The present invention relates to a slab bridge structure in which a slab made by pouring slab concrete between side surfaces of bridge girders arranged in line in a bridge width direction, throughout a longitudinal direction of the bridge girders, is rigidly connected with concrete piers.
As a conventional slab bridge structure, as described in Patent Literature 1, a slab bridge structure is known, in which a rigid connection structure is formed by pouring slab concrete between side surfaces of bridge girders arranged in line in a bridge width direction, throughout a longitudinal direction of the bridge girders, to form a slab made of a composite structure of the bridge girders and the slab concrete, further adding connection concrete, in which the bridge girder portions supported by bridge seats of concrete piers that support the bridge girders are embedded, onto the bridge seats, and concrete-joining the slab concrete and the concrete piers through the connection concrete.
Further, the slab bridge structure discloses, as means to reinforce a concrete joining structure with the connection concrete, a structure to insert connecting rods, which are embedded in the concrete piers and project upward from the bridge seats of the piers, into the bridge girder portions supported by the bridge seats, connect the bridge girder portions, and embed the connecting rods and the bridge girder portions in the connection concrete.
Patent Literature 1: JP 4318694 B
The slab bridge structure of Patent Literature 1 employs the structure to concrete-join the slab concrete and the concrete piers through the connection concrete, and to reinforce the concrete joining with the connecting rods that directly connect the concrete piers and the bridge girder portions supported by the piers.
According to the slab bridge structure of Patent Literature 1, rigid connection strength between the bridge girders and the concrete piers by the slab concrete and the connection concrete can foe remarkably improved, and strength of the connection concrete itself can be increased in an interactive manner.
The present invention provides a slab bridge structure that enables more easy and reliable connecting between concrete piers and bridge girder portions supported by the piers with a structure different from the structure of Patent Literature 1, while employing a rigid connection structure between the bridge girders and the concrete piers by slab concrete and connection concrete, similar to Patent Literature 1, and reinforces the rigid connection structure.
In essence, a slab bridge structure according to the present invention is assumed to have a rigid connection structure in which slab concrete is poured between side surfaces of bridge girders arranged in line in a bridge width direction, throughout a longitudinal direction of the bridge girders, connection concrete in which bridge girder portions supported by a bridge seat of a concrete pier that supports the bridge girders are embedded is further added onto the bridge seat, and the slab concrete and the concrete pier are concrete-joined through the connection concrete, similarly to the structure of Patent Literature 1. The present invention further employs the next structure.
That is, the slab bridge structure further includes a connecting rod embedded in the concrete pier and projecting upward from the bridge seat of the pier, and a connecting plate connecting upper end portions of the adjacent bridge girder portions, and the slab bridge structure is configured to have the bridge girders connected with the concrete pier by inserting a projection portion of the connecting rod into the connecting plate, providing a stopper to an upper-end projection portion of the connecting rod inserted in the connecting plate, and fastening the stopper to an upper surface of the connecting plate. The connecting rod and the connecting plate are connected with the concrete pier that supports the bridge girder portions while connecting the bridge girder portions in the bridge width direction to reinforce the rigid connection structure. As the stopper, a nut can be used, and the nut is screwed onto the upper-end projection portion of the connecting rod and is fastened to the bridge girder portion to be targeted.
Further, the upper end portions of the bridge girder portions of all the bridge girders are connected through the connecting plate, whereby the connecting plate is connected with the concrete pier while connecting all the bridge girders arranged in line in the bridge width direction to reinforce the rigid connection structure.
Further, the upper end portion of the bridge girder portion of the bridge girder is connected with the upper end portion of at least one another bridge girder portion through the connecting plate, whereby the bridge girder portions can be connected with the concrete pier while being connected in the bridge width direction in a minimum necessary manner.
Preferably, one end portion of the connecting plate is fit with the upper end portion of one adjacent bridge girder portion, and the other end portion of the connecting plate is fit with the upper end portion of the other adjacent bridge girder portion, to connect the upper end portions of the adjacent bridge girder portions, whereby the solid and rigid connection structure can be built while absorbing shift of the bridge girders in the bridge length direction.
Further, a first flange is installed in a protruding manner in one end portion of the connecting plate and is engaged with the upper end portion of one adjacent bridge girder portion, and a second flange is installed in a protruding manner in the other end portion of the connecting plate and is engaged with the upper end portion of the other adjacent bridge girder portion, to connect the upper end portions of the adjacent bridge girder portions and to promptly and reliably connect the bridge girder portions in the bridge width direction.
Further preferably, lower end port ions of the bridge girder portions connected with the connecting plate is connected with an auxiliary connecting plate, and the connecting rod is inserted into the auxiliary connecting plate, whereby the bridge girder portions can be reliably and firmly connected at the upper and lower end portions.
In the present invention, the concrete pier is stood on a buried pile, or sheet piles are knocked into the ground while joined with one another, facing the bank, to build an earth-retaining wall, which is continuously formed in the bridge width direction, and the concrete pier is supported by upper ends of the sheet piles projecting above water or ground, whereby a rigid connection structure that concrete-joins the pier and the slab concrete with the connection concrete is built.
The bridge girders are directly supported by the bridge seat of the concrete pier or indirectly supported by the sleeper provided on the bridge seat, and the sleeper is embedded in the connection concrete. As the sleeper, a concrete sleeper poured and formed on the bridge seat of the concrete pier or steel material can be used.
In the present invention, an abutment and a pier are collectively referred to as the term “pier”.
According to the present invention, the slab concrete and the connection concrete form the portal rigid frame structure in cooperation with each other, and the structure can remarkably improve rigid connection strength between the bridge girders and the concrete piers by the connection concrete, and can effectively suppress expansion/contraction, bending, and torsion of the bridge girders.
Further, the connecting plate is connected with the connecting rod embedded in the pier while connecting the bridge girder portions supported by the concrete pier in the bridge width direction, whereby the strength of the connection concrete itself against the expansion/contraction, torsion, and the like of the bridge girders can be easily and reliably increased in an interactive manner, and the structure becomes effective as prevention against bridge collapse in serious earthquakes.
Hereinafter, a preferable embodiment for implementing the present invention will be described on the basis of
<Overall Structure of Slab>
As illustrated in
The bridge girder 1 is a steel girder or a concrete girder. As a preferable example, as illustrated in
An upper opening 5 extending in the bridge length direction is included between upper end portions of the adjacent bridge girders 1, that is, between the upper flanges 1b. Similarly, a lower opening 5′ extending in the bridge length direction between lower end portions of the adjacent bridge girders 1, that is, between the lower flanges 1c is closed by a closing member, and the concrete is poured in the space through the upper opening 5, that is, the space is filled, whereby the slab concrete 3 is formed.
The closing member to close the lower opening 5′ is removed or is left as it is after the slab concrete 3 is formed. However, as illustrated in
At the same time, roadbed concrete 6 integrally joined with all the upper flanges 1b (all the bridge girders 1) through the upper openings 5 is poured and formed, and road pavement 7 is applied on an upper surface of the roadbed concrete 6.
As illustrated in
As an example of the hanged reinforcing bar 10, as illustrated in
A vertically installed reinforcing bar 8′ is constructed with the hanged reinforcing bar 10 or 10′ and embedded in the slab concrete 3, and an inserting rod 11 to be inserted into all the web plates 1a in the bridge width direction is embedded in the slab concrete 3.
Describing again the overall structure of the slab according to the present invention, a concrete pouring space is formed between the bridge girders 1, using various concrete bridge girders such as an H-beam bridge girder, a T-beam bridge girder, and an I-beam bridge girder made of steel material, as the bridge girder 1, the upper opening 5 is formed between the upper end portions of the adjacent bridge girders 1, the concrete is poured, that is, filled in the space through the upper opening 5, whereby the slab concrete 3 is formed. At the same time, the roadbed concrete 6 integrally joined with the upper surfaces of all the bridge girders 1 through the upper openings 5 is poured and formed, and the road pavement 7 is applied to the upper surface of the roadbed concrete 6.
Then, the vertically installed reinforcing bars 8 and the horizontally installed reinforcing bars 9 placed on the upper surfaces of all the bridge girders 1 are embedded in the roadbed concrete 6, and the hanged reinforcing bars 10 and 10′ are vertically installed and embedded in the slab concrete 3, and the inserting rods 11 inserted in web portions of all the bridge girders 1 in the bridge width direction are embedded in the slab concrete 3.
It is obvious that large numbers of the horizontally installed reinforcing bars 9, the hanged reinforcing bars 10 and 10′, and the inserting rods 11 are arranged in the bridge length direction at intervals, and large numbers of the vertically installed reinforcing bars 8 and 8′ are arranged in the bridge width direction at intervals.
<Structure on Bridge Seat of Concrete Pier: Rigid Connection Structure by Concrete Joining>
In the present invention, a structure in which the slab concrete 3 that constitutes the above-described slab 4 is concrete-joined with the concrete piers 2 through the connection concrete 12, and the bridge girders 1 that constitute the slab 4 and the concrete piers 2 are rigidly connected is formed.
In more details, a rigid connection structure of a portal rigid frame structure is configured, in which the connection concrete 12, in which the bridge girder portions 1′ supported by the bridge seats 2a are embedded, is added onto the bridge seats 2a of the concrete piers 2 that support lower end surfaces of the bridge girders 1, the slab concrete 3 and the concrete piers 2 are concrete-joined through the connection concrete 12, as illustrated in
That is, after the concrete piers 2 are built, the lower end surfaces of the bridge girders 1 are supported by the bridge seats 2a, or the lower flanges 1c are supported by the bridge seats 2a in the case of the H-beam bridge girders 1, and the connection concrete 12 is poured and formed on the bridge seats 2a.
As illustrated in
Further, as illustrated in
Further, as illustrated in
As described above, as illustrated in
As illustrated in
Alternatively, as illustrated in
As the sheet pile 19, a steel sheet pile made of a steel plate and having joints in both side edges is used, as illustrated in
The bridge girders 1 (bridge girder portions 1′) are directly supported by the bridge seats 1a of the concrete piers 2, or sleepers 20 are provided on the bridge seats 2a and the bridge girders 1 are supported by the sleepers 20, that is, the bridge girders 1 are indirectly supported by the bridge seats 2a through the sleepers 20, and the sleepers 20 are embedded in the connection concrete 12.
In more details, the concrete poured through the upper opening 5 is filled in the space between the bridge girders to form the slab concrete 3. At the same time, the concrete flows out onto the bridge seats 2a through the lower opening 5′ to concrete-join the slab concrete 3 and the piers 2. Therefore, the connection concrete 12 that coats the bridge girder portions 1′ on the piers 2 constitutes a part of the slab concrete 3.
Spaces are formed between the slab 4 and the bridge seats 2a due to intervention of the sleepers 20, the connection concrete 12 is filled in the spaces through the lower opening 5′ and is concrete-joined with the bridge seats 2a, and a bottom portion 12c of the connection concrete 12 filled in the spaces coats lower surfaces of the bridge girder portions 1′, or lower surfaces of the lower flanges 1c in the case of the H-beam bridge girder. That is, the sleepers 20 are embedded in the bottom portion 12c at the same time with the lower flanges 1c being embedded in the bottom portion 12c of the connection concrete 12.
In a case where no sleepers 20 intervene, a part of the slab concrete 3 flows out to the bridge seats 2a through the lower opening 5′, and is concrete-joined with the bridge seats 2a.
As the sleeper 20, an H-beam sleeper or a concrete sleeper is used. As a preferable example, a concrete sleeper 20 integrally placed with the concrete pier 2 is provided from an approximately central portion of the bridge seat 2a in the bridge length direction. Alternatively, the sleeper 20 is independently provided for each bridge girder, or provided to continuously extend in the bridge width direction.
As described above, the lower flanges 1c as the lower end portions of the bridge girder portions 1′ in the case where the bridge girder 1 is the H-beam bridge girder 1 are directly supported by the bridge seats 2a of the concrete piers 2, or the lower flanges 1c are indirectly supported by the bridge seats 2a through the sleepers 20. The upper flanges 1b as the upper end portions of the bridge girder portions 1′ are covered with the top portion 12a of the connection concrete 12. The ends of the bridge girder portions 1′ in the bridge length are covered with the rear end portions 12b of the connection concrete 12. The outside surfaces of the bridge girder portions 1′ supported by the right and left ends in the bridge width direction are covered with the right and left side portions 12d of the connection concrete 12. The bridge girder portions 1′ are embedded in the connection concrete 12. Therefore, the slab concrete 3 between the bridge girder portions 1′ and the bridge seams 2a of the concrete piers 2 that support the bridge girder portions 1′ are concrete-joined through the connection concrete 12.
In the case of providing the sleepers 20, the connection concrete 12 is filled in the spaces between the slab 4 and the bridge seats 2a or the space between the lower flanges 1c of the bridge girder portions 1′ and the bridge seats 2a, the spaces being formed by the sleepers 20, through the lower opening 5′, to be concrete-joined with the bridge seats 2a. The lower surfaces of the lower flanges 1c as the lower end surfaces of the bridge girder portions 1′ are covered with the bottom portion 12c of the connection concrete 12 filled in the spaces, and the sleepers 20 are embedded in the bottom portion 12c.
Similarly, in cases of using various forms of concrete bridge girders as the bridge girder 1, such as the T-beam bridge girder and the I-beam bridge girder made of steel material, the lower end surfaces of the bridge girder portions 1′ of the bridge girders 1 are directly supported by the bridge seats 2a of the concrete piers 2 or indirectly supported by the bridge seats 2a through the sleepers 20, the bridge girder portions 1′ are embedded in the connection concrete 12, and the slab concrete 3 between the bridge girder portions 1′ and the bridge 2a of the concrete piers 2 that support the bridge girder portions 1′ are concrete-joined through the connection concrete 12.
<Structure on Bridge Seat of Concrete Pier: Reinforced Structure by Connecting Rod and Connecting Plate>
In the present invention, as a concrete joining structure by the connection concrete 12, that is, means to reinforce a rigid connection structure, as illustrated in
The connecting rod 13 extends and is embedded in the vertical direction throughout approximately the entire height in the concrete pier 2, and an upper end projects upward from the bridge seat 2a. The projection portion penetrates a portion corresponding to the slab concrete 3 between the bridge girder portions 1′ and the connecting plate 14 described in details below, and is connected with the pier 2.
Alternatively, as exemplarily illustrated in
Further, as illustrated in
It is obvious that a plurality of the connecting rods 13 and the sheet pile connecting reinforcing bars 22 is arranged in the bridge width direction. Alternatively, as the connecting rod 13, the bridge seat 2a of the concrete pier 2 is drilled in the vertical direction, and a connecting rod 13 embedded in the hole formed by the drilling through filling material, and an upper end of which protrudes upward from the bridge seat 2a, may be arbitrarily used according to implementation.
The connecting plate 14 connects the upper end portions of the adjacent bridge girder portions 1′, the projection portions of the connecting rods 13 are inserted into the connecting plate 14 that connects the upper end portions of the bridge girder portion 1′, stoppers such as nuts 18 are provided to upper-end projection portions of the connecting rods 13 inserted into the connecting plate 14, and the stoppers are fastened to an upper surface of the connecting plate 14 to connect the bridge girders 1 (the bridge girder portions 1′) to the concrete pier 2.
For example, in the case where the bridge girder 1 is the H-beam bridge girder, the upper flanges 1b as the upper end portions of the adjacent bridge girder portions 1′ are connected with the connecting plate 14, the connecting rods 13 are inserted into through-holes provided in the connecting plate 14, the nuts 18 are screwed onto male screws of the connecting rods 13 projecting from the upper surface of the connecting plate 14, and the nuts 18 are fastened to the upper surface of the connecting plate 14, thereby to connect the bridge girder portion 1′ with the pier 2.
Similarly, in the case of using the T-beam bridge girder or the I-beam bridge girder made of steel material as the bridge girder 1, the upper flanges of the bridge girders are connected with the connecting plate 14, the upper-end projection portions of the connecting rods 13 are inserted into the connecting plate 14, and the stoppers such as the nuts 18 are fastened to the upper surface of the connecting plate 14. Further, in the cases of using various concrete bridge girders as the bridge girder 1, the upper end portions of the concrete girder bodies are connected with the connecting plate 14, the upper-end projection portions of the connecting rods 13 are inserted into the connecting plate 14, and the stoppers such as the nuts 18 are fastened to the upper surface of the connecting plate 14.
As illustrated in
Then, the fitting convex portion 15A as the one end portion 14a of the connecting plate 14 is fit into the fitting concave portion 15B formed in the upper flange 1b of one adjacent bridge girder portion 1′, and the fitting convex portion 15A as the other end portion 14b of the connecting plate 14 is fit into the fitting concave portion 15B formed in the upper flange 1b of the other adjacent bridge girder portion 1′, thereby to connect the upper end portions, that is, the upper flanges 1b of the adjacent bridge girder portions 1′.
Further, as illustrated in
Then, the fitting concave portion 15B as the one end portion 14a of the connecting plate 14 is fit with the fitting convex portion 15B formed in the upper flange 1b of one adjacent bridge girder portion 1′, and the fitting concave portion 15B as the other end portion 14b of the connecting plate 14 is fit with the fitting convex portion 15A formed in the upper flange 1b of the other adjacent bridge girder portions 1′, thereby to connect the upper flanges 1b of the adjacent bridge girder portions 1′.
As described above, the upper end portions of the adjacent bridge girder portions 1′ can be easily connected with the connecting plate 14, and even if the adjacent bridge girders 1 are slightly shifted in the bridge length direction, the shift can be effectively absorbed.
As illustrated in
Further, in the examples illustrated in
Further,
That is, the square seat plate 24 is installed on a fit portion of the fitting convex portion 15A of the upper flange 1b of one adjacent bridge girder portion 1′ and the fitting concave portion 15B as the one end portion 14a of the connecting plate 14, and another square seat plate 24 is installed on a fit portion of the fitting convex portion 15A of the upper flange 1b of the other adjacent bridge girder portion 1′ and the fitting concave portion 15B as the other end portion 14b of the connecting plate 14. The upper-end projection portions of the connecting rods 13 are respectively inserted into the through-holes provided in the square seat plates 24, and the nuts 18 are respectively screwed onto the upper-end projection portions (male screw portions) on the upper surface of the square seat plates 24, and are sit on the respective square seat plates 24.
Further, in the present invention, the lower end portions (lower flanges 1c) of the bridge girder portions 1′ connected with the connecting plate 14 are connected with an auxiliary connecting plate 17, and the connecting rods 13 are inserted into the auxiliary connecting plate 17, whereby the bridge girder portions 1′ to be connected can be reliably and firmly connected in the upper and lower end portions.
As the auxiliary connecting plate 17, preferably a steel plate having a similar configuration to the above-described connecting plate 14 is used, and the lower flanges 1c as the lower end portions of the adjacent bridge girder portions 1′ are connected with the auxiliary connecting plate 17, as needed.
That is, as illustrated in
Alternatively, as illustrated in
The auxiliary connecting plate 17 is supported from below by the closing member that closes the lower opening 5′ between the adjacent bridge girders 1 or by the sleeper 20, and is embedded in the connection concrete 12.
That is, each of the upper end portions of the bridge girder portions 1′ supported by the right and left ends in the bridge width direction is connected with the upper end portion of the bridge girder portion 1′ adjacent at an inner side surface side of the bridge girder portion 1′, through the connecting plate 14. Further, the upper end portions of the bridge girder portions 1′ other than the bridge girder portions 1′ supported by the right and left ends in the bridge width direction, that is, the upper end portions of the bridge girder portions 1′ adjacent to other bridge girder portions 1′ at both the right and left sides in the bridge width direction are connected with either one of the upper end portions of the bridge girder portions 1′ adjacent at both sides, through the connecting plate 14.
In the case of the connecting example of
Next, other examples of the connecting plate 14 and the auxiliary connecting plate 17 will be described.
That is, in the case where the bridge girder 1 is the H-beam bridge girder, the first flange 16A installed in a protruding manner to the one end portion 14a of the connecting plate 14 is engaged with the upper flange 1b of the one adjacent bridge girder portion 1′, and the second flange 16B is engaged with the upper flange 1b of the other adjacent bridge girder portion 1′, whereby the connecting plate 14 is bridged over the adjacent upper flanges 1b, and is connected with the connecting rods 13.
Further, as illustrated in
Further, as illustrated in
Further, the connecting plate 14 in
Further,
As described above, in the case where the bridge girder 1 is the H-beam bridge girder 1, the upper flanges 1b as the upper end portions of the adjacent bridge girder portions 1′ are connected with the connecting plate 14, the connecting rods 13 embedded in the concrete pier 2 are inserted into the connecting plate 14, the stoppers such as the nuts 18 are provided to the upper-end projection portions of the inserted connecting rods 13, the stoppers are fastened to the upper surface of the connecting plate 14, the connected connecting plate 14 and connecting rods 13 are embedded in the connection concrete 12, whereby concrete joining between the slab concrete 3 and the bridge seat 2a of the concrete pier 2 that supports the bridge girder portions 1′ through the connection concrete 12 is reinforced.
In addition, the lower flanges 1c as the lower end portions of the adjacent bridge girder portions 1′ are connected with the auxiliary connecting plate 17, and the connecting rods 13 are inserted into the auxiliary connecting plate 17 to connect the upper and lower end portions of the adjacent bridge girder portions 1′, whereby reinforcement of the concrete joining becomes reliable.
Similarly, in the cases of using T-beam bridge girder and the I-beam bridge girder made of steel material as the bridge girder 1, the upper flanges in the bridge girder portions 1′ of the bridge girders 1 can be connected with the connecting plate 14. In the cases of using various types of concrete bridge girders as the bridge girder 1, the upper end portions of the girder bodies in the bridge girder portions 1′ of the bridge girders 1 can be connected with the connecting plate 14. In any case, the concrete joining between the slab concrete 3 and the bridge seats 2a of the concrete piers 2 that support the bridge girder portions 1′ can be reinforced.
Further, it is obvious that the lower end portions of the adjacent bridge girder portions 1′ in the various types of concrete bridge girders such as the T-beam bridge girder and the I-beam bridge girder can be connected with the auxiliary connecting plate 17.
<Application Examples of Slab Bridge Structure According to Present Invention to Existing Bridges>
For example, as illustrated in
Further, as illustrated in
As described above, for the existing bridge, the upper constructed portion is removed, and the connecting rods 13 to be used for the slab bridge structure of the present invention can be easily provided using a part or all of the existing concrete piers 2 (lower constructed portions).
Therefore, the rest of the process is similar to new construction, and the rigid connection structure is obtained by directly or indirectly supporting the bridge girders 1 by the bridge seats 2a of the piers 2 while arranging the bridge girders 1 in line in the bridge width direction, pouring the slab concrete 3 between the side surfaces of the bridge girders 1 in the longitudinal direction of the bridge girders 1, further adding the connection concrete 12, in which the bridge girder portions 1′ supported by the bridge seats 2a are embedded, to the bridge seats 2a of the bridge girders 2, and concrete-joining the slab concrete 3 and the concrete pier 2 through the connection concrete 12. Accordingly, the slab bridge structure according to the present invention can be built, in which the connecting plate 14 that connects the adjacent bridge girder portions 1′ and the connecting rods 13 connected with the connecting plate 14 and embedded in the piers 2 reinforce the rigid connection structure in cooperation with each other.
Therefore, the slab bridge structure according to the present invention can be easily built while reusing the lower constructed portions of the existing bridge, and is very effective as reinforcing means or repairing means of the existing bridge.
As described above, as the slab bridge structure according to the present invention, the rigid connection structure is built by forming the slab 4 made of a composite structure of the bridge girders 1 arranged in line in the bridge width direction and supported by the concrete piers 2, and the slab concrete 3 formed throughout the longitudinal direction between the bridge girders 1, and concrete-joining the slab concrete 3 and the piers 2 through the connection concrete 12, in which the bridge girder portions 1′ supported by the bridge seats 2a of the piers 2 are embedded.
Further, as means to reinforce the rigid connection structure, the connecting rods 13 embedded in the piers 2 and projecting upward from the bridge seats 2a of the piers 2, and the connecting plate 14 that connects the upper end portions of the adjacent bridge girder portions 1′ are included. The connecting rods 13 and the connecting plate 14 reinforce the concrete joining with the connection concrete 12, and connects the bridge girder portions 1′ of the bridge girders 1 and the concrete piers 2.
Note that the above-described embodiment has described the case of forming the slab concrete 3 in the total volume of the space between the adjacent bridge girders 1. However, the embodiment is not limited to the example, and does not obstruct pouring and forming the slab concrete 3 only in an upper space of the space between the adjacent bridge girders 1 throughout the bridge length direction without pouring the concrete in a lower space of the space, and leaving the lower space in the bridge length direction or filling the lower space with light weight material like foam material. In any case, the slab concrete 3 is continuous in the spans of the piers 2 and is integrally connected with the connection concrete 12 in both ends of the piers 2.
In the described embodiment, an abutment and a pier are collectively referred to as the term “pier 2”.
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/JP2014/077692 | 10/17/2014 | WO | 00 |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO2016/059722 | 4/21/2016 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
4660243 | Kinkel | Apr 1987 | A |
7469439 | Tokuno | Dec 2008 | B2 |
20060137115 | Park | Jun 2006 | A1 |
20070251031 | Tokuno et al. | Nov 2007 | A1 |
Number | Date | Country |
---|---|---|
5-79017 | Mar 1993 | JP |
9-71904 | Mar 1997 | JP |
2000-319816 | Nov 2000 | JP |
2003-306908 | Oct 2003 | JP |
2005-240503 | Sep 2005 | JP |
2007-211566 | Aug 2007 | JP |
4318694 | Aug 2009 | JP |
Entry |
---|
International Search Report dated Jan. 13, 2015 in International Application No. PCT/JP2014/077692. |
Number | Date | Country | |
---|---|---|---|
20170233961 A1 | Aug 2017 | US |