Claims
- 1. In combination with a power plant system having a main once-through fluid flow path connected in series with furnace enclosure tubular means, primary and secondary superheaters, high and low pressure turbine means with a reheater connected therebetween, the improvement comprising utilization of multi-lead ribbed tubing as the tubular means whereby minimum start-up flow is reduced to approximately 15 percent of full load flow, a start-up system including a flash tank, valve means interposed between the primary and secondary superheater and in parallel with the main flow path whereby the transition from operation through the start-up system to flow through the main flow path is accomplished without fluctuation in steam temperature and wherein the valve means provide supercritical pressure upstream of the primary superheater outlet and variable pressure downstream of the secondary superheater inlet over the greater portion of the load range.
Parent Case Info
This application is a continuation of application Ser. No. 06/271,142 filed June 8, 1981, now abandoned.
US Referenced Citations (7)
Continuations (1)
|
Number |
Date |
Country |
Parent |
271142 |
Jun 1981 |
|