Single trip method for selectively fracture packing multiple formations traversed by a wellbore

Information

  • Patent Grant
  • 6776238
  • Patent Number
    6,776,238
  • Date Filed
    Tuesday, April 9, 2002
    22 years ago
  • Date Issued
    Tuesday, August 17, 2004
    20 years ago
Abstract
Screen assemblies (40, 42) and a single trip method for selectively fracturing multiple formations (14, 16) traversed by a wellbore (32) are disclosed. Each formation (14, 16) has a screen assembly (40, 42) having a plurality of valves (60, 66) positioned adjacent thereto. During the treatment process, the formations (14, 16) are selectively treated with a treatment fluid that is pumped into the interior of the adjacent screen assembly (40, 42). The valves (60, 66) of the respective screen assemblies (40, 42) progressively allow the treatment fluid to exit from the interior to the exterior of the screen assemblies (40, 42) such that each formation (14, 16) is progressively fractured.
Description




TECHNICAL FIELD OF THE INVENTION




This invention relates, in general, to the treatment of production intervals traversed by a wellbore to stimulate hydrocarbon production and prevent the production of fine particulate materials and, in particular, to a single trip method for selectively fracture packing multiple formations traversed by the wellbore.




BACKGROUND OF THE INVENTION




It is well known in the subterranean well drilling and completion art that hydraulic fracturing of a hydrocarbon formation is sometimes necessary to increase the permeability of the production interval adjacent the wellbore. According to conventional practice, a fracture fluid such as water, oil, oil/water emulsion, gelled water, gelled oil, CO


2


and nitrogen foams or water/alcohol mixture is pumped down the work string with sufficient volume and pressure to open multiple fractures in the production interval. The fracture fluid may carry a suitable propping agent, such as sand, gravel or engineered proppants, into the fractures for the purpose of holding the fractures open following the fracturing operation.




During the fracture operation, the fracture fluid must be forced into the formation at a flow rate great enough to generate the required pressure to fracture the formation allowing the entrained proppant to enter the fractures and prop the formation structures apart. The proppants produce channels which will create highly conductive paths reaching out into the production interval, which increases the reservoir permeability in the fracture region. As such, the success of the fracture operation is dependent upon the ability to inject large volumes of hydraulic fracture fluid along the entire length of the formation at a high pressure and at a high flow rate.




It has been found, however, that it is difficult to achieve the desired stimulation of multiple zones traversed by a single wellbore. Specifically, when multiple production intervals are fractured at the same time, one of the zones will typically dominate and take a vast majority of the treatment fluids. While this dominant zone may be properly stimulated, the other less dominant zones may receive little or no treatment fluids resulting in little or no stimulation.




Therefore a need has arisen for a method of selectively frac packing multiple zones traversed by a wellbore such that tailored fracture treatments may be preformed on each of the zones. A need has also arisen for such a method that is capable of creating fractures along the entire length of each of the zones. Further a need has arisen for such a method that is capable of stimulating each of the zones to enhance production and capable of packing each of the production intervals to prevent the production of fine particulate materials when production commences.




SUMMARY OF THE INVENTION




The present invention disclosed herein comprises a single trip method of selectively frac packing multiple zones traversed by a wellbore such that tailored fracture treatments may be preformed on each of the zones. The method of the present invention is capable of creating fractures along the entire length of each of the zones. Further, the method of the present invention is capable of stimulating each of the zones to enhance production and is also capable of packing each of the production intervals to prevent the production of fine particulate materials when production commences.




In the single trip method of the present invention, a first screen assembly having a plurality of first valves is located within the wellbore proximate a first formation and a second screen assembly having a plurality of second valves is located within the wellbore proximate a second formation. A service tool is then run downhole and positioned proximate the first formation such that a first fracture treatment fluid may be pumped through the service tool into of the first screen assembly. The first valves are then progressively operated to establish fluid communication from the interior to the exterior of the first screen assembly such that the first formation is progressively fractured. The service tool is then repositioned proximate the second formation such that a second fracture treatment fluid may be pumped into the interior of the second screen assembly. Thereafter, the second valves are progressively operated to establish fluid communication from the interior to the exterior of the second screen assembly such that the second formation is progressively fractured.




The present invention allows for a tailored treatment regimen to be delivered to each formation. As an example, the first and second fracture treatment fluids may have substantially the same composition or may have different compositions. Likewise, the first and second fracture treatment fluids may have substantially the same viscosity or may have different viscosities. In addition, the first and second fracture treatment fluids may be injected at substantially the rate or may be injected at different rates.




The first and second fracture treatment fluids may include solid agents therein. The solid agents not only prop the fractures in the first and second formations to create a highly permeable path to the wellbore, but also, pack the wellbore adjacent to the first and second formations to prevent the production of fines therethrough.




During and following the treatment process, the flow of fluids from the exterior to the interior of the first and second screen assemblies through the first and second valves is prevented as the first and second valves are preferably one-way valves only allowing fluid flow from the interior to the exterior of the first and second screen assemblies. In addition, during the treatment process, the flow of fluids between the interior and the exterior of the first and second screen assemblies through the openings in the base pipes of the first and second screen assemblies is prevented with seal members. Following the treatment process, however, the seal members must be removed. Depending upon the type of seal members used, the removal process may involve combustion, vibration, chemical reaction, mechanical removal or the like.




The progressive operation of the first valves may progress from the far end, the end having a greater hole depth, to the near end, the end having a lesser hole depth, of the first screen assembly. Alternatively, the progressive operation of the first valves may progress from the near end to the far end of the first screen assembly. Likewise, the progressive operation of the second valves may progress from the far end to the near end or the near end to the far end of the second screen assembly.




The first and second valves may be progressively operated in response to pressure within their respective screen assemblies. Alternatively, the progressive operation of the first and second valves may be achieved via wireless telemetry, a direct electrical connection, a hydraulic connection or the like.











BRIEF DESCRIPTION OF THE DRAWINGS




For a more complete understanding of the features and advantages of the present invention, reference is now made to the detailed description of the invention along with the accompanying figures in which corresponding numerals in the different figures refer to corresponding parts and in which:





FIG. 1

is a schematic illustration of an offshore oil and gas platform operating a pair of sand control screen assemblies of the present invention;





FIG. 2

is a cross sectional view of a sand control screen assembly of the present invention having a plurality of pressure sensitive valves and sand control screens;





FIG. 3

is a half sectional view of a downhole production environment including two production intervals each having a sand control screen assembly of the present invention associated therewith before a downhole treatment process;





FIG. 4

is a half sectional view of a downhole production environment including two production intervals each having a sand control screen assembly of the present invention associated therewith during a first phase of a downhole treatment process;





FIG. 5

is a half sectional view of a downhole production environment including two production intervals each having a sand control screen assembly of the present invention associated therewith during a second phase of a downhole treatment process;





FIG. 6

is a half sectional view of a downhole production environment including two production intervals each having a sand control screen assembly of the present invention associated therewith during a third phase of a downhole treatment process;





FIG. 7

is a half sectional view of a downhole production environment including two production intervals each having a sand control screen assembly of the present invention associated therewith during a fourth phase of a downhole treatment process;





FIG. 8

is a half sectional view of a downhole production environment including two production intervals each having a sand control screen assembly of the present invention associated therewith during a fifth phase of a downhole treatment process;





FIG. 9

is a half sectional view of a downhole production environment including two production intervals each having a sand control screen assembly of the present invention associated therewith during a sixth phase of a downhole treatment process;





FIG. 10

is a half sectional view of a downhole production environment including two production intervals each having a sand control screen assembly of the present invention associated therewith during a seventh phase of a downhole treatment process;





FIG. 11

is a half sectional view of a downhole production environment including two production intervals each having a sand control screen assembly of the present invention associated therewith during an eighth phase of a downhole treatment process;





FIG. 12

is a half sectional view of a downhole production environment including two production intervals each having a sand control screen assembly of the present invention associated therewith during a ninth phase of a downhole treatment process; and





FIG. 13

is a half sectional view of a downhole production environment including two production intervals each having a sand control screen assembly of the present invention associated therewith during a tenth phase of a downhole treatment process.











DETAILED DESCRIPTION OF THE INVENTION




While the making and using of various embodiments of the present invention are discussed in detail below, it should be appreciated that the present invention provides many applicable inventive concepts which can be embodied in a wide variety of specific contexts. The specific embodiments discussed herein are merely illustrative of specific ways to make and use the invention, and do not delimit the scope of the present invention.




Referring initially to

FIG. 1

, a pair of sand control screen assemblies used during the treatment of multiple intervals of a wellbore in a single trip are operating from an offshore oil and gas platform that is schematically illustrated and generally designated


10


. A semi-submersible platform


12


is centered over a pair of submerged oil and gas formations


14


,


16


located below a sea floor


18


. A subsea conduit


20


extends from a deck


22


of the platform


12


to a wellhead installation


24


including blowout preventers


26


. Platform


12


has a hoisting apparatus derrick


30


for raising and lowering pipe strings such as a work string


32


.




A wellbore


34


extends through the various earth strata including formations


14


,


16


. A casing


36


is cemented within wellbore


34


by cement


38


. Work string


32


includes various tools such as a sand control screen assembly


40


, which is positioned within production interval


44


between packers


46


,


48


and adjacent to formation


14


, and sand control screen assembly


42


, which is positioned within production interval


50


between packers


52


,


54


and adjacent to formation


16


. Sand control screen assembly


40


includes sand control screens


56


,


58


and a plurality of valves


60


. Sand control screen assembly


42


includes sand control screens


62


,


64


and a plurality of valves


66


. Once sand control screen assemblies


40


,


42


are in place a treatment fluid containing sand, gravel, proppants or the like is pumped down work string


32


such that formation


14


is fractured and production interval


44


is packed. Once this occurs, formation


16


is fractured and production interval


50


is packed.




Even though

FIG. 1

depicts a vertical well, it should be noted by one skilled in the art that the sand control screen assemblies of the present invention are equally well-suited for use in deviated wells, inclined wells or horizontal wells. Also, even though

FIG. 1

depicts an offshore operation, it should be noted by one skilled in the art that the sand control screen assemblies of the present invention are equally well-suited for use in onshore operations. Also, even though

FIG. 1

depicts two formations, it should be understood by one skilled in the art that the treatment processes of the present invention are equally well-suited for use with any number of formations.




Referring now to

FIG. 2

, therein is depicted a more detailed illustration of sand control screen assembly


40


of the present invention. Sand control screen assembly


40


includes a pair of sand control screens


56


,


58


and a plurality of valves


76


,


78


,


80


. Each of the sand control screens


56


,


58


includes a base pipe


82


that has a plurality of openings


84


which allow the flow of production fluids into sand control screen assembly


40


. The exact number, size and shape of openings


84


are not critical to the present invention, so long as sufficient area is provided for fluid production and the integrity of base pipe


82


is maintained.




Spaced around each base pipe


82


is a plurality of ribs (not pictured) that are generally symmetrically distributed about the axis of base pipes


82


. The ribs may have any suitable cross section including a cylindrical cross section, a rectangular cross section, a triangular cross section or the like. Additionally, it should be understood by one skilled in the art that the exact number of ribs will be dependant upon the diameter of base pipe


82


as well as other design characteristics that are well known in the art.




Wrapped around the ribs of each base pipe


82


is a screen wire


86


. Screen wire


86


forms a plurality of turns having gaps therebetween through which formation fluids flow. The number of turns and the gap between the turns are determined based upon the characteristics of the formation from which fluid is being produced and the size of the gravel to be used during the treatment operation. Together, the ribs and screen wire


86


may form a sand control screen jacket which is attached to each base pipe


82


by welding or other suitable techniques. Disposed within openings


84


of base pipes


82


are seal members


88


depicted as plugs which initially prevent fluid flow through openings


84


of base pipes


82


as will be explained in more detail below.




It should be understood by those skilled in the art that while

FIG. 2

has depicted a wire wrapped sand control screens, other types of filter media could alternatively be used in conjunction with the apparatus of the present invention, including, but not limited to, a fluid-porous, particulate restricting, sintered metal material such as a plurality of layers of a wire mesh that are sintered together to form a porous sintered wire mesh screen designed to allow fluid flow therethrough but prevent the flow of particulate materials of a predetermined size from passing therethrough.




In the illustrated embodiment, sand control screen assembly


40


includes valves


76


,


78


,


80


. Valves


76


,


78


,


80


are preferably one-way valves that selectively allow fluid to flow from the interior of sand control screen assembly


40


to the exterior of sand control screen assembly


40


. Valves


76


,


78


,


80


may be progressively actuated using a variety of known techniques such as sending a signal via a direct electrical connection, fiber optics, hydraulics, wireless telemetry including pressure pulses, electromagnetic waves or acoustic signals and the like. Valves


76


,


78


,


80


are preferably pressure actuated one-way valves which prevent fluid flow from the exterior to the interior of sand control screen assembly


40


and are pressure actuatable to allow fluid flow from the interior to the exterior of sand control screen assembly


40


.




Referring now to

FIG. 3

, to begin the completion process, interval


44


adjacent to formation


14


is isolated. Packer


46


seals the near end of interval


44


and packer


48


seals the far end of interval


44


. Likewise, production interval


50


adjacent to formation


16


is isolated. Packer


52


seals the near end of production interval


50


and packer


54


seals the far end of production interval


50


.




As illustrated, when the treatment operation is a sequential fracture pack operation, the objective is to enhance the permeability of formation


14


by delivering a treatment fluid containing proppants at a high flow rate and in a large volume above the fracture gradient of formation


14


such that fractures may be formed within formation


14


and held open by the proppants. The fracture operation for formation


14


can be specifically tailored to achieve the desired stimulation of formation


14


based upon the formation characteristics. In addition, a frac pack also has the objective of preventing the production of fines by packing interval


44


with the proppants. Thereafter, the permeability of formation


16


is enhanced by fracturing formation


16


using a fracture treatment that is specifically tailored to achieve the desired stimulation of formation


16


based upon the formation characteristics. In addition, production interval


50


is packed with the proppants to prevent the production of fines therethrough.




To begin this treatment process, sand control screen assembly


40


including sand screens


56


and


58


and valves


76


,


78


,


80


is positioned within casing


36


adjacent to formation


14


. Valves


76


,


78


,


80


are preferably pressure actuated one-way valves. Likewise, sand control screen assembly


42


including sand screens


62


and


64


and valves


90


,


92


,


94


is positioned within casing


36


adjacent to formation


16


. Valves


90


,


92


,


94


are preferably pressure actuated one-way valves.




Seal members


88


of sand control screen assemblies


40


and


42


, which are illustrated as plugs, prevent fluid flow through sand control screen assemblies


40


and


42


. A service tool


100


is operably positioned within work string


32


. Additionally, seal element


102


is coupled to service tool


100


. Seal element


102


contacts the interior of work string


32


forming a seal, thereby preventing fluid flow into the annulus between work string


32


and service tool


100


.




Referring now to

FIG. 4

, in the initial phase of the treatment process of the present invention, the interior of sand control screen assembly


40


is filled with a treatment fluid. This is achieved by pumping treatment fluid downhole via service tool


100


. The treatment fluid may be any appropriate fracturing fluid such as oil, water, an oil/water emulsion, gelled water or gelled oil based fracture fluid having a relatively high viscosity to enhance the fracturing process. Preferably, the treatment fluid includes solid agents


110


such as sand, gravel or proppants.




In the illustrated embodiment, pressure actuated one-way valves


76


,


78


,


80


are progressively actuated to allow the treatment fluid to travel from the interior of screen assembly


40


into interval


44


and formation


14


. As stated above, there are numerous ways to progressively actuate valves


76


,


78


,


80


. In the preferred method, as illustrated, the pressure created by the treatment fluid within screen assembly


40


progressively triggers the actuation of pressure actuated one-way valves


76


,


78


,


80


. One way to implement this method is to position pressure actuated one way valves


76


,


78


,


80


along screen assembly


40


such that the pressure required to actuate pressure actuated one-way valves


76


,


78


,


80


progressively increases from one end of interval


44


to the other end of interval


44


. For example, each adjacent pressure actuated one-way valve may be set to actuate at an incremental pressure above the prior pressure actuated one-way valve such as at increments of between about 50-100 psi. This assures a proper progression of the treatment by preventing any out of sequence activations. In addition, this approach is particularly advantageous in that the incremental pressure increase of adjacent pressure actuated one-way valves helps to insure that the entire formation is fractured.




Referring now to

FIG. 5

, the treatment fluid is continuously pumped at a high flow rate and in a large volume into screen assembly


40


such that pressure begins to build within screen assembly


40


. At this point, pressure actuated one-way valve


76


is actuated which allows the treatment fluid to travel from the interior of screen assembly


40


into interval


44


through pressure actuated one-way valve


76


. It should be noted that pressure actuated one-way valves


78


,


80


remain closed.




As treatment fluid flows from the interior of screen assembly


40


through one-way valve


76


and into production interval


44


, fractures


120


are formed in formation


14


beginning at the far end of the interval


44


. Solid agents


110


in the treatment fluid travel into the newly created fracture


120


to prop the fractures open and create a path of high permeability back to wellbore


34


. As fractures


120


cease to propagate into formation


14


, the solid agents


110


begin to screen out in production interval


44


between sand control screen assembly


40


and casing


36


around valve


76


and form a gravel pack therein which filters particulate matter out of production fluids once production begins.




As this screen out occurs around valve


76


and treatment fluid continues to be pumped at a high flow rate and in a large volume, pressure begins to build inside of sand control screen assembly


40


which actuates pressure actuated one-way valve


78


. When valve


78


opens, the treatment fluid preferably exits sand control screen assembly


40


therethrough which lowers the pressure of valve


76


causing valve


76


to close preventing fluid return from the exterior to the interior of sand control screen assembly


40


. As best seen in

FIG. 6

, the treatment fluid exiting valve


78


fractures the next portion of formation


14


.




This process continues from the far end of production interval


44


to the near end of production interval


44


. Specifically, referring now to

FIG. 7

, as treatment fluid continues to be pumped at a high flow rate and in a large volume into screen assembly


40


after screen out occurs around valve


78


, the next pressure actuated one-way valve


80


opens. At this point, one-way pressure actuated valve


78


closes. The treatment fluid travels from the interior of screen assembly


40


into interval


44


through pressure actuated one-way valve


80


and into the near end of formation


14


to create fractures


120


. Solid agents


110


in the treatment fluid travel into the newly created fracture


120


to prop the fractures open and create a path of high permeability back to wellbore


34


. Once these fractures


120


cease to propagate, solid agents


110


from the treatment fluid begin to screen out in the near end of the production interval


44


between sand control screen assembly


40


and casing


36


around valve


80


to form a gravel pack therein which filters particulate matter out of production fluids once production begins.




As no additional valves are available to relieve pressure within sand control screen


40


a pressure spike is measured at the surface. When this occurs, the fracture pack treatment of formation


14


and production interval


44


is complete. Accordingly, the treatment process of the present invention provides for a uniform distribution of treatment fluid along the entire length of formation


14


. This is achieved by progressively actuating pressure actuated one-way valves


76


,


78


,


80


such that the entire formation is fractured.




Even though

FIGS. 3-7

present the progressive frac packing of interval


44


as being progressively performed from the far end of the interval to the near end of the interval, those skilled in the art will understand that the progressive treatment process of the present invention can alternatively be performed from the near end of the interval to the far end of the interval. Additionally, it should be understood by those skilled in the art that multiple valves may be actuated simultaneously and that all the valves associated with some formations may be actuated together when the progressive treatment is not required.




Also, it should be noted by those skilled in the art that there are numerous alternatives to pressure actuated one-way valves. For example, in an alternative embodiment, a hard wired or wireless telemetry system may be used to progressively actuate the valves. For example, each valve may be actuated by sending a signal from the surface addressed to a specific valve. This assures a proper progression of the frac pack by preventing any out of sequence activations. The signals may be manually or automatically sent based upon time or the pressure response in screen assembly


40


. For example, the signal to actuate the next valve may be sent each time the pressure within screen assembly


40


reaches a particular level or each time the pressure within screen assembly


40


reaches the next preselected pressure increment.




Referring now to

FIG. 8

, following completion of the first frac packing operation of formation


14


, service tool


100


is operably repositioned to frac pack formation


16


. Once service tool


100


is positioned, a treatment process similar to that described above with reference to

FIGS. 3-7

but tailored to formation


16


may begin.




Referring now to

FIG. 9

, in the initial phase of the treatment process of the present invention, the interior of sand control screen assembly


42


is filled with a treatment fluid. This is achieved by pumping a treatment fluid down service tool


100


into sand control screen assembly


42


. The treatment fluid may be any appropriate fracturing fluid which may be the same as or different from that used to fracture formation


14


. Preferably, the treatment fluid includes solid agents


110


such as sand, gravel or proppants.




Referring now to

FIG. 10

, as the treatment fluid is continuously pumped at a high flow rate and in a large volume into screen assembly


42


, pressure begins to build within screen assembly


42


. At this point, pressure actuated one-way valve


90


is actuated which allows the treatment fluid to travel form the interior of screen assembly


42


into interval


50


through pressure actuated one-way valve


90


. It should be noted that pressure actuated one-way valves


92


,


94


are closed.




Treatment fluid flows from the interior of screen assembly


42


through one-way valve


90


into production interval


50


and the far end of formation


16


is fractured, as represented by fractures


130


. Solid agents


110


in the treatment fluid travel into the newly created fracture


130


to prop the fractures open and create a path of high permeability back to wellbore


34


. As fractures


130


cease to propagate into formation


16


, solid agents


110


begin to screen out in production interval


50


between sand control screen assembly


42


and casing


36


around valve


90


and form a gravel pack therein which filters particulate matter out of production fluids once production begins.




As this screen out occurs around valve


90


and treatment fluid continues to be pumped at a high flow rate and in a large volume, pressure begins to build causing the process of progressive valve actuation to continue from the far end of interval


50


to the near end of interval


50


. Specifically, referring now to

FIG. 11

, as treatment fluid continues to be pumped at a high flow rate and in a large volume into screen assembly


42


, screen out occurs around valve


90


causing the next pressure actuated one-way valve


92


to open. At this point, one-way pressure actuated valve


90


closes. The next section of formation


16


is now fractured as indicated by fractures


130


. As these new fractures cease to propagate and screen out occurs around valve


92


, the last pressure actuated one-way valve


94


is actuated.




As best seen in

FIG. 12

, the treatment fluid travels from the interior of screen assembly


42


into interval


50


through pressure actuated one-way valve


94


and into the near end of formation


16


to create fractures


130


. Additionally solid agents


110


in the treatment fluid travel into the newly created fracture


130


to prop the fractures open and create a path of high permeability back to wellbore


34


. Once these fractures cease to propagate, solid agents


110


in the treatment fluid begin to screen out in the near end of the production interval


50


between sand control screen assembly


42


and casing


36


around valve


94


to form a gravel pack therein which filters particulate matter out of production fluids once production begins. Solid agents


110


in the treatment fluid fill production interval


50


between sand control screen assembly


42


and casing


36


to form a gravel pack therein and, as no additional valves are available to relieve pressure within sand control screen


42


, a pressure spike is measured at the surface. When this occurs, the fracture pack treatment of formation


16


and production interval


50


is complete.




As seen in

FIG. 13

, service tool


100


may be used to wash out sand control screen assemblies


40


,


42


and work string


32


. To wash out sand control screen assemblies


40


,


42


, liquid is delivered through service tool


100


to mix with solid agents


110


. The mixture is allowed to reverse out of work string


32


via the annulus between service tool


100


and work string


32


as indicated by arrows


134


. This process of circulating the solid agents to the surface and lowering service tool


100


farther into work string


32


continues until substantially all the solid agents in work string


32


have been removed.




Following the reverse out process, seal members


88


must be removed from base pipes


82


. The technique used to remove seal members


88


will depend upon the construction of seal members


88


. For example, in the illustrated embodiment seal members


88


comprise a plurality of plugs. If the plugs are formed from an acid reactive material such as aluminum, an acid treatment may be used to remove the plugs. The acid may be pumped into the interior of screen assembly where it will react with the reactive plugs, thereby chemically removing seal members


88


. The acid may be returned to the surface via the annulus between service tool


100


and work string


32


.




Alternatively, seal members


88


may be mechanically removed. For example, a scrapper mechanism may be used to physically contact seal members


88


and remove seal members


88


from openings


84


as service tool


100


is removed from the interior of screen assemblies


40


. As another alternative, if seal members


88


are constructed from propellants, a combustion process may be used to remove seal members


88


. Likewise, if seal members


88


are constructed from friable materials such as ceramics, a vibration process, such as sonic vibrations may be used to remove seal members


88


. It should be understood by those skilled in the art that other types of seal members


88


may be used to temporarily prevent fluid flow through screen assembly which may be removed by other types of removal process without departing from the principles of the present invention. Once the interior of screen assembly has been washed, seal members


88


have been removed and service tool


100


retrieved, a tubing string (not shown) may be coupled to sand control screen assembly


42


and thereafter the production of formation fluids may begin.




As should be apparent to those skilled in the art, even though

FIGS. 3-13

present the treatment of multiple intervals of a wellbore in a vertical orientation with packers at the top and bottom of the production intervals, these figures are intended to also represent wellbores that have alternate directional orientations such as inclined wellbores and horizontal wellbores. In the horizontal orientation, for example, packer


46


is at the heel of production interval


44


and packer


48


is at the toe of production interval


44


. Likewise, while multiple production intervals have been described as being treated during a single trip, the methods described above are also suitable for treating a single production interval traversed by a wellbore or may be accomplished in multiple trips into a wellbore. Moreover, it should be understood by one skilled in the art that although the present invention was depicted with two production intervals, the present invention is suitable for use in wellbores having any number of production intervals.




It should be apparent to those skilled in the art that the present invention provides screen assemblies and a method that are capable of uniformly creating fractures along the entire length of multiple production interval in a single trip. Further, the present invention provides for screen assemblies and a method that are capable of stimulating multiple production intervals in a single trip to enhance production. Moreover, the present invention provides for screen assemblies and a method that are capable of preventing fines from entering the production tubing by providing a gravel pack in the production intervals.




While this invention has been described with reference to illustrative embodiments, this description is not intended to be construed in a limiting sense. Various modifications and combinations of the illustrative embodiments as well as other embodiments of the invention, will be apparent to persons skilled in the art upon reference to the description. It is, therefore, intended that the appended claims encompass any such modifications or embodiments.



Claims
  • 1. A single trip method for fracturing multiple formations traversed by a wellbore comprising the steps of:locating a first screen assembly having a plurality of first valves within the wellbore proximate a first formation; locating a second screen assembly having a plurality of second valves within the wellbore proximate a second formation; operably positioning a service tool proximate the first formation; injecting a first fracture treatment fluid through the service tool into the interior of the first screen assembly; progressively operating the first valves to establish fluid communication from the interior to the exterior of the first screen assembly to progressively fracture the first formation; repositioning the service tool proximate the second formation; injecting a second fracture treatment fluid into the interior of the second screen assembly; and progressively operating the second valves to establish fluid communication from the interior to the exterior of the second screen assembly to progressively fracture the second formation.
  • 2. The method as recited in claim 1 wherein the steps of injecting the first fracture treatment fluid and injecting the second fracture treatment fluid further comprise injecting fracture treatment fluids having substantially the same composition.
  • 3. The method as recited in claim 1 wherein the steps of injecting the first fracture treatment fluid and injecting the second fracture treatment fluid further comprise injecting fracture treatment fluids having different compositions.
  • 4. The method as recited in claim 1 wherein the steps of injecting the first fracture treatment fluid and injecting the second fracture treatment fluid further comprise injecting fracture treatment fluids having substantially the same viscosity.
  • 5. The method as recited in claim 1 wherein the steps of injecting the first fracture treatment fluid and injecting the second fracture treatment fluid further comprise injecting fracture treatment fluids having different viscosities.
  • 6. The method as recited in claim 1 wherein the steps of injecting the first fracture treatment fluid and injecting the second fracture treatment fluid further comprise injecting the first and second fracture treatment fluids at substantially the rate.
  • 7. The method as recited in claim 1 wherein the steps of injecting the first fracture treatment fluid and injecting the second fracture treatment fluid further comprise injecting the first and second fracture treatment fluids at different rates.
  • 8. The method as recited in claim 1 wherein the steps of injecting the first fracture treatment fluid and injecting the second fracture treatment fluid further comprise injecting treatment fluids having solid agents therein.
  • 9. The method as recited in claim 8 further comprising the step of propping the fractures in the first and second formations with the solid agents.
  • 10. The method as recited in claim 8 further comprising the step of packing the wellbore adjacent to the first and second formations with the solid agents.
  • 11. The method as recited in claim 1 further comprising preventing the flow of fluids from the exterior to the interior of the first and second screen assemblies through the first and second valves.
  • 12. The method as recited in claim 1 further comprising preventing the flow of fluids between the interior and the exterior of the first and second screen assemblies through openings in base pipes of the first and second screen assemblies with seal members.
  • 13. The method as recited in claim 12 further comprising the step of combustibly removing the seal members after fracturing the second formation.
  • 14. The method as recited in claim 12 further comprising the step of sonically removing the seal members after fracturing the second formation.
  • 15. The method as recited in claim 12 further comprising the step of chemically removing the seal members after fracturing the second formation.
  • 16. The method as recited in claim 12 further comprising the step of mechanically removing the seal members after fracturing the second formation.
  • 17. The method as recited in claim 1 wherein the step of progressively operating the first valves to establish fluid communication from the interior to the exterior of the first screen assembly further comprises progressively operating the first valves from a far end to a near end of the first screen assembly.
  • 18. The method as recited in claim 1 wherein the step of progressively operating the first valves to establish fluid communication from the interior to the exterior of the first screen assembly further comprises progressively operating the first valves from a near end to a far end of the first screen assembly.
  • 19. The method as recited in claim 1 wherein the step of progressively operating the second valves to establish fluid communication from the interior to the exterior of the second screen assembly further comprises progressively operating the second valves from a far end to a near end of the second screen assembly.
  • 20. The method as recited in claim 1 wherein the step of progressively operating the second valves to establish fluid communication from the interior to the exterior of the second screen assembly further comprises progressively operating the second valves from a near end to a far end of the second screen assembly.
  • 21. The method as recited in claim 1 wherein the steps of progressively operating the first and second valves further comprise progressively operating the first and second valves in response to pressure.
  • 22. The method as recited in claim 1 wherein the steps of progressively operating the first and second valves further comprise progressively operating the first and second valves via wireless telemetry.
  • 23. The method as recited in claim 1 wherein the steps of progressively operating the first and second valves further comprise progressively operating the first and second valves via a direct electrical connection.
  • 24. The method as recited in claim 1 wherein the steps of progressively operating the first and second valves further comprise progressively operating the first and second valves hydraulically.
  • 25. A single trip method for fracturing multiple formations traversed by a wellbore comprising the steps of:locating a first screen assembly having a plurality of first valves within the wellbore proximate a first formation; locating a second screen assembly having a plurality of second valves within the wellbore proximate a second formation; operably positioning a service tool proximate the first formation; injecting a first fracture treatment fluid through the service tool into the interior of the first screen assembly; progressively operating the first valves in response to pressure within the first screen assembly to establish fluid communication from the interior to the exterior of the first screen assembly to progressively fracture the first formation; repositioning the service tool proximate the second formation; injecting a second fracture treatment fluid into the interior of the second screen assembly; and progressively operating the second valves in response to pressure within the second screen assembly to establish fluid communication from the interior to the exterior of the second screen assembly to progressively fracture the second formation.
  • 26. The method as recited in claim 25 wherein the steps of injecting the first fracture treatment fluid and injecting the second fracture treatment fluid further comprise injecting fracture treatment fluids having substantially the same composition.
  • 27. The method as recited in claim 25 wherein the steps of injecting the first fracture treatment fluid and injecting the second fracture treatment fluid further comprise injecting fracture treatment fluids having different compositions.
  • 28. The method as recited in claim 25 wherein the steps of injecting the first fracture treatment fluid and injecting the second fracture treatment fluid further comprise injecting fracture treatment fluids having substantially the same viscosity.
  • 29. The method as recited in claim 25 wherein the steps of injecting the first fracture treatment fluid and injecting the second fracture treatment fluid further comprise injecting fracture treatment fluids having different viscosities.
  • 30. The method as recited in claim 25 wherein the steps of injecting the first fracture treatment fluid and injecting the second fracture treatment fluid further comprise injecting the first and second fracture treatment fluids at substantially the rate.
  • 31. The method as recited in claim 25 wherein the steps of injecting the first fracture treatment fluid and injecting the second fracture treatment fluid further comprise injecting the first and second fracture treatment fluids at different rates.
  • 32. The method as recited in claim 25 wherein the steps of injecting the first fracture treatment fluid and injecting the second fracture treatment fluid further comprise injecting treatment fluids having solid agents therein.
  • 33. The method as recited in claim 32 further comprising the step of propping the fractures in the first and second formations with the solid agents.
  • 34. The method as recited in claim 32 further comprising the step of packing the wellbore adjacent to the first and second formations with the solid agents.
  • 35. The method as recited in claim 25 further comprising preventing the flow of fluids from the exterior to the interior of the first and second screen assemblies through the first and second valves.
  • 36. A single trip method for fracturing multiple formations traversed by a wellbore comprising the steps of:locating a first screen assembly having a plurality of first valves within the wellbore proximate a first formation; locating a second screen assembly having a plurality of second valves within the wellbore proximate a second formation; operably positioning a service tool proximate the first formation; injecting a treatment fluid having a first composition through the service tool into the interior of the first screen assembly; progressively operating the first valves to establish fluid communication from the interior to the exterior of the first screen assembly to progressively fracture the first formation; repositioning the service tool proximate the second formation; injecting a treatment fluid having a composition that is different from the first composition into the interior of the second screen assembly; and progressively operating the second valves to establish fluid communication from the interior to the exterior of the second screen assembly to progressively fracture the second formation.
  • 37. The method as recited in claim 36 wherein the steps of injecting a treatment fluid having a first composition and injecting a treatment fluid having a composition that is different from the first composition further comprise injecting treatment fluids having solid agents therein.
  • 38. The method as recited in claim 37 further comprising the step of propping the fractures in the first and second formations with the solid agents.
  • 39. The method as recited in claim 37 further comprising the step of packing the wellbore adjacent to the first and second formations with the solid agents.
  • 40. The method as recited in claim 36 further comprising preventing the flow of fluids from the exterior to the interior of the first and second screen assemblies through the first and second valves.
  • 41. The method as recited in claim 36 wherein the steps of progressively operating the first and second valves further comprise progressively operating the first and second valves in response to pressure.
  • 42. A single trip method for fracturing multiple formations traversed by a wellbore comprising the steps of:locating a first screen assembly having a plurality of first valves within the wellbore proximate a first formation; locating a second screen assembly having a plurality of second valves within the wellbore proximate a second formation; operably positioning a service tool proximate the first formation; injecting a treatment fluid having a first viscosity through the service tool into the interior of the first screen assembly; progressively operating the first valves to establish fluid communication from the interior to the exterior of the first screen assembly to progressively fracture the first formation; repositioning the service tool proximate the second formation; injecting a treatment fluid having a viscosity that is different from the first viscosity into the interior of the second screen assembly; and progressively operating the second valves to establish fluid communication from the interior to the exterior of the second screen assembly to progressively fracture the second formation.
  • 43. The method as recited in claim 42 wherein the steps of injecting a treatment fluid having a first viscosity and injecting a treatment fluid having a viscosity that is different from the first viscosity further comprise injecting treatment fluids having solid agents therein.
  • 44. The method as recited in claim 43 further comprising the step of propping the fractures in the first and second formations with the solid agents.
  • 45. The method as recited in claim 43 further comprising the step of packing the wellbore adjacent to the first and second formations with the solid agents.
  • 46. The method as recited in claim 42 further comprising preventing the flow of fluids from the exterior to the interior of the first and second screen assemblies through the first and second valves.
  • 47. The method as recited in claim 42 wherein the steps of progressively operating the first and second valves further comprise progressively operating the first and second valves in response to pressure.
  • 48. A single trip method for fracturing multiple formations traversed by a wellbore comprising the steps of:locating a first screen assembly having a plurality of first valves within the wellbore proximate a first formation; locating a second screen assembly having a plurality of second valves within the wellbore proximate a second formation; operably positioning a service tool proximate the first formation; injecting a first treatment fluid at a first rate through the service tool into the interior of the first screen assembly; progressively operating the first valves to establish fluid communication from the interior to the exterior of the first screen assembly to progressively fracture the first formation; repositioning the service tool proximate the second formation; injecting a second treatment fluid at a rate that is different from the first rate into the interior of the second screen assembly; and progressively operating the second valves to establish fluid communication from the interior to the exterior of the second screen assembly to progressively fracture the second formation.
  • 49. The method as recited in claim 48 wherein the steps of injecting the first and second treatment fluids further comprise injecting treatment fluids having solid agents therein.
  • 50. The method as recited in claim 49 further comprising the step of propping the fractures in the first and second formations with the solid agents.
  • 51. The method as recited in claim 49 further comprising the step of packing the wellbore adjacent to the first and second formations with the solid agents.
  • 52. The method as recited in claim 48 further comprising preventing the flow of fluids from the exterior to the interior of the first and second screen assemblies through the first and second valves.
  • 53. The method as recited in claim 48 wherein the steps of progressively operating the first and second valves further comprise progressively operating the first and second valves in response to pressure.
US Referenced Citations (50)
Number Name Date Kind
1975162 Layne Oct 1934 A
2342913 Williams et al. Feb 1944 A
2344909 Williams et al. Mar 1944 A
4102395 Robinson Jul 1978 A
4558742 Huang et al. Dec 1985 A
4932474 Schroeder, Jr. et al. Jun 1990 A
4945991 Jones Aug 1990 A
5082052 Jones et al. Jan 1992 A
5113935 Jones et al. May 1992 A
5161613 Jones Nov 1992 A
5161618 Jones et al. Nov 1992 A
5165476 Jones Nov 1992 A
5333688 Jones et al. Aug 1994 A
5355956 Restarick Oct 1994 A
5386874 Laramay et al. Feb 1995 A
5390966 Cox et al. Feb 1995 A
5419394 Jones May 1995 A
5443117 Ross Aug 1995 A
5476143 Sparlin et al. Dec 1995 A
5515915 Jones et al. May 1996 A
5588487 Bryant Dec 1996 A
5636691 Hendrickson et al. Jun 1997 A
5699860 Grundmann Dec 1997 A
5755286 Ebinger May 1998 A
5842516 Jones Dec 1998 A
5848645 Jones Dec 1998 A
5868200 Bryant et al. Feb 1999 A
5890533 Jones Apr 1999 A
5921318 Ross Jul 1999 A
5934376 Nguyen et al. Aug 1999 A
6003600 Nguyen et al. Dec 1999 A
6047773 Zeltmann et al. Apr 2000 A
6059032 Jones May 2000 A
6116343 Van Petegem et al. Sep 2000 A
6125933 Ross Oct 2000 A
6220345 Jones et al. Apr 2001 B1
6227303 Jones May 2001 B1
6230803 Morton et al. May 2001 B1
6343651 Bixenman Feb 2002 B1
6450263 Schwendemann Sep 2002 B1
6464007 Jones Oct 2002 B1
6516881 Hailey, Jr. Feb 2003 B2
6516882 McGregor et al. Feb 2003 B2
6540022 Dusterhoft et al. Apr 2003 B2
6543538 Tolman et al. Apr 2003 B2
6547011 Kilgore Apr 2003 B2
6557634 Hailey, Jr. et al. May 2003 B2
6581689 Hailey, Jr. Jun 2003 B2
6588506 Jones Jul 2003 B2
6588507 Dusterhoft et al. Jul 2003 B2
Foreign Referenced Citations (6)
Number Date Country
1 132 571 Sep 2001 EP
WO 9912630 Mar 1999 WO
WO 0061913 Oct 2000 WO
WO 0114691 Mar 2001 WO
WO 0144619 Jun 2001 WO
WO 0210554 Feb 2002 WO
Non-Patent Literature Citations (7)
Entry
“Mechanical Fluid-Loss Control Systems Used During Sand Control Operations,” H.L. Restarick of Otis Engineering Corp., 1992.
“Sand Control Screens,” Halliburton Energy Services, 1994.
“Frac Pack Technology Still Evolving,” Charles D. Ebinger of Ely & Associates Inc.; Oil & Gas Journal, Oct. 23, 1995.
“Screenless Single Trip Multizone Sand Control Tool System Saves Rig Time,” Travis Hailey and Morris Cox of Haliburton Energy Services, Inc.; and Kirk Johnson of BP Exploration (Alaska), Inc. Society of Petroleum Engineers Inc., Feb., 2000.
“CapsSM Sand Control Service for Horizontal Completions Improves Gravel Pack Reliability and Increases Production Potential from Horizontal Completions,” Halliburton Energy Services, Inc., Aug., 2000.
“CAPSSM Concentric Annular Packing Service for Sand Control,” Halliburton Energy Services, Inc., Aug., 2000.
“Simultaneous Gravel Packing and Filter Cake Removal in Horizontal Wells Applying Shunt Tubes and Novel Carrier and Breaker Fluid,” Pedro M. Saldungaray of Schlumberger; Juan C. Troncoso of Repson-YPF; Bambang T. Santoso of Repsol-YPF. Society of Petroleum Engineers, Inc., Mar., 2001.