The present invention relates generally to composite sports boards, such as snowboards, skis, gliding boards, splitboards, kiteboards, wakeboards, and composite skateboards (all collectively referred to herein as a “sports boards” for ease of reference), and more particularly, to sports boards having reclaimed portions, sports boards having structural enhancements, and a method of manufacturing such sports boards.
Snowboards, skis, gliding boards, splitboards, kiteboards, wakeboards, composite skateboards and other composite sports boards (collectively, “sports boards”) and the like are commonly manufactured in a process that involves joining together a plurality of individual layers into a unitary laminated composite sports board body.
A composite sports board is a multi-layer laminated structure made up of layers of different materials. The different materials have different material properties, in order to address strength, performance, durability, flex, aesthetics and weight. For example, such composite sports boards typically include structural fiberglass/carbon/Kevlar/etc. layers, laminated to the top and bottom side of a core (e.g., wood, foam, honeycomb, etc.) with an adhesive such as epoxy or polyurethane.
Generally, the outer layers (top and bottom) of commercially-available composite sports boards are a thin plastic sheet designed to carry the graphics/decoration (such as fiberglass or nylon), and/or is a low-friction layer (such as UHMW or HDPE polyethylene, for example), and/or has a “clear coat,” none of which has material properties that are susceptible (e.g., well-suited) to forming a reliable adhesive bond because of the material properties of such surfaces. Additionally, the clear coat layer may or may not have a reliable bond to the top or base material. In the case of a snowboard, the base layer is nearly always a low friction material which is waxed by the user to increase the glide performance on the snow, making it very difficult to bond to. The surface material and surface finish of the outer layers (top and base) of these composite sports boards vary widely, but generally, they will not form a reliable bond to other layers with adhesive.
As a representative example of composite sports board manufacture, one conventional method of making snowboards uses a mold/cassette made from a relatively thick aluminum plate that has a cavity shaped to correspond to the desired finished shape of the snowboard to be manufactured. In a typical construction, a base layer of the snowboard is placed in the mold and then separate snowboard edge members (typically steel or brass) are placed in the mold at the outer perimeter, if desired. Typically, epoxy resin is then supplied into the mold (e.g., by brushing/painting on the epoxy) to wet the base layer and edge members. Layers of fiberglass (or carbon fiber, Kevlar, basalt, flax or other composite fibers) wet with resin are then laid into the mold. A core, pre-cut typically from wood, is then laid on top in the mold and more epoxy resin is supplied into the mold on the core, and then at least one more layer of fiberglass, etc. is laid on top of the core. More epoxy is then applied to the added layer(s) of fiberglass, etc., and a top sheet layer (which may have decorative graphics that will be the visible top layer of the finished snowboard) is laid on the top in the mold. The mold with the assembly of layers and epoxy resin therein is then cured in a conventional molding process that fixes the layers together in a laminated structure. By way of example, suitable conventional molding processes include a compression molding process, in which the mold is typically placed in a press under elevated temperature and pressure to cure the resin, or using an infusion or vacuum bagging process. Any suitable molding process may be used, as will be appreciated by those skilled in the art. As part of the molding process, the layers of the snowboard are often provided with a flat, 3-D camber, rocker or hybrid (combined) side profile (e.g., an upward and/or downward curve of a central portion of the snowboard, as viewed from the side), an upward curve of the nose (as viewed from the side), and/or an upward curve of the tail (as viewed from the side), etc. The molding process serves to permanently bond together the multiple individual layers of the snowboard structure, and form a unitary laminated snowboard assembly structure.
When the cured assembly is removed from the mold, the product is very rough. Additional finishing steps are typically required to form the finished snowboard product from the final snowboard assembly that exits the mold/press. The finishing process is very labor intensive. Typically, a band saw is first used to cut the fiberglass and epoxy that has squeezed out between the laminated snowboard layers. Then, many (e.g., up to twenty) sanding processes are typically used to place the base layer/bottom surface of the boards in a final finished state. This involves the removal of material from the cured assembly to compensate for local concavities and/or convexities resulting from the assembly of various parts, epoxy “squeeze-through” to the bottom surface of the snowboard, and irregularities in the layers and/or resulting from the pressing/curing process that prevent the cured board assembly from having a flat bottom surface that has a desirable level of smoothness, continuity of curvature or other shape, consistency in surface and/or thickness, etc. free from unintended local concavity, convexity and/or other irregularities resulting from the manufacturing process (collectively referred to herein as “surface consistency”).
Conventional finishing equipment is designed to sand (e.g., using a sanding belt) or grind (e.g., using a grinding stone) the bottom of a board flat, as viewed in transverse cross-section, relative to a direction of elongation of the snowboard. Accordingly, there is a certain amount of loss or waste of virgin materials used to produce a snowboard (or other composite sports board) as the natural result of the sports board manufacturing process.
Additionally, composite sports boards typically have a relatively limited lifespan that is shorter than a user's typical length of participation in the sport. Accordingly, a single sports boarder or other user is likely to outlast a single sports board, and to own multiple sports boards during a span of years of participation in the sport. Sports boards may be outgrown, damaged over time, become outdated, or simply fall out of favor, with the result that many sports boards are discarded as trash, and find their way to a landfill or similar site, with a resulting loss or waste of their component materials, and an undesirable effect of additional accumulated waste in the global environment.
Further, it is recognized that sports boards may be constructed to provide desired performance characteristics, e.g., to suit various different purposes. Generally, a relatively lighter-weight sports board is desirable. In certain cases, greater sports board stiffness is desired, either over an entire sports board area, or in selected regions of the sports board. Increased stiffness often comes from the use of a greater volume of sports board materials, which undesirably increases sports board weight.
What is needed is a method of manufacturing sports boards that allows for use of used composite sports boards to lessen the accumulation of waste in the global environment, and/or that provides for structural enhancements (e.g., increased regional stiffness) while avoiding a significant increase in sports board weight.
The present invention provides a sports board, and a method of making a sports board. The method of making a sports board allows for incorporation of portions of used (recycled) composite sports boards (or waste from the manufacture thereof) into new sports boards, to lessen the accumulation of composite sports board waste in the global environment, and reduce the quantity of new virgin materials needed in the manufacture of new composite sports boards, to lessen the environmental impact of composite sports board manufacture and use. Additionally, the present invention provides a method that allows for modification to provide structural enhancements (e.g., increased regional stiffness) to new sports boards while avoiding a significant increase in sports board weight, by way of incorporation of composite materials into new composite sports boards.
An understanding of the following description will be facilitated by reference to the attached drawings, in which:
The present invention provides a novel method of manufacture of snowboards, skis, gliding boards, splitboards, kiteboards, wakeboards, composite skateboards and other composite sports boards (collectively referred to herein as “sports boards” in non-limiting fashion, for ease of reference only) that allows for use of used composite sports boards and/or used composite sports board materials to lessen the accumulation of waste in the global environment, and/or that provides for structural enhancements (e.g., increased regional stiffness) while avoiding a significant increase in sports board weight.
Referring now to
Further, consistent with conventional snowboard construction, the snowboard 100 includes an outer edge 40, which may be constructed of steel, brass, etc., as known in the art. Longitudinally-extending portions of the outer edge 40 are defined at least along each side of the central section 12 of the board. Further still, consistent with conventional snowboard construction, the snowboard 100 includes a core 300, which may be constructed of wood, polyurethane foam or other known core materials. The exemplary core 300 extends the full width of the snowboard except for the width of the sidewall members 24.
Further still, consistent with conventional snowboard construction, the core 300 is sandwiched between top and bottom reinforcement layers 32, 34, which abut the upper and lower surfaces of the core 300 and become impregnated with adhesive that is cured during manufacture to provide structural reinforcement to the core 300 and finished snowboard 100, as known in the art. The top and bottom reinforcement layers 32, 34 may be constructed of any conventional material used for this purpose, such as fiberglass, graphite or Kevlar/carbon fibers arranged in a fabric or mat (such as a 700 gsm biaxial fiberglass mat). Further still, consistent with conventional snowboard construction, the top reinforcement layer 32 is overlain by a top sheet 37, which is typically imprinted or otherwise provided with decorative graphics that provide the finished snowboard product with its desired finished appearance. The top sheet 37 may be formed of any conventional material known for use for this purpose, such as a polyethylene, urethane, acrylic, Nylon™/polyamide, polybutylene terephthalate, ABS/TPU, a wood veneer, a separate and additional pre-cured fiberglass layer, the top reinforcement layer itself acting as a top sheet, a titanal/aluminum alloy material layer, etc. Accordingly, in some embodiments, a separate/additional top sheet layer may be excluded from the finished snowboard. In any event, the finished snowboard includes a plurality of layers permanently bonded together into a unitary lamination.
Still further, consistent with conventional snowboard construction, the snowboard 100 further includes a base layer 38. The base layer 38 has a lower surface 39 that is the running surface that abuts the snow, ground, etc., and thus is typically formed of a durable low-friction material, an example of which include ultra-high molecular weight polyethylene. The base layer 38 may be formed of any suitable material, such as polyethylene or other materials preferred of their low-friction properties. As known in the art, the base layer 38 may be made from a transparent material that can be printed (screen printed, sublimated or direct digital printed, e.g., on the bonding side) to add graphics. Further, the base layer 39 may be die-cut with different colored or printed base material pieces insert into the die-cut areas to create an inlaid graphic/design. This latter configuration in particular is susceptible to adhesive migrating through the joints between the pieces in the layer, and the parts may have different thickness and/or sit out of plane/not flush, which creates an uneven bottom surface particularly in need of sanding/grinding after pressing/curing, to provide a desirably consistent bottom surface.
This exemplary embodiment has a base surface 39 that is flat (i.e., generally visibly flat as described above, without significant and/or deliberate convex or concave curvature, or other intended non-flat profile in the vertical/Z-direction) in a direction transverse to the direction of elongation (the X-direction, as shown in
In accordance with the present invention, the snowboard includes at least one core insert. Preferably, the core insert is included in the core 300 layer of the snowboard, at least in part, although the core insert may be incorporated into and/or span other layers. In certain embodiments, the core insert is disposed selectively to provide a desired structural enhancement, e.g., to increase or decrease the stiffness or other properties of the core 300 and resulting snowboard 100 including the core, and/or to provide a desired appearance. In certain embodiments, the core insert is formed from reclaimed snowboard materials, e.g., in accordance with the reclamation method described herein. In certain embodiments, the core insert is formed as a multi-layer lamination and is disposed in the core 300 to have its lamination direction oriented transversely to that of a lamination direction of the remainder of the layers of the snowboard 100, e.g., to provide a stiffening effect in the region of the core insert. Notably, the stiffening (or other) effect associated with the core insert may be provided only in a regional/localized area (namely the region/area of the core insert) such that the material properties of the sports board/core associated with the material properties in the region of the core insert (because of the different materials and/or layer orientation) are different from those of the area/region (e.g. in the same layer) adjacent the core insert, to provide for highly-selectable/highly-tunable core and/or sports board properties, performance and/or effects.
As referred to above, materials other than reclaimed snowboard materials may be used as core inserts and be incorporated into new snowboards in accordance with the present invention. Preferably, however, core inserts are constructed from reclaimed sports board material to reduce environmental waste and reduce the need for virgin materials in producing new sports boards, and to reduce the overall carbon footprint for sports board products. A method for reclaiming sports board materials from used/existing sports boards so they may be used in producing new sports boards is described below with reference to
Referring now to
The exemplary method involves gathering a plurality of sports boards (which may be gliding boards, such as snowboards, skis, splitboards, kiteboards, wakeboards, composite skateboards and other composite sports boards). It may be advantageous to process similar types of sports boards together as a set. From each of a set of sports boards, the method involves removing the edges from each sports board, if they include edges. Referring again to
Next, the exemplary method involves cutting each of one or more sports boards into one or more slabs. Preferably, the cuts are organized so that one or more slabs of similar sizes and shapes can be gathered from one or more sports boards, such that sets of slabs of similar size and shape can be matched together and laminated to form a block blank that can then be used as sheet stock for creating core inserts that can be incorporated into the cores of new sports boards, as discussed in greater detail below. Referring again to
Referring again to
Referring again to
It should be noted, however, that
Further, it should be noted that the discussion in the example above describes creation of block blanks for insertion into finished boards by cutting each of a plurality of sports boards to form at least one slab, stacking the slabs in a first lamination direction (with a layer of adhesive between adjacent slabs), and curing the adhesive to laminate the slabs to form a block blank comprising a plurality of slabs (and layers) bonded together in the first lamination direction. However, this is exemplary only, and other steps for creation of the block blanks may be employed. By way of alternative example, the block blanks may be created by stacking composite sports boards with adhesive disposed in between, curing the adhesive to laminate the composite sports boards, and then cutting the plurality of composite sports boards bonded with cured adhesive to form the block blanks, such that the block blanks comprises a similar finished block blank with a similar plurality of layers bonded together in the first lamination direction.
In some embodiments, it may be sufficient to cut through the outermost layer only, in order to prepare the composite sports board material for making a reliable adhesive bond. In other embodiments, it may be necessary or advisable to cut through more than just the outermost layer, in order to prepare the composite sports board material for making a reliable adhesive bond. For example, in the case of a composite sports board that has a clearcoat on top of the top sheet, it may be sufficient for the cut/trench to penetrate through the clear coat and also the top sheet material, to expose the fiberglass layer below. In other embodiments, the cut/trench may extend through an outer layer, fiberglass layer and into a core material/layer.
Composite board construction and layer thickness may vary, especially if different used composite sports boards from different manufacturers are used to prepare slabs, block blanks and core inserts. Top sheet layers may have a thickness of approximately 0.4 mm and fiberglass layers and base material layers may have thicknesses of approximately 1 mm. It may be desirable, e.g., when using a mechanical trenching process, to use a relatively deeper repeatable cut depth intended to cut through multiple layers, regardless of the board's construction. Though trenches extending through only a single material layer is shown for illustrative purposes, it will be appreciated that the cut/trench may extend through multiple material layers. A cut depth of about 0.5 mm-1.5 mm may be suitable for this purpose.
In some cases, no cuts may be necessary in order to prepare the reclaimed sports board material for making a reliable adhesive bond. For example, a sports board made with a fiberglass layer as the top sheet may just need to be sanded in order to achieve a reliable bond. A wakeboard may be built in this way, with the fiberglass layer being the top and base, while a snowboard will almost exclusively have a base layer made of polyethylene.
Additionally, old/used composite sports boards may have become contaminated and may be less susceptible to forming reliable adhesive bonds. Contamination may be from wax being used on the base of a snowboard (e.g., to improve the glide), stickers (containing adhesives) being applied to the surfaces of the boards, oils, and dirt/dust, etc. from use, wear and tear, and/or storage. In some cases, top sheets and base materials are only treated for bonding on one side (the bonding side) by the raw material suppliers. This means that adhesives like epoxy or PU will not form a reliable bond on the untreated surface even if an underlying material might itself be susceptible to forming a reliable bond.
It will be appreciated that any suitable mechanical trenching process and any suitable equipment may be used to form trenches 236 in slabs consistent with the present invention. By way of alternative examples, one or more routers with slot-cutting or other router bits may be used to form one or more trenches, angle griding cutting wheels, a planer with slotted cutting blades, scrapers, heated blades, a low-pressure waterjet, sand blasting, bead blasting, a rotary disc with an eccentrically-located cutter, etc. may be used. Other trenching processes may also be used.
It will be appreciated that any other surface preparation processes may be used to prepare the slabs for lamination and suitable adhesive bonding. For example, a belt sanding or other sanding or grinding process, using conventional equipment, may be used to remove wax from the base or otherwise add irregular texture to the surfaces of the base layer and top sheet layer to promote reliable adhesive bonding. As an alternative example, a corona treatment process, using conventional equipment, may be used to increase the surface energy of the surfaces of the base layer and top sheet to promote reliable adhesive bonding. As another alternative example, a flame treatment process, using conventional equipment, may be used to remove oils/wax and promote reliable adhesive bonding. Alternatively, acid etching of the surfaces or sand blasting (especially if an aluminum skin has been used as a top sheet) may be used for this purpose.
In certain embodiments a combination of one or more of the above-described surface preparation processes may be used to prepare slabs for adhesive-based lamination. For example, an exemplary surface preparation process may involve belt grinding each slab to remove residual wax on the base layer, then passing the top sheet and base layer of the slabs over a gang saw to create trenches on both sides, and then flame treating the top sheet and base layer of each slab to remove any oils and contamination, prior to application of adhesive, between slabs, layering the slabs, and placing the adhesive-laden set of slabs in a press for application of heat and/or pressure to cure the assembly into a reclaimed block blank.
After the reclaimed slabs have been prepared using a suitable surface preparation process, the method involves joining multiple surface-treated slabs together in a lamination process to form a reclaimed block blank. This involves gathering together a plurality of slabs in a stacked or abutting arrangement with a layer of adhesive spread between each pair of adjacent slabs. The assembly of surface-prepared slabs with adhesive therein is then cured in a conventional lamination process that fixes the layers together in a laminated structure. By way of example, a suitable conventional lamination process includes a compression process, in which the assembly is typically placed in a press under elevated pressure and/or temperature to cure the adhesive. Any suitable lamination process may be used, as will be appreciated by those skilled in the art.
After multiple slabs have been joined together in a lamination process to form a reclaimed block blank, the method involves cutting the reclaimed block blank 240 to form a core panel 250. Although the cutting may be performed in any desired direction, the cutting is preferably performed in the same direction as the lamination, e.g., vertically in
After the reclaimed block blank 240 has been cut to form a core panel 250, the method involves cutting core inserts 260 from the core panel 250. It should be noted that multiple core inserts can likely be cut from a single core panel 250.
After the core inserts 260 have been cut from the core panel 250, the method involves incorporating the core inserts into the sports board (e.g., core 300 in this example).
It will be appreciated that in other embodiments, the core inserts 260 may be laid out to be elongated in a direction transverse (e.g., horizontally as shown in
The core inserts 260 may be incorporated into the sports board by applying epoxy, polyurethane glue or other adhesive to the core inserts and/or the associated portion of the sports board (e.g., core panel) during layup and assembly, for curing as part of the finished core or finished sports board, as discussed in greater detail below.
It should be noted that the core is well-suited for receiving the core inserts, as described in the example above, but that in other embodiments, the core inserts may be inserted in other layers, or may span not only the core layer but also other layers, in accordance with the present invention. Additionally, it should be noted that core inserts may be formed from materials other than used sports boards in accordance with the present invention. Further, it should be noted that core blocks may be formed of any desired materials, in any desired orientation, core panels may be cut in any desired orientation, and core inserts may be incorporated into the sports board in any desired orientation, to provide any desired material property, performance characteristic, or visual appearance effect, in accordance with the present invention.
Additionally, examples of core insert use in sports boards is illustrated in
In keeping with the foregoing example,
As known in the art, the second/cover portion 170 may be formed of metal, and may be generally sheet-like. The second cover/portion 170 has a structure and surface configured adapted to produce a final/cured snowboard assembly having a desired configuration. The second cover/portion 170 may (or may not) define a central boss 172 dimensioned and shaped identically or complementarily (e.g., to allow for shaping, varying application of pressure, for pressure relief, or other purposes) to allow to the cavity 162 of the first/base portion 160, to form the final snowboard assembly 90 in the desired fashion.
As will be appreciated from
In this exemplary embodiment, as in conventional snowboard construction, the base layer 38 is first placed in the first/base portion 160 of the mold/cassette 160. This may involve first fitting the edge elements 40 to the sides of a sheet of polyethylene or other material intend to act as the base layer 38 of the finished snowboard, e.g., with the flange 40a of the edge members 40 overlying a portion of the peripheral edge of the base layer 38. The flange 40a provides mechanical attachment for the adhesive and fiberglass/other layer to grip onto and keep the edge attached to the pressed and cured base layer 38. The base layer 38 and edge members 40 are positioned within the cavity 162 of the first/base portion 160 of the tooling, with the edge members 40 abutting or in adjacent relationship with the sidewalls 166 of the first/base portion 160.
In this example, adhesive is then applied to the upper/top surface of the base layer 38 and edge members 40. Optionally, the bonding foil 42 is then applied over the members 40 (e.g., their flanges 40a) and the upper surface of the base layer 38.
The lower reinforcing layer 34 is also coated with adhesive. The lower reinforcing layer 34 is placed in the mold cassette 160 over the base layer 38, edge members 40, and foils 42.
Adhesive is then applied to coat and wet out the lower reinforcing layer 34. If desired, metal inserts, such as threaded metal inserts 50 may be inserted into corresponding openings defined in a core 300, e.g., for service as attachment points for shoe/boot bindings of the like, as shown in
If the core inserts 260 have not already been incorporated into to the core 300 as part of pre-assembly of the core 300, then the core inserts 260 may be added to the core 300 at this stage (either on the bottom side of the core, top side of the core, or through the entire thickness of the core, as appropriate), with adhesive applied to the openings in the core 300 and/or core inserts 260.
A bottom side 33 of the core 300 may then be wet/coated with adhesive, and the core 300 may be placed into the first/base portion 160 of the tooling 150, with the bottom side 33 positioned on the atop the bottom reinforcement layer 34.
Next, a top side 35 of the core 300 may be wet/coated with adhesive, and then the top reinforcement layer 32 is laid over the adhesive and core 300, preferably covering and overhanging the entire core 300. Accordingly, the top reinforcement layer 32 spans the cavity 162 of the first/base portion 160 of the tooling 150, and preferably extends beyond the cavity 162. Adhesive is then applied to coat and wet out the top reinforcement layer 32.
Next, the top sheet 37 is positioned to overlie the adhesive and top reinforcement layer 32, and then the second/cover portion 170 of the tooling 150 is mated to the first/base portion 160. This may or may not involve aligning a central boss of the second/cover portion 170 with the cavity 162 of the first/base portion 160 of the final assembly tooling 150. Optionally, the first and second portions 160, 170 may be taped together or otherwise be secured relative to one another.
The snowboard assembly 90, thus prepared, may then be molded in a conventional molding process for a suitable dwell time to allow the adhesive to cure, e.g., by placement of the entire molding tooling 150 thus prepared in a conventional press under elevated temperature and pressure in a conventional compression molding process.
Registration holes and pins may be used to promote proper alignment of the core 300, top sheet 37 and other layers, as known in the art, e.g., so that the edges 40 are properly positioned to be used as a guide for a band saw during trimming of the final pressed snowboard assembly. Additional layers of the fiberglass mat, etc. may be applied over the registration pins/sockets, or elsewhere, if additional strength is desired in these areas.
After the snowboard assembly 90 has been suitably cured, the snowboard assembly 90 may be removed from the assembly tooling 150. The snowboard assembly 90 may then be trimmed, e.g., using a band saw and following the edge members 40 and/or a by a CNC milling/routing machine, following a specific trimming/shape outline path, as appropriate, to form the finished snowboard 100. Additional conventional steps may also be performed at this time, such as sanding the snowboard around its perimeter, drilling/opening all inserts, cutting a sidewall angle, apply edge sealer, apply sidewall print graphics if desired, finishing the bottom surface to a desired surface consistency or shape, applying wax to the bottom surface 39 of the base layer 38, etc., to form the finished snowboard 100.
As mentioned above, the examples are provided herein for illustrative and non-limiting purposes only. By way of example, it should be appreciated that although the drawings illustrate an exemplary sandwich construction, in which full layers generally overlap other full layers of material, the present invention also encompasses other constructions, such as cap and semi-cap constructions in which one or more layers may overlie and surround the peripheral edges of one or more other layers.
While there have been described herein the principles of the invention, it is to be understood by those skilled in the art that this description is made only by way of example and not as a limitation to the scope of the invention. Accordingly, it is intended by the appended claims, to cover all modifications of the invention which fall within the true spirit and scope of the invention.
This application claims the benefit of priority, under 35 U.S.C. § 119(e), of U.S. Provisional Patent Application No. 63/315,359, filed Mar. 1, 2022, the entire disclosure of which is hereby incorporated herein by reference.
Number | Date | Country | |
---|---|---|---|
63315359 | Mar 2022 | US |