Abstract
The drilling rig includes a first substructure and a second substructure. The second substructure is positioned generally parallel to and spaced apart from the first substructure and generally the same height as the first substructure. The drilling rig further includes a drill rig floor coupled to the first and second substructures, where the drill rig floor positioned substantially at the top of the first and second substructures.
Description
FIELD OF THE DISCLOSURE

The present disclosure relates generally to drilling rigs, and specifically to box-on-box rig structures for land drilling in the petroleum exploration and production industry.


BACKGROUND OF THE DISCLOSURE

Land-based drilling rigs may be configured to be skidded from location to location to drill multiple wells within the same area known as a wellsite. In certain situations, it is necessary to skid across an already drilled well for which there is a well-head in place. Further, mast placement on land-drilling rigs may have an effect on drilling activity. For example, depending on mast placement on the drilling rig, an existing well-head may interfere with the location of land-situated equipment such as, for instance, existing wellheads, and may also interfere with raising and lowering of equipment needed for operations.


SUMMARY

The present disclosure provides for a drilling rig. The drilling rig may include a first substructure; a second substructure, the second substructure being positioned generally parallel to and spaced apart from the first substructure and being generally the same height as the first substructure; and a drill floor coupled to the first and second substructures, the drill floor positioned substantially at the top of the first and second substructures.


The present disclosure also provides for a substructure for use in a drilling rig. The substructure may include a substructure frame, the substructure frame configured to at least partially support a drilling floor; and a tank support structure affixed to the substructure.


The present disclosure also provides for a drilling rig. The drilling rig may include a first substructure; a second substructure, the second substructure being positioned generally parallel to and spaced apart from the first substructure and being generally the same height as the first substructure; and a drill floor coupled to the first and second substructures. The drill floor may be positioned substantially at the top of the first and second substructures. The drill floor may include a V-door, the V-door generally aligned with a side of the drill floor, and the side of the drill floor with which the V-door is aligned may face towards the first or second substructure. The drilling rig may also include a mast coupled to the drill floor. The drilling rig may also include a tank support structure affixed to the first or second substructure. The tank support structure may include a tank and mud process equipment. The drilling rig may also include a grasshopper positioned to carry cabling and lines to the drilling rig. The grasshopper may be positioned to couple to the drill floor generally at a side of the drill floor, and the side of the drill floor to which the grasshopper couples may face towards the first or second substructure.





BRIEF DESCRIPTION OF THE DRAWINGS

The summary and the detailed description are further understood when read in conjunction with the appended drawings. For the purpose of illustrating the present disclosure, there are shown in the drawings exemplary embodiments of said disclosure; however, the disclosure is not limited to the specific methods, compositions, and devices disclosed. In addition, the drawings are not necessarily drawn to scale. In the drawings:



FIG. 1 is a side elevation from the driller's side of a drilling rig consistent with at least one embodiment of the present disclosure.



FIG. 2 is an overhead view of a drilling rig consistent with at least one embodiment of the present disclosure.



FIG. 3 is an isometric view of a drilling rig consistent with at least one embodiment of the present disclosure.



FIG. 4 is an isometric view of a drilling rig consistent with at least one embodiment of the present disclosure.





DETAILED DESCRIPTION

The present disclosure may be understood more readily by reference to the following detailed description, taken in connection with the accompanying figures, which form a part of this disclosure. It is to be understood that this disclosure is not limited to the specific devices, methods, applications, conditions or parameters described and/or shown herein, and that the terminology used herein is for the purpose of describing particular embodiments by way of example only and is not intended to be limiting of the present disclosure. Also, as used in the specification, including the appended claims, the singular forms “a,” “an,” and “the” include the plural, and reference to a particular numerical value includes at least that particular value, unless the context clearly dictates otherwise. The term “plurality,” as used herein, means more than one.



FIG. 1 depicts a side elevation of drilling rig 10 from the “driller's side” consistent with at least one embodiment of the present disclosure. Drilling rig 10 may include drill rig floor 20, right substructure 30, and left substructure 40. Right and left substructures 30, 40 may support drill rig floor 20. Mast 50 may be coupled to drill rig floor 20. As would be understood by one having ordinary skill in the art with the benefit of this disclosure, the terms “right” and “left” as used herein are used only to refer to each separate substructure to simplify discussion, and are not intended to limit this disclosure in any way. Mud gas separator tank 60 may be positioned within right or left substructures 30, 40, as shown in FIG. 1 or cantilevered from the left or right substructures 30, 40 as shown in FIGS. 3 and 4. V-door side 22 of drilling rig 10 may be located over right substructure 30. The V-door side 52 of mast 50 may correspondingly face right substructure 30. Pipe handler 24 may be positioned to carry piping through a V-door as understood in the art positioned on V-door side 22 of drilling rig 10. In some embodiments, grasshopper 26 may be positioned to carry cabling and lines to drilling rig 10. In other embodiments (not shown), V-door side 22 and mast V-door side 52 may face left substructure 40. In some embodiments, as depicted in FIG. 1, blow out preventer 90 may be located between left substructure 40 and right substructure 30, i.e. drilling rig 10 may be centered over a wellbore.


In some embodiments, tank support structure 80 and tanks 70 may be included in drilling rig 10. Tank support structure 80 may be affixed to right substructure 30 or left substructure 40 by means known to those of ordinary skill in the art with the benefit of this disclosure, including, but not limited to, welding and bolting. As shown in FIG. 1, tank support structure 80 may be affixed to left substructure 40. Tank support structure 80 may be located on the opposite substructure from V-door side 22 of drilling rig 10. Tanks 70 may, for example, be mud tanks, auxiliary mud tanks, or other tanks useful in drilling operations and may be located within tank support structure 80. In some embodiments, mud process equipment 100 may also be mounted within tank support structure 80. Mud process equipment may include, for example, shakers, filters, and other equipment associated with the use of drilling mud.



FIG. 2 depicts an overhead view of drilling rig 10 consistent with at least one embodiment of the present disclosure in which V-door side 22 of drilling rig 10, drill rig floor 20, and tank support structure 80 are shown. In some embodiments, choke manifold 102 may likewise be located on the rig floor. In some embodiments, accumulator 104 may likewise be located on the rig floor.



FIG. 3 depicts drilling rig 10 having drill rig floor 20. Drill rig floor 20 includes V-door side 22. Pipe handler 24 may connect to drilling floor 20 through V-door 28. FIG. 3 further depicts V-door side 22 of drilling rig 10 above right substructure 30 and perpendicular to the long axis of right substructure 30. FIG. 3 also depicts V-door side 52 of mast 50 perpendicular to the long axis of right substructure 30. Left substructure 40 is shown opposite right substructure 30. As shown in FIG. 3, right substructure 30 and left substructure 40 are elongated substructures. FIG. 4 depicts tank support structure 80 affixed to left substructure 40. Tanks 70 are shown positioned within tank support structure 80. Mud process equipment 100 is located within tank support structure 80.


As they are mounted directly to a substructure (30 or 40) of drilling rig 10, tanks 70, mud process equipment 100, choke manifold 102, and accumulator 104 may travel with drilling rig 10 during a skidding operation. As such any pipe or tubing connections between or taken from tanks 70, mud process equipment 100, choke manifold 102, and/or accumulator 104 may remain connected during the skidding operations. This arrangement may allow, for example, more rapid rig disassembly (“rigging-down”) and assembly (or “rigging-up”) of drilling rig 10 before and after a skidding operation.


Additionally, by facing V-door side 22 of drilling rig 10 toward one of the substructures 30, 40, equipment and structures that pass through the V-door or to drilling floor 20 from V-door side 22 of drilling rig 10 may, for example, be less likely to interfere with additional wells in the well field.


One having ordinary skill in the art with the benefit of this disclosure will understand that the specific configuration depicted in FIGS. 1, 2 may be varied without deviating from the scope of this disclosure.


Those skilled in the art will appreciate that numerous changes and modifications can be made to the preferred embodiments of the present disclosure and that such changes and modifications can be made without departing from the spirit of said disclosure. It is, therefore, intended that the appended claims cover all such equivalent variations as fall within the true spirit and scope of said disclosure.

Claims
  • 1. A box-on-box land based drilling rig comprising: a first elongated substructure;a second elongated substructure, the second elongated substructure being positioned generally parallel to and spaced apart from the first elongated sub structure;a drill rig floor fixedly coupled to the first and second elongated substructures; anda mast coupled to the drill rig floor, wherein the mast further comprises a V-door side and wherein the V-door side of the mast is perpendicular to a long axis of the first elongated substructure,wherein the box-on-box land based drilling rig is adapted to be traveled in an assembled state through a wellsite.
  • 2. The land based drilling rig of claim 1, further comprising a choke manifold, the choke manifold positioned on the drill rig floor.
  • 3. The land based drilling rig of claim 2, wherein a catwalk is coupled to the first elongated substructure or second elongated substructure and is adapted to travel with the land based drilling rig.
  • 4. The land based drilling rig of claim 1, wherein the land based drilling rig is a box-on-box rig.
  • 5. The land based drilling rig of claim 1, wherein the drill rig floor comprises a V-door, the V-door generally aligned with a V-door side of the drill rig floor, the V-door side of the drill rig floor aligned perpendicular to a long axis of the first elongated substructure.
  • 6. The land based drilling rig of claim 1 further comprising one or more tanks, the one or more tanks positioned within the land based drilling rig.
  • 7. The land based drilling rig of claim 1 further comprising a mud gas separator, the mud gas separator positioned within the first elongated substructure or the second elongated substructure.
  • 8. The land based drilling rig of claim 1 further comprising a pipe handler, the pipe handler positioned to carry piping through a V-door on the V-door side of the drill rig floor.
CROSS-REFERENCE TO RELATED APPLICATIONS

This application is a continuation of U.S. non-provisional application Ser. No. 15/191,094, filed Jun. 23, 2016, which is a continuation of U.S. non-provisional application Ser. No. 14/180,049, filed Feb. 13, 2014, and now granted as U.S. Pat. No. 9,810,027, which is itself a non-provisional application which claims priority from U.S. provisional application No. 61/764,259 filed Feb. 13, 2013.

US Referenced Citations (130)
Number Name Date Kind
1733484 Davis Oct 1929 A
2332479 Woolslayer et al. Oct 1943 A
2345253 Funk Mar 1944 A
2347115 Lewis Apr 1944 A
2594847 Bates Apr 1952 A
3028881 Koomey et al. Apr 1962 A
3433268 Greer Mar 1969 A
3483933 Dyer Dec 1969 A
3676984 Clark Jul 1972 A
3716149 Scaggs Feb 1973 A
3739853 Wales Jun 1973 A
3802137 Armstrong Apr 1974 A
3851770 Jenkins et al. Dec 1974 A
3922825 Eddy et al. Dec 1975 A
3942593 Reeve, Jr. Mar 1976 A
4021978 Busse et al. May 1977 A
4117941 McCleskey et al. Oct 1978 A
4221088 Patterson Sep 1980 A
4235566 Beeman et al. Nov 1980 A
4267675 Cochran May 1981 A
4290495 Elliston Sep 1981 A
4403898 Thompson Sep 1983 A
4421179 Boyadjieff Dec 1983 A
4474254 Etter et al. Oct 1984 A
4478015 Lawrence et al. Oct 1984 A
4478291 Futros Oct 1984 A
4488708 Frye Dec 1984 A
4493382 Collins Jan 1985 A
4587778 Woolslayer et al. May 1986 A
4757592 Reed Jul 1988 A
4759414 Willis Jul 1988 A
4823870 Sorokan Apr 1989 A
4834604 Brittain et al. May 1989 A
4850439 Lund Jul 1989 A
4899832 Bierscheid, Jr. Feb 1990 A
4979578 Landry Dec 1990 A
5107940 Berry Apr 1992 A
5248005 Mochizuki Sep 1993 A
5305833 Collins Apr 1994 A
5375667 Trevisani Dec 1994 A
5492436 Suksumake Feb 1996 A
6161358 Mochizuki Dec 2000 A
6491477 Bennett, Jr. et al. Dec 2002 B2
6634436 Desai Oct 2003 B1
6779614 Oser Aug 2004 B2
6848515 Orr et al. Feb 2005 B2
6962030 Conn Nov 2005 B2
7255180 Beato et al. Aug 2007 B2
7306055 Barnes Dec 2007 B2
7308953 Barnes Dec 2007 B2
7308963 Barnes Dec 2007 B2
7401656 Wood et al. Jul 2008 B2
7404697 Thompson Jul 2008 B2
7600585 Patton et al. Oct 2009 B2
7628229 Wood et al. Dec 2009 B2
7765749 Palidis Aug 2010 B2
7819207 Cowan Oct 2010 B2
7832974 Fikowski et al. Nov 2010 B2
7878254 Abdollahi et al. Feb 2011 B2
7931076 Ditta et al. Apr 2011 B2
7967540 Wright Jun 2011 B2
7992646 Wright et al. Aug 2011 B2
8051930 Barnes et al. Nov 2011 B1
8250816 Donnally et al. Aug 2012 B2
8297362 Strider et al. Oct 2012 B1
8316588 Cicognani Nov 2012 B2
8468753 Donnally et al. Jun 2013 B2
8474216 Goerner Jul 2013 B1
8516751 Konduc et al. Aug 2013 B2
8549815 Donnally et al. Oct 2013 B2
8555564 Wasterval Oct 2013 B2
8661743 Flusche Mar 2014 B2
8720128 Vogt May 2014 B2
8813436 Donnally et al. Aug 2014 B2
8863449 Donnally et al. Oct 2014 B2
8904716 Donnally et al. Dec 2014 B2
8985238 Sorokan et al. Mar 2015 B2
8985928 Flusche Mar 2015 B2
8997435 Reddy et al. Apr 2015 B2
9016004 Vogt Apr 2015 B2
9027287 Trevithick et al. May 2015 B2
9091125 Konduc et al. Jul 2015 B2
9091126 Thiessen et al. Jul 2015 B2
9132871 Crisp et al. Sep 2015 B2
9140080 Flusche Sep 2015 B2
9151412 Trevithick et al. Oct 2015 B2
9163462 Donnally et al. Oct 2015 B2
9212481 Stramandinoli Dec 2015 B2
9228394 Wijning et al. Jan 2016 B2
9249626 Flusche Feb 2016 B2
9260929 Mark Feb 2016 B2
9267328 Flusche Feb 2016 B2
9309728 Reddy et al. Apr 2016 B2
9291012 Wells, Sr. May 2016 B2
9334668 Wijning et al. May 2016 B2
9353601 Hause May 2016 B2
9382766 Flusche Jul 2016 B2
9399890 Mark Jul 2016 B2
9441423 Donnally et al. Sep 2016 B2
9366053 Thiessen et al. Oct 2016 B2
9464488 Thiessen Oct 2016 B2
9488014 Sparkman et al. Nov 2016 B2
9562407 Magnuson Feb 2017 B2
9631443 Folk Apr 2017 B2
9650840 Cheng et al. May 2017 B2
9677298 Konduc et al. Jun 2017 B2
9708861 Reddy Jul 2017 B2
9790751 Reddy et al. Oct 2017 B2
9810027 Reddy Nov 2017 B2
9845813 Shimizu et al. Dec 2017 B2
9926719 Reddy Mar 2018 B2
20030172599 Frink Sep 2003 A1
20040134666 Orr Jul 2004 A1
20050126827 Berry Jun 2005 A1
20060081379 Fehres Apr 2006 A1
20080237170 Altman et al. Oct 2008 A1
20090000218 Lee et al. Jan 2009 A1
20090025980 Callander et al. Jan 2009 A1
20090200856 Chehade et al. Aug 2009 A1
20110072737 Wasterval Mar 2011 A1
20120304553 Konduc et al. Dec 2012 A1
20130305632 Rivera, Sr. et al. Nov 2013 A1
20140224543 Padira et al. Aug 2014 A1
20150143759 Sparkman et al. May 2015 A1
20160010323 Konduc Jan 2016 A1
20160298394 Padira Oct 2016 A1
20160369570 Reddy et al. Dec 2016 A1
20160376808 Magnuson Dec 2016 A1
20170106925 Gupta et al. Apr 2017 A1
20170292334 Reddy Oct 2017 A1
Foreign Referenced Citations (8)
Number Date Country
2755483 Nov 2010 CA
2753417 Feb 2011 CA
201778661 Mar 2011 CN
849533 Sep 1952 DE
2751370 Jul 2014 EP
2556042 Jun 1985 FR
2016025521 Feb 2016 WO
2016048458 Mar 2016 WO
Non-Patent Literature Citations (7)
Entry
Nabors 990 Proyecto Llanos.WMV; https://www.youtube.com/watch?v=6BgfgWumRIU, Nabors Rig 990 Chichimene, Colombia; Youtube.com; Aug. 10, 2011 (231 pages).
Office Action issued in U.S. App. No. 15/191,140 dated Jul. 13, 2017 (12 pages).
Drilling Contractor; “Nabors modular Rig 702 in Papua New Guinea-bound for ExxonMobil”; Drilling Contractor, in Drilling Rigs & Automation, News, Jul. 6, 2011; 2 pages; www.drillingcontractor.org.
Drilling Contractor; “Nabors to base all future land rigs on Minimum Area AC rig concept”; Drilling Contractor, in News, Aug. 22, 2011; 2 pages; www.drillingcontractor.org.
Sebastion, Simone; “Big drill soon begins long commute to work”; Houston Chronicle, Sunday, Jul. 3, 2011; 3 pages; www.chron.com.
Gass, John “Declaration Under 37 C.F.R. §1.132 including Exhibits A, B, C and D” dated Jul. 24, 2017 (235 pages).
Gaddy, Dean E., “Critical path analysis improves rig-moving procedures”, Oil & Gas Journal, Nov. 16, 1998 (5 pages).
Related Publications (1)
Number Date Country
20180119496 A1 May 2018 US
Provisional Applications (1)
Number Date Country
61764259 Feb 2013 US
Continuations (2)
Number Date Country
Parent 15191094 Jun 2016 US
Child 15853283 US
Parent 14180049 Feb 2014 US
Child 15191094 US