Strand, B. and Bakke, W., “Subsea Separation on the Troll Field,” Scandinavian Oil-Gas Magazine, Jul. 8, 1998, pp. 122-124. |
Baggs, C., Kent, I., and Allen, John, “Troll Pilot Control System: Advanced Control System for a Subsea Separator,” Offshore Technology Conference (OTC) 12154, May 1-4, 2000, pp 1-10. |
Arnold, K.E. and Ferguson, P.L., “Tomorrow's Compact Separation Train,” Hart's E&P, Dec. 1999, pp. 80-82. |
Fj{acute over (ø)}sne, E., “Subsea Processing—Maximising Value in Areas With Existing Infrastructure,” FMC Energy Systems, FMC Kongsberg Subsea, Offshore Technology Conference (OTC) 14008, May 6-9, 2002, pp. 1-5. |
Eriksen, S., “How Can Subsea Processing Remove Processing Constraints,” FMC Energy Systems/FMC Kongsberg Subsea, Aug. 30, 2001, 11 pages. |
Davalath, J. “Economic Benefits of Compact Subsea Separation System,” FMC Energy Systems, United States, Deep Offshore Technology 1999, 14 pages. |
Songhurst, B.W. and Eyre, G.P., “Experience Gained From the First U.K. Subsea Separator,” British Offshore Engineerig Technology, Offshore Technology Conference (OTC) 6423, May 7-10, 1990, pp. 43-50. |
Smith, J.R., “The Highlander Field: Eight Years On,” Texaco Norm Sea United Kingdom, Offshore Technology Conference (OTC) 7438, May 2-5, 1994, pp. 177-187. |
Crook, J. “Seabed Separation First for Troll,” Petroleum Review, Mar. 1999, p. 31. |
“SUBSIS: Subsea Separation and Injection System,” ABB Offshore Systems, ABB Oil, Gas & Petrochemicals, (undated), 4 pages. |
“Subsea Separation and Injection by ABB's SUBSIS,” ABB Offshore Systems , www.abb.com/oilandgas, Aug. 1999, 3 pages. |
Davalath, J., Wessel, J., and Hatlo, A., “State of the Art in Subsea Pumping Technology,” FMC Energy Systems, Nov. 7-9, 2000, 11 pages. |
“Helico-Axial Multiphase Pump, Deepwater Technology,” Multiphase, Guinard Pumps, Textron Fluid Handling Products, May 1989, 12 pages. |
Technical Bulletin, “Increased Oil Production by Means of Subsea Processing,” Framo Engineering AS, Bergen, Norway, Jan. 1999, 4 pages. |
Technical Bulletin, “Boosting—Increased Oil Production and Recovering Utilizing,” Framo Engineering AS, Bergen, Norway, Nov. 1999, 4 pages. |
Technical Bulletin, “Subsea Multiphase Pumps for Shell, Draugen,” Framo Engineering AS, Bergen, Norway, May 1999, 4 pages. |
Technical Bulletin, “Framo Subsea Multiphase Booster Pumps for BP ETAP,” Framo Engineering AS, Bergen, Norway, Apr. 1999, 4 pages. |
“Subsea Multiphase Pump,” Kvaener Eureka a.s., Lier, Norway, (undated), 6 pages. |
Technical Bulletin, “Increased Oil Production by Means of Subsea Multiphase Boosting,” Framo Engineering AS, Bergen, Norway, Nov. 1999, 4 pages. |
Rekve, S., “Fourth-Quarter Seafloor Pump Demo Set,” Hart's E&P 5th Deepwater Technology (undated), p. 31. |
“Multiphase Booster Pumps Provide Efficient Production Tool,” Hart's E&P 5th Deepwater Technology, (undated), p. 32. |
Bradbury, J., “Pumping Up the Volume,” Hart's E&P, Oct. 2001, p. 29. |
“Hydraulic Turbine Drive Submersible Centrigual Pumps,” Weir Pumps, Nov. 2001, pp. 1-2. |
Harden, W.G. and Downie, A.A., “Field Trial and Subsequent Large-Scale Deployment of a Novel Multiphase Hydraulic Submersible Pump in Texaco's Catain Field,” Offshore Technology Conference (OTC) 13197, Apr. 30-May 3, 2001, pp. 1-19. |
Arnold, K.E. and Ferguson, P.L., “Tomorrow's Compact Separation Train,” Hart's E&P, Dec. 1999, pp. 80-81. |