The present invention relates to the field of subsea systems with artificial lift for petroleum production.
The use of centrifugal pumps in petroleum wells increases the production flow. However, when centrifugal pumps are utilized in wet completion well installations, the cost of intervention for maintenance is high. Specifically, maintenance of the centrifugal pump requires: i) interruption of production of the well, ii) retrieval of the production column, pump and accessories of the well, and iii) the use of a probe for maintenance of the pump. In many cases these items represent an obstacle, not only with regard to production profits, but also with respect to the production process.
Brazilian Application No. PI 0400926-6 entitled “Subsea Pumping Module System and Installation Method of the Same” describes an alternative configuration in which a pumping unit is installed in an auxiliary or dummy well, where it is easier to retrieve the pumping unit for maintenance. However, because it is necessary to construct this auxiliary or dummy well, the cost of production is higher. Even construction of a hollow pile may represent an increase in costs.
U.S. Pat. No. 6,508,308 (hereinafter U.S. '308) describes multi-stage methods for production in a wellhead, which includes fluid pumps operated sequentially during the life of the well. In the embodiments described in U.S. '308, the production column is bifurcated into a pair of legs. One of the legs includes a first fluid pump which may be actuated in a selective manner to facilitate fluid flow through that leg. A sliding glove and a flapper valve diverter are also provided to block production flow through that leg or the other leg to permit the selective use of the first fluid pump.
Thus, U.S. '308 discloses production systems that can produce oil without removing the production column from the well. The described systems include a “Y”-shaped block assembly with two legs. The “Y”-shaped block is suspended at the lower end of a production column. One of the legs supports a first fluid pump.
The first fluid pump, which is positioned within the production column, is used until it ceases operation. Then, the second fluid pump is introduced into the production column with the assistance of coiled tubing. The fluid is thereafter lifted to the surface using the second fluid pump. This eliminates the need to remove the production column from the well to replace the first fluid pump. When the second fluid pump ceases to operate, it may be easily removed from the well and replaced without the time and costs associated with removing the production column from the well.
Despite the technological advances in the art, there continues to be a need for a subsea petroleum production system that may be installed and recovered by cable. Such a production system is described and claimed in this application.
In a broad sense, the present invention relates to a subsea petroleum production system which includes a subsea pumping module provided downstream of a Wet Christmas Tree (WCT) on the seabed. The subsea pumping module comprises at least one submersible centrifugal pump (SCP) and is coupled with a flow base, which permits a petroleum production bypass. The hereinafter SCP pumping module and the flow base may be installed and recovered by a cable.
The invention provides a subsea petroleum production system which can be installed by an anchoring vessel or a cable installation vessel, having low daily costs.
The invention provides a subsea production system which integrates dedicated technology such as electric centrifugal pumps operating in the inclined position, underwater engineering and installation technology.
The invention also provides a subsea petroleum production system which can be quickly tested and replaced, with the provision of an associated backup being sufficient.
The invention provides a subsea petroleum production system which permits functional tests of the integration of pump/motor/electrical systems on land prior to installation and offshore placement on the seabed.
The invention also provides a subsea petroleum production system which enables the reuse of cables, electrical connectors, flying leads, etc., should a pump be replaced.
The invention also provides a subsea petroleum production system which simultaneously reduces production shutdown time (time spent awaiting a rig plus actual work time), and reduces costs.
The invention also provides a subsea petroleum production system which operates on the seabed and is subjected to temperature changes, including extreme low temperatures.
The invention provides a subsea petroleum production system which enables the launch of the structure with a production line.
The invention provides a subsea petroleum production system in which the flow base and the pumping module can be relocated.
The invention equally provides a subsea petroleum production system which boosts multiphase flow.
The invention also provides a subsea petroleum production system which enables the injection of water in an injection well to keep pressure in the petroleum reservoir while the production well produces the desired petroleum.
The invention provides a subsea petroleum production system which permits the transfer of petroleum between points of collection, for example, between two production platforms or between a platform and a vessel.
The invention provides a subsea petroleum production system to be utilized in series, thus enabling long distance transport of multiphase fluid.
The invention also provides a method of installing the subsea petroleum production system.
The above and/or other aspects of the present invention will become apparent and more readily appreciated from the following description of the exemplary embodiment, taken in conjunction with the accompanying drawings, in which:
Reference will now be made in detail to embodiments of the present invention, examples of which are illustrated in the accompanying drawings, wherein like reference numerals refer to like elements throughout. The exemplary embodiments are described below so as to explain the present invention by referring to the figures.
As is described herein and shown in
In accordance with the architecture described above, in the case of the removal of the SCP pumping module (20), a bypass feature of the production flow lines enables production to continue through an alternative method, for example, a gas lift.
The present concept utilizes standard equipment/components from suppliers. Furthermore, the pump, motor and their accessories are also conventional, commercially available equipment.
Underwater mechanical and electrical connectors, as well as interfaces for a remote operated vehicle (ROV) and are also readily available.
One of the important aspects of the subsea production system is the installation and retrieval of the system by cable utilizing the method “buoy and chains,” pioneered by PETROBRAS, which avoids the need for a rig for such procedures.
Although
In
A flow base (10) is provided with an inlet connection (12) (e.g., hub or flange) for receiving a production flow line (31) upstream of the subsea production system (100) and an exit connection to a production flow line (32) downstream of the subsea production system (100). Control valves (14) permit the directing of inlet and outlet flows as it is deemed necessary. As mentioned above, the flow base (10) also has a ground stabilizing skirt (11), which is directly supported on the seabed.
A pumping module (20) includes at least one SCP (21) arranged in series or parallel with one or more submersible centrifugal pumps, and inclined up to 85 degrees with respect to the vertical direction. The pumping module (20) also includes a hydraulic connector (22) for coupling the pumping module (20) to the flow base (10). A base structure (23) protects the at least one SCP (21) from external forces. The base structure (23) is provided with devices (25), which are compatible with installation tools and a panel (24) that provides the requisite electrical connections.
The hydraulic connector (22) connects an SCP (21) to a flow base (10) through a hub (16).
In
In the next stage of the installation method, the position of a production line (61) where the position of a flow base (10) is determined by calculation. Thereafter, as is shown in
The installation of the pumping module (20) is accomplished according to the method shown in
In conclusion, it may be said that the exemplary embodiments of the invention represent an alternative, among others, with regard to the employment of multiphase pumps up to the approximate limit of 60% of gas fraction present in the multiphase flow.
It is important to appreciate that the description of the methods of installation of a subsea production system (100) of one exemplary embodiment of the invention contemplates various alternative embodiments, all of which are encompassed within the scope of the invention.
The following are some advantages of the exemplary embodiments of the invention with respect to the state of the art.
The architecture of the exemplary embodiment of the present invention, with its two independent arrangements, provides for a continuity of production with a sole arrangement yielding a flow of more than fifty percent of production flow.
The architecture of the exemplary embodiment of the present invention allows the entire system to be trial tested on land with all of the available resources and at a lower cost.
In the present architecture the installation of the flow base may be accomplished together with the production line.
The exemplary embodiments allow more resources to be available for cable installation.
The submersible centrifugal pumps can be rotodynamic multiphase pumps. These pumps are marketed under the FRAMO brand. This manufacturer, the market leader in this area, has a project to develop a 45 bar pump. In the future pumps of 100 bar, 110 bar, 150 bar and so forth will be required. The project will require new alterations and specifications. In the case of SCPs, arranged in a series, provide increments on the order of approximately 80 bar for each pump positioned in the hydraulic series, without the need for a new project and new specifications. Therefore, when the system requires 160 bar, two pumps may be installed in series and so on.
As related to in the state of art, the following additional advantages of the exemplary subsea production system (100) are noted:
a. Installation by an anchoring vessel of low daily operational cost;
b. Absence of technological barriers, since the invention system includes the integration of dedicated components and state of art, e.g., centrifugal transfer pumps operating in the horizontal position, underwater engineering and installation technologies;
c. No requirement for specific resources, which implies less shutdown time waiting for pump replacement resources;
d. Reduction in shutdown time for retrieving the pumping system for maintenance;
e. Testing and rapid substitution by providing an available backup system;
f. Possibility of performing pump/motor/electrical systems integration functional tests on land and offshore before the positioning of the underwater system on the seabed;
g. Reuse of cables, electrical connectors, flying leads, etc., in the event of pump replacement;
h. The operation of the subsea system on the seabed, in which the system is subjected to thermal changes effected with extreme low temperatures, translates into a better cooling of the electric motor;
i. Possibility of launching the structure together with the production line;
j. Possibility of relocating the flow base (10) and the pumping module (20); and
k. Assembly of motor/pump/seals components may be accomplished at the factory under ideal environmental conditions.
Although exemplary embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes may be made in these exemplary embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Number | Date | Country | Kind |
---|---|---|---|
0403295 | Aug 2004 | BR | national |
Number | Name | Date | Kind |
---|---|---|---|
4194857 | Chateau et al. | Mar 1980 | A |
4813495 | Leach | Mar 1989 | A |
5154741 | da Costa Filho | Oct 1992 | A |
6068053 | Shaw | May 2000 | A |
6102673 | Mott et al. | Aug 2000 | A |
6230810 | Rivas | May 2001 | B1 |
6230824 | Peterman et al. | May 2001 | B1 |
6394195 | Schubert et al. | May 2002 | B1 |
6457529 | Calder et al. | Oct 2002 | B2 |
6474422 | Schubert et al. | Nov 2002 | B2 |
6508308 | Shaw | Jan 2003 | B1 |
6651745 | Lush et al. | Nov 2003 | B1 |
7150325 | Ireland et al. | Dec 2006 | B2 |
7249634 | de Albuquerque Lima Goncalves et al. | Jul 2007 | B2 |
7314084 | Rodrigues et al. | Jan 2008 | B2 |
Number | Date | Country | |
---|---|---|---|
20060118310 A1 | Jun 2006 | US |