This invention is related to a rockfall prevention structure, a rockfall prevention method, and a method for designing said structure for preventing rockfall.
Conventionally, it is known a method as this kind of rockfall prevention structure which drives an anchor into a slope that needs stabilization (as in JP Un-Examined Patent Publication No. 2007-262734) and, also it is known a method that covers a slope, using a net assembly constructed of combined vertical and horizontal rope materials, and a net covering such combined vertical and horizontal rope materials, and then fixes the net assembly to the slope by fixing the upper ends of the vertical rope materials and both ends of the horizontal rope materials to the slope through a buffering tool (as in JP Un-Examined Patent Publication No. JP 2002-227140).
According to the method in JP 2007-262734, it is possible to restrain the slope surface from collapsing. If, however, there are any joints (cracks or crevices) in a rock bed surface and thus specific masses of rock involving such joints have the potential to fall off, it is not possible to prevent the falling of such specific masses of rock.
On the other hand, according to the method in JP 2002-227140, it is possible to trap the fallen rock mass within its net assembly, should the rock mass fall, without getting its net assembly damaged by way of the buffering effect of the buffering tool and therefore it is possible to prevent the fallen rock mass from falling outside its net assembly. However, it is unable to capture the earth and sand released together with the falling identified rock mass, causing a concern that the released earth and sand may fall onto areas such as roads below the protective structure. At the same time, the method is difficult for use at sites where there is fear that the whole surface may collapse because when a identified rock mass falls, other rock masses surrounding the fallen identified rock mass tend to fall easily.
Moreover, identified rock masses that may easily fall are not distributed evenly throughout the slope but are unevenly distributed at each slope. Accordingly, the method that fixes the anchors at nearly equal intervals as is conventionally done has ample room for improvement in terms of economic point of view.
Henceforth, this invention aims to provide a rockfall prevention structure and rockfall prevention method that are able to prevent the collapse of slope surface and the falling of identified rock masses. Besides that, this invention also aims to provide a rockfall prevention structure and rockfall prevention method equipped with the required strength through economical design never performed in the past.
The invention as claimed in Claim 1 is a rockfall prevention structure that covers a slope by a net assembly comprising rope members combined in intersectional directions and a wire net connected to the rope members, said net assembly being fixed to the slope by a fixing means, wherein said fixing means is one or more anchors inserted into the slope so as to stabilize a surface layer of the slope, while said anchors and said net assembly have a strength enough to suppress the movement of identified rock masses in the slope.
The invention as claimed in Claim 2 is the rockfall prevention structure wherein the length of the said anchor to be inserted is 2 meters or more.
The invention as claimed in Claim 3 is the rockfall prevention structure wherein a secondary net is laid on top of said net assembly, and said secondary net is fixed to the slope.
The invention as claimed in Claim 4 is the rockfall prevention structure wherein a vegetation mat is provided on the slope.
The invention as claimed in Claim 5 is a rockfall prevention method that covers a slope by a net assembly comprising rope members combined in intersectional directions and a wire net connected to the rope members, said net assembly being fixed to the slope by a fixing means, comprising the steps of: inserting anchors into the slope to stabilize a surface layer of the slope; and allowing said anchors and said net assembly to suppress the movement of identified rock masses in the slope.
The invention as claimed in Claim 6 is the rockfall prevention method wherein selection of said anchors and net assembly for use and setting of intervals of said anchors are carried out based on slope data, geologic data and joint data of said identified rock mass.
The invention as claimed in Claim 7 is the rockfall prevention method wherein said selection and setting are carried out every one block, said one block being defined by an area of said net assembly surrounded by said anchors.
The invention as claimed in Claim 8 is the rockfall prevention method wherein said anchors are inserted at varying intervals.
Based on the configuration claimed in Claim 1, the anchor will prevent the slope surface from collapsing and at the same time, the anchor and the net assembly will suppress the movement of identified rock masses at the slopes and prevent them from falling.
Based on the configuration claimed in Claim 2, it will provide the effectiveness to prevent the surface layer from collapsing.
Based on the configuration claimed in Claim 3, the secondary net will partially reinforce the net assembly covering the slope which will be effective in restraining movement of identified rock masses.
Based on the configuration claimed in Claim 4, the slope will be able to be vegetated by the vegetation mat.
Based on the configuration claimed in Claim 5, there can be provided a method to prevent rockfall using the anchor to prevent the slope surface from collapsing and at the same time using the anchor and the net assembly to suppress the movement of identified rock masses at the slope.
Based on the configuration claimed in Claim 6, an anchor and net assembly that suit the slope conditions can be set using the data and a structure that suits the slope conditions can be provided through the setting of anchor interval.
Based on the configuration claimed in Claim 7, a structure that suits the various conditions of each block can be provided.
Based on the configuration claimed in Claim 8, a design that better meets the conditions can be provided by decreasing or increasing anchor intervals at areas having greater or smaller potential impact from identified rock masses respectively.
The preferred modes for carrying out the invention will be explained with reference to the attached drawings. Wherein:
Notwithstanding that, the embodiments explained hereunder shall not be construed to limit the contents of the invention as described in the patent claims. Similarly, all configurations explained hereunder are not necessarily the pre-requisites of this invention. Each embodiment explained hereafter describes the rockfall prevention structure and rockfall prevention method that are not found in prior art and are obtained from the application of new rockfall prevention structure and rockfall prevention method that are different from the prior art.
A first embodiment of the invention will be explained in reference to
In
For example, even if the top slant 11U is cut, the top and bottom twist-joining points 13 and 13 are still connected to the top slant 12U, vertical side 12T and bottom slant 12S of the other side, and thus it is advantageous because the overall net assembly will not break even if some part of the hexagonal shapes were cut.
The said anchor 6 is made of parts such as a steel rod 16 that is inserted into prepared drilled holes in slope 1 which is then entrenched into slope 1 using fixing materials such as grouting material. The anchor 6 includes an anchor plate 17 at its distal end to hold the wire net 5. In order to stabilize 0.5 to 1.5 meters thickness T of the surface layer 21, the length of the anchor to be inserted will be 2 meters or more, which, in this embodiment, is 3 meters. In other words, the anchor 6 is inserted up to a stable layer below the surface layer 21.
Although the anchoring point of the net assembly 2 using anchor 6 can be at any points, it is preferred that the net assembly 2 is anchored on the rope materials 3 and 4. If the anchor 6 is settled at the intersection of the rope materials 3 and 4, both rope materials 3 and 4 can be anchored.
Next, the design method of the said rockfall prevention structure will be explained.
According to this invention, the types of the anchor 6 and net assembly 2 to be used are determined after the conditions of slope 1 are carefully examined, to thereby stabilize the surface layer 21 and suppress the movement of the identified rock mass 22 at the surface of the slope 1. Here, the wording “suppressing the movement” means preventing the dislodgement and consequently the falling of identified rock mass 22 by identifying the rock mass 22 that is likely to fall due to cracks or other causes so that the movement of the identified rock mass 22 from its present position can be prevented. Here, the term “identified rock mass 22” refers to a relatively large rock mass that protrudes out from slope 1 and is predicted to fall because of the conditions at the rock joint.
As shown in
Based on each of the above data, “calculation of geological model” (S2: Step 2) is carried out to thereby calculate the force that will be applied to the net assembly 2 if the identified rock mass 22 on slope 1 were to suddenly fall, as shown in
Next, the “calculation of block size for stabilization” (S3: Step 3) is performed where the data obtained from the above “calculation of geological model” (S2) is used to calculate and set the interval for anchor 6. The setting data for “reinforcing anchor type” and “reinforcing anchor interval” are input in advance {S1′: Step 1′) such as the yield strength or diameter of the anchor 6 for “reinforcing anchor type” and horizontal and vertical intervals for “reinforcing anchor interval”. In the meantime, the terms “reinforcing anchor” and “mesh” used in the drawings refer to the anchor 6 and the net assembly 2, respectively.
Once the various conditions of the anchor 6 are set, the “checking of reinforcing anchor” (S4: Step 4) is performed, where the data derived from the above Step 3 and Step 1′ are used to examine if the anchor 6 set in Step 1′ meets the requirements. If the requirements are not met, the procedure must be retraced to Step 1′ where the setting data are reset, and then return to Step 3 and undergo re-checking at Step 4. If the requirements of anchor 6 are met there, the procedure progresses to “setting of mesh” (S5: Step 5), in which the type of mesh is set, or in other words, the type of the net assembly 2 to be used is selected and then, the data for the net assembly 2, i.e., the data for the wire net 5, vertical and horizontal rope materials 3 and 4 are input.
Next, the “checking of mesh type” (S6: Step 6) is carried out to determine whether the net assembly 2 selected in Step 5 meets the design requirements, in such a manner as: determining whether the net assembly 2 meets the required strength against the reactive forces T and P calculated based on calculations such as anchor interval determined in Step 1′ under “calculation of geological model” in Step 2. If not, progressing either to “tensile strength of mesh type” (S7: Step 7) where the conforming tensile strength of the net assembly 2 in Step 5 is input again or to “narrowing anchor interval” (S8: Step 8) where the data in Step 1′ is re-input. As the force applied to the net assembly 2 can be reduced if the interval of the anchors 6 is reduced, the requirements in Step 6 can be met by changing the parameters both in Step 7 and in Step 8 or either in Step 7 or in Step 8 if they are not met initially.
If the net assembly 2 does not meet the requirements in Step 6, the requirements may be met in Step 7 by re-selecting all or at least one of the options such as re-selecting a wire net 5 with higher strength, increasing the strength of both or either one of the vertical and horizontal rope material 3 and/or 4, or narrowing the gap of both or either one of the vertical and horizontal rope materials 3 and 4.
Once the net assembly 2 that meets the requirements are set through the checking in Step 6, the step progresses and ends at “setting of reinforcing anchor length” (S9: Step 9) where the length of anchor 6 for the stabilization is determined according to site conditions such as the thickness of surface layer 22 and the gradient of slope 1.
As illustrated in
According to the present embodiment, therefore, there is provided the rockfall prevention structure such that the slope 1 is covered with the net assembly 2 constructed of the rope materials 3 and 4 combined in the intersectional directions and the wire net 5 connected thereto and then those rope materials 3, 4 are fixed to the slope 1 by the fixing means, wherein the fixing means is the anchor 6 to be inserted into the slope 1 in order to stabilize the surface layer 21 of the slope 1, and the anchor 6 and the net assembly 2 have strength enough to suppress the movement of identified rock masses 22 at the slope 1, whereby the anchors 6 can prevent the collapse of the surface layer 21 of the slope 1, at the same time, the anchors 6 and the net assembly 2 can suppress the movement of identified rock masses 22 at the slope 1, thus enabling the identified rock masses 22 to be prevented from falling from the slope 1.
Also, according to the present embodiment, it is effective in preventing the surface layer 21 from collapsing because the insertion length of the anchor 6 is 2 meters or more in this embodiment.
According to the present embodiment, therefore, there is provided the rockfall prevention method such that the slope 1 is covered with the net assembly 2 constructed of the rope materials 3 and 4 combined in the intersectional directions and the wire net 5 connected thereto and then the net assembly 2 is fixed to the slope 1, wherein the anchors 6 are inserted into the slope 1 in order to stabilize the surface layer 21 of the slope 1, and the anchors 6 and the net assembly 2 serve to suppress the movement of identified rock masses 22 at the slope 1, whereby the anchors 6 can prevent the collapse of the surface layer 21 of the slope 1, at the same time, the anchors 6 and the net assembly 2 can suppress the movement of identified rock masses 22 at the slope 1, thus enabling the identified rock masses 22 to be prevented from falling from the slope 1.
Also, according to the present embodiment, selection of the anchor 6 and net assembly 2 for use as well as setting of the intervals of anchors 6 is made based on the slope data, geological data and rock joint data of the identified rock masses 22, and thus, the specific anchor 6 and net assembly that meet the conditions of the slope 1 can be set based on various data, further enabling the provision of the structure that meets the conditions of the slope 1 by setting the interval of the anchors 6.
Also, according to the present embodiment, the aforesaid selection and setting are made with the area of the net assembly 2 surrounded by the anchors 6 as one block, and thus there can be provided a structure that meets varying conditions of each block.
According to the present embodiment, the anchors 6 are arranged at varying intervals, and thus a design that better meets the requirements can be provided. For example, if the force from the identified rock mass 22 at certain area is greater, the interval of anchor 6 at that area may be made narrower. If the force is smaller, the interval of anchor 6 at that area may be made wider.
Also, as effects of the above embodiment, an efficient designing can be carried out because conditions such as the interval of anchor 6 can be changed as and when required during the selection and checking of the net assembly 2 in such a manner that after setting conditions of the anchor 6 such as strength and interval thereof that meet the conditions of slope 1, selection and checking of the net assembly 2 are carried out that meets the working conditions under the conditions of the anchor 6 thus set and the conditions of the slope 1, and then, the interval of anchor 6 is re-selected to make it narrower during the selection of net assembly 2 if such working conditions of the net assembly 2 turn out to fail to be met.
The said net formation 31 is placed on the vertical direction of slope 1 as well as on the horizontal direction of slope 1 where adjoining net formations 31 and 31 on the horizontal direction of the slope 1 are connected using a connecting material (not shown in the drawing) at both of its guide rope materials 32 and 32, followed by the placement of the horizontal rope materials 4, and if needed by design requirements, the vertical rope materials 3 are placed before they are anchored by anchor 6 at required locations to thereby construct a rockfall prevention structure.
The said guide rope materials 32 may be used as the vertical rope materials so that the guide rope materials 32 may be anchored into the slope 1 using the anchors 6. In that case, as the vertical guide rope materials 32 are provided beforehand, the number and/or length of the vertical rope materials 3 used can be reduced and the strength of the vertical rope materials 3 used can be saved.
The horizontal guide rope material 34 are intertwined or interlaced, throughout their length or for only part thereof, with the wire material 11 and 12 and/or with the longitudinal rope materials and are arranged outside intertwining regions 13 defined by two twisted portions 11T and 12 T of wires 11 and 12 and/or by the portions of longitudinal rope materials.
The said net formation 31 is placed on the vertical direction of slope 1 as well as on the horizontal direction of slope 1 where adjoining net formations 31 and 31 on the horizontal direction of slope 1 are connected by a connecting material (not shown in the drawing) at both of its guide rope materials 32 and 32, and if needed by design requirements, the vertical rope material 3 and/or horizontal rope material 4 are also arranged which are then anchored by the anchors 6 at required locations to construct a rockfall prevention structure.
The said guide rope materials 34 may be used as the horizontal rope materials so that the guide rope materials 34 may be anchored into the slope 1 using the anchors 6. In that case, as the horizontal guide rope materials 34 are provided beforehand, the number and/or length of the horizontal rope materials 4 used can be reduced and the strength of the horizontal rope materials 4 used can be saved.
At the intersection of the crossing wire materials 43 and 44, intersection connecting materials 45 and 46 are fixed to resist forces applied on the intersections that tend to shift the intersections in such a manner that both ends of one intersection connecting material 45 are provided with a fastening section 45K formed by winding the material 45 around the crossing wire material 43 in a coil form with the intersection of the crossing wire material 43 placed therebetween, and these fastening sections 45K are connected with each other via a central section 45C at the centre of the intersection connecting material 45, and similarly, both ends of the other intersection connecting material 46 are provided with a fastening section 46K formed by winding the other intersection connecting material 46 around the other crossing wire material 44 in a coil form with the intersection of the crossing wire material 44 placed therebetween, and these fastening sections 46K are connected with each other via a central section 46C at the centre of the intersection connecting material 46.
As shown in
As is apparent from the foregoing, according to the present embodiment, the secondary net 41 is able to effectively prevent the movement of the identified rock masses 22 as it partially reinforces the net assembly 2 covering over the slope 1 because the secondary net 41 is laid on top of a part of the net assembly 2 and is anchored to the slope 1 using the anchors 6 serving as the fixing means of the secondary net assembly.
By spraying seeds and if necessary, vegetation substrate material onto the said vegetation mat 51, the vegetation mat 51 will be able to nurture them and achieve vegetation.
Therefore in this invention, through the construction of the vegetation mat 51 on the above-mentioned slope, the vegetation mat 51 will be able to achieve vegetation on the slope 1.
This invention is not limited to the above embodiments but can also be embodied in various variations. For example, the secondary net 41 may also be spread over the overall surface of the slope 1 to improve the effectiveness in suppressing the movement of the identified rock masses 22 because the intersections of the crossing wire materials 43 and 44 of the secondary net 41 are provided with the intersection connecting materials 45 and 46 giving a net mesh that is difficult to break open. In the embodiments, apart from the 18 horizontal and vertical rope materials shown, the rope materials can also be crossed diagonally.
Number | Date | Country | Kind |
---|---|---|---|
2008-045936 | Feb 2008 | JP | national |
This is a continuation of prior U.S. patent application Ser. No. 12/735 938, filed Aug. 25, 2010, the disclosure of which is hereby incorporated by reference in its entirety.
Number | Date | Country | |
---|---|---|---|
Parent | 12735938 | Aug 2010 | US |
Child | 13729562 | US |