The present invention relates to a steam turbine system including one or more steam turbines powered by or a boiler or a steam generator and driving a power output shaft connected to an electrical generator for the generation of electrical power. As is well known in the art, the electrical generator generates 50 Hz AC or 60 Hz AC.
During the recent 10-15 years remarkable progress has been made concerning the efficiency of power plants fuelled by coal, natural gas, oil or any other combustible material. In particular the introduction of new high temperature steel has meant significant improvement of the major parameters of the conventional and well proven water/steam cycle so that now main steam pressures in the range of 300 bar together with main and reheat steam temperatures in the range of 600° C. are commercial available.
In attempts to obtain further improvements of efficiencies and economy the most recent developments targets water/steam cycles where main and reheat steam temperatures are in the range of 700° C. and beyond.
However, there are areas in the water/steam cycle where problems are starting to show up as the bleed steam for some of the regenerative pre-heaters is very hot and highly super heated with steam temperatures beyond 600° C. Experiences from certain power plants indicate that efficiency changes very little if the regenerative pre-heater is being switched off which pre-heater is bleeding on the first extractions after the steam has been re-heated.
The furnace is another area of the water/steam cycle where problems start to be severe as more and more of the heat transferred to the advanced water/steam cycle is being transferred through the re-heaters, which means more difficult cooling conditions for the furnace walls.
In the literature examples of refined or improved power plants have been described in FR 1 312 886, FR 1 511 106, DE 10 49 875, DE 15 51 257, U.S. Pat. No. 3,842,605, U.S. Pat. No. 4,003,786, U.S. Pat. No. 5,404,724, SU 1553-738 and U.S. Pat. No. 6, 494,045, to which reference is made and which U.S. patents are hereby incorporated in the present specification by reference.
Although these attempts have to some extent improved the efficiency of the power plants and also allow the use of the above-described high temperature steam, a need exists for further improving the efficiency of the power plants as the temperature range of the steam is increased as described above. Conventional approaches for fulfilling this need have generally related to changes of the conventional arrangement where the bleed steam follows the same path as the main and reheat steam and is being extracted from cold re-heaters and intermediate and low-pressure turbines for the regenerative condensate and feed water pre-heaters.
The above need is fulfilled according to the present invention by the provision of a separate turbine in addition to the conventional steam path including high-pressure, intermediate and low-pressure turbines.
According to the present invention, efficiency improvements and cost reductions are contemplated to be obtained by the use of the above-described separate pressure turbine and furthermore, as will be described below, certain design and engineering advantages are contemplated to be obtained by the use of the additional or separate turbine according to the present invention.
The above need, together with numerous advantages, which will be evident from the below description of the present invention, are obtained according to the teachings of the present invention by a steam turbine power plant comprising:
In a particular example mentioned above of a steam turbine system of a power plant, viz. the steam turbine system described in DE 10 49 875, a three stage turbine set-up is shown in the drawings and described comprising a high pressure steam turbine, an intermediate pressure steam turbine and a low pressure steam turbine. However, the system fails as compared to the steam turbine system according to the present invention to include the tuning turbine which is characteristic of the present invention and which provides the advantages to be described in greater details below and fulfilling the needs mentioned above.
As already mentioned above, the separate turbine or the tuning turbine characteristic of the present invention provides a path from the high-pressure steam turbine to the regenerative heater system thereby providing the above described efficiency improvements. By the use of the tuning turbine which is fed with steam from the high-pressure turbine and allowing the regenerative systems or the regenerative pre-heaters to bleed on the tuning turbine, the steam temperature in the bleeds becomes relatively low allowing the bleed lines to be manufactured in less expensive materials as in conventional high temperature bleed installations. Furthermore, the extreme losses by using high superheated steam for the reheating condensate and the feed water in the regenerative system are avoided by the use of the tuning turbine as the bleed steam provides low thermodynamic losses in the regenerative system.
As will be described in greater details below, the enthalpy drop in the tuning turbine is fairly high and therefore, the tuning turbine is preferably designed as a high speed turbine for obtaining a high blading efficiency. Furthermore, from the concern of obtaining high efficiency in the power plant, it is contemplated that the tuning turbine being a high speed turbine may advantageously be combined with a high speed high-pressure turbine thereby also reducing the costs of the overall turbine system and the power plant and also improving the blading efficiency. Provided the high-pressure turbine and the tuning turbine be designed as high speed turbines, the two high speed turbines being constituted by the high-pressure turbine, the tuning turbine are advantageously arranged opposite one another thereby reducing the total trusts of the two turbines, thereby also reducing the losses of the high-pressure turbine balance piston.
A particular feature of the use of the tuning turbine according to the teachings of the present invention allows a part of or all pre-heaters to receive steam and thereby generate power, which pre-heaters bleed on the tuning turbine.
According to the presently preferred embodiment of the steam turbine system according to the present invention, the system preferably further comprises one or more additional low-pressure steam turbines having respective output shaft or a common output shaft connected to the power output shaft, the one or more additional low-pressure turbines together with the first low-pressure steam turbine constituting a cascade of low-pressure turbines defining the third pressure output conduit.
Dependant on the actual design of the various turbines of the steam turbine system according to the present invention including the high-pressure steam turbine, the intermediate pressure steam turbine and the low-pressure steam turbine, the individual low-pressure steam turbines of the cascade of low-pressure steam turbines, the output shafts of the respective turbine may be connected directly to the power output shaft connected to the electrical generator provided the rotational velocity of the turbine allows the output shaft in question to be connected directly and without mechanical losses to the power output shaft. Provided the turbine in question, such as the high-pressure turbine or the tuning turbine are designed as high speed turbines, the turbine in question is connected through a gear assembly to the power output shaft. Consequently, as the low-pressure steam turbine or the cascade of low-pressure steam turbines are contemplated in certain embodiments to be designed as medium speed or high speed turbines, the low-pressure steam turbine or alternatively one or more of the cascade of the low-pressure turbines may be connected to the power output shaft through a single or a plurality of gear assemblies.
As described above, the first heat exchanger or first re-heater is interconnected between the high-pressure steam turbine and the intermediate pressure turbine or alternatively between the intermediate pressure turbine and the first low-pressure turbine, the steam turbine system according to the present invention preferably includes a further or second heat exchanger or re-heater as the first heat exchanger or first re-heater is interconnected between the high-pressure turbine and the intermediate pressure turbine whereas the further or second heat exchanger or further or second re-heater is interconnected between the intermediate pressure steam turbine and the first low-pressure steam turbine or the preferred cascade of low-pressure steam turbines.
The steam regenerative heater system of the steam turbine system according to the present invention may be configurated in numerous alternative ways as will be obvious to a person having ordinary skill in the art. The regenerative heat system may be constituted by a single integral system having a plurality of pre-heaters and conventional water tanks etc., alternatively be composed of several parallel, serial or independently operated regenerative systems. According to the presently preferred embodiment of the steam turbine system according to the present invention, the steam regenerative heater system is divided into two parts as the steam regenerative heat system comprises a first part and a second part, the first part connecting the third pressure output conduit to the boiler conducting steam output from the first low-pressure steam turbine or from the one or more additional low-pressure steam turbines to the boiler, the second part connecting the bleed output of the steam turbine to the boiler for the return of steam from the turbine to the high-pressure boiler, the fourth steam output conduit being connected to the second part and the at least one bleed output of the tuning turbine being connected to the second regenerative system.
According to an alternative embodiment of the steam turbine system according to the present invention including a two part steam regenerative heater system, the output of the tuning turbine and/or the one or more bleed outputs of the tuning turbine are connected to the first part of the steam regenerative heater system, i.e. the part interconnecting the low-pressure turbine part and the boiler.
As mentioned above, the turbines of the steam turbine system according to the present invention are according to the conventional AC power requirements in different countries designed to provide a rotational speed of the power output shaft of 3000 rpm or alternatively 3600 rpm for the generation of 50 Hz AC and 60 Hz AC, respectively.
The steam turbine system according to the present invention allows as described above the use of high temperatures and high pressures thereby improving the efficiency of the system. According to the presently preferred embodiment of the steam turbine system according to the present invention, the high-pressure boiler generates steam at a pressure of 200-600 bar and a temperature of 500-900° C., such as a pressure of 200-400 bar, 400-600 bar, or alternatively 300-500 bar and a temperature of 500-600° C., 600-700° C., 700-800° C., 800-900° C.
According to the high efficiency concept of the present invention, the steam return to the high-pressure boiler preferably has a temperature of 250-500° C., such as 300-400° C. or 400-500° C. or alternative approximately 300-350° C.
The present invention is now to be further described with reference to the drawing in which
In
For the generation of steam, a boiler 22 is provided having a high-pressure and high temperature steam output conduit 24 delivering high-pressure and high temperature steam to a first turbine constituted by a high-pressure turbine 26. The output of the high-pressure turbine 26 is connected to an intermediate pressure turbine 28 through a conduit 30 in which a first heat exchanger or re-heater 32 is included. The intermediate pressure turbine 28 has its output connected through a further re-heater 34 to a further intermediate turbine 36, the output of which is connected to two low-pressure turbines 38 and 40. The high-pressure turbine 26 has its output shaft connected directly or through a gear assembly to the power output shaft 20 and similarly, the intermediate low-pressure turbines 28 and 36 are connected through gear assemblies or directly to the power output shaft 20. The high-pressure turbine 26 is preferably constituted by a high speed turbine such as a turbine rotating at a speed of 4000-12000 rpm whereas the intermediate and low-pressure turbines are preferably constituted by turbines rotating at a rotational speed of 3000 rpm allowing the generator 12 to produce 50 Hz AC. Alternatively, provided the system be used in e.g. the US, the power output shaft 20 rotates at 3600 rpm for the generation of 60 Hz AC and similarly, the high speed rotating high-pressure turbine 26 rotate at 4000-12000 rpm. The outputs of the low-pressure turbines 38 and 40 are connected to a condenser 42, and the bleed outputs of the low-pressure 38 and 40 are connected to a respective pre-heater 44 and 46 which are connected in a series configuration also including a further pre-heater 48 which is connected to the condenser 42.
The pre-heaters 44, 46 and 48 and the condenser 42 together constitute a regenerative system which is further connected to a further or regenerative system shown in the lower left hand part of
The output of the tuning turbine 50 is connected to a pre-heater 58 which is further connected to two additional pre-heaters 60 and 62 which receives steam from a respective bleed output of the tuning turbine 50. The tuning turbine 50 shown in
The water return from the high-pressure heater 1 may include two alternative conduit configurations as is illustrated in
In
Therefore, the use of the tuning turbine also offers more freedom to optimise bleed pressures and coupling of the regenerative pre-heaters.
By introducing the use of the tuning turbine, the heat transfer to the re-heaters is contemplated to be reduced by some 20-25% which means reduction of in particular expensive final sections of the re-heater(s) and the re-heat steam lines. For the double re-heat cycles the first re-heater and its steam lines is reduced by some 30-35% and the second re-heater and its steam lines by some 10-15%. Also, the impact of pressure losses in re-heaters and re-heat steam lines is reduced by similar figures as reheat steam flows decrease.
At the same time, feed water flow and the heat transferred to the cycle through the high pressure sections is increased by some 5-10%, which will be beneficial to the cooling of the furnace walls.
Through the introduction of the use of the tuning turbine the use of the advanced coupling of the high-pressure heaters with forward-pumping of the condensate is favourable, as efficiency is improved and costs reduced. Further the use of the tuning turbine reduces the cost of the economiser.
The present invention has been described above with reference to a specific embodiment, however, it is contemplated that numerous modifications and alterations may be made which modifications and alterations will be obvious to a person having ordinary skill in the art, consequently, such modifications and alterations are to be considered part of the present invention as defined in the appending patent claims.
A prototype embodiment of the steam turbine system 10 shown in
Number | Date | Country | Kind |
---|---|---|---|
03388008.9 | Feb 2003 | EP | regional |
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCT/DK04/00069 | 2/3/2004 | WO | 6/6/2006 |