Abstract
The drilling rig includes a first substructure and a second substructure. The second substructure is positioned generally parallel to and spaced apart from the first substructure and generally the same height as the first substructure. The drilling rig further includes a drill floor coupled to the first and second substructures, where the drill floor positioned substantially at the top of the first and second substructures.
Description
FIELD OF THE DISCLOSURE

The present disclosure relates generally to drilling rigs, and specifically to slingshot rig structures for land drilling in the petroleum exploration and production industry.


BACKGROUND OF THE DISCLOSURE

Land-based drilling rigs may be configured to be traveled from location to location to drill multiple wells within the same area known as a wellsite. In certain situations, it is necessary to travel across an already drilled well for which there is a well-head in place. Further, mast placement on land-drilling rigs may have an effect on drilling activity. For example, depending on mast placement on the drilling rig, an existing well-head may interfere with the location of land-situated equipment such as, for instance, existing wellheads, and may also interfere with raising and lowering of equipment needed for operations.


SUMMARY

The present disclosure provides for a land based drill rig. The land based drill rig may include a first and a second lower box, the lower boxes positioned generally parallel and spaced apart from each other. The land based drill rig may further include a drill rig floor. The drill rig floor may be coupled to the first lower box by a first strut, the first lower box and first strut defining a first substructure. The drill rig floor may also be coupled to the second lower box by a second strut, the second lower box and second strut defining a second substructure. The struts may be hingedly coupled to the drill rig floor and hingedly coupled to the corresponding lower box such that the drill floor may pivot between an upright and a lowered position. The drill rig floor may include a V-door oriented to generally face one of the substructures.


The present disclosure also provides for a land based drilling rig. The land based drilling rig may include a first and a second lower box, the lower boxes positioned generally parallel and spaced apart from each other. The land based drill rig may further include a drill rig floor. The drill rig floor may be coupled to the first lower box by a first strut, the first lower box and first strut defining a first substructure. The drill rig floor may also be coupled to the second lower box by a second strut, the second lower box and second strut defining a second substructure. The struts may be hingedly coupled to the drill rig floor and hingedly coupled to the corresponding lower box such that the drill rig floor may pivot between an upright and a lowered position. The drill rig floor may include a V-door oriented to generally face one of the substructures. The land based drilling rig may further include a mast coupled to the drill rig floor. The land based drilling rig may further include a tank support structure affixed to the first or second substructure. The tank support structure may include a tank and mud process equipment. The land based drilling rig may further include a grasshopper positioned to carry cabling and lines to the drilling rig. The grasshopper may be positioned to couple to the drill floor generally at a side of the drill rig floor, and the side of the drill rig floor to which the grasshopper couples may face towards the first or second substructure.





BRIEF DESCRIPTION OF THE DRAWINGS

The summary and the detailed description are further understood when read in conjunction with the appended drawings. For the purpose of illustrating the present disclosure, there are shown in the drawings exemplary embodiments of said disclosure; however, the disclosure is not limited to the specific methods, compositions, and devices disclosed. In addition, the drawings are not necessarily drawn to scale. In the drawings:



FIG. 1 is a side elevation from the driller's side of a drilling rig consistent with at least one embodiment of the present disclosure.



FIG. 2 is an overhead view of a drilling rig consistent with at least one embodiment of the present disclosure.



FIG. 3 is a perspective view of a drilling rig consistent with at least one embodiment of the present disclosure.



FIG. 4 is a side elevation of a drilling rig consistent with at least one embodiment of the present disclosure in a mast lowered position.



FIG. 5 is a side elevation view of the drilling rig of FIG. 4 in a mast raised position.





DETAILED DESCRIPTION

The present disclosure may be understood more readily by reference to the following detailed description, taken in connection with the accompanying figures, which form a part of this disclosure. It is to be understood that this disclosure is not limited to the specific devices, methods, applications, conditions or parameters described and/or shown herein, and that the terminology used herein is for the purpose of describing particular embodiments by way of example only and is not intended to be limiting of the present disclosure. Also, as used in the specification, including the appended claims, the singular forms “a,” “an,” and “the” include the plural, and reference to a particular numerical value includes at least that particular value, unless the context clearly dictates otherwise. The term “plurality,” as used herein, means more than one.



FIG. 1 depicts a side elevation of drilling rig 10 from the “driller's side” consistent with at least one embodiment of the present disclosure. Drilling rig 10 may include drill rig floor 20, right substructure 30, and left substructure 40. Right and left substructures 30, 40 may support drill rig floor 20. Mast 50 may be mechanically coupled to one or both of right and left substructures 30, 40 or drill rig floor 20. As would be understood by one having ordinary skill in the art with the benefit of this disclosure, the terms “right” and “left” as used herein are used only to refer to each separate substructure to simplify discussion, and are not intended to limit this disclosure in any way. In some embodiments, drill rig floor 20 may include V-door 23, defining a V-door side of drill rig floor 20 and V-door side 22 of drilling rig 10 may be located over right substructure 30. The V-door side 52 of mast 50 may correspondingly face right substructure 30. Pipe handler 24 may be positioned to carry piping through a V-door as understood in the art positioned on V-door side 22 of drilling rig 10. In some embodiments, grasshopper 60 may be positioned to carry cabling and lines to drilling rig 10. In other embodiments (not shown), V-door side 22 and mast V-door side may face left substructure 40. In some embodiments, as depicted in FIG. 1, blow out preventer 90 may be located between left substructure 40 and right substructure 30, i.e. drilling rig 10 may be centered over a wellbore.


In some embodiments, tank support structure 80 and tanks 70 may be included in drilling rig 10. Tank support structure 80 may be affixed to right substructure 30 or left substructure 40 by means known to those of ordinary skill in the art with the benefit of this disclosure, including, but not limited to, welding and bolting. As shown in FIG. 1, tank support structure 80 may be affixed to left substructure 40. Tank support structure 80 may be located on the opposite substructure from V-door side 22 of drilling rig 10. Tanks 70 may, for example, be mud tanks, auxiliary mud tanks, or other tanks useful in drilling operations and may be located within tank support structure 80. In some embodiments, mud process equipment 100 may also be mounted within tank support structure 80. Mud process equipment may include, for example, shakers, filters, and other equipment associated with the use of drilling mud.


In some embodiments, tank support structure 80 may be mechanically coupled to right substructure 30 or left substructure 40 by one or more equipment support cantilevers 63. In some embodiments, one or more equipment support cantilevers 63 may be hingedly coupled to one or both of right and left substructures 30, 40. Equipment support cantilevers 63 may be utilized to support one or more pieces of drilling rig equipment mechanically coupled to equipment support cantilevers 63 including, for example and without limitation, tank support structure 80, drill line spooler 65, hydraulic power units (HPUs), compressors, variable frequency drives (VFDs), choke manifolds, accumulators, or other pieces of rig equipment. In some embodiments, one or more of right and left substructures 30, 40 may include one or more compartments 68. Compartments 68 may be formed in an interior of the respective substructure 30, 40. In some embodiments, compartments 68 may be closed by hatch or door 69, which may close compartments 68 while allowing access thereto.


In some embodiments, one or both of right and left substructures 30, 40 may include one or more upper equipment support cantilevers 67. As depicted in FIG. 1, each upper equipment support cantilever 67 may be hingedly coupled to one of right or left substructure 30, 40. In some embodiments, upper equipment support cantilevers 67 may be utilized to support one or more pieces of drilling rig equipment mechanically coupled to upper equipment support cantilevers 67, including one or more of, for example and without limitation, mud process equipment 100, choke manifold 102, accumulator 104, mud gas separators, process tanks, trip tanks, drill line spoolers, HPU's, VFD, or driller's cabin 106.



FIG. 2 depicts an overhead view of drilling rig 10 consistent with at least one embodiment of the present disclosure in which V-door side 22 of drilling rig 10, drill rig floor 20, and tank support structure 80 are shown. In some embodiments, choke manifold 102 may likewise be located on the rig floor. In some embodiments, accumulator 104 may likewise be located on the rig floor.


In some embodiments, substructures 30, 40 may be fixed as depicted in FIGS. 1, 2. In some embodiments, as depicted in FIG. 3, substructures 30′, 40′, may pivotably support drill rig floor 20. Drill rig floor 20 may be pivotably coupled to one or more lower boxes 130 by a plurality of struts 140 together forming substructures 30′, 40′ (pivot points shown as pivot points 141). Lower boxes 130 may support drill rig floor 20. Lower boxes 130 may be generally parallel to each other and spaced apart. Struts 140 may be hingedly coupled to drill rig floor 20 and to lower boxes 130. In some embodiments, struts 140 may be coupled to lower boxes 130 and drill rig floor 20 such that they form a bar linkage therebetween, allowing relative motion of drill rig floor 20 relative to lower boxes 130 while maintaining drill rig floor 20 parallel to lower boxes 130. Thus, drill rig floor 20 may be moved from an upper position as shown in FIG. 3 to a lower position while remaining generally horizontal


In some embodiments, the movement of drill rig floor 20 may be driven by one or more hydraulic cylinders 150. In some embodiments, when in the upright position, one or more diagonals 160 may be coupled between drill rig floor 20 and lower boxes 130 to, for example and without limitation, maintain drill rig floor 20 in the upright position.


In some embodiments, with reference to FIGS. 1-3, as they are mounted directly to a substructure (30 or 40) of drilling rig 10, one or more pieces of equipment may travel with drilling rig 10 during a skidding operation. For example and without limitation, equipment may include tanks 70, mud process equipment 100, choke manifold 102, accumulator 104, mud gas separators, process tanks, trip tanks, drill line spoolers, HPU's, VFD, or driller's cabin 106. As such any pipe or tubing connections between or taken from tanks 70, mud process equipment 100, choke manifold 102, and/or accumulator 104 may remain connected during the skidding operations. This arrangement may allow, for example, more rapid rig disassembly (“rigging-down”) and assembly (or “rigging-up”) of drilling rig 10 before and after a skidding operation.


Additionally, by facing V-door side 22 of drilling rig 10 toward one of the substructures 30, 40, equipment and structures that pass through the V-door 23 or to drill rig floor 20 from V-door side 22 of drilling rig 10 may, for example, be less likely to interfere with additional wells in the well field.


In some embodiments, as depicted in FIGS. 4, 5, mast 50 may be mechanically coupled to rig drill rig floor 20. In some embodiments, not depicted, mast 50 may be mechanically coupled to one or both of right and left substructures 30, 40. In some embodiments, mast 50 may be mechanically coupled to drill rig floor 20 by one or more pivot points 54. In some embodiments, as depicted in FIG. 4, mast 50 may be mechanically coupled to pivot points 54 in a horizontal position, defined as a mast lowered position of drilling rig 10. In some embodiments, mast 50 may be transported in the horizontal position. In some embodiments, mast 50 may be constructed from one or more mast subunits and may be transported in a disassembled state. In some embodiments, drilling rig 10 may include one or more hydraulic cylinders 56. Hydraulic cylinders 56 may, in some embodiments, be mechanically coupled to one of drill rig floor 20 or one or both of right and left substructures 30, 40. Hydraulic cylinders 56 may be mechanically coupled to mast 50 at one or more mast lift points 58. Once hydraulic cylinders 56 are mechanically coupled to mast 50, hydraulic cylinders 56 may be extended to raise mast 50 from the horizontal position depicted in FIG. 4 a vertical position as depicted in FIG. 5, defined as a mast raised position of drilling rig 10. In some embodiments, hydraulic cylinders 56 may be mechanically coupled to drill rig floor 20 at one or more rig floor lifting points 21.


In some embodiments, as depicted in FIGS. 4, 5, drilling rig 10 may include one or more hydraulic walkers 120. Hydraulic walkers 120 may, in some embodiments, be positioned at a lower end of one or both right and left substructures 30, 40. In some embodiments, hydraulic walkers 120 may be hydraulically actuatable to move or walk drilling rig 10 to a different location in the wellsite. In some embodiments, hydraulic walkers 120 may be operable to move or walk drilling rig 10 in any direction. In some embodiments, equipment positioned on equipment support cantilevers 63 and upper equipment support cantilevers 67 as previously discussed may be moved with drilling rig 10 as it is moved or walked.


One having ordinary skill in the art with the benefit of this disclosure will understand that the specific configurations depicted in FIGS. 1-5 may be varied without deviating from the scope of this disclosure.


Those skilled in the art will appreciate that numerous changes and modifications can be made to the preferred embodiments of the present disclosure and that such changes and modifications can be made without departing from the spirit of said disclosure. It is, therefore, intended that the appended claims cover all such equivalent variations as fall within the true spirit and scope of said disclosure.

Claims
  • 1. A slingshot land-based drilling rig comprising: a first substructure having a long axis;a second substructure having a long axis, the long axis of the second substructure generally parallel to the long axis of the first substructure;a drill rig floor coupled to the first and second substructures, the drill rig floor including a V-door, the V-door perpendicular to the long axis of the first sub structure;a mast, the mast mechanically coupled to one or more of the first substructure, the second substructure, and the drill rig floor; anda mast hydraulic cylinder mechanically coupled to one of the first substructure, the second substructure, or the drill rig floor and mechanically coupled to the mast;wherein the first elongated substructure and second elongated substructure are adapted to be traveled through a wellsite when coupled to the drill rig floor and assembled and set up for drilling, the mast coupled to the first substructure, the second substructure or the drill rig floor.
  • 2. The land-based drilling rig of claim 1, wherein the first and second substructures comprise: a lower box, the lower box of the first substructure and the lower box of the second substructure positioned generally parallel and spaced apart from each other; andat least one strut, the at least one strut pivotably coupling the drill rig floor to the lower box, the at least one strut hingedly coupled to the drill rig floor and the lower box;wherein the drill rig floor is immovable with respect to the first and second substructures when the land-based drilling rig is assembled and set up for drilling.
  • 3. The land-based drilling rig of claim 2, wherein the at least one strut is coupled to the lower box and drill rig floor to form a bar linkage.
  • 4. The land-based drilling rig of claim 2, wherein the land-based drilling rig further comprises a raising hydraulic cylinder, the raising hydraulic cylinder mounted on the lower box and the drill rig floor.
  • 5. The land-based drilling rig of claim 1 further comprising one or more hydraulic walkers, the hydraulic walkers positioned at a lower end of one or both of the first and second substructures.
  • 6. The land-based drilling rig of claim 1 further comprising equipment positioned on the land-based drilling rig, wherein the equipment comprises tanks, mud process equipment, choke manifold, accumulator mud gas separator, process tank, trip tank, drill line spooler, VFD, drillers cabin, or a combination thereof.
  • 7. The land-based drilling rig of claim 6, wherein piping or tubing connections between or from tanks, mud processing equipment, choke manifold, accumulator or a combination thereof remain connected while moving the land-based drilling rig.
  • 8. The land-based drilling rig of claim 6, wherein the choke manifold is positioned on the drill rig floor.
  • 9. The land-based drilling rig of 1, wherein an accumulator is positioned on the drill rig floor.
  • 10. The land-based drilling rig of claim 1, wherein the drill rig floor is fixedly coupled to the first and second substructures wherein the drill rig floor is immovable with respect to the first and second substructures when the land-based drilling rig is assembled and set up for drilling.
  • 11. The land-based drilling rig of claim 1, wherein the land-based drilling rig is a box-on-box rig.
  • 12. The land-based drilling rig of claim 1, wherein the land-based drilling rig comprises only two substructures.
  • 13. The land-based drilling rig of claim 1, wherein the mast has a V-door side and wherein the V-door side of the mast is perpendicular to a long axis of the first sub structure.
  • 14. A method comprising: transporting a slingshot land-based drilling rig to a well field and positioning the land-based drilling rig, wherein the land-based drilling rig comprises:a first substructure having a long axis;a second substructure having a long axis, the long axis of the second substructure generally parallel to the long axis of the first substructure;a drill rig floor coupled to the first and second substructures, the drill rig floor including a V-door, the V-door perpendicular to the long axis of the first substructure, the drill rig floor having a V-door side on which the V-door is located;a mast, the mast mechanically coupled to one or more of the first substructure, the second substructure, and the drill rig floor, the mast having an open side, the open side facing the V-door side; anda mast hydraulic cylinder mechanically coupled to one of the first substructure, the second substructure, or the drill rig floor and mechanically coupled to the mast;positioning the mast in a horizontal position;raising the mast from a horizontal to a vertical position; andtraveling the first elongated substructure and second elongated substructure through a wellsite, wherein the first elongated substructure and second elongated substructure are traveled through a wellsite when coupled to the drill rig floor, and assembled and set up for drilling, the mast coupled to the first substructure, and the second substructure or the drill rig floor.
  • 15. The method of claim 14, wherein the first and second substructures comprise: a lower box, the lower box of the first substructure and the lower box of the second substructure positioned generally parallel and spaced apart from each other; andat least one strut, the at least one strut pivotably coupling the drill rig floor to the lower box, the at least one strut hingedly coupled to the drill rig floor and the lower box;wherein the drill rig floor is immovable with respect to the first and second substructures when the land-based drilling rig is assembled and set up for drilling.
  • 16. The method of claim 15 further comprising the step of: raising the drill rig floor from a lowered position to an upright position while maintaining the drill rig floor parallel to the lower boxes.
  • 17. The method of claim 16, wherein the step of raising the drill rig floor from a lowered position to a vertical position is performed with the drill rig floor maintained in a horizontal position.
  • 18. The method of claim 16 further comprising after the step of raising the drill rig floor: coupling one or more diagonals between the drill rig floor and the lower boxes.
  • 19. A slingshot land-based drilling rig comprising: a first substructure;a second substructure, the second substructure being positioned generally parallel to the first substructure, a space between the first and second substructures having a long axis;a drill rig floor coupled to the first and second substructures, the drill rig floor including a V-door, the V-door perpendicular to the long axis of the space between the first and second substructures;a mast, the mast mechanically coupled to one or more of the first substructure, the second substructure, and the drill rig floor; anda mast hydraulic cylinder mechanically coupled to one of the first substructure, the second substructure, or the drill rig floor and mechanically coupled to the mastwherein the first elongated substructure and second elongated substructure are adapted to be traveled through a wellsite when coupled to the drill rig floor, the mast coupled to the first substructure, the second substructure or the drill rig floor and the mast hydraulic cylinder mechanically coupled to the first substructure, the second substructure or the drill floor.
  • 20. The land-based drilling rig of claim 19, wherein the first and second substructures comprise: a lower box, the lower box of the first substructure and the lower box of the second substructure positioned generally parallel and spaced apart from each other; andat least one strut, the at least one strut pivotably coupling the drill rig floor to the lower box, the at least one strut hingedly coupled to the drill rig floor and the lower box;wherein the drill rig floor is immovable with respect to the first and second substructures when the land-based drilling rig is assembled and set up for drilling.
  • 21. The land-based drilling rig of claim 20, wherein the at least one strut is coupled to the lower box and drill rig floor to form a bar linkage.
  • 22. The land-based drilling rig of claim 20, wherein the land-based drilling rig further comprises a raising hydraulic cylinder, the raising hydraulic cylinder mounted on the lower box and the drill rig floor.
  • 23. The land-based drilling rig of claim 19, wherein the drill rig floor is fixedly coupled to the first and second substructures wherein the drill rig floor is immovable with respect to the first and second substructures when the land-based drilling rig is assembled and set up for drilling.
  • 24. The land-based drilling rig of claim 19, wherein the land-based drilling rig is a box-on-box rig.
  • 25. A slingshot land-based drilling rig comprising: a first substructure having a long axis;a second substructure having a long axis, the long axis of the second substructure generally parallel to the long axis of the first substructure;a drill rig floor coupled to the first and second substructures, the drill rig floor including a V-door, the V-door perpendicular to the long axis of the first substructure, the drill rig floor having a V-door side on which the V-door is located;a mast, the mast mechanically coupled to one or more of the first substructure, the second substructure, and the drill rig floor, the mast having an open side, the open side facing the V-door side; anda mast hydraulic cylinder mechanically coupled to the drill rig floor and mechanically coupled to the mast.
  • 26. The land-based drilling rig of claim 25, wherein the first and second substructures comprise: a lower box, the lower box of the first substructure and the lower box of the second substructure positioned generally parallel and spaced apart from each other; andat least one strut, the at least one strut pivotably coupling the drill rig floor to the lower box, the at least one strut hingedly coupled to the drill rig floor and the lower box;wherein the drill rig floor is immovable with respect to the first and second substructures when the land-based drilling rig is assembled and set up for drilling.
  • 27. The land-based drilling rig of claim 26, wherein the land-based drilling rig further comprises a raising hydraulic cylinder, the raising hydraulic cylinder mounted on the lower box and the drill rig floor.
  • 28. The land-based drilling rig of claim 25, wherein the drill rig floor is fixedly coupled to the first and second substructures wherein the drill rig floor is immovable with respect to the first and second substructures when the land-based drilling rig is assembled and set up for drilling.
  • 29. The land-based drilling rig of claim 25, wherein the land-based drilling rig is a box-on-box rig.
CROSS-REFERENCE TO RELATED APPLICATIONS

This application is a continuation of U.S. Ser. No. 15/893,463, which is a continuation of U.S. application Ser. No. 15/191,140, which is a continuation in part which claims priority from U.S. application Ser. No. 14/616,234, filed Feb. 6, 2015, and U.S. application Ser. No. 14/180,049 filed Feb. 13, 2014. U.S. application Ser. No. 14/616,234 is itself a continuation in part of U.S. application Ser. No. 14/180,049, which is itself a non-provisional application which claims priority from U.S. provisional application No. 61/764,259, filed Feb. 13, 2013.

US Referenced Citations (161)
Number Name Date Kind
1733484 Davis Oct 1929 A
2332479 Woolslayer et al. Oct 1943 A
2345253 Funk Mar 1944 A
2347115 Lewis Apr 1944 A
2594847 Bates et al. Apr 1952 A
3028881 Koomey et al. Apr 1962 A
3255836 Hoppmann et al. Jun 1966 A
3433268 Greer Mar 1969 A
3483933 Dyer et al. Dec 1969 A
3576225 Chambers Apr 1971 A
3676984 Clark Jul 1972 A
3716149 Scaggs Feb 1973 A
3739853 Wales Jun 1973 A
3754361 Branham Aug 1973 A
3802137 Armstrong Apr 1974 A
3851770 Jenkins et al. Dec 1974 A
3922825 Eddy Dec 1975 A
3937334 Bleyl et al. Feb 1976 A
3942593 Reeve, Jr. Mar 1976 A
3991887 Trout Nov 1976 A
4021978 Busse et al. May 1977 A
4029165 Miller et al. Jun 1977 A
RE29541 Russell Feb 1978 E
4117941 McCleskey et al. Oct 1978 A
4221088 Patterson Sep 1980 A
4235566 Beeman et al. Nov 1980 A
4267675 Cochran May 1981 A
4290495 Elliston Sep 1981 A
4375892 Jenkins Mar 1983 A
4403898 Thompson Sep 1983 A
4407629 Willis Oct 1983 A
4421179 Boyadjieff Dec 1983 A
4473977 Reed Oct 1984 A
4474254 Etter et al. Oct 1984 A
4478015 Lawrence et al. Oct 1984 A
4478291 Futros Oct 1984 A
4488708 Frye Dec 1984 A
4493382 Collins et al. Jan 1985 A
4587778 Woolslayer et al. May 1986 A
4744710 Reed May 1988 A
4757592 Reed Jul 1988 A
4759414 Willis Jul 1988 A
4823870 Sorokan Apr 1989 A
4834604 Brittain May 1989 A
4850439 Lund Jul 1989 A
4899832 Bierscheid, Jr. Feb 1990 A
4979578 Landry Dec 1990 A
5107940 Berry Apr 1992 A
5248005 Mochizuki Sep 1993 A
5305833 Collins Apr 1994 A
5375667 Trevisani Dec 1994 A
5492436 Suksumake Feb 1996 A
5921336 Reed Jul 1999 A
6161358 Mochizuki Dec 2000 A
6491477 Bennett, Jr. et al. Dec 2002 B2
6581525 Smith Jun 2003 B2
6634436 Desai Oct 2003 B1
6848515 Orr Feb 2005 B2
6955223 Orr et al. Oct 2005 B2
6962030 Conn Nov 2005 B2
6976540 Berry Dec 2005 B2
7228919 Fehres et al. Jun 2007 B2
7255180 Beato et al. Aug 2007 B2
7306055 Barnes Dec 2007 B2
7308953 Barnes Dec 2007 B2
7401656 Wood et al. Jul 2008 B2
7404697 Thompson Jul 2008 B2
7600585 Patton et al. Oct 2009 B2
7628229 Wood et al. Dec 2009 B2
7765749 Palidis Aug 2010 B2
7819207 Cowan Oct 2010 B2
7832974 Fikowski et al. Nov 2010 B2
7878254 Abdollahi et al. Feb 2011 B2
7931076 Ditta Apr 2011 B2
7967540 Wright et al. Jun 2011 B2
7992646 Wright Aug 2011 B2
3051930 Barnes et al. Nov 2011 A1
8181698 Springett et al. May 2012 B2
8297362 Strider et al. Oct 2012 B1
8316588 Cicognani Nov 2012 B2
8468753 Donnally et al. Jun 2013 B2
8474216 Goerner Jul 2013 B1
8516751 Konduc et al. Aug 2013 B2
8549815 Donnally et al. Oct 2013 B2
8555564 Wasterval Oct 2013 B2
8561685 Rodgers Oct 2013 B2
8661743 Flusche Mar 2014 B2
8720128 Vogt May 2014 B2
8813436 Donnally et al. Aug 2014 B2
8863449 Donnally et al. Oct 2014 B2
8904716 Donnally et al. Dec 2014 B2
8985928 Flusche Mar 2015 B2
8997435 Reddy et al. Apr 2015 B2
9016004 Vogt Apr 2015 B2
9027287 Trevithick et al. May 2015 B2
9091125 Konduc et al. Jul 2015 B2
9091126 Thiessen et al. Jul 2015 B2
9132871 Crisp et al. Sep 2015 B2
9140080 Flusche Sep 2015 B2
9151412 Trevithick et al. Oct 2015 B2
9163462 Donnally et al. Oct 2015 B2
9212481 Stramandinoli Dec 2015 B2
9228394 Wijning et al. Jan 2016 B2
9249626 Flusche Feb 2016 B2
9260929 Mark Feb 2016 B2
9267328 Flusche Feb 2016 B2
9309728 Reddy et al. Apr 2016 B2
9291012 Wells, Sr. May 2016 B2
9334668 Wijning et al. May 2016 B2
9353601 Hause May 2016 B2
9382766 Flusche Jul 2016 B2
9399890 Mark Jul 2016 B2
9441423 Donnally et al. Sep 2016 B2
9366053 Thiessen et al. Oct 2016 B2
9464488 Thiessen Oct 2016 B2
9488014 Sparkman et al. Nov 2016 B2
9562407 Magnuson Feb 2017 B2
9631443 Folk Apr 2017 B2
9650840 Cheng et al. May 2017 B2
9708861 Reddy et al. Jul 2017 B2
9739098 Fox Aug 2017 B2
9790751 Reddy et al. Oct 2017 B2
9810027 Reddy et al. Nov 2017 B2
9845813 Shimizu et al. Dec 2017 B2
9879442 Magnuson et al. Jan 2018 B2
9926719 Reddy et al. Mar 2018 B2
20020001255 Flood et al. Jan 2002 A1
20030155154 Oser Aug 2003 A1
20030172599 Frink Sep 2003 A1
20040240973 Andrews Dec 2004 A1
20080237170 Altman et al. Oct 2008 A1
20090000218 Lee et al. Jan 2009 A1
20090025980 Callander et al. Jan 2009 A1
20090053013 Maltby Feb 2009 A1
20090200856 Chehade Aug 2009 A1
20090218138 Donnally Sep 2009 A1
20090272540 Rodgers Nov 2009 A1
20090283324 Konduc Nov 2009 A1
20100163247 Wright Jul 2010 A1
20100186960 Reitsma et al. Jul 2010 A1
20110072737 Wasterval Mar 2011 A1
20110174545 Hartke et al. Jul 2011 A1
20120138327 Sorokan Jun 2012 A1
20120168179 Having et al. Jul 2012 A1
20120304553 Konduc et al. Dec 2012 A1
20130305632 Rivera, Sr. et al. Nov 2013 A1
20140014417 Smith et al. Jan 2014 A1
20140054097 Bryant Feb 2014 A1
20150315861 Zachariasen et al. Nov 2015 A1
20160010323 Konduc Jan 2016 A1
20160186495 Flusche Jun 2016 A1
20160215592 Helms Jul 2016 A1
20160280524 Crisp et al. Sep 2016 A1
20160369570 Reddy et al. Dec 2016 A1
20170106925 Gupta et al. Apr 2017 A1
20170292334 Reddy et al. Oct 2017 A1
20170350153 Reddy et al. Dec 2017 A1
20180016851 Reddy et al. Jan 2018 A1
20180030788 Reddy et al. Feb 2018 A1
20180119496 Reddy et al. May 2018 A1
20180128056 Gupta et al. May 2018 A1
Foreign Referenced Citations (8)
Number Date Country
2755483 Nov 2010 CA
2753417 Feb 2011 CA
201778661 Mar 2011 CN
849533 Sep 1952 DE
2751370 Jul 2014 EP
2556042 Jun 1985 FR
2016025521 Feb 2016 WO
2016048458 Mar 2016 WO
Non-Patent Literature Citations (5)
Entry
Nabors 990 Proyecto Llanos.wmv; https://www.youtube.com/watch?v=6BgfgWumRIU, Nabors Rig 990 Chichimene, Colombia; Youtube.com; Aug. 10, 2011 (231 pages).
Drilling Contractor; “Nabors modular Rig 702 in Papua New Guinea—bound for ExxonMobil”; Drilling Contractor, in Drilling Rigs & Automation, News, Jul. 6, 2011; 2 pages; www.drillingcontractor.org.
Drilling Contractor; “Nabors to base all future land rigs on Minimum Area AC rig concept”; Drilling Contractor, in News, Aug. 22, 2011; 2 pages; www.drillingcontractor.org.
Sebastion, Simone; “Big drill soon begins long commute to work”; Houston Chronicle, Sunday, Jul. 3, 2011; 3 pages; www.chron.com.
Gaddy, Dean E., “Critical path analysis improves rig-moving procedures”, Oil & Gas Journal, Nov. 16, 1998 (5 pages).
Related Publications (1)
Number Date Country
20180258665 A1 Sep 2018 US
Provisional Applications (1)
Number Date Country
61764259 Feb 2013 US
Continuations (2)
Number Date Country
Parent 15893463 Feb 2018 US
Child 15977997 US
Parent 15191140 Jun 2016 US
Child 15893463 US
Continuation in Parts (2)
Number Date Country
Parent 14616234 Feb 2015 US
Child 15191140 US
Parent 14180049 Feb 2014 US
Child 14616234 US