damiano et al. | Dec 1986 | A |
4630868 | Jones et al. | Dec 1986 | A |
4658921 | Karpa | Apr 1987 | A |
4741577 | Sato et al. | May 1988 | A |
4763544 | Blakemore | Aug 1988 | A |
4805451 | Leon | Feb 1989 | A |
4827765 | Kessler | May 1989 | A |
4889202 | Bron | Dec 1989 | A |
4922922 | Pollock et al. | May 1990 | A |
4973226 | McKee | Nov 1990 | A |
4974675 | Austin et al. | Dec 1990 | A |
4983090 | Lehmann et al. | Jan 1991 | A |
4996882 | Kistler | Mar 1991 | A |
5050690 | Smith | Sep 1991 | A |
5064349 | Turner et al. | Nov 1991 | A |
5167490 | McKee et al. | Dec 1992 | A |
5172591 | Bohon | Dec 1992 | A |
5199198 | Godbout | Apr 1993 | A |
5237863 | Dunham | Aug 1993 | A |
5423222 | Rudd et al. | Jun 1995 | A |
5475615 | Lin | Dec 1995 | A |
5559547 | Hagar | Sep 1996 | A |
5569860 | Aizawa et al. | Oct 1996 | A |
5698085 | Yu | Dec 1997 | A |
5722807 | Hodge | Mar 1998 | A |
5811750 | Caprioglio | Sep 1998 | A |
5857530 | Gronseth | Jan 1999 | A |
6081880 | Sollars | Jun 2000 | A |
6155347 | Mills | Dec 2000 | A |
6216547 | Lehtovaara | Apr 2001 | B1 |
6253626 | Shoberg et al. | Jul 2001 | B1 |
6292537 | Zimmermann | Sep 2001 | B1 |
6374186 | Dvorkin et al. | Apr 2002 | B1 |
6521469 | La Rosa et al. | Feb 2003 | B1 |
6775966 | Frego | Aug 2004 | B2 |
6837342 | Olschewki et al. | Jan 2005 | B1 |
6921120 | Ervin | Jul 2005 | B1 |
6937921 | Mazumder | Aug 2005 | B1 |
7500390 | Mills | Mar 2009 | B2 |
7647773 | Koenig | Jan 2010 | B1 |
7935876 | West | May 2011 | B1 |
8126689 | Soliman et al. | Feb 2012 | B2 |
8157537 | Chavez Zapata | Apr 2012 | B2 |
8797033 | Girrell | Aug 2014 | B1 |
20020040963 | Clayton et al. | Apr 2002 | A1 |
20020070050 | Wassell | Jun 2002 | A1 |
20020144968 | Ruddy | Oct 2002 | A1 |
20020166965 | Matsuda et al. | Nov 2002 | A1 |
20030089177 | Luthje et al. | May 2003 | A1 |
20030140710 | Nakayama et al. | Jul 2003 | A1 |
20030150263 | Economides et al. | Aug 2003 | A1 |
20030163257 | Ravi et al. | Aug 2003 | A1 |
20030173958 | Goldfine | Sep 2003 | A1 |
20040016295 | Skinner et al. | Jan 2004 | A1 |
20040047289 | Azami et al. | Mar 2004 | A1 |
20040056654 | Goldfine | Mar 2004 | A1 |
20040139806 | Christmas | Jul 2004 | A1 |
20040221985 | Hill et al. | Nov 2004 | A1 |
20040231429 | Niezgorski et al. | Nov 2004 | A1 |
20040246816 | Ogle | Dec 2004 | A1 |
20050211430 | Patton et al. | Sep 2005 | A1 |
20060225523 | Reddy et al. | Oct 2006 | A1 |
20060271299 | Ward et al. | Nov 2006 | A1 |
20070007955 | Goldfine | Jan 2007 | A1 |
20070013619 | Watanabe et al. | Jan 2007 | A1 |
20070067092 | Burkatovsky | Mar 2007 | A1 |
20070172357 | Saito et al. | Jul 2007 | A1 |
20070183260 | Lee et al. | Aug 2007 | A1 |
20070222438 | Reeves | Sep 2007 | A1 |
20080034134 | Kumar | Feb 2008 | A1 |
20080035376 | Freyer | Feb 2008 | A1 |
20080123079 | Numata et al. | May 2008 | A1 |
20080123719 | Lee et al. | May 2008 | A1 |
20080216554 | McKee | Sep 2008 | A1 |
20080225710 | Raja et al. | Sep 2008 | A1 |
20080271541 | Neuman | Nov 2008 | A1 |
20080314577 | Adamek | Dec 2008 | A1 |
20090063054 | Newman | Mar 2009 | A1 |
20090071645 | Kenison et al. | Mar 2009 | A1 |
20090151330 | Chamarthi et al. | Jun 2009 | A1 |
20090194273 | Surjaatmadja et al. | Aug 2009 | A1 |
20100088076 | Koutsabeloulis et al. | Apr 2010 | A1 |
20100135170 | Fan et al. | Jun 2010 | A1 |
20100218941 | Ramurthy et al. | Sep 2010 | A1 |
20100262048 | Shinomiya et al. | Oct 2010 | A1 |
20100300886 | Lin et al. | Dec 2010 | A1 |
20100307766 | Kampman et al. | Dec 2010 | A1 |
20100319910 | Ives et al. | Dec 2010 | A1 |
20110024188 | Wassell et al. | Feb 2011 | A1 |
20110048737 | Schneider | Mar 2011 | A1 |
20110090496 | Samson et al. | Apr 2011 | A1 |
20110132662 | Dennis | Jun 2011 | A1 |
20110132663 | Johnston et al. | Jun 2011 | A1 |
20110313626 | Bowen et al. | Dec 2011 | A1 |
20120016589 | Li et al. | Jan 2012 | A1 |
20120101395 | Fujita et al. | Apr 2012 | A1 |
20120103248 | Hickman | May 2012 | A1 |
20120132467 | Zeineddine | May 2012 | A1 |
20120152024 | Johansen | Jun 2012 | A1 |
20120289866 | Irby et al. | Nov 2012 | A1 |
20140014334 | Mason | Jan 2014 | A1 |
Number | Date | Country |
---|---|---|
3744194 | Jul 1989 | DE |
19654572 | Jul 1997 | DE |
102004044464 | Mar 2006 | DE |
1193261 | Apr 2002 | EP |
1512311 | Oct 2005 | EP |
1313400 | Nov 2005 | EP |
1733994 | Dec 2006 | EP |
1968184 | Sep 2008 | EP |
1931856 | Apr 2010 | EP |
2592952 | Jul 1987 | FR |
930912 | Jul 1963 | GB |
2091817 | Aug 1982 | GB |
2273865 | Jul 1994 | GB |
2330889 | May 1995 | GB |
2000060846 | Feb 2000 | JP |
2000065762 | Mar 2000 | JP |
2000111393 | Apr 2000 | JP |
2000211839 | Aug 2000 | JP |
2000287949 | Oct 2000 | JP |
2000353860 | Dec 2000 | JP |
2001059803 | Mar 2001 | JP |
2001133229 | May 2001 | JP |
2002191072 | Jul 2002 | JP |
2002263432 | Sep 2002 | JP |
2003177011 | Jun 2003 | JP |
2004251863 | Sep 2004 | JP |
2005002564 | Jan 2005 | JP |
2005083961 | Mar 2005 | JP |
3110605 | May 2005 | JP |
2007212844 | Aug 2007 | JP |
2009104564 | May 2009 | JP |
2012011482 | Jan 2012 | JP |
2012077726 | Apr 2012 | JP |
2012088270 | May 2012 | JP |
2012088271 | May 2012 | JP |
5256683 | Aug 2013 | JP |
8202954 | Sep 1982 | WO |
8906351 | Jul 1989 | WO |
9824933 | Jun 1998 | WO |
9825015 | Jun 1998 | WO |
0139284 | May 2001 | WO |
2007003162 | Jan 2007 | WO |
2007126332 | Nov 2007 | WO |
2007126333 | Nov 2007 | WO |
2008003577 | Jan 2008 | WO |
2008009794 | Jan 2008 | WO |
2011017415 | Feb 2011 | WO |
2011057817 | May 2011 | WO |
2011122955 | Oct 2011 | WO |
2011159307 | Dec 2011 | WO |
2012047678 | Apr 2012 | WO |
2012079906 | Jun 2012 | WO |
2012087604 | Jun 2012 | WO |
2012107108 | Aug 2012 | WO |
Entry |
---|
International Search Report and Written Opinion issued in connection with corresponding PCT Application No. PCT/US2014/050064 dated May 7, 2015. |
Ward et al., “Evaluation of Wellhead Fatigue Using In-Service Structural Monitoring Data (OTC 23981)”, Offshore Technology Conference, Houston, Texas, USA, pp. 1-13, May 6, 2013. |
Koshhny, Marco et al., “Magneto-Optical Sensors Accurately Analyze Magnetic Field Distribution of Magnetic Materials”, Advanced Materials & Processes, Feb. 2012, pp. 13-16. |
Number | Date | Country | |
---|---|---|---|
20150041119 A1 | Feb 2015 | US |