Not applicable.
1. Field of the Invention
The present invention relates to the process of constructing a building using shear walls, poured-in-place concrete tunnel forms, and other similar construction methods. More specifically, the present invention relates to beneficially distributing the seismic actions in a building constructed with stacks of shear walls or tunnel forms by coupling the shear walls at the top of the building.
2. Background and Related Art
In the construction of large residential complexes, high-rise buildings, and other multistory buildings, it is important to consider the axial, shear, and flexural forces exerted on the buildings. Axial forces are those acting parallel to the longitudinal axes of the buildings, and are typically caused by the weight of the building materials and the weight of the contents of the building. Shear forces and flexural moments act substantially perpendicular to the longitudinal axes of the buildings, and may be caused by winds or seismic activity. Because buildings act like vertical cantilever beams, the shear forces exerted on the buildings create potentially harmful bending moments and flexural demands. Thus, structural walls, beams, and other reinforcing members must be able to withstand not only axial loads but also lateral loads and the shear forces and flexural demands they create.
Shear walls are well known in the art for withstanding significant lateral loads. Shear walls may be made from a variety of building materials known by those skilled in the art. Generally, shear wall materials include fibers which resist relative movement, i.e., fibers which resist movement relative to surrounding fibers. Often, shear walls used in multistory buildings are made from poured concrete with reinforcing steel, also known as rebar.
Multistory buildings act as cantilever beams such that when lateral loads are applied to the building, the flexural resistance is greatest at the base of the building and decreases generally linearly toward the top of the building. Thus, it is often necessary to increase the thickness of the shear walls at the base of a multistory building, as well as increase the amount of reinforcing, to compensate for the increased forces and moments at the base. However, it is very desirable to maintain thin shear walls and limit the amount of reinforcing in shear walls. Thin shear walls and reduced reinforcing decreases costs and increases the speed of construction. Thinner walls with less reinforcing also increases the ductility of the walls, which leads to a reduced likelihood of distress in the building.
The advent of poured-in-place concrete tunnel construction methods has increased the cost-effectiveness and strength of multistory concrete buildings. The process of constructing a building using poured-in-place concrete tunnel construction methods is also typically called “tunnel forming” or “tunnel framing.” Construction of buildings using tunnel forming has been utilized for many years in the construction of multistory concrete buildings. Tunnel forming allows the walls and floor of a certain level of the building to be poured simultaneously. This method greatly reduces the costs associated with multistory concrete construction. There are many structures used in the tunnel forming process, such as those that are described in U.S. Pat. Nos. 4,439,064, 4,261,542, and 3,979,919, each of which is incorporated herein by reference.
However, even with tunnel forming, bottom-heavy flexural forces pose a problem. With typical shear wall structures, lateral loads from any direction cause undesired shear forces and flexural demands. With tunnel forming, shear forces acting parallel with the direction of the longitudinal axes of the horizontal concrete tunnels are slightly less problematic than shear forces acting perpendicular to these axes. Thus, even though tunnel forming partially reduces the problem with shear forces and flexural demands, it does not completely eliminate the problem. Consequently, conventional shear wall structures, tunnel form structures, as well as other building structures are susceptible to shear forces in any direction, thereby necessitating increased flexural resistance in such buildings without the use of thicker structural or shear walls, or increased reinforcing.
The present invention overcomes the deficiencies of the prior art.
The embodiments described herein provide an apparatus and method for coupling multiple portions of structural walls of a multistory building such that the building will resist lateral loads caused by seismic actions, for example. In one embodiment, the apparatus is a structure comprising a first portion of stacked shear walls having a top end that is moveable between an unloaded position and a loaded position, and a bottom end that is substantially fixed; a second portion of stacked shear walls having a top end that is moveable between an unloaded position and a loaded position, and a bottom end that is substantially fixed; and a rigid member connecting the first top end to the second top end, wherein the rigid member couples the top ends in the unloaded and loaded positions.
In another embodiment, the apparatus is a structure comprising a first stack of poured-in-place concrete tunnels with each tunnel having a first longitudinal axis, and two vertical portions and a horizontal portion, wherein the first stack has a bottom row of tunnels and a top row of tunnels; a second stack of poured-in-place concrete tunnels adjacent the first stack with each tunnel having a second longitudinal axis, and two vertical portions and a horizontal portion, wherein the second stack has a bottom row of tunnels and a top row of tunnels; a rigid member that connects the first top row to the second top row; and wherein the first longitudinal axis is parallel to the second longitudinal axis. In yet another embodiment, the first longitudinal axis is perpendicular to the second longitudinal axis.
In a further embodiment, the apparatus is a multi-story building for resisting seismic actions, the building comprising a first stack of shear walls moveable between an unloaded position and a loaded position; a second stack of shear walls adjacent the first stack, the second stack moveable between an unloaded and loaded position; and a stiff, rigid member attached to the first and second stacks such that the first and second stacks are coupled, and move together substantially simultaneously and coincidentally between the unloaded and loaded positions
In the various embodiments, the coupling apparatus is a coupling member that may be a rectangular or I-shaped beam made of various materials, such as poured concrete and rebar, steel or industrial plastic. Alternatively, the coupling member may be a wall of poured concrete and reinforcing steel, as well as other forms as will be described herein. The coupling member is preferably attached adjacent to the tops of at least two stacks of shear walls or tunnel forms, thereby coupling the separate stacks of shear walls significantly more robustly than other means, such as corridor walls, floors and other incidental structures.
In one embodiment, the method comprises coupling separate portions of a multistory building by constructing a first series of stacked shear walls having a top end and a bottom end; constructing a second series of stacked shear walls adjacent the first series, the second series of shear walls having a top end and a bottom end; attaching a rigid member to the first and second series of shear walls; and connecting the first and second series with the rigid member such that when the first and second series move in response to a lateral load, the first series moves substantially simultaneously and coincidentally with the second series. In another embodiment, the rigid member is attached adjacent the top ends of the series of shear walls.
Thus, the building, as coupled by the rigid member, is converted from a cantilevered beam to a vertical truss, thereby distributing the shear and flexural forces due to lateral loads in such a way so as to resist seismic and other such actions without increasing the thickness of the shear walls or the amount of reinforcing used in the shear walls.
The features and characteristics mentioned above, and others, provided by the various embodiments of this invention will be readily apparent to those skilled in the art upon reading the following detailed description of preferred embodiments, and by referring to the accompanying drawings.
For a detailed description of some of the preferred embodiments of the invention, reference will now be made to the accompanying drawings wherein:
In the following discussion and in the claims, the terms “including” and “comprising” are used in an open-ended fashion, and thus are to be interpreted to mean “including, but not limited to . . . ”. When referring to loads and forces, the term “axial” is intended to mean those forces or loads acting substantially perpendicular or vertical to the earth's surface. The term “lateral” is used to refer to forces or loads acting substantially parallel or horizontal to the earth's surface. The term “shear forces” refers to those forces created within a building's structure as a result of an applied lateral load. The terms “flexural forces,” “flexural moments,” “flexural resistance” and “flexural demands” relate to the bending moments created within a building as a result of an applied lateral load.
This exemplary disclosure is provided with the understanding that it is to be considered an exemplification of the principles of the invention, and is not intended to limit the invention to that illustrated and described herein. In particular, various embodiments of the present invention provide a number of different constructions and methods of operation. It is to be fully recognized that the different teachings of the embodiments discussed below may be employed separately or in any suitable combination to produce desired results.
A number of embodiments of a structural wall coupling system for multistory buildings according to the present invention will now be described with reference to the accompanying drawings. Referring first to
Referring now to
Referring now to
The structure of building 140 is typical of many modern day, multistory or high-rise residential and office buildings. The simple and relatively uniform design reduces the costs and time associated with constructing such buildings. Furthermore, the proliferation of tunnel forming as a means of constructing such buildings dictates that many of these buildings will include stacks of tunnels, such as those seen in
Referring next to
Referring now to
In
Cap beam 67 serves to bridge the structural gap, such as corridor 55, between two major structural portions of a building, such as stacks 51a, b of building 50. Cap beam 67 is a rigid member that is securely coupled to both stacks 51a, b. Cap beam 67 may take many forms, and may be used in buildings with various configurations. For example, several different embodiments of cap beam 67 may be seen in
Comparing
To illustrate the previously described flexural force distribution in building 50, reference should now be made to
As shown in
Referring now to
A first embodiment of cap beam 67 is shown as I-beam 97. Beam 97 is affixed to the tops 69a, b of a set of shear walls 54a, b, and spans corridor 55 so as to couple shear wall 54a with wall 54b. Next, rectangular beams 107, 117 are shown, positioned similarly to beam 97. Beams 107, 117 illustrate that cap beam 67 may have various dimensions. Beam 107 also shows that the beam may be set within recesses 109a, b of shear walls 54a, b, respectively. Finally, cap beam 67 may be poured as a continuous wall 127. Wall 127 may be attached to tops 69a, b or fixed within recesses 109a, b of shear walls 54a, b. Wall 127 may also extend over the entire lengths of shear walls 54a, b. It should be appreciated that the several embodiments of cap beam 67 in
In the embodiments shown in
Although the coupling member has been shown and described in various ways, the shape and makeup of the beam are constrained by the stiffness required to provide the coupling effect which causes the building to have a second location of plastic hinging, and by space limitations above the shear walls. To ensure proper stiffness, the coupling member may be made of concrete, steel or industrial plastic, or any other material used in the field to form stiff members. The coupling member may also include reinforcing, such as rebar or steel fibers, or other materials commonly used in the field for reinforcing. Coupling member 67 must have the physical integrity to withstand the forces that cause stacks 141a, b to bend independently, as seen in
Placement of the beam or coupling member is at or near the roof level of the building. Thus, the partially completed structure has reached the roof level before the coupling member can be poured or attached, which typically occurs at about 80% completion of the building. When the coupling member is poured or attached, it is preferred that the coupling member be securely attached to the shear wall or tunnel form it is intended to be attached to, which may include extending the reinforcing steel or rebar present in the shear wall or tunnel form into the coupling member. As mentioned above, space limitations between the shear walls and the roof of the building may constrain the potential shapes of the coupling beam. For example, if space between the roof and the shear walls is limited, beam 117 of
As mentioned previously, cap beam 67 may be used in buildings having a variety of configurations. For example, a coupling beam may be used in building 40 of
In an alternative embodiment, a coupling member or members are applied to a building constructed using poured-in-place concrete tunnel construction methods. Buildings such as buildings 40, 140, and 50 may be constructed using the tunnel forming technique seen in
For example, building 50 may be built using the tunnel form technique, in which case the cross section of building 50 of
The above discussion is meant to be illustrative of the principles and various embodiments of the present invention. Many variations and modifications of the invention and apparatus and methods disclosed herein are possible and are within the scope of the invention. Accordingly, the scope of protection is not limited by the description set out above, but is only limited by the claims which follow, that scope including all equivalents of the subject matter of the claims.
The present application claims the benefit of U.S. Provisional Application Ser. No. 60/417,780 filed Oct. 11, 2002, entitled Structural Wall Coupling System, which is hereby incorporated herein by reference.
Number | Name | Date | Kind |
---|---|---|---|
1886962 | La Roche | Nov 1932 | A |
3149437 | Wheeler-Nicholson | Sep 1964 | A |
3254466 | Von Heidenstam | Jun 1966 | A |
3372519 | Russell | Mar 1968 | A |
3462908 | Wysocki | Aug 1969 | A |
3775928 | Dawson et al. | Dec 1973 | A |
3805461 | Jagoda | Apr 1974 | A |
3979919 | Blonde et al. | Sep 1976 | A |
4261542 | Lefebvre | Apr 1981 | A |
4282690 | Meheen | Aug 1981 | A |
4439064 | van der Gaarden | Mar 1984 | A |
4525975 | McWethy | Jul 1985 | A |
4735028 | Bouchon et al. | Apr 1988 | A |
5491942 | Prokasky | Feb 1996 | A |
5737895 | Perrin | Apr 1998 | A |
5867964 | Perrin | Feb 1999 | A |
6668508 | Boone et al. | Dec 2003 | B2 |
6935077 | Wulfert et al. | Aug 2005 | B2 |
Number | Date | Country | |
---|---|---|---|
20040083663 A1 | May 2004 | US |
Number | Date | Country | |
---|---|---|---|
60417780 | Oct 2002 | US |