The present invention relates to shear punching die assemblies. More particularly, the present invention relates to shear punching die assemblies in which a material is pressed or punched to form a work while the material is clamped between upper and lower die units of the shear punching die assembly.
A known shear punching die assembly includes a lower die unit that has a main punch and a stripper disposed around the main punch, and an upper die unit that has an ejector positioned axially opposite to the main punch and a die disposed around the ejector. In the known art, a material (a sheet material) is transferred and placed between upper and lower die units of the shear punching die assembly. Thereafter, the upper and lower die units are closed (i.e., a die closing operation is performed), so that the main punch of the lower die unit engages the die of the upper die unit. As a result, the material is punched out by the main punch, so that a formed article or work is formed. At this time, the ejector is moved to a retracted position with the work, so that the work can be retained in the die. Subsequently, the upper and lower die units are opened (i.e., a die opening operation is performed). Thereafter, a hydraulic removing mechanism (a hydraulic cylinder) connected to the ejector is actuated so as to push the ejector. As a result, the work retained in the die is ejected or removed from the die. Thus, a punching operation (a work manufacturing operation) is completed. Further, such a known shear punching die assembly is taught, for example, by Japanese Laid-open Patent Publication Number 6-31695.
However, in the known shear punching die assembly, it is not possible to rapidly eject the work from the die of the upper die unit, because the hydraulic removing mechanism cannot generally be moved at high speeds. That is, a work removing operation cannot be speeded up beyond a certain level. Therefore, even if a punching operation of the material is speeded up, a manufacturing speed of the work cannot substantially be increased. This may lead to a speed up limitation of a manufacturing speed of the work.
In another shear punching die assemblies, a motor driven removing mechanism or a spring driven removing mechanism is used in place of the hydraulic removing mechanism. Because the motor driven removing mechanism or the spring driven removing mechanism can generally be moved at high speeds than the hydraulic removing mechanism, the work removing operation can be speeded up. However, these shear punching die assemblies have some drawbacks. For example, in the spring driven removing mechanism, the ejector is normally biased toward the main punch. Therefore, the work can be thrust back from the die of the upper die unit toward a processed material before the upper and lower die units are sufficiently opened. As a result, the work may be pushed toward the processed material at the start of the die opening operation. The pushed work may possibly reengage a punched hole of the processed material. Therefore, extra time is required for removing the work from the processed material. Thus, these shear punching die assemblies still admit of improvement.
Thus, there is a need in the art for an improved shear punching die assembly.
In one embodiment of the present invention, shear punching die assembly having first and second die units in which a material is punched to form a work while the material is clamped between the first and second die units may include a main punch contained in the first die unit and having a cross-sectional shape corresponding to a shape of the work, an ejector contained in the second die unit and positioned axially opposite to the main punch, an ejector biasing member normally biasing the ejector toward the main punch, an ejector retaining device that is capable of acting on the ejector when the first and second die units are in a closed condition, thereby retaining the ejector in a predetermined position, and an ejector releasing device that is capable of acting on the ejector retaining device when the first and second die units are opened over a desired distance, thereby releasing the ejector.
According to the present embodiment, the work can be rapidly ejected from the second die unit because a hydraulic removing mechanism is not used. In addition, the work can be automatically removed from the second die unit when the first and second die units are opened. Therefore, a manufacturing speed of the work can be easily speeded up by simply speeding up a punching operation of the material.
In addition, the work is reliably retained on the second die unit until the first and second die units are sufficiently opened. Therefore, the work can be effectively prevented from interfering with a processed material when the first and second die units are opened. In particular, the work can be effectively prevented from reengaging a punched hole of the processed material. Therefore, an extra time is not required for removing the work from the processed material. This may contribute to further speeding up of the manufacturing speed of the work.
In another embodiment of the invention, the ejector retaining device may include a pressing body and a retainer member. The retainer member is arranged and constructed to engage the pressing body and press the pressing body toward an outer circumferential surface of the ejector when the first and second die units are in the closed condition. The retainer member is arranged and constructed to be disengaged from the pressing body when the first and second die units are moved to an opened condition, so as to permit the pressing body to move away from the outer circumferential surface of the ejector. The ejector releasing device is composed of the ejector biasing member. The ejector biasing member is arranged and constructed to be capable of moving the ejector when the first and second die units are moved to the opened condition, thereby moving the pressing body away from the outer circumferential surface of the ejector.
In a further embodiment of the invention, the ejector may include an engagement recess that are capable of engaging the pressing body. The retainer member is arranged and constructed to be capable of moving toward and away from the pressing body when the first and second die units are closed and opened.
In a further embodiment of the invention, the ejector retaining device may include a pressing body and an pressing body biasing member. The pressing body biasing member is arranged and constructed to normally bias the pressing body toward an outer circumferential surface of the ejector. The ejector releasing device comprises a first contacting member formed in an arm that is attached to the first die unit, and a second contacting member formed in the pressing body. The first contacting member is arranged and constructed to engage the second contacting member when the first and second die units are moved to the opened condition, thereby moving the pressing body away from the outer circumferential surface of the ejector against a biasing force of the pressing body biasing member.
In a further embodiment of the invention, the pressing body and the ejector may respectively include an engagement projection and an engagement recess that are capable of engaging each other. The first and second contacting members may respectively include a protrusion formed in the arm and a rod attached to the pressing body,
In a still further embodiment of the invention, the arm may have a guide slot that is arranged and constructed such that the rod can move therealong when the upper and lower die units are relatively moved. The protrusion may be projected into the guide slot such that a width of the guide slot can be reduced.
Other objects, features, and advantages, of the present invention will be readily understood after reading the following detailed description together with the accompanying drawings and the claims.
Detailed representative embodiments of the present invention will now be described with reference to the drawings.
First, a first embodiment of the present invention will be described with reference to
A shear punching die assembly is intended to press or punch a strip-shaped metal sheet material M in order to form a molded material or work W. The work W may be utilized as, for example, a construction element of a seat reclining device of a vehicle. Further, the shear punching die assembly is constructed such that the sheet material M is continuously fed vertically to a plane in FIGS. 1 and 3-7.
As shown in, for example,
As shown in
As shown in
As shown in
The ejector 23 is movably attached to the upper base 21 via a compression spring or a gas spring (a second elastic member) 24. Therefore, the ejector 23 is capable of vertically moving along the upper punch 22 and the die 25 while closely contacting the same. Further, the gas spring 24 is arranged so as to normally bias the ejector 23 downwardly.
As shown in
As shown in
Further, as shown in
The retainer member 50 is integrally provided with a downwardly extended vertical rod 53. The vertical rod 53 has a head or enlarged portion 53a that is formed in a lower end thereof. The vertical rod 53 is introduced into the inner bore 16a of the guide member 16 through the guide slot 16b, so that the head portion 53a can move upwardly and downwardly in the inner bore 16a. Further, the head portion 53a is positioned so as to contact or engage the upper wall of the guide member 16 when the upper die unit 20 is lifted up to a desired position from a closed position (i.e., when the upper and lower die units 10 and 20 open from a closed condition shown in
Also, the vertical rod 53 is provided with a compression spring 54 that is positioned between the retainer member 50 and a spring seat 25c formed in the die 25. The compression spring 54 is arranged so as to normally bias the retainer member 50 upwardly
Further, in this embodiment, the ejector locking member 42 and the retainer member 50 will also be referred to as an ejector retaining device that can retain the ejector 23 in a predetermined position (an upper retracted position). Also, the compression spring 24 will be referred to as an ejector releasing device that can release the ejector 23 retained in the predetermined position.
Representative methods for manufacturing the work W from the sheet material M using this shear punching die assembly will now be described.
First, as shown in
Thereafter, the drive means is actuated so that the upper die unit 20 is moved downwardly toward the lower die unit 10 (i.e., a die closing operation or punching operation is started). When the upper and lower die units 10 and 20 reach a condition shown in
Subsequently, when the upper die unit 20 is further moved toward the lower die unit 10 and reaches a closed position shown in
At this time, the ejector 23 of the upper die unit 20 is moved upwardly by the work W against a spring force of the gas spring 24, so as to be shifted to the upper retracted position from the normal position. As a result, the work W may preferably be clamped between the ejector 23 and the lower punch 13. Similarly, the stripper 15 of the lower die unit 10 is moved downwardly against the spring force of the gas spring 14, so as to be shifted to a lower retracted position thereof. As a result, the processed sheet material M′ may preferably be clamped between the die 25 and the stripper 15. Further, the waste piece S corresponding to the central opening H of the work W may fall down into the punching hole 12 of the lower punch 13.
When the ejector 23 is shifted to the upper retracted position, the front roller 43 of the ejector locking member 42 is aligned with the notch 23a. Consequently, the ejector locking member 42 is rightwardly moved by the spring force of the compression spring 41, so that the front roller 43 engages the notch 23a of the ejector 23.
Upon rightward movement of the ejector locking member 42, the rear rollers 44 of the ejector locking member 42 are disengaged from the recess 51 of the retainer member 50. As a result, the retainer member 50 is moved upwardly toward an uppermost position thereof by a spring force of the compression spring 54, so as to contact the rollers 44 (
After the punching operation is completed, the drive means is actuated so that the upper die unit 20 is lifted up toward the opened position. Thus, a die opening operation or work removing operation is started. At this time, the vertical rod 53 of the retainer member 50 is drawn from the inner bore 16a of the guide member 16 while the retainer member 50 is positioned at the uppermost position (i.e., while the front roller 43 of the ejector locking member 42 engages the notch 23a of the ejector 23.) As a result, the upper die unit 20 is lifted up while the ejector 23 is maintained at the upper retracted position. That is, the upper die unit 20 is moved upwardly while the work W is not applied with the spring force of the gas spring 24 via the ejector 23. Therefore, the upper die unit 20 is lifted up while the work W is reliably retained between the upper punch 22 and the die 25 by a frictional force.
Thereafter, when the upper die unit 20 reaches the desired position shown in
When the upper die unit 20 is further moved upwardly, as shown in
When the upper die unit 20 reaches a position shown in
Upon completion of the punching operation and the work removing operation, the manufacturing process is repeated in the same manner as described above while the sheet material M is successively conveyed between the upper and lower die units 10 and 20.
According to the present shear punching die assembly, the work W can be rapidly ejected from the upper die unit 20 because a hydraulic removing mechanism is not used. Therefore, it is possible to easily speed up a manufacturing speed of the work W by simply speeding up the punching operation.
Further, according to the present shear punching die assembly, the work W is reliably retained on the upper die unit 20 until the die opening operation is substantially completed. In other words, the work W can be removed from the upper die unit 20 only after the upper and lower die units 10 and 20 are sufficiently opened. As a result, the work W cannot be pushed toward the processed sheet material M′ at the start of the die opening operation. Therefore, the work W can be effectively prevented from reengaging the processed material M′ during the die opening operation (the work removing operation).
In addition, according to the present shear punching die assembly, the retainer member 50 moves relative to the ejector locking member 42 depending on the die opening operation and the die closing operation, so that the ejector locking member 42 can move toward and away from the ejector 23. As a result, the front roller 43 of the ejector locking member 42 is automatically engaged with and disengaged from the notch 23a of the ejector 23 depending on the die opening operation and the die closing operation, so that the ejector 23 can be locked and unlocked (released). Thus, the ejector retaining device and the ejector releasing device can be structurally simplified.
The second detailed representative embodiment will now described with reference to
Because the second embodiment relates to the first embodiment, with regard to matters that are the same in the first and second embodiments, a detailed description may be omitted.
Similar to the first embodiment, a shear punching die assembly is intended to press or punch a strip-shaped metal sheet material M in order to form a molded material or work W.
As shown in, for example,
The lower die unit 110 is essentially composed of a lower pressing member or punch (a main punch) 113 and a stripper 115. The lower punch 113 is fixedly attached to the lower base 111 and having a cross-sectional shape corresponding to the work W to be formed. Also, the lower punch 113 has a vertical punching hole 112 that is formed therein. The stripper 115 is movably disposed around the lower punch 113. In addition, the stripper 115 has a bore having a cross-sectional shape corresponding to the cross-sectional shape of the lower punch 113. That is, the stripper 115 is closely adjacent to the lower punch 113. Also, the stripper 115 is movably attached to the lower base 111 via an elastic member or gas spring 114. Therefore, the stripper 115 is capable of vertically moving along the lower punch 113 while closely contacting the same. As will be appreciated, the gas spring 114 is arranged so as to normally bias the stripper 115 upwardly.
The lower die unit 110 further includes a pair of vertical arms 130. The arms 130 are attached to the lower base 111 so as to extend toward the upper die unit 120. The arms 130 are positioned along a feeding direction of the sheet material M so as to be spaced away from each other (
The upper die unit 120 is essentially composed of an upper pressing member or punch (a subsidiary punch) 122, an ejector 123 and a die 125. The upper punch 122 is fixedly attached to the upper base 121 and having a cross-sectional shape corresponding to the punching hole 112 of the lower punch 113. The ejector 123 is movably disposed around the upper punch 122 and is positioned axially opposite to the lower punch 113. Also, the ejector 123 has a cross-sectional shape corresponding to the work W. In other words, the ejector 123 has the same cross-sectional shape as the lower punch 113. The die 125 is fixedly attached to the upper base 121. The die 125 is positioned around the ejector 123 in such a way that the ejector 123 can move along the die 125. Further, the die 125 has a bore having a cross-sectional shape corresponding to an outer profile of the ejector 123. That is, the die 125 is closely adjacent to the ejector 123. In addition, the ejector 123 is movably attached to the upper base 121 via an ejector biasing member or gas spring 124. Therefore, the ejector 123 is capable of vertically moving along the upper punch 122 and the die 125 while closely contacting the same. As will be appreciated, the gas spring 124 is arranged so as to normally bias the die 125 downwardly.
As shown in
The compression spring 141 of the ejector locking member 142 is arranged so as to normally bias the ejector locking member 142 rightwardly, i.e., toward the notch 123a of the ejector 123. Conversely, as shown in
Further, in this embodiment, the ejector locking member 142 and the compression spring 141 will also be referred to as an ejector retaining device that can retain the ejector 123 in a predetermined position (the retracted position). Also, the upper protrusions 132 formed in the arms 130 and the transverse rod 142b of the ejector locking member 142 will be referred to as an ejector releasing device that can release the ejector 123 retained in the predetermined position.
Representative methods for manufacturing the work W from the sheet material M using this shear punching die assembly will now be described.
First, as shown in
At this time, the ejector 123 of the upper die unit 120 is moved upwardly against a spring force of the gas spring 124, so as to be shifted to an upper retracted position. As a result, the work W may preferably be clamped between the ejector 123 and the lower punch 113. Similarly, the stripper 115 of the lower die unit 110 is moved downwardly against a spring force of the gas spring 114, so as to be shifted to a lower retracted position thereof. As a result, the processed sheet material M′ may preferably be clamped between the die 125 and the stripper 115. Further, the waste piece S corresponding to the central opening H of the work W falls down into the punching hole 112 of the lower punch 113.
Further, when the upper die unit 120 is moved downwardly toward the lower die unit 110, the transverse rod 142b of the ejector locking member 142 is disengaged from the upper protrusions 132 formed in the upper extensions 130b of the arms 130 and is moved downwadly within the guide slots 131 while the engagement projection 142a of the ejector locking member 142 contacts the outer circumferential surface of the ejector 123. Thereafter, when the upper die unit 120 is further moved downwardly and reaches the closed position shown in
After the punching operation is completed, as shown in
Thereafter, when the upper die unit 120 is further moved upwardly and reaches a position shown in
Upon completion of the punching operation and the work removing operation, similar to the first embodiment, the manufacturing process is repeated in the same manner as described above while the sheet material M is successively conveyed between the upper and lower die units 110 and 120.
According to the present shear punching die assembly, similar to the first embodiment, the work W can be rapidly ejected from the upper die unit 120 because a hydraulic removing mechanism is not used. Therefore, it is possible to easily speed up a manufacturing speed of the work W by simply speeding up the punching operation.
Further, according to the present shear punching die assembly, the work W is reliably retained on the upper die unit 120 until the die opening operation is completed. In other words, the work W can be removed from the upper die unit 120 only after the upper and lower die units 110 and 120 are sufficiently opened. As a result, the work W cannot be pushed toward the processed sheet material M′ at the start of the die opening operation. Therefore, the work W can be effectively prevented from reengaging the processed material M′ during the die opening operation (the work removing operation).
In addition, according to the present shear punching die assembly, the transverse rod 142b of the ejector locking member 142 is engaged with and disengaged from the upper protrusions 132 of formed in the arms 130 depending on the die opening operation and the die closing operation. As a result, the engagement projection 142a of the ejector locking member 142 is automatically engaged with and disengaged from the notch 123a of the ejector 123, so that the ejector 123 can be locked and unlocked (released). Thus, the ejector retaining device and the ejector releasing device can be structurally simplified.
Naturally, in this embodiment, various changes and modifications may be made to the present invention without departing from the scope of the invention. For example, in this embodiment, although the lower punch (the main punch) 113 and the ejector 123 are respectively disposed on the lower die unit 110 and the upper die unit 120, the lower punch (the main punch) 113 and the ejector 123 are respectively disposed on the upper die unit 120 and the lower die unit 110.
Representative examples of the present invention have been described in detail with reference to the attached drawings. This detailed description is merely intended to teach a person of skill in the art further details for practicing preferred aspects of the present invention and is not intended to limit the scope of the invention. Only the claims define the scope of the claimed invention. Therefore, combinations of features and steps disclosed in the foregoing detail description may not be necessary to practice the invention in the broadest sense, and are instead taught merely to particularly describe detailed representative examples of the invention. Moreover, the various features taught in this specification may be combined in ways that are not specifically enumerated in order to obtain additional useful embodiments of the present invention.
Number | Date | Country | Kind |
---|---|---|---|
2006-309092 | Nov 2006 | JP | national |
2007-288436 | Nov 2007 | JP | national |
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCT/JP2007/072492 | 11/14/2007 | WO | 00 | 5/8/2009 |