The present invention relates to a technique for determining a boiler water condition; and more particularly to a technique for monitoring and controlling a steam boiler water condition based upon the determination.
The present PSE (Probe Steam Enhancement (aka “PS-Enhancement”)) unit uses a model foam detection algorithm that averages water sample data over a period of time and compares each average sample data in an incremental manner with past sample data by a fixed constant. If this process is valid for four consecutive average data samples, then the system declares a foam condition in the boiler. This averaging algorithm for foam detection starts as soon as the boiler unit is turned ON.
The present foam detection algorithm has a number of limitations/constraints that creates a faulty/irregular shutdown of boilers. By way of example, the limitations are as follows:
All above conditions create a faulty shutdown of boilers without any actual foam condition. To overcome such limitations, an algorithm has to be defined to measure water quality to calculate a foam threshold and start the foam condition algorithm when there is a continuous drop in water level. Change in water resistance is affected due to following parameters:
1. Size of Boiler—Large, Medium and Small size boilers;
2. Water Quality—Pure, with salt/conductive chemicals;
3. Hot or Cold water; and
4. Size of the water bubbles—When water heats-up.
In view of the aforementioned problems in the art, there is a need to provide a better way to detect and respond to such steam boiler water conditions.
The following is a detailed explanation of each of the aforementioned points:
In summary, the present invention takes into account both the aforementioned problems in the art and points recognized by the inventors, and provides a new and better way to detect and respond to such steam boiler water conditions.
By way of example, and according to some embodiments, the present invention takes the form of a new and unique boiler controller for determining a boiler water condition featuring a signal processor configured to implement a boiler control algorithm to:
The boiler controller may also include one or more of the following features:
The signal processor may be configured to implement the boiler control algorithm to determine if the present stable average is within the allowable limit, then increment a stable water counter and rewrite the stable average signaling with the present stable average signaling, else declare a foam condition as the boiler water condition and reset the stable water counter.
The signal processor may be configured to implement the boiler control algorithm to repeat for M sets of the N consecutive probe data samples the following:
The signal processor may be configured to determine if any data sample is out of the allowable limits (+/−) while comparing present average and stable average, then the stable water counter will get reset and will start counting from 0.
The signal processor may be configured, once the stable water counter reaches to a count “M”, to set a new foam threshold as a last average data plus an offset.
The signal processor may be configured, once the water is stable, to sense the probe for consecutive probe data samples and verify if any crosses the foam threshold before starting the foam algorithm and start a present foam algorithm only if this condition is satisfied.
According to some embodiments, the present invention may take the form of a method for determining the boiler water condition, featuring steps for:
By way of example, advantage of the new boiler control algorithm may include:
The drawing includes the following Figures, not necessarily drawn to scale, including:
In the Figures, similar parts are labeled with similar reference numerals. Moreover, not every part is labelled with a reference numeral and lead line in every Figure, so as to reduce clutter in the drawing.
By way of example, and according to some embodiments of the present invention,
The present invention takes into account and implements a new boiler control algorithm generally indicated as 30 in
A. Turn on the PSE unit.
B. If the boiler's probe 14 is in an in-water condition, the boiler controller 20 in the steam boiler system will start a counter like counter 20c (see
C. Once the steam boiler or burner 12 is ON, “N” consecutive probe data samples will be averaged and will be set as a stable average. By way of example, in operation the boiler controller 20 may be configured to implement the new boiler control algorithm to provide control signaling to actuate the probe sensor 16 and sense the probe 14, receive probe data signaling from the probe sensor 16 containing information about the “N” consecutive probe data samples, and provide further control signaling to store consecutive probe data signaling containing information about the “N” consecutive probe data samples, e.g., in the memory 20b (
D. Next “N” consecutive data samples will then be averaged and will be compared with the set “Stable average”. If the present (i.e., next) stable average is within an allowable limit(s) (or variation), then increment a stable water counter 20c and rewrite the stable average with the present stable average. By way of example, in operation the boiler controller 20 may be configured to implement the new boiler control algorithm, e.g., consistent with that set forth in step C, to sense the probe 14 and determine next “N” consecutive data sample signaling containing information about the next “N” consecutive data samples, which may then be stored in memory 20b. Moreover, the boiler controller 20 may be configured to implement the new boiler control algorithm to provide control signaling to receive memory signaling containing information about the next “N” consecutive probe data samples (e.g., stored in a memory 20b), process the next “N” consecutive probe data samples to obtain next stable average signaling containing information about the next stable average, compare the next stable average to the set stable average (e.g., stored and received back from in the memory 20b), and determine if the next stable average is within the allowable limit. If the boiler controller 20 determines that the next (i.e., present) stable average is within the allowable limit, then the boiler controller 20 provides control signaling to increment the counter 20c for stable water counting, rewrite the stable average signaling with the next stable average signaling, e.g., which may be stored in the memory 20b. The boiler controller 20 may also be configured to determine corresponding signaling containing information about the steam boiler water condition, e.g., based upon whether the present stable average is within an allowable limit and a comparison of the present stable average signaling and the stable average signaling. The corresponding signaling may take the form of, or may include, control signaling to continue to implement the new boiler control algorithm to further monitor or evaluate the steam boiler water condition, e.g., including to shut down the boiler system consistent with that set forth herein. By way of further example, the “allowable limit” may include, or take the form of, an allowable standard deviation, e.g., which may be determined depending on the boiler application. The scope of the invention is not intended to be limited to any particular allowable limit, e.g., small boiler applications may have one allowable limit, large boiler applications may have another allowable limit, and intermediate boiler applications may have still another allowable limit, as one skilled in the art would appreciate.
E. The boiler controller 20 in the steam boiler system 10 may be configured to implement the new boiler control algorithm to repeat at least step D for “M” sets of data samples.
F. If any data sample is out of the allowable limits (+/−) while comparing present average and stable average during the step D, then the stable water counter 20c will get reset and will start counting from 0. By way of example, in operation the boiler controller 20 may be configured to implement the new boiler control algorithm to determine if any next (i.e., present) stable average is out of the allowable limits (+/−) while comparing the next stable average signaling and the set stable average signaling during the step D; and if so, then the boiler controller 20 may be configured to provide control signaling, e.g., to reset the stable water counter 20c to start counting from 0.
G. Once the stable water counter 20c reaches to a count “M”, the last average data plus an offset will be set as a new foam threshold. By way of example, in operation the boiler controller 20 may be configured to implement the new boiler control algorithm to receive stable water counter signaling containing information that the stable water counter 20c reached the count “M”, and provide foam threshold signaling containing information about the last stable average data sample plus an offset to set as the foam threshold, e.g., which may be stored in the memory 20b. The scope of the invention is not intended to be limited to any particular so-called offset, e.g., small boiler applications may have one offset. large boiler applications may have another offset, and intermediate boiler applications may have still another offset, as one skilled in the art would appreciate. Moreover, the count M is a counter or number, e.g. that is predetermined depending on the particular boiler application and may by set in the boiler controller 20, e.g., as one skilled in the art would appreciate.
H. Once the water is stable, the probe 14 will sense, e.g., three consecutive probe data samples and verify if any crosses the foam threshold before starting the foam algorithm. The present foam algorithm will start only if this condition is satisfied. By way of example, in operation the boiler controller 20 may be configured to implement the new boiler control algorithm and provide control signaling to actuate the probe sensor 16 to sense the some consecutive number of probe data samples (e.g., 3), receive consecutive probe data sample signaling containing information about the consecutive probe data samples, process the consecutive probe data sample signaling, compare the consecutive probe data sample signaling to foam threshold signaling containing information about the foam threshold to verify if the consecutive probe data crosses the foam threshold, e.g., before starting the foam algorithm of the new boiler control algorithm. The scope of the invention is not intended to be limited to any particular so-called foam algorithm. The scope of the invention is intended to include, and embodiments are envisioned using, foam algorithms that are both now known in the art, and later developed in the future.
It should be understood that, unless stated otherwise herein, any of the features, characteristics, alternatives or modifications described regarding a particular embodiment herein may also be applied, used, or incorporated with any other embodiment described herein. Also, the drawing herein is not drawn to scale.
Although the invention has been described and illustrated with respect to exemplary embodiments thereof, the foregoing and various other additions and omissions may be made therein and thereto without departing from the spirit and scope of the present invention.
This application claims benefit to provisional patent application Ser. No. 62/287,727, filed 27 Jan. 2016, which is hereby incorporated by reference in its entirety.
Number | Name | Date | Kind |
---|---|---|---|
1977898 | Seniff | Oct 1934 | A |
2875156 | Johnson | Feb 1959 | A |
5600997 | Kemp et al. | Feb 1997 | A |
5611241 | Henry et al. | Mar 1997 | A |
5739504 | Lyons et al. | Apr 1998 | A |
6390027 | Lyons et al. | May 2002 | B1 |
6666086 | Coleman et al. | Dec 2003 | B2 |
6688329 | Murray et al. | Feb 2004 | B2 |
6904800 | Merwin | Jun 2005 | B2 |
6918356 | Rowe et al. | Jul 2005 | B2 |
7243540 | Merwin | Jul 2007 | B2 |
7249573 | Kemp et al. | Jul 2007 | B2 |
7317993 | Merwin | Jan 2008 | B2 |
7409301 | Tynkov | Aug 2008 | B2 |
7436187 | Thompson | Oct 2008 | B2 |
7500453 | Lindberg | Mar 2009 | B2 |
7706989 | Merwin et al. | Apr 2010 | B2 |
7891572 | Murray | Feb 2011 | B1 |
8521495 | Ray et al. | Aug 2013 | B2 |
8756992 | Bogdanchik | Jun 2014 | B2 |
9121607 | Labbe et al. | Sep 2015 | B2 |
20050043907 | Eckel et al. | Feb 2005 | A1 |
20060152225 | Thomson | Jul 2006 | A1 |
20080109176 | Merwin et al. | May 2008 | A1 |
20120010845 | Bohan et al. | Jan 2012 | A1 |
20130269416 | Myrick et al. | Oct 2013 | A1 |
20130277440 | Cohen | Oct 2013 | A1 |
20140136127 | Sanchez et al. | May 2014 | A1 |
Number | Date | Country |
---|---|---|
1800792 | May 2006 | CN |
2011131837 | Oct 2011 | WO |
Entry |
---|
TDS control: Spriax Sarco, accessed on Jun. 24, 2018, with a priority date shown of Mar. 26, 2015. |
English language abstract of CN1800792. |
Kun Yang, “Industrial boiler feed water system of smart regulation,” Topresearch, research001.com, Master thesis, Liaoning Technical Univ, 2005 (2 pages). http://www.research001.com/?showinfo-31-86485-0.html. |
Draper, Phil, “Limit Controls for Steam and Hot Water Boilers,” Gems Sensors & Controls, gemssensors.com, accessed Feb. 2016 (4 pages). http://www.gemssensors.com/˜/media/GemsNA/Brochures/limit-controls-for-steam-and-hot-water-boilers.ashx. |
Improved Boiler Performance and Optimization with Infra-View® Boiler Thermometer, Infra-View®, Infra-view.com, accessed Feb. 2016 (5 pages). http://www.infra-view.com/Boiler-Thermometer/Tech-Paper. |
AQ25A44B/U, Honeywell, customer.honeywell.com, accessed: Feb. 2016 (2 pages). https://customer.honeywell.com/en-US/pages/product.aspx?cat=HonECC%20Catalog&pid=AQ25A44B/U. |
Number | Date | Country | |
---|---|---|---|
20170234527 A1 | Aug 2017 | US |
Number | Date | Country | |
---|---|---|---|
62287727 | Jan 2016 | US |