Conventional steam power plant plants have a closed water-steam cycle. In the steam generator so much energy is added to the boiler feed water by combustion of a fossil fuel that it passes into the vaporous aggregate condition. This steam drives a generator via one or several steam turbines and afterwards is liquefied again in one condenser.
As it is not possible to economically store electric energy in big scope, there were already considerations in the past aiming at storing thermal energy in a steam power plant in order to thereby increase the flexibility resp. adaption to net requirements (peak load).
It is known from U.S. Pat. No. 4,003,786 to arrange a chain of heat exchangers parallel to the preheater passage of the steam power plant. Via these heat exchangers it is possible to exchange heat between a part of the condensate stream and a thermo-oil. This means that the heat exchangers are streamed through by condensate on the one hand and a thermo-oil on the other hand. Thus it is possible to confer heat from the condensate to the thermo-oil in times of low demand and to store this heated thermo-oil. When subsequently a high output is requested, it is possible to re-confer the heat stored in the thermo-oil to the condensate via the same heat exchangers and thus to reduce the demand of tapping steam for preheating the condensate. Consequently, the output available at the generator is increased and the demanded peak load can be met in a better way.
This known arrangement is very complex and requires a multitude of heat exchangers as well as two heat reservoirs. For this reason two different heat reservoirs are required, because both heat reservoirs are operated at different temperatures, i.e. approximately 190° and 520° C.
It is the object of the invention to provide a steam power plant which can provide peak load stream and control energy, wherein the apparative effort required therefor is to be preferably low. Furthermore the strengthening of already existing steam power plants is to be possible in a preferably simple manner and with small manipulations of the steam power plant process.
According to the invention this object is solved by means of a steam power plant comprising a steam generator, a turbine, a condenser, a condensate line and at least one preheater and a heat reservoir, wherein the condensate line connects the condenser, the at least one preheater and a feed water container with each other and wherein the heat reservoir is arranged parallel to the at least one preheater and the heat reservoir is loaded with condensate which was preheated by at least one preheater.
Thus it is possible to branch off condensate to some extent and to temporarily store it in the heat reservoir in the weak load times so that the output of the steam generator can be maintained, even if the generated electric output of the power plant is considerably reduced. In these weak load times it is easily possible to branch off much tapping steam from the steam turbine and to preheat more condensate as is actually required.
This preheated condensate is temporarily stored in a heat reservoir according to the invention, wherein the heat reservoir is arranged parallel to one or several preheaters, preferably one or several low-pressure preheaters.
When the load now increases considerably, then it is possible to convey the condensate stored in the heat reservoir and being already preheated directly into the feed water container under circumvention of the preheaters. This means that only a very small condensate stream streams through the preheaters and consequently the steam quantity which has to be branched off from the turbines in order to preheat the condensate in the preheaters is reduced correspondingly. All the same the condensate stream streaming into the feed water container is maintained corresponding to the present load. Consequently after a shortest time more electric output is at disposal.
As with the steam power plant according to the invention the sensitive heat remains in the condensate and the condensate is temporarily stored in the heat reservoir, the apparative effort is low and the heat losses caused by the temporary storage of the condensate are also very low.
A further advantage of the steam power plant according to the invention is to be seen in that it is also possible to provide control energy by means of the heat reservoir, i.e. by either storing heat in the heat reservoir at short notice corresponding to the present demand or taking it therefrom.
A further advantage is to be seen in that the steam generator can be operated on a higher partial load level in weak load times and thus with an improved degree of efficiency.
A further very important advantage is to be seen in that even already existing steam power plants can generally be strengthened into a steam power plant according to the invention by integrating a heat reservoir, so that the advantages according to the invention can also be realized in already existing installations. Due to the simple apparative construction it is in fact also practically possible to retrofit already existing steam power plants.
In further advantageous embodiment of the invention it is provided that a “cold” connection of the heat reservoir is connected with a section of the condensate line extending upstream of the at least one preheater.
In an analogue manner a “warm” connection of the heat reservoir is connected with a section of the condensate line extending downstream of the at least one preheater.
As a connection of the heat reservoir, i.e. the cold connection, is connected with the condensate line upstream of the preheater(s) and the “warm” connection of the heat reservoir is connected with the section of the condensate line extending downstream of the preheater(s), the cold resp. warm condensate can easily be branched off from the condensate line resp. re-fed at the suitable place. It is also possible, according to the requirement profile of the heat reservoirs, to alternatively optimally control the temperature level of the tapping steam parallel to a preheater, two preheaters or several preheaters corresponding to the disposability at the turbine.
The connection of the heat reservoir according to the invention preferably takes place via a connecting line, wherein in a first section of the connecting line a pump, preferably a speed-regulated, pump is provided. Alternatively or additionally also in the second section of the connecting line a pump, preferably a speed-regulated pump, can be provided. However, use of pumps can/must not be necessary. Pumps can generally be necessary when discharging (hot/cold) the stored condensate in order to convey against existing system pressure. The furnishing of the heat reservoirs takes place via a bypass arranged control valves. The conveyance takes place via existing main condensate pumps.
By means of the at least one pump and the at least one control valve it is possible to exactly control the condensate stream which is branched off from the main condensate line and conveyed into the heat reservoir resp. the quantity of the condensate stream re-fed into the condensate line from the heat reservoir and thus achieve an optimal controllability of the power plant according to the invention. Usually the first section of the connecting line, which connects the condensate line with the cold connection of the heat reservoir, and the second section of the connection line, which connects the warm connection of the heat reservoir with the condensate line, will be constructed symmetrically. Of course non-return valves, shutoff devices etc. can be provided when required and in dependence.
Of course it is also possible, to some extent as emergency option, to provide a choke valve parallel to the control valve, so that in case of breakdown or maintenance of the control valve or in case of breakdown of the control valve the operation of the power plant, even with somewhat reduced control quality, can continue without disturbances.
Basically it is possible to construct the pressure reservoir in such a way concerning its pressure resistance that it withstands the pressure given in the condensate lines. Such a reservoir is usually constructed as mere displacement reservoir being 100% filled with condensate. However, from an operational point of view this often is not optimal. For this reason, a heat reservoir being filled with condensate up to only approximately 90% can be used. The remaining 10% are filled up by means of a steam bolster. Wherein control and choke valves have the task of maintaining the mass streams simultaneously supplied and discharged, overlapped by the heat reservoir level to be maintained.
In further advantageous embodiment of the invention it is provided that the steam power plant has several preheaters being connected in series, especially several low-pressure preheaters, and that the heat reservoir is arranged resp. connected parallel to the one or several of the preheaters. By means of the flexible connection of the heat reservoir either parallel to one, two or a different number of preheaters, the storage capacity of the heat reservoir can be adapted to the requirements and systematically more or less tapping steam from the high-pressure part, the medium-pressure part resp. the low-pressure part of the steam turbine can be provided for preheating the condensate. Thus a further degree of freedom for optimizing the operation of the steam power plant is given.
The above-mentioned object is also solved by a method for operating a steam power plant according to independent claim 9. Wherein the advantages according to the invention, as explained in connection with claims 1 to 8, are realized.
Further advantages and advantageous embodiments of the invention can be taken from the following drawing, its specification and the patent claims. All features described in the drawing, its specification and the patent claims can be relevant for the invention either taken by themselves or in optional combination with each other.
Shown are:
In
In a steam generator 1 under utilization of fossil fuels or by means of biomass out of the feed water live steam is generated, which is expanded in a steam turbine 3 and thus drives a generator G. Turbine 3 can be separated into a high-pressure part HD, a medium-pressure part MD and a low-pressure part ND.
After expanding the steam in turbine 3, it streams into a condenser 5 and is liquefied there. For this purpose a generally liquid cooling medium, as e.g. cooling water, is supplied to condenser 5. This cooling water is then cooled in a cooling tower (not shown) or by a river in the vicinity of the power plant (not shown), before it enters into condenser 5.
The condensate originated in condenser 5 is then supplied, by a condensate pump 7, to several preheaters VWi, with i=1 . . . n. In the shown embodiment behind the second preheater VW2 a feed water container 8 is arranged. Behind the feed water container 8 a feed water pump 9 is provided.
In combination with the invention it is of significance that the condensate from condenser 5 is preheated with steam beginning with the first preheater VW1 until the last preheater VW5. This so-called tapping steam is taken from turbine 3 and leads to a diminution of the output of turbine 3. With the heat exchange between tapping steam and condensate the temperature of the condensate increases from preheater to preheater. Consequently the temperature as well of the steam utilized for preheating must increase from preheater to preheater.
In the shown embodiment the preheaters VW1 and VW2 are heated with steam from low-pressure part ND of steam turbine 3, whereas the last preheater VW5 is partially heated with steam from high-pressure part HD of steam turbine 3. The third preheater VW3 arranged in the feed water container 8 is heated with steam from medium-pressure part MD of turbine 3.
In
Concerning the parts of the steam power process that are not represented
In a first section 19.1 of the condensate line three condensate pumps 7.1, 7.2 and 7.3 are arranged. As several condensate pumps 7 are provided, the supply quantity can be simply controlled and in case of breakdown of one condensate pump the operation of the steam power plant is not impaired. The condensate pumps 7.1 to 7.3 are secured by means of shutoff devices 13 and non-return valves 15 and can be shut off if necessary.
Downstream of the condensate pumps 7.1 to 7.3 a flow-through measurement 17 and a condensate cleaning installation KRA are provided. Downstream of the condensate cleaning installation KRA a first section 21.1 of a connecting line 21 branches off. The first section 21.1 of the connecting line 21 is connected with a cold connection 23 of a heat reservoir 25. A second section 21.2 of the connecting line connects a warm connection 27 of heat reservoir 25 with a second section 19.2 of condensate line 19. The second section 19.2 of the condensate line is arranged downstream of preheater VW and upstream of feed water container 8. In the first section 19.1 as well as in the second section 19.2 of the condensate line liquid condensate flows.
Parallel to the control valves 31.1 and 31.3 choke valves 33.1 and 33.2 are provided which take over the tasks of control valves 31 in case of their breakdown.
All in all this guarantees a very high disposability and operation security of the power plant according to the invention. This is also achieved by realizing an identical construction at the cold and the warm side of heat reservoir 25 containing multiple redundancies. The redundancies can affect pumps 29 as well as control valves 31 and choke valves 33.
In the embodiment shown in
In
Control valve 31.2 takes care that the filling level of heat reservoir 25 remains constant. Choke valve 33.2 is closed.
The shown shutoff devices 35 are necessary in order to separate the heat reservoir installation from the main condensate system in case of improper operation resp. excess of a defined container level.
When loading heat reservoir 25 cold condensate from heat reservoir 25 gets into condensate line 19.1 and is then preheated in preheater passage VW1 to VW4 as well as the condensate sucked out of condenser 5 by condensate pumps 7. With the condensate stream through the preheater passage of course the demand of tapping steam increases, so that the electric output of steam turbine 3 (cf.
As heat reservoir 25 when being loaded with preheated condensate is filled out of the second section 19.2 of the condensate line, the temperature of the condensate in heat reservoir 25 increases; i.e. sensitive heat is stored in heat reservoir 25.
When loading heat reservoir 25 pump 29.1 is in operation. The shutoff devices before and behind pump 29.1 are opened. Choke valves 33.1 and 33.2, pump 29.2 and shutoff devices of pump 29.2 are closed. Control valve 31.2 is in engagement. Consequently the condensate stream taken from the heat reservoir exclusively streams via pump 29.1 and flow-through measurement 17.
In
In the other embodiments as well (
When loading pump 29.1 is set into operation and pump 29.2 is set out of operation. When unloading heat reservoir 25 pump 29.2 is in operation.
With the embodiment of the steam power plant according to the invention explained by means of
Between condensate line 19 and heat reservoir 25 shutoff devices 35 are arranged. With the utilization of a heat reservoir being filled with condensate only up to 90% and with a steam bolster up to 10%, a lower operation pressure in the heat reservoir occurs than in condensate line 19, which has the result of a cost-saving construction.
In
The first branch line 37.1 branches off from condensate line 19 between condensate cleaning installation KRA and the first preheater VW1. The second branch line 37.2 is arranged between the first preheater VW1 and the second preheater VW2. The third branch line 37.3 is arranged between the second preheater VW2 and the third preheater VW3. The same applies to the fourth branch line 37.4.
In each of these branch lines 37.1 to 37.4 a shutoff device 35.1 to 35.5 is provided. Furthermore, parallel to each preheater VW1 to VW4, a bypass-line 39.1 to 39.4 with a shutoff device (without reference numeral) is provided.
With branch lines 37 it is possible, according to requirements, to connect heat reservoir 25 parallel e.g. only to the first preheater VW1. This means that in heat reservoir 25, due to the comparatively small temperature difference between the cold condensate and the condensate preheated solely by the first preheater VW1, only relatively little energy is stored with a low temperature level.
Alternatively it is also possible to connect preheater 25 parallel to preheater VW4 and thus operate it on a temperature level corresponding to the temperature level of preheater VW4. Of course it is also possible to connect heat reservoir 25 parallel to the preheaters VW2 and VW3. Depending on the requirements concerning the operation of the steam power plant all combinations of parallel connection of heat reservoir 25 to one or several preheaters VW1 are possible. This variation of the steam power plant according to the invention thus allows a very flexible and thus economical and thermodynamically optimal operation of the steam power plant. The stream directions of the condensate during loading and unloading heat reservoir 25 are illustrated by arrows 36 and 41.
With the embodiment according to
In
As the pressure in condensate line 19.1 upstream of condensate pumps 7 is very small, it is possible to load the heat reservoir without pump 29. The pressure difference between second section 19.2 and the exit of condenser 5 is sufficient for this purpose.
When unloading heat reservoir 25 during operation of pump 29.2 the condensate can be extracted via the cold connection 23 and the first section 21.1 of connecting line 21 and fed-in by control valve 31.1 into heat reservoir 25. When heat reservoir 25 is unloaded the third section 21.3 of connecting line 21 is closed and loading takes place via the first section 21.1 of the connecting line and a corresponding control of control valve 33.1. In this case condensate pumps 7 take over the pressure increase of the condensate required for loading, because contrary to the aforementioned embodiments a pump 29.1 is not provided.
With the embodiment according to
With the embodiment according to
With the embodiment according to
The embodiment according to
With the embodiment according to
Number | Date | Country | Kind |
---|---|---|---|
09015097.0 | Dec 2009 | EP | regional |