Currently, the task of inserting coiled tubing in a flowline involves retrieving the flowline to the surface such as onto a deck of a vessel and removing the flowline termination. Some tools exist that are used to push coiled tubing into a flowline but only topside. No tools accomplish remediation of a flowline blockage subsea using coiled tubing.
Various figures are included herein which illustrate aspects of embodiments of the disclosed inventions.
In a first embodiment, referring generally to
In embodiments, subsea coiled tubing inserter 10 is adapted to push and/or pull coiled tubing string 100 into and out from flowline 120 and may comprise coiled tubing injector head 103 (not specifically shown in the figures).
In embodiments, sealer 20 comprises a stripper packer.
In embodiments, disconnect valve 40 further comprises a blowout preventor valve, shear ram 41, grip/seal ram 42, or the like, or a combination thereof.
In embodiments, coiled tubing cutter 12 may also be present and used to cut coiled tubing string 100 in case of an emergency disconnect. Coiled tubing cutter 12 is typically located externally to coiled tubing inserter 10.
In certain embodiments, subsea insertion tool 1 may further comprise one or more flexible flowlines 122 (not specifically shown in the figures) disposed between subsea insertion tool 1 and flowline termination 123 (not specifically shown in the figures) which may be used for horizontal insertion to aid in alignment.
Subsea insertion tool 1 may also comprising an alignment system (not specifically shown in the figures) for aligning the tool with a pipeline termination.
In embodiments, subsea insertion tool 1 further comprises first remotely operated vehicle ROV panel 13, disposed proximate second end 1a of the subsea insertion tool 1 and operatively in communication with coiled tubing inserter 10, and second remotely operated vehicle ROV panel 14, disposed proximate first end 1a of subsea insertion tool 1 and operatively in communication with gate valve 30 and disconnect valve 40.
Referring now to
In typical embodiments, heater 101 comprises a heating cable such as a mineral insulated cable. Although illustrated as heating a discrete section of coiled tubing string 100 proximate a reel end of coiled tubing string 100, heater 101 may be configured to heat the entire length of coiled tubing string 100. Heater 101 is typically used to heat chemicals which are pumped down coiled tubing string 100 to a temperature required for remediation of the blockage.
Vibrator 111 may comprise an agitator, a vibrator, an impact hammer, or the like, or a combination thereof.
Mechanical tractor 112 (not specifically shown in the figures) may further be present and adapted to aid in horizontal movement within flowline 120. In such embodiments, mechanical tractor 112 would replace vibrator 111.
In contemplated embodiments, one or more mechanical scrapers/brushes 113 may be present and adapted to abrade a blockage 121 and remove it from flowline 120. In such embodiments, rotator 130 may be present and operatively in communication with mechanical scraper/brush 113 where rotator 130 is configured to rotate mechanical scraper/brush 113 to provide a rotational motion to help abrade the blockage and remove it from flowline 120.
In certain of these embodiments, chemical pumping unit 80 may also be present and in fluid communication with coiled tubing string 100.
In certain of these embodiments, subsea depressurizing and de-inventorying skid 200 may be present. If so, coiled tubing string 100 is typically disposed on an upper portion of subsea depressurizing and de-inventorying skid 200.
In the operation of exemplary methods, referring still to
Coiled tubing string 100 is typically unspooled from coiled tubing reel 70 and the unspooled coiled tubing string 100 inserted subsea into subsea flowline 120 to where jetting nozzle 110 is positioned proximate a blockage in flowline 120. Fluid is provided, e.g. pumped, from chemical pumping unit 80 to coiled tubing string 100 through to jetting nozzle 110 to remediate the blockage in flowline 120.
In certain embodiments, heater 101 is energized to heat fluid within coiled tubing string 100 to a temperature appropriate the achieve the remediation of the blockage.
Coiled tubing string 100 may be inserted subsea into the subsea flowline from a pipeline termination such as pipeline end terminations (PLET), flowline terminators (FLET), pipeline end manifolds (PLEM), or the like, from platform at a riser, or the like. In other embodiments, coiled tubing string 100 is inserted subsea into flowline 120 using subsea insertion tool 1 deployed subsea, where subsea insertion tool 1 is as described above. If present, gate valve 30 may be used when coiled tubing string 100 is not in a bore of a valve.
In embodiments where subsea coiled tubing inserter 10 comprises coiled tubing injector head 103, subsea coiled tubing inserter 10 may be used to selectively insert coiled tubing string 100 into and remove coiled tubing string 100 out from flowline 120.
In embodiments using subsea insertion tool 1, disconnect valve 40 may be used for emergency disconnection of coiled tubing string 100. Further, large bore connector 15 may be used to vent/flush flowline 120 and subsea insertion tool 1 during operation to de-pressurize and de-inventory flowline 120. Further still, flowline connector 50 may be used to connect with a pipeline termination. In these embodiments, sealer 20 may be used to form a dynamic seal on an outer diameter of coiled tubing string 100.
Where subsea insertion tool 1 further comprises coiled tubing cutter 12 located externally to coiled tubing inserter 10, coiled tubing cutter 12 may be used to cut coiled tubing string 100 in case of emergency disconnect.
Where subsea insertion tool 1 further comprises flexible flowline 122, flexible flowline 122 may be used during horizontal insertion of coiled tubing string 100 to aid in alignment of the bore of subsea insertion tool 1 with the bore of flowline 120. Similarly, where subsea insertion tool 1 further comprises an alignment system, the alignment system may be to aid in aligning subsea insertion tool 1 with a pipeline termination.
In embodiments, subsea insertion tool 1 may be positioned in a substantially horizontal position, as illustrated in
In embodiments, subsea insertion tool 1 may further comprise a balance structure for use in vertical position configurations and the balance structure used to transmit loads from subsea insertion tool 1 to a seabed and to provide a foundation for subsea insertion tool 1.
The foregoing disclosure and description of the inventions are illustrative and explanatory. Various changes in the size, shape, and materials, as well as in the details of the illustrative construction and/or an illustrative method may be made without departing from the spirit of the invention.
This application claims priority through U.S. Provisional Application 62/671,346 filed on May 14, 2018.
Number | Date | Country | |
---|---|---|---|
62671346 | May 2018 | US |