This invention relates to the application of safer delivery methods for installing and removing tubing from a shifting injector while under tension and may be particularly applicable in the coiled tubing sector of the oil and gas industry.
Premier Coil Solutions (PCS), 18993 GH Circle, Waller, Tex., USA, is an advanced manufacturer of coiled tubing products. Premier Coil Solutions, herein known as PCS, is a worldwide leader in Engineering and Manufacturing Excellence in the coiled tubing industry.
Coiled tubing was developed in the 1960's. A Coiled Tubing Unit (CTU) is equipped with a string of long continuous metal pipe normally 1″-3.5″ in diameter, spooled onto a large reel which is centered on a large trailer, skid, or truck, for deployment using a machine called an injector to, for example, perform well intervention duties. These duties used to be performed by a number of different machines, crews, and units, but now have been combined into a single unit or CTU that is capable of performing tasks that were not possible with one unit 10 years ago. This long continuous pipe or “Tubing” often only has a brief lifecycle, which can be ruined with a single puncture, cut, or other issue. Moreover, the Tubing is usually not as effective once separated and thus it is usually desirable for it to remain in one piece. Tubing generally is no longer useful or not as useful after being deployed or spooled to a footage of approximately 750,000 to 1.5 million running feet. Once the tubing leaves the tubing manufacturing facility the time starts on the lifecycle or amount of total footage deployed and returned to the CTU.
Typically, the tubing is sent down-hole into either an oil or gas well to perform or assist in performing a well service event after which it is usually spooled back on the CTU. Depending on the operation and function of what is performed down-hole, in some cases it may take upwards of 5 or even 10 or more trips of deployment and spooling to complete the action. This repetitive operation gets added into the lifecycle of the pipe, and depending on how actively the unit is used, it will reach the end of its' cycle and the tubing must be removed and re-spooled with new pipe in a matter of one, two, or three months. As the market demands larger well sizes and deeper wells, improvements in coiled tubing deployment are needed to accommodate. That is, CTU's are often equipped with larger size and lengths of tubing, and require larger methods in which to transport, store, and deploy tubing. Advantageously, the methods described herein meet many of the needs of the coiled tubing industry to safely deploy coiled tubing.
The methodology of preparing the unit for the impending work usually starts when new tubing is introduced as shown in
The height of the injector (105) as it lays on the trailer (107) is why the levelwind arm (103) is usually adjusted. That is, the adjustment is part of a method in which the injector is introduced to the tubing by an industry method called “stabbing” of the pipe into the injector.
The stabbing operation may be dangerous due to the fact that spooled tubing is a semi-flexible metal and is under tension. As such, it must be released in a controlled manner to prevent unwanted unwrapping of the spool which could result in lashing tubing which creates a safety hazard. This precise operation combined with the fact that the pipe is typically in an unsupported state mean that the stabbing process should be controlled carefully. A variable that can reduce the stabbing time and associated risk is the distance between the reel and the injector.
The tubing is typically secured by a clamp near the counter (100) to prevent the tubing from going back through the counter and unspooling. Depending on the length of pipe that the tubing supplier provides on the other side of the counter (injector side 105), trimming the tubing (108) in
As shown in
Securement of the spooled reel (104) and tubing (108) remains paramount throughout the “stabbing” procedure. Typically, the less amount of tubing that is deployed, the safer and more efficient the operation becomes. The tubing is forced down by gravity and the natural curve of the tubing, so the levelwind arm (103) must initially be positioned somewhat high and then gradually lowered toward the end of the stabbing process. Thus, the tubing position generally varies in the up and down direction while the tubing (108) is positioned into the hole in the injector (112) shown in
Sometimes the tubing is cut too short or the angled cut is not suitable for the tubing to be placed into the injector. In such cases often a crane or other device is employed to change the angle of the pipe, and this may further add to the potential for harm to personnel or equipment. In cases when the angles are not correct or suitable as shown in
As shown in
Embodiments described herein may permit movement of the injector on any axis relative to the tubing reel, i.e., vertical (up and down), horizontal (forward and backward), and tilted relative to any of the cardinal directions or axes. In other embodiments, the top of the injector (into which coiled tubing is being stabbed) may be permitted to be tilted forward, backward, or to either side at the top while not moving the bottom of the injector, thereby permitting an operator to incrementally move and “work” the injector into a position to as required to safely and efficiently stab it with coiled tubing.
The present inventions not only allow for vertical movement of the injector from the transport position but in one embodiment may also allow for movement of the injector toward or away from the tubing reel to further facilitate the stabbing process. In one embodiment the injector is positioned fully rearward at the start of stabbing operations. The injector can then be positioned 2, 3, or 4 feet or more forward depending on the need. The injector can also be positioned rearward at any time, up to a mechanical stop. These movements can be performed in any convenient and coordinated manner. In one embodiment the movements are conducted remotely through the application of a valve or other remotely located “control” device keeping an operator away from the moving equipment and coiled tubing during the stabbing process.
In one embodiment the shift toward or away from the tubing reel may be conducted using hydraulic forces, actuated for a shift, and it can be extended to greater lengths. As shown in one embodiment in
While the embodiments of the invention have been shown and described, modifications thereof can be made by one skilled in the art without departing from the spirit and teachings of the invention. The embodiments described and the examples provided herein are exemplary only, and are not intended to be limiting. Many variations and modifications of the invention disclosed herein are possible and are within the scope of the invention. Accordingly, the scope of protection is not limited by the description set out above, but is only limited by the claims which follow, that scope including all equivalents of the subject matter of the claims. The appended drawings illustrate only typical embodiments of the disclosed methods and systems and therefore are not to be considered limiting of its scope and breadth.
This application claims priority to U.S. Provisional Patent Application No. 62/966,069 filed on Jan. 27, 2020, which is incorporated herein by reference in its entirety.
Number | Name | Date | Kind |
---|---|---|---|
5575332 | Wasterval, Jr. | Nov 1996 | A |
6457534 | Rolovic | Oct 2002 | B1 |
20070125551 | Havinga | Jun 2007 | A1 |
20120103633 | Korach | May 2012 | A1 |
20140308105 | Soertveit | Oct 2014 | A1 |
20180030793 | Behrens | Feb 2018 | A1 |
Number | Date | Country | |
---|---|---|---|
20210270096 A1 | Sep 2021 | US |
Number | Date | Country | |
---|---|---|---|
62966069 | Jan 2020 | US |