Structure of slackening type blasting mat

Information

  • Patent Grant
  • 6655290
  • Patent Number
    6,655,290
  • Date Filed
    Monday, April 23, 2001
    23 years ago
  • Date Issued
    Tuesday, December 2, 2003
    21 years ago
  • Inventors
  • Examiners
    • Nelson; Peter A.
    Agents
    • Birch, Stewart, Kolasch & Birch, LLP
Abstract
A blasting mat assembly comprising a steel plate member having thickness capable of bearing a blasting pressure of explosives inputted to blasting hole; an elastic member which is fixedly attached along a bottom edge of the steel plate member for isolating blasting noise, blasting gas and flying material. Explosives inputted into each blasting hole of blasting region are discharged; and a weight reinforcing member which is welded to a top surface of the steel plate member in a structure of a grid frame made of steel beams.
Description




BACKGROUND OF THE INVENTION




The present invention relates to a structure of a slackening type blasting mat for excluding by excavating part of a sloping surface formed by a base rock layer at one side, or both sides, of a road upon establishing or expanding of the road, or for excavating a part of a middle portion of a base rock layer made of a solid surface.




In general, there is a need to cut out a sloped surface made of base rock layer in road construction work for establishing or expanding a remote hill road, or a seashore road along mountain topography. In this case, excavating work of a base rock slope is executed by utilizing heavy-duty equipment such as a large type braker or excavator. In order to prevent accident or damage of passing vehicles during operation, a problem occurs in which mechanical excavating work utilizing the heavy duty equipment is decreased in its excavating efficiency, and a working term becomes longer when the sloped base rock layer is a hard base rock layer which is high in base rock strength. In such a case, cutting out the sloped rock surface is executed by a blasting method utilizing explosives.




In accordance with the blasting method of prior art, a so called mobile type blasting method has been used in which explosives filled in a number of blasting holes pierced into a base rock layer are detonated so that the base rick layer is completely released from the mother rock via its blasting pressure.




However, since the mobile type blasting method of the prior art increases the blasting pressure by using large quantities of explosives in order to completely release the base rock layer of a part desired to be cut out from the mother rock, there has been a problem of high blasting noise, and that a part of base rock broken upon blasting flies far away from the blasting site to a remote place. But also a blasting vibration coming from the blasting pressure is transmitted far away. Consequently, the blasting has been done by laying a mat made of rubber material or a straw bag etc. on the base rock surface so that the blasting noise is decreased and the broken base rock layer particles cannot be filed. But, since the rubber mat and the straw bag covered on the base rock layer fly away together with broken base rock particles by the blasting pressure, it is hard to expect an effect capable of largely decreasing the blasting noise and vibration. And in a case when human dwelling houses and the like are located within 100 m near a construction working site, there is a problem that an application of a blasting method is difficult to safely implement and a passing of neighboring roads should be isolated.




A base rock layer made of hard rock has to be cut out with a predetermined width at a construction site for establishing or expanding the mountain road or seashore road. Dwelling houses and livestock facilities scattered within 100 m from that construction working site and publicestablishments due to the exploding noise and the blasting vibration and the like produced upon blasting the base rock layer, not only the dwelling residences are exposed to noise but also flying stones are thrown into residences. Also, the building is shaken due to the blasting vibration or a ground-sinking phenomenon occurs. Furthermore, a problem is arisen which gives vast casualties to various animals bred in livestock facilities. Still further there is a worry about producing casualties which induces an accident due to influence of exploding sound, such as when a locomotive engine driver is startled causing a derailing accident of the train.




SUMMARY OF THE INVENTION




Accordingly, it is an object of the present invention to provide a blasting mat assembly, which does not influence residences near the working site, or livestock facilities and public establishments.




Still another object of the present invention is to make even a part of a middle portion of base rock layer made of a non-free surface to be excavated to a predetermined depth by the blasting method.




In order to attain the objects of the present invention, there is provided a blasting mat assembly comprising:




a metal plate having a continuous bottom major surface for covering a blasting region, said plate having a thickness capable of containing blasting forces within said region;




an elastic barrier connected to the periphery of the continuous bottom major surface for dampening blast noise and containing flying debris generated by the blast; and




a frame having a substantial weight resting on a top major surface of the metal plate, said frame having metal beams in a grid configuration overlying the top major surface of the metal plate.




The elastic barrier comprises a plurality of juxtaposed rubber tires. Axes of the rubber tires are oriented substantially orthogonal to said top and bottom major surfaces.




The beams of the frame are preferably steel I-beams or H-beams. The metal plate is steel and has a thickness of at least 3 mm. Further scope of applicability of the present invention will become apparent from the detailed description given hereinafter. However, it should be understood that the detailed description and specific examples, while indicating preferred embodiments of the invention, are given by way of illustration only, since various changes and modifications within the spirit and scope of the invention will become apparent to those skilled in the art from this detailed description.











BRIEF DESCRIPTION OF THE DRAWINGS




The present invention will become more fully understood from the detailed description given hereinbelow and the accompanying drawings which are given by way of illustration only, and thus are not limitative of the present invention, and wherein:





FIG. 1

is a side view of one embodiment for explaining the present invention,





FIG. 2

is a plan view for showing a state of a blasting hole arrangement of the present invention,




FIG.


3


and

FIG. 4

are cross sectional views showing a pierced hole depth of blasting holes of the present invention,





FIG. 5

is a view of a blast executing state of the present invention,





FIG. 6

is a perspective view for depicting a blasting mat structure of the present invention,





FIG. 7

is a cross sectional view of blasting mat of the present invention, and





FIG. 8

is a view of an embodiment applying the present invention to a solid surface base rock layer.











DETAILED DESCRIPTION OF PREFERRED EMBODIMENT




Explaining an embodiment of the present invention in more detail with reference to the accompanying drawings,

FIG. 1

is a side view of one embodiment for explaining the present invention.




A reference numeral


1


depicts a base rock layer formed at one side or both sides of road when establishing or expanding a mountain road or seashore road, and reference numeral


2


denotes a blasting mat assembly according to the present invention.




The blasting mat


2


is constructed such that a steel plate member


21


having a thickness (more than 3 mm) and a continuous lower major surface capable of sufficiently bearing the blasting pressure of explosives is provided over a blasting hole. An elastic member


22


is fixedly attached to an edge portion of the steel plate member


21


thereby diminishing blasting noise and flying stones. A weight reinforcing member


23


made of a steel frame such as from I-type beams or H-type beams rests on a top surface of the steel plate member


21


and is welded to edge portions in a grid shape. A carrying wire


24


capable of lifting the blasting mat


2


is fixedly attached at a top surface of the steel plate member


21


, or else by a hooking member to its weight center portion, so that the blasting mat


2


can be moved and carried by utilizing heavy duty equipment


3


, such as a large type braker or excavator.




The elastic member


22


attached to bottom edge portion of the blasting mat


2


is very elastic and easy to attach by bolts and the like. It is preferable to use waste tires


22




a


which sufficiently bears the blasting pressure together with vibrations of the steel plate member upon blasting of explosive and simultaneously exterior discharging of blasting noise, blasting gas and flying stones. A close adherence to bumpy ground surfaces is helpful so that all directions about the steel plate member


21


are protected.




The blasting method of the present invention, which blasts and cuts out the portion between free surface


11


and cut-out surface


12


of the base rock layer


1


from a top layer to a bottom layer stepwise by using the blasting mat


2


as described above, operates as follows.




A blasting region


14


is formed on a horizontal top surface between free surface


11


and cut-out surface


12


of the base rock layer by equally dividing the area into predetermined regions. Then a number of blasting holes


15


are pierced at predetermined distance intervals in each blasting region


14


, and the blasting holes


15


are formed not only in the blasting regions


14


but also in neighboring blasting regions


14


, the holes are pierced so as to maintain a predetermined distance therebetween among the blasting holes


15


.




Each of the blasting holes


15


formed in the blasting regions


14


are pierced by previouslyestablishing the piercing depth to reflect the dislocation structure of the base layer


1


.




That is, as in

FIG. 3

, the blasting hole


15


located at adjacent to free surface


11


, and the blasting hole


15


located at the middle, are deeply pierced while the blasting hole net to the cut out surface


12


is pierced a little shallower whereby the blasting method can be executed in steps, or as shown in

FIG. 4

, the blasting method can be executed by equally piercing the depth of all blasting holes.




An explosive


15




a


having a blasting power capable of slackening the cutting out portion up to the depth desired, is filled in the blasting holes


15


formed in each of the blasting regions


14


. Then a blasting lead wire is connected, and a quantity of explosive filled to the blasting hole


15


is filled only up to a degree (less than 0.4 kg/m2) which is relatively weak so that only a crack of the base rock layer


1


is slackened from the mother rock, i.e., cut out surface


12


. Said blasting lead wire is provided such that the explosives


15




a


filled in the blasting holes


15


are located at each blasting region


14


can be subsequently blasted at time intervals of extremely short time periods (about 0.02 second to 0.05 second). Sand


15




b


is filled to the blasting hole


15


after connecting the blasting lead wire to the explosives


15




a.






As described above, after the explosive


15




a


and the sand


15




b


are filled into the blasting hole


15


of each blasting region


14


, a blasting mother wire for blasting the explosive


15




a


of each blasting hole


15


is connected to the blasting means, and then the blasting mat


2


is lifted by heavy duty equipment


3


, whereby the top surface of the blasting region


14


to be blasted is covered. Since the area of the blasting mat


2


is bigger than the blasting region


14


, and the waste tires


22




a


of elastic member


22


are closely adhered on the top surface of the blasting region


14


outside of the blasting holes


15


, and are pressed by the weight of reinforcing member


23


, even if the top surface of the blasting region


14


, i.e., the horizontal top surface


13


of base rock layer


1


is an uneven and irregularly bumpy surface, the waste tires


22




a


of the elastic member


22


are closely adhered on top surface of bumpy blasting region


14


. The weight reinforcing member


23


is strongly pressed by a boom bar of the heavy-duty equipment


3


, said waste tires


22




a


are pressed and adhered on the top of the blasting region


14


by more strong elasticity. At the same time, even among mutually neighboring waste tires


22




a


, the blasting mat


2


maintains a firm posture to contain strong blasting pressure and vibration.




As described above, during blasting the blasting mat


2


provided over the blasting region


14


is pressed by the heavy duty equipment


3


, and the explosives


15




a


filled into each blasting hole


15


are successively blasted. At this moment, the successive blasting of explosives


15




a


produces only a crack so that the base rock layer


1


of the blasting region


14


is completely divided from the cutting out surface


12


, and the sand


15




b


which has been filled to the blasting hole


15


upon blasting of explosive


15




a


and blasting gas and blasting noise are moved upward of the blasting hole


15


responsive to strong pressure. The steel plate member


21


of the blasting mat


2


which covers the top surface of the blasting region


14


is a steel plate of a thickness capable of sufficiently bearing the blasting pressure, and since the waste tires


22




a


of elastic member


22


are, not only closely adhered on top of the blasting region


14


, but are closely adhered each other, the blasting pressure produced upon blasting of explosives


15




a


and the flying sand accompanying it and the blasting gas, are not flown or leaked through the exterior of the blasting mat


2


. Since the waste tires


22




a


are elastic each absorb the blasting noise and vibration. The blasting noise and vibration transferred around blasting site can be significantly decreased, and the blasting pressure of explosives


15




a


are of a degree capable to cut out with a crack base rock layer


1


from mother rock. The blasting vibration is transferred only around of the blasting region


14


, but it is not transferred outwardly.




Thus, when the blasting work of the blasting region


14


of one place is finished, the blasting mat


2


is moved by heavy-duty equipment


3


to the next blasting region


14


and covered. The blasting work is progressed in a stepwise manner, and after the blasting works of all blasting region


14


of the base rock layer


1


are finished, the cutting out work of the base rock layer


1


is completed via means excavating the base rock layer


1


of the blasting region


14


by heavy duty equipment such as a braker, ripper and the like.




EXAMPLE




A blasting of a base rock layer was tested as follows by applying the blasting method in accordance with the present invention, and measured results such as vibration and noise according to it are shown in Table 1.




In accordance with the above test results, the maximum value of noise at a facility distanced by


50


m from the blast working site was measured as 67.6 dB, and it did not exceed 60 dB. However, noise lower than 90 dB causes humans and animals to start to feel pain from the noise. Particularly, the noise at 10 m neighboring the working site was no more than 92.6 dB. In maximum value, and was lower than 100 dB equivalent to a vehicle running on highway. The vibration was also detected as 0.1 cm/s at 50 m. Therefore, it has shown that an influence giving to livestock was almost none in a case when a cattle shed or the like were distanced apart more than 100 m from the working site.




Blasting Condition




Blast working object:




Hard rock layer (a working site of condition as FIG.


2


and

FIG. 3

) cutting slope width 25 m, height 15*Blasting hole piercing diameter and equipment:




(Φ51 mm, Crawler drill




*Used Explosive:




Φ32 mm New MITE 5500




(product of Hankook Gun Powder Co. Ltd.)




*Used Detonator:




MS electric detonator (product of Hankook Gun Powder Co. Ltd.)




*Blasting Hole Piercing Depth:




Inner side hole 2.0 m, free surface side 3.0 m




Each blasting hole piercing distance: 0.9 m




Blasting hole piercing number: 6 ea (2 row Arrangement)




Blasting Mat:




Steel plate thickness 3.5 mm, width 3.0 m, length 2.3 m, weight 2.2 tom




op of the blasting mat is pressed by bucket of fork crane.

















TABLE 1











vibraton,






filling








noise,






quantity




measuring value




















measuring






per




particle







noise







instrument




blasting




distance




blasting




speed




frequency




acceleration




PVS




dB(A) dB(L)




measuring






kind




numbers




(m)




(kg)




(cm/sec)




(Hz)




(g)




(cm/sec)




storm pressure




location























DS677




1




50




0.75




T:0.038




>100




0.0298




0.110




67.6(A)




50 m place






(2506)







V:0.097




51




0.0331









(german







L:0.070




73




0.0414






company




2




50




0.75




T:0.041




39




0.0215




0.064




62.0(A)






product







V:0.046




47




0.0215










L:0.080




32




0.0331







3




51




0.75




T:0.079




39




0.0199




0.010




64.6(A)










V:0.048




73




0.0255










L:0.052




34




0.0182







4




52




0.5




T:0.051




37




0.0149




0.064




65.8(A)










V:0.030




47




0.0182










L:0.048




34




0.0149







5




53




0.75




T:0.083




27




0.0199




0.100




64.0(A)










V:0.091




51




0.0348










L:0.083




32




0.0199







6




54




0.5




T:0.054




37




0.0149




0.057




65.0(A)










V:0.045




51




0.0149










L:0.040




39




0.0116






BMIII




1




30




0.75




T:0.349




54




0.133




0.528




74.4(A)




30 m place






(BA5687)







V:0.051




85




0.196






(german







L:0.394




45




0.116






company







T:0.232




51




0.0928




0.375




74.4(A)






product)




2




31




0.75




V:0.322




54




0.166










L:0.289




47




0.109







3




32




0.75




T:0.195




60




0.0829




0.398




73.1(A)










V:0.230




43




0.113










L:0.362




45




0.106







4




33




0.5




T:0.140




57




0.0663




0.296




70.1(A)










V:0.162




39




0.0563










L:0.254




43




0.0696







5




34




0.75




T:0.325




47




0.106




0.568




69.6(A)










V:0.560




43




0.176










L:0.378




39




0.109







6




35




0.5




T:0.149




57




0.0729




0.269




68.0(A)










V:0.227




60




0.0795










L:0.257




37




0.0696






BMIII




1




70




0.75




T:0.079




38




0.0331




0.099




65.8(A)




70 m place






(BA5745)







V:0.081




51




0.0255






(german







L:0.064




33




0.0331






company




2




70




0.75




T:0.049




68




0.0331




0.083




61.2(A)






product)







V:0.071




60




0.0265










L:0.069




68




0.0331







3




2




0.75




Impossible




43




0.298




impossible




94.9(A)




 2 m place










to measure




54




0.587




to measure










37




0.324







4




10




0.5




T:1.80




49




1.35




2.00




91.5(A)




10 m place










V:1.60




73




1.09










L:1.59




73




0.981







5




10




0.75




T:6.36




15.8




1.48




10.8




90.7(A)










V:9.86




19.7




5.57










L:6.12




15.1




3.13







6




10




0.5




T:2.77




79




2.68




3.46




92.6(A)










V:2.60




64




2.01










L:2.17




79




1.75














In accordance with the present invention the blasting method using an explosive is executed in order to cut out one part of a free surface of a base rock layer utilizing a mat assembly, including a mat body made of thick steel plate member and waste tire absorbing member covering the work site, so that flying stones, blasting noise, or blasting vibration are remarkably decreased, whereby not only casualty generation due to noise and vibration can be extremely minimized. But also public facilities, such as electric power transmitting towers whereby a part of a free surface of the base rock layer can be slackened from mother rock. Since stones after blasting are isolated, base rock layer cutting work is made to progress without controlling the passing of vehicles on neighboring roads. And, since an operator of a blasting site, and the heavy duty equipment such as a braker, ripper and the like excavating the blasted base rock layer are located at a short distance (about 5-10 m) of the blasting site , the excavating work can be speedily progressed by heavy duty equipment after the blasting work of the blasting region is finished, Consequently, cutting work of the base rock layer can be reduced.



Claims
  • 1. A blasting mat assembly comprising:a metal plate having a continuous bottom major surface for covering a blasting region, said plate having a thickness capable of containing blasting forces within said region; an elastic barrier connected to the periphery of the continuous bottom major surface for dampening blast noise and containing flying debris generated by the blast; and a frame having a substantial weight resting on a top major surface of the metal plate, said frame having metal beams in a grid configuration overlying the top major surface of the metal plate.
  • 2. The blasting mat assembly of claim 1 wherein the elastic barrier comprises a plurality of juxtaposed rubber tires.
  • 3. The blasting mat assembly of claim 2 wherein axes of the rubber tires are oriented substantially parallel to said top and bottom major surfaces.
  • 4. The blasting mat assembly of claim 3 wherein said beams are steel I-beams or H-beams.
  • 5. The blasting mat assembly of claim 1 wherein said beams are steel I-beams or H-beams.
  • 6. The blasting mat assembly of claim 1 wherein said metal plate is steel and has a thickness of at least 3 mm.
  • 7. The blasting mat assembly of claim 3 wherein said metal plate is steel and has a thickness of at least 3 mm.
Priority Claims (1)
Number Date Country Kind
2000-26596 May 2000 KR
US Referenced Citations (6)
Number Name Date Kind
2806426 Klokseth Sep 1957 A
2926605 Hammel, Jr. et al. Mar 1960 A
3331322 Belanger Jul 1967 A
3793953 Lewis Feb 1974 A
3943853 Robertson et al. Mar 1976 A
4315463 Arcand Feb 1982 A
Foreign Referenced Citations (1)
Number Date Country
1019201 Oct 1977 CA