Stable idle procedure

Information

  • Patent Grant
  • 6387153
  • Patent Number
    6,387,153
  • Date Filed
    Tuesday, October 10, 2000
    23 years ago
  • Date Issued
    Tuesday, May 14, 2002
    22 years ago
Abstract
A procedure for holding production of molten metal in a direct smelting process is disclosed. In situations where it is necessary to hold metal production and there is a continuing available supply of oxygen-containing gas and solid carbonaceous material, the hold procedure includes the steps of stopping supply of metalliferous feed material, continuing to inject oxygen-containing gas and solid carbonaceous material into the vessel and generating heat within the vessel to maintain the temperature of the molten bath above a temperature at which the bath freezes. In situations where it is necessary to hold production and there is a continuing supply of oxygen-containing gas but no available solid carbonaceous material, the hold procedure includes the steps of stopping supply of metalliferous feed material and injecting oxygen-containing gas and gaseous or liquid combustible material into the vessel and generating heat within the vessel to maintain the bath temperature.
Description




FIELD OF THE INVENTION




The present invention relates to a process for producing molten iron from a metalliferous feed material, such as ores, partly reduced ores, and metal-containing waste streams, in a metallurgical vessel containing a molten bath.




The present invention relates particularly to a molten bath-based direct smelting process for producing molten iron from a metalliferous feed material.




BACKGROUND




The term “direct smelting process” is understood to mean a process that produces a molten metal, in this case iron, from a metalliferous feed material.




The present invention relates more particularly to a molten bath-based direct smelting process that is generally referred to as the HIsmelt process.




In general terms, the HIsmelt process includes thesteps of:




(a) forming a molten bath having a metal layer and a slag layer on the metal layer in a direct melting vessel;




(b) injecting metalliferous feed material and solid carbonaceous material, and optionally fluxes, into the metal layer via a plurality of lances/tuyeres;




(c) smelting metalliferous feed material to metal in the metal layer;




(d) causing molten material to be protected as splashes, droplets, and streams into a space above a nominal quiescent surface of the molten bath to form a transition zone; and




(e) injecting an oxygen-containing gas into the vessel via one or more than one lance/tuyere to post-combust reaction gases released from the molten bath, whereby the ascending and thereafter descending splashes, droplets and streams of molten material in the transition zone facilitate heat transfer to the molten bath, and whereby the transition zone minimises heat loss from the vessel via the aide walls in contact with the transition zone.




A preferred form of the HIsmelt process is characterized by foxing the transition zone by injecting carrier gas, metalliferous feed material, solid carbonaceous material, and optionally fluxes into the bath through lances that extend downwardly and inwardly through side walls of the vessel so that the carrier gas and the solid material penetrate the metal layer and cause molten material to be projected from the bath.




This form of the HIsmelt process is an improvement over earlier forms of the process which form the transition zone by bottom injection of carrier gas and solid carbonaceous material through tuyeres into th bath which causes droplets and splashes and streams of molten material to be projected from the bath.




The applicant has carried out extensive pilot plant work on operating the HIsmelt process with continuous discharge of molten iron and periodic tapping of molten slag from the direct smelting vessel and has made a series of significant findings in relation to the process.




One of the findings, which is the subject of a first aspect of the present invention, is that in situations where there is a continuing supply of oxygen-containing gas and solid carbonaceous material it is possible to hold the process indefinitely, ie stop producing metal, and maintain a pool of molten metal in the vessel, and then continue operating the process and resume metal production.




This is an important finding because there are a number of situations in which it is important to be able to stop production of molten iron for relatively short periods of time. One example of such a situation is when downstream operations can not take molten iron produced by the process. In this situation, whilst the process can continue to operate and produce molten iron, there is a cost penalty associated with not being able to use the molten iron immediately in the downstream processing operations. Another example is where there is an unforseen interruption to the supply of metalliferous feed material to the process and it is not possible to continue operating the process. In such situations, without a hold procedure, the only option is to immediately shut-down the process and empty molten iron and slag from the vessel and then restart the process when the cause of the shutdown has been rectified. A process shutdown/start-up is a major exercise with considerable lost production and cost.




Another of the findings in the pilot plant work, which is the subject of a second aspect of the present invention, is that in situations where there has been an interruption to the supply of solid carbonaceous material but there is an available supply of gaseous or liquid combustible material, such as natural gas, it is possible to hold the process for a considerable period of time, ie stop producing metal, and maintain a pool of molten metal in the vessel, and then continue operating the process and resume metal production.




This is an important finding because, in such a situation, without a hold procedure, the only option is to immediately shut-down the process and empty molten iron and slag from the vessel and then restart the process when the cause of the shutdown has been rectified. A process shutdown/start-up is a major exercise with considerable lost production and cost.




The above findings are applicable particularly to direct smelting processes which discharge molten metal continuously and tap molten slag periodically.




SUMMARY OF THE INVENTION




The first aspect of the present invention provides a direct smelting process for producing molten metal from a metalliferous feed material in a vessel that contains a molten bath having a metal layer and a slag layer on the metal layer, which process includes the following standard operating procedure of:




(a) injecting carrier gas, metalliferous feed material, and solid carbonaceous material, and optionally fluxes, into the molten bath via a plurality of solid material injection lances/tuyeres positioned above and extending towards the surface of the metal layer and causing molten material to be projected from the molten bath as splashes, droplets and streams into a space above a nominal quiescent surface of the molten bath to form a transition zone;




(b) smelting metalliferous feed material to metal in the molten bath;




(c) injecting oxygen-containing gas into the vessel via one or more than one lance/tuyere and post-combusting reaction gases released from the molten bath, whereby the ascending and thereafter descending splashes, droplets and streams of molten material in the transition zone facilitate heat transfer to the molten bath;




(d) tapping molten metal and molten slag as required from the vessel;




and which process is characterised by the following hold procedure for situations in which it is necessary to stop production of molten metal for a period of time other than situations in which there has been an interruption to the supply of oxygen-containing gas and/or solid carbonaceous material to the process:




(i) stopping supply of metalliferous feed material into the vessel;




(ii) continuing to inject carrier gas and solid carbonaceous material into the molten bath via the solid material injection lances/tuyeres and generating combustible material in the molten bath and causing molten material and combustible material to be projected into the transition zone; and




(iii) continuing to inject oxygen-containing gas into the vessel via one or more than one lance/tuyere and combusting combustible material projected into the transition zone, whereby the ascending and thereafter descending splashes, droplets and streams of molten material in the transition zone facilitate heat transfer to the molten bath to maintain the temperature of the molten bath above a temperature at which the bath freezes.




Preferably the amount of solid carbonaceous material and oxygen containing gas that is injected into the vessel is reduced during the hold procedure.




Preferably the hold procedure includes periodically adding fluxes to the molten bath.




Preferably the hold procedure includes periodically tapping of molten slag during the hold period.




The second aspect of the present invention provides a process for producing molten metal from a metalliferous feed material in a vessel that contains a molten bath having a metal layer and a slag layer on the metal layer, which process includes the following standard operating procedure of:




(a) injecting carrier gas, metalliferous feed material, and solid carbonaceous material, and optionally fluxes, into the molten bath via a plurality of solid material injection lances/tuyeres positioned above and extending towards the surface of the metal layer and causing molten material to be projected from the molten bath as splashes, droplets and stream into a apace above a nominal quiescent surface of the molten bath to form a transition zone;




(b) smelting metalliferous feed material to metal in the molten bath;




(c) injecting oxygen-containing gas into the vessel via one or more than one lance/tuyere and post-combusting reaction gases released from the molten bath, whereby the ascending and thereafter descending splashes, droplets and streams of molten material in the transition zone facilitate heat transfer to the molten bath;




(d) tapping molten metal and molten slag as required from the vessel;




and which process is characterised by the following hold procedure for situations in which it is necessary to stop production of molten metal for a period of time and there has been an interruption to the supply of solid carbonaceous material to the process:




(i) stopping supply of metalliferous feed material into the vessel; and




(ii) injecting oxygen-containing gas and gaseous or liquid combustible material into the vessel and combusting the combustible material to maintain the temperature.




The term “combustible material” in regard to the first aspect of the invention is understood to include, by way of example, carbon monoxide, solid char, and hydrogen and other volatiles that may be generated from a solid carbonaceous material.




The term “quiescent surface” in the context of the molten bath is understood to mean the surface of the molten bath under process conditions in which there is no gas/solids injection and therefore no bath agitation.




Typically, the hold period of time is up to 5 hours.




Preferably, step (d) of the process includes continuously tapping molten metal from the vessel.




Where the process includes continuously tapping molten metal via a forehearth, preferably the hold procedure includes varying the pressure in the vessel and thereby varying the level of molten metal in the vessel and forcing molten metal from the vessel into the forehearth and from the forehearth into the vessel. Varying the pressure causes circulation of molten metal between the vessel and the forehearth and assists in maintaining a relatively uniform temperature of the molten metal in the vessel and the forehearth.




Preferably the solid carbonaceous material is coal.




Preferably the gaseous combustible material includes natural gas.




Preferably the oxygen-containing gas is air or oxygen-enriched air.




More preferably the oxygen-enriched air contains less than 50% by volume oxygen.




Preferably the process operates at high post-combustion levels.




Preferably the post-combustion levels are greater than 60%.




Preferably, the metalliferous feed material is an iron-containing feed material. The preferred feed material is iron ore.




The iron ore may be pre-heated.




The iron ore may be partially reduced.




Preferably metalliferous feed material is smelted to metal predominantly in the metal layer.











BRIEF DESCRIPTION OF THE DRAWING




The present invention is described further by way of example with reference to the accompanying drawing,

FIG. 1

which is a vertical section through a preferred form of a direct smelting vessel for carrying out a preferred embodiment of a process for direct smelting iron ore to molten iron in accordance with the present invention.











DETAILED DESCRIPTION




The vessel shown in

FIG. 1

has a hearth that includes a base


3


and sides


55


formed from refractory bricks; side walls


5


which form a generally cylindrical barrel extending upwardly from the sides


55


of the hearth and which include an upper barrel section


51


and a lower barrel section


53


; a roof


7


; an outlet


9


for off-gases; a forehearth


81


which can discharge molten iron continuously; a forehearth connection


71


that interconnects the hearth and the forehearth


81


; and a tap-hole


61


for discharging molten slag.




In use, under standard operating (ie steady-state) conditions, the vessel contains a molten bath of iron and slag which includes a layer


15


of molten iron and a layer


16


of molten slag on the metal layer


15


. The arrow marked by the numeral


17


indicates the position of the nominal quiescent surface of the metal layer


15


and the arrow marked by the numeral


19


indicates the position of nominal quiescent surface of the slag layer


16


. The term “quiescent surface” is understood to mean the surface when there is no injection of gas and solids into the vessel.




The vessel also includes 2 solids injection lances/tuyeres


11


extending downwardly and inwardly at an angle of 30-60° to the vertical through the side walls


5


and into the slag layer


16


. The position of the lances/tuyeres


11


is selected so that the lower ends are above the quiescent surface


17


of the metal layer


15


under steady-state process conditions.




In use, under standard operating conditions iron ore, solid carbonaceous material (typically coal), and fluxes (typically lime and magnesia) entrained in a carrier gas (typically N


2


) are injected into the molten bath via the lances/tuyeres


11


. The momentum of the solid material/carrier gas causes the solid material and gas to penetrate the metal layer


15


. The coal is devolatilised and thereby produces gas in the metal layer


15


. Carbon partially dissolves into the metal and partially remains as solid carbon. The iron ore is smelted to metal and the smelting reaction generates carbon monoxide gas. The gases transported into the metal layer


15


and generated via devolatilisation and smelting produce significant buoyancy uplift of molten metal, solid carbon, and slag (drawn into the metal layer


15


as a consequence of solid/gas/injection) from the metal layer


15


which generates an upward movement of splashes, droplets and streams of molten material, and these splashes, and droplets, and streams entrain slag as they move through the slag layer


16


.




The buoyancy uplift of molten metal, solid carbon and slag causes substantial agitation in the metal layer


15


and the slag layer


16


, with the result that the slag layer


16


expands in volume and has a surface indicated by the arrow


30


. The extent of agitation is such that there is reasonably uniform temperature in the metal and the slag regions—typically, 1450-1550° C. with a temperature variation of the order of 30°.




In addition, the upward movement of splashes, droplets and streams of molten metal and slag caused by the buoyancy uplift of molten metal, solid carbon, and slag extends into the top space


31


above the molten material in the vessel and:




(a) forms a transition zone


23


; and




(b) projects some molten material (predominantly slag) beyond the transition zone and onto the part of the upper barrel section


51


of the side walls


5


that is above the transition zone


23


and onto the roof


7


.




In general terms, the slag layer


16


is a liquid continuous volume, with gas bubbles therein, and the transition zone


23


is a gas continuous volume with splashes, droplets, and streams of molten metal and slag.




The vessel further includes a lance


13


for injecting an oxygen-containing gas (typically preheated oxygen enriched air) which is centrally located and extends vertically downwardly into the vessel. The position of the lance


13


and the gas flow rate through the lance


13


are selected so that under standard operating conditions the oxygen-containing gas penetrates the central region of the transition zone


23


and maintains an essentially metal/slag free space


25


around the end of the lance


13


.




In use, under standard operating conditions, the injection of the oxygen-containing gas via the lance


13


post-combusts reaction gases CO and H


2


in the transition zone


23


and in the free space


25


around the end of the lance


13


and generates high temperatures of the order of 2000° C. or higher in the gas space. The heat is transferred to the ascending and descending splashes, droplets, and streams, of molten material in the region of gas injection and the heat is then partially transferred to the metal layer


15


when the metal/slag returns to the metal/slag layers


15


/


16


.




The free space


25


is important to achieving high levels of post combustion because it enables entrainment of gases in the space above the transition zone


23


into the end region of the lance


13


and thereby increases exposure of available reaction gases to post combustion.




The combined effect of the position of the lance


13


, gas flow rate through the lance


13


, and upward movement of splashes, droplets and streams of molten material is to shape the transition zone


23


around the lower region of the lance


13


—generally identified by the numerals


27


. This shaped region provides a partial barrier to heat transfer by radiation to the side walls


5


.




Moreover, under standard operating conditions, the ascending and descending droplets, splashes and stream of molten material are an effective means of transferring heat from the transition zone


23


to the molten bath with the result that the temperature of the transition zone


23


in the region of the side walls


5


is of the order of 1450° C.-1550° C.




The vessel is constructed with reference to the levels of the metal layer


15


, the slag layer


16


, and the transition zone


23


in the vessel when the process is operating under standard operating conditions and with reference to splashes, droplets and streams of molten material that are projected into the top space


31


above the transition zone


23


when the process is operating under steady-state operating conditions, so that:




(a) the hearth and the lower barrel section


53


of the side walls


5


that contact the metal/slag layers


15


/


16


are formed from bricks of refractory material (indicated by the cross-hatching in the figure);




(b) at least part of the lower barrel section


53


of the side walls


5


is backed by water cooled panels


8


; and




(c) the upper barrel section


51


of the side walls


5


and the roof


7


that contact the transition zone


23


and the top space


31


are formed from water cooled panels


57


,


59


.




Each water cooled panel


57


,


59


(not shown) in the upper barrel section


51


of the side walls


5


has parallel upper and lower edges and parallel side edges and is curved so as to define a section of the cylindrical barrel. Each panel includes an inner water cooling pipe and an outer water cooling pipe. The pipes are formed into a serpentine configuration with horizontal sections interconnected by curved sections. Each pipe further includes a water inlet and a water outlet. The pipes are displaced vertically so that the horizontal sections of the outer pipe are not immediately behind the horizontal sections of the inner pipe when viewed from an exposed face of the panel, ie the face that is exposed to the interior of the vessel. Each panel further includes a rammed refractory material which fills the spaces between the adjacent straight sections of each pipe and between the pipes. Each panel further includes a support plate which forms an outer surface of the panel.




The water inlets and the water outlets of the pipes are connected to a water supply circuit (not shown) which circulates water at high flow rate through the pipes.




The vessel also includes


2


natural gas burners


12


extending downwardly and inwardly at an angle of 30-60° to the vertical through the side walls


5


. As is described hereinafter, the natural gas burners


12


can be used in a hold procedure.




The pilot plant work referred to above was carried out as a series of extended campaigns by the applicant at its pilot plant at Kwinana, Western Australia.




The pilot plant work was carried out with the vessel shown in the figure and described above and in accordance with the steady-state process conditions described above. In particular, the process operated with continuous discharge of molten iron via the forehearth


81


and periodic tapping of molten slag via the tap-hole


61


.




The pilot plant work evaluated the vessel and investigated the process under a wide range of different:




(a) feed materials;




(b) solids and gas injection rates;




(c) slag inventories—measured in terms of the depth of the slag layer and the slag:metal ratios;




(d) operating temperatures; and




(e) apparatus set-ups.




In the context of the present invention it was found in the pilot plant work that is was possible to hold the process for up to 5 hours with a pool of molten metal in the vessel and to re-start the process at the end of the hold period. This finding is significant in terms of providing a process that is flexible and can minimise shut-downs of the process.




The applicant found that the following hold procedures worked successfully.




1. Situations in which there is an interruption to the supply of the oxygen-containing gas.




The hold procedure includes the following steps.




(a) Stop supply of all feed materials to the vessel, other than maintaining a low positive flow of carrier gas to lances/tuyeres


11


.




(b) Drain slag from the vessel to a point at which there is a relatively small layer of slag on the metal layer


15


.




(c) Allow the slag to freeze on the metal layer


15


.




(d) Add charcoal to the forehearth


81


and stop spray cooling of the external surface of the forehearth connection


71


.




The applicant found that this procedure maintains the metal in the vessel in a molten state for greater than 6 hours. In this context, the forehearth


81


is a more exposed area than the vessel and it is necessary to monitor the state of the molten metal and take steps (such as adding extra charcoal to the forehearth surface) to insulate the metal to reduce heat loss.




Once the supply of oxygen-containing gas has been restored, the direct smelting process can be re-started.




2. Situations in which there is a continuing supply of oxygen-containing gas and solid carbonaceous material and it is otherwise necessary to hold metal production.




(a) In the specific situation where there is continuing supply of feed materials to the vessel but it is necessary to stop production of molten. iron, the hold procedure includes the following steps:




(i) Stop supplying iron ore to the vessel.




(ii) Continue supplying solid carbonaceous material at a reduced amount and carrier gas via the lances/tuyeres


11


and thereby generate upward movement of splashes, droplets and streams of molten material and solid carbon into the transition zone. The molten material is projected onto the water cooled panels, and forms solid layers predominantly formed from slag that minimise heat lose via the panels.




(iii) Continue to inject oxygen-containing gas at a reduced amount via the lance


13


and combust material in the transition zone. The descending splashes, droplets and streams of molten material transfer heat to the molten bath.




(iv) Add extra charcoal to the forehearth


81


and stop spray cooling of the external surface of the forehearth connection.




(v) increase pressure in the vessel to a pre-set upper limit in a series of steps over a time interval.




(vi) Decrease pressure in the vessel to a pre-set lower limit in a series of steps over a time interval.




(vii) Repeat steps (v) and (vi) and sample the forehearth temperature and carbon periodically.




(viii) Periodically tap slag.




The purpose of varying the pressure is to pulse molten metal from the vessel into the forehearth


81


and from the forehearth


81


into the vessel to circulate molten metal through both regions. The circulation of molten metal ensures that there is relatively uniform temperature of the molten metal and avoids local freezing of the metal.




(b) In the specific situation where there is a loss of coal feed but continuing supply of other feed material, the hold procedure includes the following steps:




(i) Stop supplying iron ore to the vessel and maintain a positive flow of carrier gas into the vessel via the solids injection lances/tuyeres


11


;




(ii) Decrease the flow rate of the oxygen-containing gas via the lance


13


to a lower flow rate and inject natural gas into the vessel via the burners


12


. The natural gas combusts in the vessel and generates heat that maintains the temperature within the vessel.




(iii) Add extra charcoal to the forehearth


81


and stop spray cooling of the forehearth outlet.




(iv) Increase pressure in the vessel to a pre-set upper limit in a series of steps over a time interval.




(v) Decrease pressure in the vessel to a pre-set lower limit in a series of steps over a time interval.




(vi) Repeat steps (iv) and (v) and sample the forehearth temperature and carbon periodically.




Depending on the estimated time before coal feed can be re-established, it may be appropriate to reduce the amounts of molten metal and slag in the vessel to minimum levels.




Once coal supply has been re-established the preferred start-up procedure is to heat and carburise the molten metal to approximately 1450° C. and saturated carbon and then ram up feed material supply.




Many modifications may be made to the preferred embodiments of the process of the present invention as described above without departing from the spirit and scope of the present invention.



Claims
  • 1. A process for producing molten metal from a metalliferous feed material in a vessel that contains a molten bath having a metal layer and a slag layer on the metal layer, the process comprising:(a) injecting carrier gas, metalliferous feed material, and solid carbonaceous material, and optionally fluxes, into the molten bath via a plurality of solid material injection lances/tuyeres positioned above and extending towards the surface of the metal layer and causing molten material to be projected from the molten bath as splashes, droplets and streams into a space above a nominal quiescent surface of the molten bath to form a transition zone; (b) smelting metalliferous feed material to metal in the molten bath; (c) injecting oxygen-containing gas into the vessel via one or more than one lance/tuyere and post-combusting reaction gases released from the molten bath, whereby the ascending and thereafter descending splashes, droplets and streams of molten material in the transition zone facilitate heat transfer to the molten bath; (d) tapping molten metal and molten slag as required from the vessel; and (e) a hold procedure for situations in which it is necessary to stop production of molten metal for a period of time other than situations in which there has been an interruption to the supply of oxygen-containing gas and/or solid carbonaceous material to the process, the hold procedure comprises: (i) stopping supply of metalliferous feed material into the vessel; (ii) continuing to inject carrier gas and solid carbonaceous material into the molten bath via the solid material injection lances/tuyeres and generating combustible material in the metal layer and causing molten material and combustible material to be projected into the transition zone; and (iii) continuing to inject oxygen-containing gas into the vessel via one or more than one lance/tuyere and combusting combustible material projected into the transition zone, whereby the ascending and thereafter descending splashes, droplets and streams of molten material in the transition zone facilitate heat transfer to the molten bath to maintain the temperature of the molten bath above a temperature at which the bath freezes.
  • 2. The process defined in claim 1 wherein the hold period of time is up to 5 hours.
  • 3. The process defined in claim 1 wherein step (d) includes continuously tapping molten metal from the vessel.
  • 4. The process defined in claim 1 wherein step (d) includes continuously tapping molten metal from the vessel via a forehearth and the hold procedure includes varying the pressure in the vessel and thereby varying the level of molten metal in the vessel and forcing molten metal from the vessel into the forehearth and from the forehearth into the vessel.
  • 5. The process defined in claim 4 wherein the amount of solid carbonaceous material and oxygen containing gas that is injected into the vessel is reduced during the hold procedure.
  • 6. The process defined in claim 4 wherein the hold procedure includes periodically adding fluxes to the molten bath.
  • 7. The process defined in claim 1 wherein the solid carbonaceous material is coal.
  • 8. The process defined in claim 1 wherein the hold procedure includes periodically tapping molten slag during the hold period.
  • 9. A process for producing molten metal from a metalliferous feed material in a vessel that contains a molten bath having a metal layer and slag layer on the metal layer, the process comprising.:(a) injecting carrier gas, metalliferous feed material, and solid carbonaceous material, and optionally fluxes, into the molten bath via a plurality of solid material injection lances/tuyeres positioned above and extending towards the surface of the metal layer and causing molten material to be projected from the molten bath as splashes, droplets and streams into a space above a nominal quiescent surface of the molten bath to form a transition zone; (b) smelting metalliferous feed material to metal in the molten bath; (c) injecting oxygen-containing gas into the vessel via one or more than one lance/tuyere and post-combusting reaction gases released from the molten bath, whereby the ascending and thereafter descending splashes, droplets and streams of molten material in the transition zone facilitate heat transfer to the molten bath; (d) tapping molten metal and molten slag as required from the vessel; and (e) a hold procedure for situations in which it is necessary to stop production of molten metal for a period of time and there has been an interruption to the supply of solid carbonaceous material to the process, the hold procedure comprises: (i) stopping supply of metalliferous feed material into the vessel; and (ii) injecting oxygen-containing gas and gaseous or liquid combustible material into the vessel and combusting the combustible material to maintain the temperature.
  • 10. The process defined in claim 9 further includes decreasing the flow rate of oxygen-containing gas from the flow rate for the standard operating procedure to a lower rate that is consistent with the hold procedure.
  • 11. The process defined in claim 9 wherein the combustible material supplied to the vessel in step (e) (ii) includes natural gas.
  • 12. The process defined in claim 9 wherein the hold period of time is up to 5 hours.
  • 13. The process defined in claim 9 wherein step (d) includes continuously tapping molten metal from the vessel.
  • 14. The process defined in claim 9 wherein step (d) includes continuously tapping molten metal from the vessel via a forehearth and the hold procedure includes varying the pressure in the vessel and thereby varying the level of molten metal in the vessel and forcing molten metal from the vessel into the forehearth and from the forehearth into the vessel.
  • 15. The process defined in claim 9 wherein the hold procedure includes maintaining a positive pressure of carrier gas injection via the solids injection lances/tuyeres.
  • 16. A process for producing molten metal from a metalliferous feed material in a vessel that contains a molten bath having a metal layer and a slag layer on the metal layer, the process comprising:(a) injecting carrier gas, metalliferous feed material, and solid carbonaceous material, and optionally fluxes, into the molten bath via a plurality of solid material injection lances/tuyeres positioned above and extending towards the surface of the metal layer and causing molten material to be projected from the molten bath as splashes, droplets and streams into a space above a nominal quiescent surface of the molten bath to form a transition zone; (b) smelting metalliferous feed material to metal in the molten bath; (c) injecting oxygen-containing gas into the vessel via one or more than one lance/tuyere and post-combusting reaction gases released from the molten bath, whereby the ascending and thereafter descending splashes, droplets and streams of molten material in the transition zone facilitate heat transfer to the molten bath; (d) continuously tapping molten metal from the vessel via a forehearth; (e) tapping molten slag as required from the vessel; (f) a hold procedure for situations in which it is necessary to stop production of molten metal for a period of time other than situations in which there has been all interruption to the supply of oxygen-containing gas and/or solid carbonaceous material to the process, the hold procedure comprises: (i) stopping supply of metalliferous feed material into the vessel; (ii) continuing to inject carrier gas and solid carbonaceous material into the molten bath via the solid material injection lances/tuyeres and generating combustible material in the metal layer and causing molten material and combustible material to be projected into the transition zone; and (iii) continuing to inject oxygen-containing gas into the vessel via one or more than one lance/tuyere and combusting combustible material projected into the transition zone, whereby the ascending and thereafter descending splashes, droplets and streams of molten material in the transition zone facilitate heat transfer to the molten bath to maintain the temperature of the molten bath above a temperature at which the bath freezes; and (iv) varying the pressure in the vessel and thereby varying the level of molten metal in the vessel and forcing molten metal from the vessel into the forehearth and from the forehearth into the vessel.
  • 17. A process for producing molten metal from a metalliferous feed material in a vessel that contains a molten bath having a metal layer and a slag layer on the metal layer, the process comprising:(a) injecting carrier gas, metalliferous feed material, and solid carbonaceous material, and optionally fluxes, into the molten bath via a plurality of solid material injection lances/tuyeres positioned above and extending towards the surface of the metal layer and causing molten material to be projected from the molten bath as splashes, droplets and streams into a space above a nominal quiescent surface of the molten bath to form a transition zone; (b) smelting metalliferous feed material to metal in the molten bath; (c) injecting oxygen-containing gas into the vessel via one or more than one lance/tuyere and post-combusting reaction gases released from the molten bath, whereby the ascending and thereafter descending splashes, droplets and streams of molten material in the transition zone facilitate heat transfer to the molten bath; (d) continuously tapping molten metal from the vessel via a forehearth; (e) tapping molten slag as required from the vessel; (f) a hold procedure for situations in which it is necessary to stop production of molten metal for a period of time and there has been an interruption to the supply of solid carbonaceous material to the process, the hold procedure comprises: (i) stopping supply of metalliferous feed material into the vessel; (ii) injecting oxygen-containing gas and gaseous or liquid combustible material into the vessel and combusting the combustible material to maintain the temperature; (iii) varying the pressure in the vessel and thereby varying the level of molten metal in the vessel and forcing molten metal from the vessel into the forehearth and from the forehearth into the vessel.
Priority Claims (1)
Number Date Country Kind
PQ3463 Oct 1999 AU
US Referenced Citations (90)
Number Name Date Kind
2647045 Rummel Jul 1953 A
3844770 Nixon Oct 1974 A
3845190 Yosim et al. Oct 1974 A
3888194 Kishigami et al. Jun 1975 A
3890908 von Klenck et al. Jun 1975 A
3894497 Helke et al. Jul 1975 A
4007034 Hartwig et al. Feb 1977 A
4053301 Stephens, Jr. Oct 1977 A
4145396 Grantham Mar 1979 A
4177063 Dickson Dec 1979 A
4207060 Zangs Jun 1980 A
4356035 Brotzmann et al. Oct 1982 A
4389043 Weber et al. Jun 1983 A
4400936 Evans Aug 1983 A
4402274 Meenan et al. Sep 1983 A
4431612 Bell et al. Feb 1984 A
4447262 Gay et al. May 1984 A
4456017 Wunsche Jun 1984 A
4468298 Byrne et al. Aug 1984 A
4468299 Byrne et al. Aug 1984 A
4468300 Byrne et al. Aug 1984 A
4481891 Takeshita et al. Nov 1984 A
4504043 Yamaoka et al. Mar 1985 A
4511396 Nixon Apr 1985 A
4565574 Katayama et al. Jan 1986 A
4566904 von Bogdandy et al. Jan 1986 A
4572482 Bedell Feb 1986 A
4574714 Bach et al. Mar 1986 A
4602574 Bach et al. Jul 1986 A
4664618 Gitman May 1987 A
4681599 Obkircher Jul 1987 A
4684448 Itoh et al. Aug 1987 A
4701214 Kaneko et al. Oct 1987 A
4718643 Gitman Jan 1988 A
4786321 Hoster et al. Nov 1988 A
4790516 Sugiura et al. Dec 1988 A
4798624 Brotzmann et al. Jan 1989 A
4804408 Puhringer Feb 1989 A
4849015 Fassbinder et al. Jul 1989 A
4861368 Brotzmann et al. Aug 1989 A
4874427 Hamada et al. Oct 1989 A
4890562 Gitman Jan 1990 A
4913734 Romenets et al. Apr 1990 A
4923391 Gitman May 1990 A
4940488 Maeda et al. Jul 1990 A
4946498 Weber Aug 1990 A
RE33464 Gitman Nov 1990 E
4976776 Elvander et al. Dec 1990 A
4999097 Sadoway Mar 1991 A
5005493 Gitman Apr 1991 A
5024737 Claus et al. Jun 1991 A
5037808 Tarcy et al. Aug 1991 A
5042964 Gitman Aug 1991 A
5050848 Hardie et al. Sep 1991 A
5051127 Hardie et al. Sep 1991 A
5065985 Takahashi et al. Nov 1991 A
5177304 Nagel Jan 1993 A
5191154 Nagel Mar 1993 A
5222448 Morgenthaler et al. Jun 1993 A
5238646 Tarcy et al. Aug 1993 A
5271341 Wagner Dec 1993 A
5279715 La Camera et al. Jan 1994 A
5301620 Nagel et al. Apr 1994 A
5302184 Batterham et al. Apr 1994 A
5322547 Nagel et al. Jun 1994 A
5332199 Knapp et al. Jul 1994 A
5333558 Lees, Jr. Aug 1994 A
5396850 Conochie et al. Mar 1995 A
5401295 Brotzman Mar 1995 A
5407461 Hardie et al. Apr 1995 A
5415742 La Camera et al. May 1995 A
5443572 Wilkison et al. Aug 1995 A
5480473 Hardie et al. Jan 1996 A
5489325 Keogh et al. Feb 1996 A
5498277 Floyd et al. Mar 1996 A
5518523 Brotzmann May 1996 A
5529599 Calderon Jun 1996 A
5613997 Satchell, Jr. Mar 1997 A
5630862 Greenwalt May 1997 A
5640708 Conochie et al. Jun 1997 A
5647888 Keogh et al. Jul 1997 A
5683489 Hayashi et al. Nov 1997 A
5741349 Hubble et al. Apr 1998 A
5800592 den Hartog et al. Sep 1998 A
5802097 Gensini et al. Sep 1998 A
5869018 Stephens, Jr. Feb 1999 A
5871560 Fluch et al. Feb 1999 A
4940488 Maeda et al. Aug 1999 C1
5938815 Satchell, Jr. Aug 1999 A
6083296 Innes et al. Jul 2000 A
Foreign Referenced Citations (36)
Number Date Country
A-2386484 Jul 1984 AU
B-4106485 Apr 1986 AU
B-6970787 Sep 1987 AU
B-2244888 May 1989 AU
B-2683188 Jul 1989 AU
B-2880289 Aug 1989 AU
A-4285989 Apr 1990 AU
A-4930790 Sep 1990 AU
A-49309.90 Sep 1990 AU
B-7484091 Aug 1992 AU
B-9095791 Aug 1992 AU
A-4893893 Apr 1994 AU
B-4893793 May 1994 AU
B-5082096 Jan 1997 AU
3139375 Apr 1973 DE
3244744 May 1984 DE
079 182 May 1983 EP
084 288 Jul 1983 EP
422 309 Apr 1991 EP
541 269 May 1993 EP
592 830 Apr 1994 EP
657 550 Jun 1995 EP
2 043 696 Oct 1980 GB
2 088 892 Jun 1982 GB
WO 8901981 Mar 1989 WO
WO 9212265 Jul 1992 WO
WO 9306251 Apr 1993 WO
WO 9419497 Sep 1994 WO
WO 9619591 Jun 1996 WO
WO 9631627 Oct 1996 WO
WO 9717473 May 1997 WO
WO 9720958 Jun 1997 WO
WO 9723656 Jul 1997 WO
WO 9827232 Jun 1998 WO
WO 9827239 Jun 1998 WO
WO 9916911 Apr 1999 WO
Non-Patent Literature Citations (24)
Entry
U.S. application No. 09/550,421, Dry, filed Apr. 17, 2000.
U.S. application No. 09/160,913, Dry, filed Sep. 25, 1998.
U.S. application No. 09/331,277, Jai, filed Jun. 17, 1999.
U.S. application No. 09/331,272, Bates, filed Jun. 17, 1999.
U.S. application No. 09/509,314, Bates, filed Mar. 21, 2000.
U.S. application No. 09/535,665, Leigh, filed Mar. 21, 2000.
U.S. application No. 09/462,282, McCarthy, filed Mar. 16, 2000.
U.S. application No. 09/478,750, Dry, filed Jan. 6, 2000.
U.S. application No. 09/509,286, MCarthy, filed Mar. 21, 2000.
U.S. application No. 09/509,264, Dry, filed Mar. 21, 2000.
U.S. application No. 09/509,290, Dry, filed Mar. 21, 2000.
U.S. application No. 09/509,323, Dry, filed Mar. 21, 2000.
U.S. application No. 09/587,774, Bates, filed Jun. 6, 2000.
U.S. application No. 09/611,514, Bates, filed Jul. 7, 2000,
U.S. application No. 09/632,730, Dry, filed Aug. 4, 2000.
U.S. application No. 09/634,059, Burke, filed Aug. 9, 2000.
U.S. application No. 09/669,397, Batterham, filed Sep. 26, 2000.
U.S. application No. 09/662,821, Dry, filed Oct. 12, 2000.
Patent Abstract of Japan, JP, A, 10-280020 (Nippon Steel Corp.), Oct. 20, 1998.
Patent Abstracts of Japan, C-951, p. 24, JP, A, 04-63218, (Kawasaki Heavy Ind. Ltd), Feb. 28, 1992.
Patent Abstracts of Japan, C-627, p. 109, Jp, A, 01-127613 (Kawasaki Steel Corp.), May 19, 1989.
Patent Abstracts of Japan, C-951, JP, A, 4-63217 (Kawasaki Heavy Ind. Ltd.), Feb. 28, 1992.
Patent abstracts of Japan, C-497, p. 115, JP, A, 62-280315 (Nippon Kokan K.K.), Dec. 15, 1987.
Derwent Abstract Accession No. 87-039748/06 Class Q77, JP, A, 61-295334, Dec. 26, 1986.