The invention described in this document is a steering device which can provide primary or reserve steering for vessels of a wide range of types and sizes.
Navigation of any vessel in water depends upon effective steering. Damage or loss of steering gear can be catastrophic. Reserve steering control such as an emergency tiller is carried by many vessels and such provision is a requirement of shipping regulations. Few vessels carry any form of reserve rudder even though many vessels are disabled because of damage to the rudder itself rather than its control mechanism. Every year a number of yachts are lost or abandoned because of rudder damage. One reason that few vessels carry a practical emergency or reserve rudder despite the obvious desirability of doing so is that no suitable equipment has been available.
Some vessels carry some form of drogue for use in the event of rudder failure with a view to steering the vessel by means of drag—by altering the athwartships position of the line attaching the drogue to the vessel. In practice such arrangements are seldom satisfactory.
Even where a spare rudder is carried and provision made for it to be deployed from the stem of a vessel—to manoeuvre a solid rudder which may weigh tens of kilograms over the transom of a vessel in a heavy sea before locating onto mountings or into a cassette means that in the course of deployment the reserve rudder is likely to injure the crew and the task may well be impossible.
The instant invention is distinguished from other forms of emergency steering in that it steers by means of lift in the manner of a conventional rudder but is attached to the vessel by lines and may be regarded as being towed somewhat in the manner of a drogue.
Steering of the vessel using the instant invention is effected by a steering surface (‘blade’) immersed or partly immersed in the water upon which the vessel floats. An essential feature of the invention is that the blade is positioned by at least one and usually two or more lines (referred to below as ‘guys’, ‘ties’ or ‘control lines’ according to function) acting in tension to transfer some or all of the force between the vessel and the blade. The lines connect the blade directly to the vessel—the lines do not connect to a separate post to which is hinged the blade. Lines can be used to control the steering.
The blade can be made of rigid material in the manner of a conventional rudder or include a non-rigid material such as sailcloth suitably supported by a framework.
The vessel is steered using a suitable mechanism to move the blade relative to the vessel in a manner analogous to the control of a conventional rudder. Movement of the blade may be achieved by transfer of torque to the rudder via a tiller, quadrant or similar. Alternatively the blade may be moved by means of adjustment of the geometry of lines. It does not rely upon precise location by means of fixed points at the stem of the vessel. By including lines to transmit steering effort the instant invention can be made in such a manner that it weighs only a fraction of most conventional rigid rudders. Accordingly it can be made easier to stow, easier and less hazardous to deploy than a spare conventional rudder whilst being more effective than alternatives such as a drogue. A single design can easily be deployed on a wide range of vessels without modification.
The device in
Many variations of the design in
The blade illustrated by
In the device with a blade 1 constructed according to
A number of variations of the design outlined in
Construction assembly deployment and use of a paradigm example of the current invention according to
A sail 6 is constructed from a heavy grade of sailcloth (380 gm/sq metre polyester). A range of other materials is available. The cloth is cut according to
An improvement on the example under consideration could incorporate a luff sock within pole sleeve 16. The luff sock could be made of light sailcloth. Its function would be to guide the passage of pole 8 on assembly of the device. A window could also be cut into pole sleeve 16 to admit boom 7 more smoothly.
The shape of sail 6 is an isosceles triangle with leech 14 and foot 15 each about 60% of the length of luff 13 which is about 1.8 metre. The lateral area of the sail is approximately the same as the area of the permanent rudder of the vessel on which it is deployed. Other examples could adopt almost any substantially triangular sail shape but where one side is only a fraction of the length of the other two function is likely to be significantly compromised. Usually the area of lateral resistance of sail 6 will be in the range 60% to 150% of that of the vessels own rudder. Non-triangular shapes could be adopted. Stiffening devices such as battens could be employed. An entirely solid blade could be used.
All three edges of sail 6 are reinforced with high strength tape sewn along the edges according to
A boom 7 assembly is constructed from materials suitable to withstand the marine environment. A 20 mm×12 mm glassfibre sail batten was used and has been found to make a suitable boom 7 but large yachts may use larger sections, multiple battens and/or other materials. Other methods of tensioning the clew could be employed but with the system used by the current example the length of boom 7 is at least equal to the perpendicular distance from luff 13 to clew 10 less the minimum diameter of pole 8 plus sufficient length to accommodate the attachment points (referred to below) including sufficient length for a lanyard to tension clew 10. It is not necessarily disadvantageous for boom 7 to be longer than the minimum as this will give increased leverage but at a cost of reduced movement particularly at the limits. A small excess of boom 7 length will be trivial in its effect on performance of the present invention. Some applications may deliberately opt for a longer than minimum boom for the advantage given by extra leverage, for example in avoiding the need for a multiple purchase.
A stainless steel gooseneck 9 according to
The purpose of the two diverging sections of plate is to form a saddle into which different sections of pole 8 may securely rest. A dense plastic material is bonded to the inside face of the saddle which mates upon the pole when assembled.
A retaining tape 25 which is to go around the pole 8 is attached to attachment point 24 on one side of the gooseneck 9. On the other side of gooseneck 9 a fastening point 32 is provided for the retaining tape 25. The purpose of the tape is not only to hold gooseneck 9 snug to pole 8 but also by locating in the slot on the tape 29 along luff 13 to prevent vertical movement of gooseneck 9 on the pole. At this stage the tape is attached to gooseneck 9 attachment point 24 but otherwise left loose.
An alternative approach would be to use fastening point 32 as a guide through which retaining tape 25 passes aft to be tensioned at the clew 10 end of pole 7. Many other designs are also possible.
Many other designs of gooseneck are possible including welded metal fabrications and constructions moulded from plastic, carbon fibre etc. Booms might be constructed with an integral gooseneck. Many different methods of locating the pole at the gooseneck could be employed.
At the clew end of boom 7 a hole is drilled. Lashings are used to attach on each side of the boom one articulated pulley block for control lines 18 and 19 and to provide an eye for a lanyard which is used to tension the clew. The arrangement is capable of accommodating uneven loads. Other examples could provide an end fitting constructed in stainless steel or plastics in similar manner to gooseneck 9 fitting or in the form of a sock with a closed end constructed from spectra tape which fits over the end of the boom. The end fitting should be capable of accommodating the blocks needed for control lines 18 and 19, tensioning lanyard for clew 10 and if appropriate retaining tape 25. One articulated block is attached to each side of the end fitting.
The boom 7 and sail 6 assemblies are brought together by sliding boom 7 gooseneck end first through boom sleeve 17 from clew 10 towards pole sleeve 16. The tape on gooseneck 9 is fed out through the slot 30 on the appropriate side of sail 6, through the slot 29 on the tape along luff 13, back through the second slot 30 in sail 6 and either to the attachment point on gooseneck 9. It is located but not made fast. Likewise the lanyard from clew 10 to the clew end of boom 7 is loosely made up.
This assembly is rolled sail round boom. It could be stowed with the other components of the device perhaps with some lines ready attached perhaps in a valise or case against the time when the emergency rudder is needed.
In preparation for use the assembly described above is unrolled and pole 8 is inserted down pole sleeve 16 such that it protrudes to a suitable extent beneath tack 11.
The vessel's own spinnaker pole is used as pole 8 but other spars might in some cases be suitable such as a whisker pole or a boom or gaff from the mizzen sail of a ketch or yawl. Any suitable spar could be used provided the essential sailing (or motoring) function of the vessel is maintained or regardless of function if the vessel is to be towed. Alternatively a specific spar could be carried for the purpose.
A lanyard is fastened from the loop on tack 11 to the bottom of pole 8. A second lanyard is taken from head 12 to the top of pole 8 returning several times to give a purchase, hauled tight and made fast. Retaining tape 25 is then tensioned and made fast. Next clew 10 is tensioned by means of the lanyard (which returns several times) to the clew end of boom 7 and made fast. All fastenings are then checked for tension and security and adjusted accordingly. The assembled blade 1 is now complete.
The layout of the system and the deployment of blade 1 will now be described and explained by reference to
In some embodiments of the invention it might be desirable to fasten one or more further ties to pole 8 to share the vertical load and/or restrict the transverse movement of pole 8 at deck level. In many cases it will be convenient to fasten a line to the vessel from head 12 to support blade 1 during deployment.
Tiller 5 is attached prior to deploying blade 1. Tiller ties 21 are attached to suitable points. Ideally three tiller ties 21 are attached at different angles to achieve triangulation and define the position of the pivot of tiller 5.
Guy 3 is brought under the hull of vessel 28 from the stern and on deck over the starboard side. Guy 4 is similarly passed from the stern to the port side. Guys 3 and 4 are then made fast to suitable strong points on the deck of vessel 28, in the current example the sheet winches. In most examples the fastening positions of guys 3 and 4 will not be normally critical and it may for example be satisfactory to make them fast to a foredeck cleat. If the angle is regarded as too shallow then it can be made more acute by an athwartships line joining the two guys 3 and 4. If the lengths of guys 3 and 4 have not been preset then they could be set up temporarily for adjustment after the blade assembly is in the water.
Control lines 18 and 19 are brought from the clew to their respective quarters and through blocks 26 which are located as close as convenient to the quarters of vessel 28. They are then led through further blocks 27 before being fastened to tiller 5. Blocks 27 are positioned so that control lines 18 and 19 make an angle of 15-20 degrees aft towards their point of attachment to tiller 5 in the fore and aft position to minimise the reduction of steering effect as tiller 5 angle increases. The attachment point of control lines 18 and 19 to tiller 5 is chosen to optimise the balance between leverage for the helmsman and adequate range of movement of control lines 18 and 19.
The line from head 12 to vessel 28 is then attached and the blade 1 is lowered into the water. Tie(s) 2 are then attached to vessel 28.
Subject to any adjustment the device is now ready for use. If the various lines have not been preset they should now be adjusted to optimise the geometry. Guys 3 and 4 and ties 2 are altered so that blade 1 is:
Control lines 18 and 19 are adjusted so that the slack is just taken up on both with blade 1 and tiller 5 in the fore and aft position.
In the present example of the instant invention there is no need for any direct connection between tiller 5 and blade 1. The only further connection needed between tiller 5 and blade 1 when both are installed is via control lines 18 and 19. Hence the present example of the current invention would still apply even if there are obstructions such as a backstay or mast between blade 1 and tiller 5. Likewise in the case of a centre cockpit yacht tiller 5 could be located in the cockpit whilst still being able to control blade 1 aft of the stern of vessel 28.
It should be noted that most sailing yachts have many strong points which can be used to turn or fasten the various lines which are required for the instant invention in use. In some cases it may be necessary to take lines to remote points and/or use a single point for more than one function. It may also be necessary to re-route some of the various other lines needed to sail the yacht.
The device is now ready for use. Steering of the vessel is the same as the steering of any normal tiller steered yacht.
Moving tiller 5 according to
Numerous variations of the layout described above in addition to those already mentioned are possible.
In the case of the current example of the invention it has been shown that guys 3 and 4 can be fastened in a range of positions along luff 13 without material effect on the function of the device. The preferred position is in the range from just below tack 11 to just below gooseneck 9. In some applications it might be preferable to fasten guys 3 and 4 above tack 11 to reduce the unsupported length of pole 8.
Provision could be made for guys 3 and 4 to be attached to blade 1 prior to stowage and introduction of pole 8. Guys 3 and 4 could be passed through one 25 mm loop, around a luff sock, through the second 25 mm loop and formed into a loop by tying or splicing. When pole 8 is introduced it will be guided inside the loops in guys 3 and 4 by the luff sock in the same way that it is guided through gooseneck 9 tape loop.
Likewise control lines 18 and 19 could be attached to guys 3 and 4 respectively and the lanyards to tack 11 and head 12 could be attached prior to stowage.
Tensioning of sail 6 has been described to be by means of lacing but other means may be appropriate. For example in very large applications a screw tensioner may be preferred. With the particular type of configuration currently under consideration it will always be necessary to tension clew 10 but luff 13 could be tensioned by adjustment on either or both of tack 11 and head 12.
Control lines 18 and 19 could be tethered at any point along guys 3 and 4 or they could be floating—attached either by a block or loop round guys 3 and 4. Alternatively control lines 18 and 19 could act on clew 10 only terminating at clew 10 or on an extended boom 7.
Rather than bringing control lines 18 and 19 straight from clew 10 to blocks 26 on the quarters they could be brought through blocks at or near the top of pole 8 so that steering effect was solely by means of the transfer of the load on control lines 18 and 19 to guys 3 and 4.
If a single fall of control lines 18 and 19 to tiller 5 does not give sufficient range of movement a reverse purchase could be used. Conversely more power could be achieved by a multiple purchase or by bringing the control lines 18 and 19 from clew 10 to the quarter instead of taking them to guys 3 and 4.
It is not essential to operate control lines 18 and 19 by means of tiller 20. On small boats or for a limited time it may be possible to establish satisfactory control by pulling directly on control lines 18 and 19. Alternatively they could be taken to a sheet/halyard winch or anchor windlass or some form of steering wheel.
Connecting control lines 18 and 19 to a single handle which steers vessel 28 by traversing the cockpit may be convenient in some cases.
On yachts with large wheels control lines 18 and 19 could be fastened directly to a spoke or the rim of the ships wheel and the vessel steered in the usual way. Both lines would need to be fastened such that they were hauled in and paid out at the same rate—usually by fastening to the same spoke or together on the rim.
One of many possible alternative methods of blade assembly construction would be to employ two separate booms 7, one from head 12 to clew 10 and one from tack 11 to clew 10. They could be either in sleeves in leech 14 and foot 15 or alongside leech 14 and foot 15. In either case arrangement could be made for booms 7 to be retained at the ends of the tape on luff 13 so that the compression force on booms 7 has the effect of tensioning luff 13. Booms 7 are thereby prevented from diverging.
In such a configuration there may well be a tendency for sail 6 to crease. One method of addressing this problem is to introduce a form of wedge between the ends of booms 7 near to clew 10 on which the tensioning on clew 10 acts such that as clew 10 is tensioned the wedge is drawn in forcing booms 7 apart at clew 10. The diverging force of booms 7 at luff 13 and the effect of the wedge near clew 10 will tension sail 6 both horizontally and vertically by means of the tensioning on clew 10 clew alone.
Number | Date | Country | Kind |
---|---|---|---|
0713003.2 | Jul 2007 | GB | national |
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCT/GB2008/002243 | 7/1/2008 | WO | 00 | 1/5/2010 |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO2009/004323 | 1/8/2009 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
3838660 | Frisbee | Oct 1974 | A |
4218986 | Hackney | Aug 1980 | A |
5114104 | Cincotta et al. | May 1992 | A |
20060118023 | Howlett | Jun 2006 | A1 |
20080105183 | Santarone | May 2008 | A1 |
Number | Date | Country |
---|---|---|
0562780 | Sep 1993 | EP |
2414804 | Dec 2005 | GB |
2008016681 | Feb 2008 | WO |
Number | Date | Country | |
---|---|---|---|
20100192826 A1 | Aug 2010 | US |