The present invention relates to earth retaining systems and, more particularly, to a one-step sheet pile retaining wall system not requiring temporary shoring.
Current earth retaining systems designed to accommodate significant embankment widening, particularly along existing roadway where traffic will be running adjacent to the work, require massive quantities of excavation and the utilization of select rock/aggregate backfill as well as the need for costly and time-consuming temporary shoring.
Specifically, current earth retaining systems associated with embankment widening involve a two-stage process: (1) temporary shoring installation and (2) then wall construction. Such systems typically include a MSE wall, T-Wall, reinforced concrete cantilever wall, or soldier beam and lagging wall (with regard to providing a platform of sufficient width from which to drill/construct the soldier beam and lagging wall).
Temporary shoring can be problematic when retaining an embankment for doing construction along the top of the embankment, such as for widening of a highway. For instance, since the temporary typically-vertical shoring would often extend well below the level of the highway, such effort in installing the temporary vertical shoring adds not only time to the construction process, but also might inadvertently result in the demolition of elements of the highway not marked for construction, such as previously-installed storm drainage piping, just for the sake of installing the temporary shoring. Also, the presence of the temporary shoring raises the possibility of its failure or movement, whereby such not-marked-for construction elements including the adjacent roadway surface being traveled on by the general public are damaged, or worse yet, rendered unsafe.
As can be seen, there is a need for a one-step sheet pile retaining wall system not requiring temporary shoring yet adapted to accommodate significant embankment widening along existing roadway where traffic will be running adjacent to the work area. The one-step sheet pile retaining wall system embodied herein provides an outer row of sheet piles that constitutes the wall portion of the structure with perpendicular sheets comprising fins connected to the outer sheets via three-way connectors along the length of the wall. The sheet pile retaining wall for all practical purposes would be built without the need for massive quantities of excavation, select rock/aggregate backfill, or temporary shoring.
The present invention reduces the earth retaining process to only one stage, i.e., the actual construction of the wall. This one step approach, ideally, results in the realization of significant time savings in addition to the cost reductions, assuming sheets can be driven to the required depth without too much difficulty. If deemed advantageous to shorten the overall time required for sheet pile installation, driving shoes could be used to help in this regard.
In one aspect of the present invention, the embankment widening retaining system provides a face wall defining a front face of the embankment having a gradient; the face wall including a plurality of face wall sheet piles, wherein each face wall sheet pile has a face length, the face length including a face depth extending below the gradient; and a face cantilever extending above the gradient; a group of fin sheets perpendicularly extending from the face wall; the group of fin sheets including a plurality of fin sheet piles having a fin bottom approximately the same elevation as the face bottom, and wherein said face and fin sheet piles are generally corrugated (Z-shaped); a cementitious flowable backfill disposed in a backfill space defined by the gradient, the face cantilever, and adjacent fin sheet cantilever; a drainage/utility cradle disposed in a cradle space paralleling the wall face defined by the face or adjacent fin sheet, the cementitious flowable backfill, and higher, adjacent fin sheets away from the wall face edging the cradle; and a three-way connector interconnecting each adjacent face wall sheet piles and first fin sheet pile.
In another aspect of the present invention, the embankment widening retaining system generally includes one brace fin sheet pile, each brace fin sheet pile spaced apart along and perpendicularly connected to the face wall and higher than those sheets defining the bottom of the drainage cradle (which is seated on the cementitious flowable backfill), the relevance of said higher first fin sheet being its significance in serving to reduce stresses in the wall face.
In yet another aspect of the present invention, the cementitious flowable backfill in its initial fluid state will serve to prestress the wall system including face and fins, and in its set state will help reduce overall pressure acting on the wall face.
These and other features, aspects and advantages of the present invention will become better understood with reference to the following drawings, description and claims.
The following detailed description is of the best currently contemplated modes of carrying out exemplary embodiments of the invention. The description is not to be taken in a limiting sense, but is made merely for the purpose of illustrating the general principles of the invention, since the scope of the invention is best defined by the appended claims.
Broadly, an embodiment of the present invention provides a one-step sheet pile retaining wall system not requiring temporary shoring. The wall system may provide a front face having a plurality of interlocked fin sheets perpendicularly extending therefrom. Between the gradient and the higher front face and adjacent fin sheets will generally be cementitious flowable backfill for pre-stressing the wall system when fluid—along with reducing overall pressure on the wall face when set, thereby supporting a drainage cradle of sufficient width from which storm drainage/utility construction may occur. Between the slope of the existing embankment gradient and the higher front wall face may be cementitious flowable backfill for pre-stressing the wall system when fluid and, when set, supporting the aforementioned cradle, from which the remaining construction can build off of while reducing overall earth pressure acting on the wall face upon completion of construction as a result of this set.
Referring to
It should be understood by those skilled in the art that the use of directional terms such as above, below, and the like are used in relation to the illustrative embodiments as they are depicted in
The cementitious flowable backfill 18 may be used as a pre-stressing measure described more in depth below. In certain embodiments, the cementitious flowable backfill 18 may be operatively engaged to the face wall 22 and fin sheets 80 and 24 (for example via shear studs and reinforcing within the cementitious flowable backfill mass) to help hold back the face wall 22 upon set.
Moreover, the cementitious flowable backfill 18 enables the seating of a drainage cradle 19 on the set cementitious flowable backfill 18. Once the cementitious flowable backfill 18 hardens, it no longer pushes directly against the face wall 22, but sits down vertically on its notched bottom within the embankment. From there, the hardened cementitious flowable backfill 18 provides a platform/pathway for the drainage cradle 19, which is being designed to accommodate pipes/utilities behind the front face wall 22.
Referring to
Geotechnical Considerations
The perpendicular sheets will serve as vertically planar, continuous tiebacks, i.e., fins providing resistance to lateral loading acting on the wall through the following mechanisms: a) soil/steel interaction, i.e., shear resistance including friction (and cohesion) and b) the dead weight of the fins including soil adhering to them enhanced by vibratory densification during pile driving to provide additional restoring moment to the overall wall system. It being understood that the design of the sheet pile wall system 10 as well as the designs of other wall types—particularly those founded within slopes—will need to consider global stability as part of the overall design process—as well as other design criteria peculiar to each wall type. It being understood that the embankment being retained has an upper surface, the inclined part of the embankment, or gradient.
In one embodiment, the sheet pile wall system 10 may incorporate cementitious flowable backfill 18 in a backfill portion of the wedge defined by the existing ground slope/gradient and the wall face 22, said backfill portion being bounded along its upper periphery by the pipe/utility cradle 19. The cementitious flowable backfill 18 is generally less expensive than properly-compacted embankment material, select or otherwise, as the compacted embankment material requires placement in relatively-thin lifts, which in turn requires significantly more time for placement and compaction to achieve a comparable degree of performance from a settlement-limiting aspect. The hydrostatic fluid pressure of the cementitious flowable backfill 18 will act to pre-stress the wall system 10 prior to set before placement of the overlying backfill and pavement structure. And by incorporating step notching 27, as illustrated in
Structural Considerations
From a structural standpoint, the most critical point along the wall face is where it is cantilevered above the brace fin sheet pile 80 directly connecting to the face with moment within the wall sheet being the controlling factor in its design. The brace fin sheet pile 80 connected to the wall face 22 is higher than the adjoining several cradle fin sheets 29, the tops of which are depressed from sheets on either side, terminating at cradle bottom 31, to serve as a cradle 19 to allow for construction of pipes/utilities 33 behind the wall face 22, as illustrated in
The fin sheets will act in tension—serving as vertically-planar, continuous anchors—providing resistance to lateral movement of the wall face 22. With the strength of steel being measured in tens of thousands of kips per square inch, the interconnected, continuous nature of sheet piles results in loadings in tension being relatively low when compared to the available strength—and it is for this reason that fin sheet sizes (weights) may be considerably less than sheet sizes required for the wall face.
In addition to essentially eliminating the need for temporary shoring to allow for the construction of this particular sheet pile retaining wall system 20, the other big key to its economic success is the methodology for how it is constructed.
Construction Methodology
Basically, a temporary working bench 23 upon which the pile driving unit would be situated would be excavated to a depth of 18 inches to 2 feet below the innermost fin sheets, i.e., those sheets situated higher on the embankment closer to active traffic. (The 18 inch to 2 foot clearance would allow for the pile hammer to grab/secure these piles for subsequent driving.) Generally speaking (but not always), sheet piles would be driven in two groups to allow for greater constructability. Group 1 piles 25a would include the wall face 22 and those fin piles in the immediate area of the roadway drainage/utility cradle. A sufficient number of fin sheets would be installed to provide
Following Group 1 pile 25a installation and cementitious, flowable backfill installation, Group 2 pile 25b installation to complete fin installation would begin. (This cementitious backfill—once set after placement in lifts generally limited to a 3 to 4-foot maximum thickness—will serve to reduce loading on the wall face 22 which is not only an important feature for the completed wall system 10 but also a factor in limiting loading on the wall face 22 when backfilling up to the bottom of the cradle 19 with only Group 1 piles 25a in place). And once Group 1 25a and Group 2 piles 25b are in place within a given stretch of highway, backfilling with earthen (non-cementitious) material beneath the entire roadway in the wall construction zone would occur. In conjunction with this construction would be installation of roadway drainage (and utilities) within the specified cradle 19. At this point, construction of the overlying pavement structure and moment slab/safety barrier (or guide rail) would then occur. Please see the
Now with particular regard to the development of tension in the wall fins, a slight, inward transverse force would be applied to the fin sheets during vibrating/driving, thus removing play in the interlocks. As necessary to keep the wall face within horizontal tolerance, wall sheets at the 3-way connectors 32 would be re-visited and a slight, outward transverse force would be applied to the pile hammer. Vertical tolerance would be achieved by driving pile lengths longer than design lengths and cutting/burning off the excess.
Referring to
It should be understood, of course, that the foregoing relates to exemplary embodiments of the invention and that modifications may be made without departing from the spirit and scope of the invention as set forth in the following claims.
Number | Name | Date | Kind |
---|---|---|---|
1277847 | Cahn | Sep 1918 | A |
2001473 | Smith | May 1935 | A |
3492826 | Gardner | Feb 1970 | A |
5145287 | Hooper | Sep 1992 | A |
6715964 | Nottingham | Apr 2004 | B2 |
20080145153 | Wendt | Jun 2008 | A1 |
20080152435 | Heindl | Jun 2008 | A1 |
20110064527 | Nottingham et al. | Mar 2011 | A1 |
20110188948 | Heindl | Aug 2011 | A1 |
20120076594 | Park | Mar 2012 | A1 |
Number | Date | Country |
---|---|---|
4226067 | May 1993 | DE |
60059228 | Apr 1985 | JP |