Claims
- 1. A method of completing a subsea well comprising the steps of,running a BOP stack by means of a marine riser from a surface vessel for connection of a bottom end of said BOP stack to the top of a wellhead at a seabed, disconnecting said BOP stack and marine riser from said wellhead, removing said BOP stack and marine riser a sufficient lateral distance above said seabed, but substantially short of retrieving said BOP stack and marine riser back to the surface, to facilitate installation of a xmas tree onto said wellhead, connecting a bottom end of said xmas tree to said top of said wellhead, moving said BOP stack by means of said marine riser to a top end of said xmas tree for connection thereto, and connecting a bottom end of said BOP stack to said top end of said xmas tree.
- 2. The method of claim 1 wherein,said xmas tree is positioned to the top of said wellhead independently of said BOP stack.
- 3. The method of claim 1 further comprising the step of,lowering said xmas tree to said wellhead independently of said marine riser.
- 4. The method of claim 3 wherein,said lowering step is characterized by lowering said xmas tree from a vessel to said top of said wellhead by means of a cable.
- 5. The method of claim 3 wherein,said lowering step is characterized by lowering said xmas tree from a vessel to said top of said wellhead by means of drill pipe.
- 6. The method of claim 3 wherein,said lowering step is characterized by lowering said xmas tree by means of tubing.
- 7. The method of claim 1 further comprising the steps of,lowering said xmas tree to a parked location at a sufficient lateral distance from said wellhead before said step of disconnecting said BOP stack from said wellhead, and after said step of disconnecting said BOP stack from said wellhead, securing the bottom of the BOP stack to the xmas tree at said parked location and moving said xmas tree and connected BOP stack to the top of said wellhead.
- 8. The method of claim 7 wherein,said step of lowering said xmas tree to a parked location is performed independently of said marine riser.
- 9. The method of claim 1 wherein,said BOP stack includes a lower marine riser package (LMRP) connected between a top of said BOP stack and said marine riser, and the method further comprising the steps of lowering said xmas tree to a parked location at a relatively small lateral distance from said wellhead, and after said step of disconnecting said BOP stack and marine riser from said wellhead, disconnecting said LMRP from said BOP stack, parking said BOP stack at a seabed position, connecting a bottom end of said LMRP to said top end of said xmas tree, and moving said parked xmas tree with said marine riser and LMRP to said top of said wellhead.
- 10. The method of claim 1 wherein,said BOP stack includes a landing string through a bore of said stack having a running tool connected at the lower end of the landing string, and the method further comprising the steps of, lowering said xmas tree to a parked location at a relatively small distance from said wellhead, and after said step of disconnecting said BOP stack from said wellhead, positioning said BOP stack over said parked xmas tree, lowering said landing string and said running tool through and out the bottom of said BOP stack and connecting said running tool to said xmas tree, raising said xmas tree up under said BOP stack and connecting it thereto, and moving said xmas tree to said top of said wellhead.
- 11. The method of claim 1 wherein,said BOP stack includes a lower marine riser package (LMRP) and a landing string through a bore of said stack having a running tool connected at the lower end of the landing string, and the method further comprising the steps of lowering said xmas tree to a parked location at a relatively small distance from said wellhead, and after said step of disconnecting said BOP stack from said wellhead, parking said BOP stack at a seabed position, disconnecting said LMRP from said BOP stack, positioning said LMRP over said parked xmas tree, lowering said landing string and said running tool through and out of the bottom of said LMRP and connecting said running tool to said xmas tree, raising said xmas tree up under said LMRP, and connecting it thereto, and moving said xmas tree to said top of said wellhead.
- 12. The method of claim 1 further comprising the steps of,removing said BOP stack from said top end of said xmas tree, and installing a tree cap at said top end of said xmas tree.
- 13. The method of claim 9 further comprising the steps of,removing said LMRP from said top end of said xmas tree, and installing a tree cap at said top end of said xmas tree.
- 14. The method of claim 12 further comprising the steps of,removing said tree cap at said top end of said xmas tree, and re-installing a BOP to said top of said xmas tree.
- 15. The method of claim 13 further comprising the steps ofremoving said tree cap at said top end of said xmas tree, and re-installing a LMRP to said top of said xmas tree.
- 16. The method of claim 13 further comprising the steps of,removing said tree cap at said top end of said xmas tree, and re-installing a BOP to said top of said xmas tree.
- 17. The method of claim 13 further comprising the steps of,removing said tree cap at said top end of said xmas tree, and re-installing a LMRP to said top of said xmas tree.
- 18. The method of claim 1 further comprising the steps of,installing a BOP adaptor to a top profile at said top end of said xmas tree, and said step of connecting said BOP stack to said top end of said xmas tree includes the step of connecting said bottom end of said BOP stack to said BOP adaptor.
- 19. The method of claim 18 further comprising the steps of,removing said BOP stack with said BOP adaptor from said xmas tree top profile, and installing a tree cap at said top profile of said xmas tree.
- 20. The method of claim 19 further comprising the steps of,removing said tree cap from said top profile of said xmas tree, installing said BOP adaptor to a bottom end of said BOP stack, and moving said BOP stack and said BOP adaptor to said top of said xmas tree, and connecting said BOP adaptor, while connected to said BOP stack, to said top profile of said xmas tree.
- 21. The method of claim 19 further comprising the steps of,removing said tree cap from said top profile of said xmas tree, lowering a lower workover riser package by means of an open-sea completion/intervention riser to said xmas tree, and connecting said lower workover riser package to said top profile of said xmas tree.
- 22. The method of claim 1 wherein,said BOP stack includes a lower marine riser package (LMRP), and the method further comprising the steps of installing a BOP adaptor to a top profile at said top end of said xmas tree, and said step of connecting said marine riser to said top end of said xmas tree includes the steps of disconnecting said BOP stack from said LMRP and connecting said LMRP to said BOP adaptor.
- 23. The method of claim 22 further comprising the steps of,removing said LMRP with said BOP adaptor from said xmas tree top profile, and installing a tree cap at said top profile of said xmas tree.
- 24. The method of claim 23 further comprising the steps of,removing said tree cap from said top profile of said xmas tree, installing a BOP adaptor to a bottom end of a BOP stack, and moving said BOP stack and BOP adaptor to said top of said xmas tree, and connecting said BOP adaptor, while connected to said BOP stack, to said top profile of said xmas tree.
- 25. The method of claim 24 further comprising the steps of,removing said tree cap from said top profile of said xmas tree, lowering a lower workover riser package by means of an open-sea completion/intervention riser to said xmas tree, and connecting said lower workover riser package to said top profile of said xmas tree.
- 26. The method of claim 1 further comprising the step of,parking a BOP adaptor prior to said step of connecting a bottom end of said BOP stack to said top end of said xmas tree.
- 27. The method of claim 26 wherein,said step of connecting said BOP stack to said top end of said xmas tree includes the step of, first connecting said bottom end of said BOP stack to said parked BOP adaptor, and next connecting the BOP stack and connected BOP adaptor to said top end of said xmas tree.
- 28. The method of claim 26 wherein,said adaptor is run by drill pipe.
- 29. The method of claim 26 wherein said adaptor is run by tubing.
- 30. The method of claim 19 wherein,said BOP adaptor is removed independently of said BOP stack.
- 31. The method of claim 1 wherein,said BOP stack is characterized by a slimbore having a substantially smaller diameter than a standard bore of an 18¾″ BOP stack.
- 32. The method of claim 31 further comprising the steps ofinstalling a BOP adaptor to a top profile at said top end of said xmas tree, and said step of connecting said BOP stack to said top end of said xmas tree includes the step of connecting said bottom end of said BOP stack to said BOP adaptor.
- 33. The method of claim 32 further comprising the steps ofremoving said BOP stack with said BOP adaptor from said xmas tree top profile, and installing a tree cap at said top profile of said xmas tree.
- 34. The method of claim 33 further comprising the steps ofremoving the said tree cap from said top profile of said xmas tree, installing said BOP adaptor to a bottom end of an 18¾″ BOP stack, and moving said 18¾″ BOP stack and said BOP adaptor to said top of said xmas tree, and connecting said BOP adaptor, while connected to said BOP stack, to said profile of said xmas tree.
- 35. A method of completing a subsea well comprising the steps of,attaching a tubing spool having internal interface profiles to a wellhead housing, running a BOP stack by means of a marine riser and Lower Marine Riser Package (LMRP) from a surface vessel for connection of a bottom end of said BOP stack to a top profile of said tubing spool, running a tubing hanger having an external diameter sized to pass through said bore of said BOP stack for landing in said internal interface profiles of said tubing spool, disconnecting said BOP stack from said top of said tubing spool and moving said BOP stack a minimal distance therefrom, well short of retrieving said BOP stack to the surface, connecting a xmas tree to said top of said tubing spool, said xmas tree having a BOP adaptor which has a bottom end connected to a top profile of said xmas tree and a top end sized and arranged for securement to said bottom end of said BOP stack, and connecting said bottom end of said BOP stack to said top end of said BOP adaptor.
- 36. The method of claim 35 further comprising the step of,deploying said xmas tree and BOP adaptor to said top of said tubing spool independently of said marine riser.
- 37. The method of claim 36 wherein,said deploying step includes lowering said xmas tree and BOP adaptor by means of a cable from a surface location.
- 38. The method of claim 36 wherein,said deploying step includes lowering said xmas tree and BOP adaptor by means of a drill pipe string.
- 39. The method of claim 36 wherein,said deploying step includes lowering said xmas tree and BOP adaptor by means of a tubing string.
- 40. The method of claim 35 wherein,said xmas tree and BOP adaptor are parked at a seabed location, and further comprising the step of, moving said xmas tree and BOP adaptor from said parked location to said top of said tubing spool.
- 41. The method of claim 40 wherein,said moving step includes attaching said BOP stack to said top end of said BOP adaptor, and transferring said BOP stack, BOP adaptor and xmas tree to the top of said tubing spool by means of said marine riser.
- 42. The method of claim 40 wherein,said moving step includes attaching said LMRP to said top end of said BOP adaptor, and transferring said LMRP, BOP adaptor and xmas tree to the top of said tubing spool by means of said marine riser.
- 43. The method of claim 40 wherein,said moving step includes using a running tool on the bottom end of a landing string which extends through said marine riser and said BOP stack, said method further comprising the steps of using said landing string and said running tool to raise said BOP adaptor and xmas tree for connection to the bottom of said BOP stack, and then using said marine riser and said Bop stack to move said BOP adaptor and said xmas tree to the top of said tubing spool.
- 44. The method of claim 40 wherein,said moving step includes using a running tool on the bottom end of a landing string which extends through said marine riser and said LMRP, said method further comprising the steps of, using said landing string and said running tool to raise said BOP adaptor and xmas tree for connection to the bottom of said LMRP, and then using said marine riser and said LMRP to move said BOP adaptor and said xmas tree to the top of said tubing spool.
- 45. The method of claim 35 wherein,said BOP stack, LMRP and marine riser are characterized by a slimbore defined as having an internal bore which is substantially less than that of a standard 18¾″ BOP stack and associated riser system, and said top profile of said tubing spool is of 18¾″ nominal bore configuration.
- 46. The method of claim 45 wherein,said xmas tree is characterized by a re-entry hub of typically 13⅝″ nominal bore configuration and said BOP adaptor is arranged and designed to connect to said re-entry hub at a lower end and having an adaptor profile at a top end of 18¾″ nominal bore configuration.
- 47. The method of claim 35 wherein,said tubing spool has a body through which an annulus conduit runs from a location below a sealing location of said tubing hanger to a location above said sealing location, and wherein, said step of running said tubing hanger for landing in said tubing spool includes the step of carrying a string of production or injection tubing for insertion into the well while being supported by said tubing hanger, and said xmas tree includes production or injection and annulus conduits and said step of connecting said xmas tree to said top of said tubing spool includes the step of connecting said production or injection bore of said xmas tree to said production or injection conduit carried by said tubing hanger and interfacing said annulus bore of said xmas tree with said annulus conduit in said tubing spool at said location above said tubing hanger sealing location.
- 48. The method of claim 35 including the step of,running said tubing hanger on the end of a landing string through said marine riser and through said bore of said BOP stack.
- 49. The method of claim 48 including the step of,connecting a tubing hanger running tool at the end of said landing string to said tubing hanger, and running said tubing hanger through said marine riser and said bore of said BOP stack for landing said tubing hanger in said interface profile of said tubing spool.
- 50. The method of claim 49 further comprising the steps of,disconnecting said running tool from said tubing hanger, and prior to said step of disconnecting said BOP stack from said top of said tubing spool, lifting said landing string clear of said tubing spool, and removing said BOP stack and landing string a sufficient lateral distance to facilitate installation of said xmas tree onto said tubing spool.
- 51. The method of claim 35 further comprising the steps of,removing said BOP and said BOP adaptor from said top end of said xmas tree, and installing a tree cap at said top end of said xmas tree.
- 52. The method of claim 51 further comprising the steps of,removing said tree cap at said top of said xmas tree, connecting said BOP adaptor to the bottom of said BOP stack, moving said BOP stack and BOP adaptor to said top of said xmas tree, and connecting said BOP stack and said BOP adaptor to said top of said xmas tree.
- 53. The method of claim 52 further comprising the steps of,removing said tree cap from said top profile of said xmas tree, lowering a lower workover riser package by means of an open-sea completion/intervention riser to said xmas tree, and connecting said lower workover riser package to said top profile of said xmas tree.
- 54. The method of claim 35 further comprising the step of,parking said BOP adaptor at a sea bed position prior to said step of connecting said BOP adaptor to said top end of said xmas tree.
- 55. The method of claim 54 further comprising the steps of,connecting said bottom end of said BOP stack to said parked BOP adaptor, and connecting the BOP stack and BOP adaptor to said top end of said xmas tree.
- 56. The method of claim 54 wherein,said adaptor is parked by running it to the sea bed by drill pipe.
- 57. The method of claim 54 wherein,said adaptor is parked by running it to the sea bed by tubing.
- 58. The method of claim 51 wherein,said BOP adaptor is removed independently of said BOP stack.
CROSS REFERENCE TO RELATED APPLICATION
This application claims priority from U.S. provisional application Ser. No. 60/061,293, filed Oct. 7, 1997.
US Referenced Citations (16)
Provisional Applications (1)
|
Number |
Date |
Country |
|
60/061293 |
Oct 1997 |
US |